GSV: Geological Survey of Victoria   Geological Survey of Victoria

GALLOWAY1




*** GALLOWAY1 ***

galloway1 000 LINKS HYPERLINKAGES GIPPSLAND_OFFSHORE_EXPLO_WELLS GIPPSLAND_OFFSHORE_DEVEL_WELLS LINKS HYPERLINKAGES GIPPSLAND_WELLS GIPPSLAND_ON_SHORE_WELLS GIPPSLAND_OFFSHORE_WELLS Geoscience Australia may also have other information: (see the GA Well Summary page for the well with this ENO (436244):
Geoscience Australia may also have other information: (see the GA well search page: http://dbforms.ga.gov.au/www/npm.well.search ) *** ENO=436244 -- GALLOWAY 1
HDR WELL_NAME = GALLOWAY-1
HDR DATE 1: SPUD_DATE = 29-JUL-06 HDR DATE 3: RIG_RELEASE_DATE = 24-AUG-06 HDR DATE 4: DB_ENTRY_BY = EF03_SW (database header data entry) HDR DATE 4: DB_ENTRY_DATE = 02-AUG-06 (database header data entry date) HDR DATE 5: DB_ROW_UPDATER = KG10_SW (database header data entry last updated by) HDR DATE 5: DB_ROW_UPDATE_DATE = 29-JUL-10 (database header data entry last update date) HDR DATE 6: THEORETICAL OPENFILE BASIC DATE= 24-AUG-08 HDR DATE 6: THEORETICAL OPENFILE INTERPRETIVE DATE= 24-SEP-11
HDR DEVIATION_IND = Y (i.e. has this hole been deviated?) HDR LOC: BASIN DESCRIPTION= Gippsland Basin HDR LOC: BASIN_CODE = GIPPSLAND HDR LOC: COUNTRY = AUSTRALIA HDR LOC: FIELD_NAME = UNKNOWN FIELD HDR LOC: ONSHORE_IND = N HDR LOC: PROVINCE_STATE = VIC HDR LOC: TITLE_NAME = VIC/P39(v) HDR LOC: TITLE_NAME: SDO: CURRENT TITLE (Current as at 23-FEB-12) BY LOCATION: ENCLOSING GALLOWAY-1 : TITLE_NAME=GEP24 HDR OPERATOR = Nexus Energy N.L. HDR PLATFORM_IND = N (i.e. is this hole off a platform?) HDR SIDETRACK_IND = N (i.e. is this hole a sidetrack?)
HDR DPH GREATEST OF DEPTHS = 2315 HDR DPH: DRILL_TD = 2315 HDR DPH: DRILL_TD = DRILLERS TOTAL DEPTH: Total or maximum depth of the well as reported by the operator/driller (PPDM definition). HDR DPH: FINAL_TD = 2315 HDR DPH: FINAL_TD = FINAL TOTAL DEPTH: The actual measurement along the well path from the reference datum to the bottom of the well (PPDM definition). HDR DPH: LOG_TD = 2315 HDR DPH: LOG_TD = LOGGERS TOTAL DEPTH: Total or maximum depth of the well as measured by the logging tool and reported by the logger/logging service (PPDM definition). HDR DPH: MAX_TVD = 1364.69 HDR DPH: MAX_TVD = MAXIMUM TRUE VERTICAL DEPTH: The maximum true vertical depth from the surface datum reference to the final total depth or deepest point, measured on a straight line (PPDM definition). HDR ELEV: DEPTH_DATUM = RT HDR ELEV: DEPTH_DATUM LONGNM= Rotary Table HDR ELEV: DEPTH_DATUM_ELEV = 8.6 HDR ELEV: ELEVATION_REF = RT HDR ELEV: ELEVATION_REF LN = Rotary Table HDR ELEV: GROUND_ELEV = 2.7 HDR ELEV: REF_ELEV = 8.6 HDR ELEV: RT_ELEV = 8.6 HDR STORAGE_UNIT = Metres
HDR CURRENT_CLASS = E_WILDCAT HDR CURRENT_CLASS LONG_NAME = Exploration Wildcat HDR CURRENT_STATUS = P&A HDR CURRENT_STATUS LONG_NAME= Plugged and Abandoned HDR INITIAL_CLASS = E_WILDCAT HDR INITIAL_CLASS LONG_NAME = Exploration Wildcat HDR PLOT SYMBOL DESCRIPTION = Plugged and Abandoned --- DRY HOLE HDR PLOT_SYMBOL = 104
WELL_ALIAS BOREHOLE_NAME = SEACOMBE-20000 : [WELL_BORE] WELL_BORE: the BOREHOLE and BORE NUMBER of the well WELL_ALIAS BOREHOLE_SITE_ID=SIT959457 : equivalent BOREHOLE_NAME=SEACOMBE 20000 WELL_ALIAS PLOT_NAME= GALLOWAY-1 WELL_ALIAS UWI= 200006051037 WELL_ALIAS WELL_NAME= 436244 : [WELL_PEDIN_E] WELL_PEDIN_ENO Geoscience Australia ENO WELL_ALIAS WELL_NAME= 959457 : [WELL_SITE_ID] WELL_SITE_ID -- GEDIS Boreholes Database SITE ID WELL_ALIAS WELL_NAME= GALLOWAY-1 : [WELL_GENERIC] WELL_GENERIC -- a generic wellname WELL_ALIAS WELL_NAME= W1474 : [WELL_BOX_NO] WELL_BOX_NO: the W Number (Well Box No) of the well
NODE_COORD BOTTOM HOLE LAT & LONG = -38.0921889 147.5774472 NODE_COORD SURFACE LAT & LONG = -38.0857722 147.56225 NODE_COORD DATUM = COORD_SYSTEM_ID=4283 GEODETIC_DATUM_ID=4283
FORMATION_TOPS SOURCE=WCR 0006 FORM_ID= JEMMY'S POINT FM TOP_DEPTH= 5.9 BASE_DEPTH= 143 Jemmy's Point Formation (Age:Undisclosed ) ...Member of....SEASPRAY GROUP >>> REMARK =From WCR PE912198 Page 9 (WCR=Well Completion Report) FORMATION_TOPS SOURCE=WCR 0006 FORM_ID= SEASPRAY GROUP TOP_DEPTH= 5.9 BASE_DEPTH= 2110.4 Seaspray Group (Age:Tertiary ) >>> REMARK =From WCR PE912198 Page 9 (WCR=Well Completion Report) FORMATION_TOPS SOURCE=WCR 0143 FORM_ID= TAMBO RIVER FM TOP_DEPTH= 143 BASE_DEPTH= Tambo River Formation (Age:Tertiary ) ...Member of....SEASPRAY GROUP >>> REMARK =From WCR PE912198 Page 9 (WCR=Well Completion Report) FORMATION_TOPS SOURCE=WCR 0235 FORM_ID= GIPPSLAND LIMESTONE TOP_DEPTH= 235 BASE_DEPTH= Gippsland Limestone (Age:Tertiary ) ...Member of....SEASPRAY GROUP >>> REMARK =From WCR PE912198 Page 9 (WCR=Well Completion Report) FORMATION_TOPS SOURCE=WCR 1881 FORM_ID= LAKES ENTRANCE FM TOP_DEPTH= 1880.1 BASE_DEPTH= Lakes Entrance Formation (Age:Tertiary ) ...Member of....SEASPRAY GROUP >>> REMARK =From WCR PE912198 Page 9 (WCR=Well Completion Report) FORMATION_TOPS SOURCE=WCR 2111 FORM_ID= GURNARD FORMATION TOP_DEPTH= 2110.4 BASE_DEPTH= Gurnard Formation (Age:Tertiary ) ...Member of....LATROBE GROUP >>> REMARK =From WCR PE912198 Page 9 (WCR=Well Completion Report) FORMATION_TOPS SOURCE=WCR 2111 FORM_ID= LATROBE GROUP TOP_DEPTH= 2110.4 BASE_DEPTH= Latrobe Group (Age:Cretaceous ) >>> REMARK =From WCR PE912198 Page 9 (WCR=Well Completion Report) FORMATION_TOPS SOURCE=WCR 2125 FORM_ID= COARSE CLASTICS TOP_DEPTH= 2124.4 BASE_DEPTH= Coarse Clastics (Age:M. Eocene ) ...Member of....LATROBE GROUP >>> REMARK =From WCR PE912198 Page 9 (WCR=Well Completion Report) FORMATION_TOPS SOURCE=WCR 2197 FORM_ID= N. ASPERUS TOP_DEPTH= 2196.7 BASE_DEPTH= N. asperus (Age:Tertiary ) ...Member of....LATROBE GROUP >>> REMARK =From WCR PE912198 Page 9 (WCR=Well Completion Report)
GENERAL REMARKS 001 RMK_TYPE= LOCATION RMK= Galloway-1 was drilled from an onshore surface location to an offshore subsurface target. GENERAL REMARKS 002 RMK_TYPE= TVD RMK= TVD values from WCR vary: page 282 (Sperry Drill Survey) lists TVD as 1364.69m. Page 9 (Well Summary) lists TVD as 1356m Subsea.
ASSETS (BRIEF) DATA_TYPE DATA_SUB_TYPE BARCODE ITEM_NAME [MEDIA_TYPE] SCANNED_OR_DIGITAL_FILES
ASSETS (BRIEF) GENERAL ESUBS_CD_DVD PE911536 DDRs, Well & Permit Data 2005 to 2007 [DVD] 2007 (3259 DIGITAL FILES) in: COMPACTUS Bay of COMPACTUS_1 used to store tapes ASSETS (BRIEF) TITLE ANNUAL_RPT PE501019 VIC/P39(v) Permit Year 4 Annual Report [CD] 2008 in: COMPACTUS Bay of COMPACTUS_1 used to store tapes ASSETS (BRIEF) WELL DAILY_RPT PE915276 GALLOWAY-1 Drilling & Workover Rpts [CD] 2006 (279 DIGITAL FILES) in: COMPACTUS Bay of COMPACTUS_1 used to store tapes ASSETS (BRIEF) WELL WCR_RPT PE912197 GALLOWAY-1 WCR Basic Data [CD] 2007 PE912197__((_GALLOWAY-1_WCR_BASIC_DATA_))_.TAR.GZ(25.4m)......... PE912197__((_GALLOWAY-1_WCR_BASIC_DATA_))_.TAR.GZ(25.4m)......... SAM2_381_PE912197__((_GALLOWAY-1_WCR_BASIC_DATA_))_I_MEDIA_LABELLING.JPG(2.7m)......... PE912197__((_GALLOWAY-1_WCR_BASIC_DATA_))__FILES_LISTING.TXT(0.0m)......... PE912197__((_GALLOWAY-1_WCR_BASIC_DATA_))__FILES_LISTING.TXT(0.0m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes ASSETS (BRIEF) WELL WCR_RPT PE912198 GALLOWAY-1 WCR Interpreted Data [CD] 2007 PE912198__((_GALLOWAY-1_WCR_INTERPRETED_DATA_))_.TAR.GZ(10.1m)......... SAM2_382_PE912198__((_GALLOWAY-1_WCR_INTERPRETED_DATA_))_I_MEDIA_LABELLING.JPG(2.7m)......... PE912198__((_GALLOWAY-1_WCR_INTERPRETED_DATA_))__FILES_LISTING.TXT(0.0m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) WELL DAILY_RPT PE911536_5 Daily Drilling, Geol, Workover, Mud Rpts [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007 ASSETS (BRIEF) WELL DIRECTIONAL PE911536_8 Geodetic Survey Data [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007 ASSETS (BRIEF) WELL DIRECTIONAL PE912197_045GALLOWAY-1 deviation survey data [CD] 2007 PE912197__((_GALLOWAY-1_WCR_BASIC_DATA_))_.TAR.GZ(25.4m)......... PE912197__((_GALLOWAY-1_WCR_BASIC_DATA_))_.TAR.GZ(25.4m)......... SAM2_381_PE912197__((_GALLOWAY-1_WCR_BASIC_DATA_))_I_MEDIA_LABELLING.JPG(2.7m)......... PE912197__((_GALLOWAY-1_WCR_BASIC_DATA_))__FILES_LISTING.TXT(0.0m)......... PE912197__((_GALLOWAY-1_WCR_BASIC_DATA_))__FILES_LISTING.TXT(0.0m)......... in: WCR_RPT WCR Gallaway-1 ASSETS (BRIEF) WELL DRILL_RPT PE911536_9 Drilling Data, Logs, TD Curves & Reports [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007 ASSETS (BRIEF) WELL LOG_TAPE_OR_DISK PE911536_16 Digital Well Logs [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007 ASSETS (BRIEF) WELL RPT PE911536_13 Abandonment Programs, P&A Approvals [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007 ASSETS (BRIEF) WELL WELL_LOG PE911536_14 Well Log Images [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007
ASSETS (BRIEF) WELL PETROLOGY_RPT PE501019_1 GALLOWAY-1 Petrophysics Analysis [CD] 2006 in:REPORT VIC/P39(v) Permit Year 4 Annual Report ASSETS (BRIEF) WELL PROPOSAL_RPT PE907846 Logistics Proposal Rig 32 Relocation [PAPER] 2009 in:WELL_BOX Exploration Well Box 11
ASSETS (BRIEF) GENERAL REGISTRY_FILE F7705129 VIC/P39(V)/3/A 1 Registry File [PAPER] 2006 in:[ADMIN] SEE RECFIND DATABASE ASSETS (BRIEF) GENERAL REGISTRY_FILE F7743121 IR/04/0292 Registry File [PAPER] 2009 in:COMPACTUS COMPACTUS_1 55 Collins St
LINKS HYPERLINKAGES COPYRIGHT_DISCLAIMER ABOUT_DBMAP HOW_TO_GET_OR_SUBMIT_DATA This data has been dumped from Victorian Govt (http://www.dpi.vic.gov.au) dbMap database on 23-FEB-12
ASSETS *** ALSO: Search the Geoscience Australia database for other information: (see http://dbforms.ga.gov.au/www/npm.well.search ) *** ENO=436244 GALLOWAY-1
CORE/CUTTINGS Galloway-1 cuttings : SAMPLE_TYPE=CUTT 00060 DEPTH_RANGE= 60.000 TO 2315.000M STORAGE_BAY=239 ROW=Y TO Y #TRAYS=7 [ <--this shows the actual cores and cuttings that DPI has stored in the DPI Werribee core shed ]
ASSET Counts Summary: GENERAL ESUBS_CD_DVD [DVD] 1 ASSET Counts Summary: GENERAL REGISTRY_FILE [PAPER] 2 ASSET Counts Summary: TITLE ANNUAL_RPT [CD] 1 ASSET Counts Summary: WELL DAILY_RPT [CD] 1 ASSET Counts Summary: WELL DAILY_RPT [DVD] 1 ASSET Counts Summary: WELL DIRECTIONAL [CD] 1 ASSET Counts Summary: WELL DIRECTIONAL [DVD] 1 ASSET Counts Summary: WELL DRILL_RPT [DVD] 1 ASSET Counts Summary: WELL LOG_TAPE_OR_DISK [DVD] 1 ASSET Counts Summary: WELL PETROLOGY_RPT [CD] 1 ASSET Counts Summary: WELL PROPOSAL_RPT [PAPER] 1 ASSET Counts Summary: WELL RPT [DVD] 1 ASSET Counts Summary: WELL WCR_RPT [CD] 2 ASSET Counts Summary: WELL WELL_LOG [DVD] 1
A WELL_DRILL_HISTORY: DRILL_OBS_NO DRILL_DATE DEPTH DEPTH_TVD HOLE_IND MUD_WT REMARK source B WELL_DRILL_HISTORY:001 11-JUL-06 .0 9999.99 Santos.. Santos.. DRILLING MORNING REPORT # 1 Galloway 1 - Start Up 'Copyright IDS, 2006' AT 20060630, SANTOS_CBU_onshore_drllg Page 1 Printed on 10 Jul 2006 [FILE:/Galloway1-StartUp_Ensign32_1 [From:WELL_DAILY] B WELL_DRILL_HISTORY:002 12-JUL-06 .0 9999.99 Install mouse hole and cement. Install matting boards Operations For Period 0000 Hrs to 2400 Hrs on 12 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS P RM 0000 0600 6.00 0.0m Wait on daylight PS P RMT 0600 1800 12.00 0.0m Install mouse hole. used third party Auger unable to clean out hole .Water table at 2.1m. Hole under mined and calasped. Drove 20" mouse hole sleeve with digger and cemented in place. Scraped of lease and performed final lazer level checks. Installed matting boards. Total loads on site42 PS P RM 1800 2400 6.00 0.0m Wait on daylight Operations For Period 0000 Hrs to 0600 Hrs on 13 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS RM 0000 0000 0.00 0.0m Wait on daylight HSE Summary Events Date of Last Days Since Description Remarks Pre-Tour Meetings 12 Jul 2006 0 Days Pre tour safety meeting Held pre tour safety meeting.Topic discussed. Rigging and slinging, Enviromental isues. Transport. Santos.. Santos.. DRILLING MORNING REPORT # 2 Galloway 1 - Start Up 'Copyright IDS, 2006' AT 20060630, SANTOS_CBU_onshore_drllg Page 1 Printed on 14 Jul 2006 Santos.. Santos.. DRILLING MORNING REPORT # 2 Galloway 1 - Start Up 'Copyright IDS, 2006' AT 20060630, SANTOS_CBU_onshore_drllg Page 2 Printed on 14 Jul 2006 [FILE:/Galloway1-StartUp_Ensign32_2 [From:WELL_DAILY] B WELL_DRILL_HISTORY:003 13-JUL-06 .0 9999.99 Install sub bases. Continue to off load trucks. Install spreader beams on sub base. Install draworks. Spot mud tanks. Operations For Period 0000 Hrs to 2400 Hrs on 13 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS P RM 0000 0000 0.00 0.0m Wait on daylight PS P RM 0600 1800 12.00 0.0m Install remaining matting. Install sub bases and install spreader beams. Fabricate and install cellar guard. Spot mud tanks. Install draworks and rotary table. Total loads 57 Rig move 80% Rigged up 15% PS P RM 1800 2400 6.00 0.0m Wait on daylight General Comments Comments Rig Requirements Changed out Chubb security shacks . Spotted rig site security shack. HSE Summary Events Date of Last Days Since Description Remarks Pre-Tour Meetings 13 Jul 2006 0 Days Pre tour safety meeting Held pre tour safety meeting.Topic discussed. Rigging and slinging, Remindd crews of smoking area and housekeping. Santos.. Santos.. DRILLING MORNING REPORT # 3 Galloway 1 - Start Up 'Copyright IDS, 2006' AT 20060630, SANTOS_CBU_onshore_drllg Page 1 Printed on 13 Jul 2006 Santos.. Santos.. DRILLING MORNING REPORT # 3 Galloway 1 - Start Up 'Copyright IDS, 2006' AT 20060630, SANTOS_CBU_onshore_drllg Page 2 Printed on 13 Jul 2006 [FILE:/Galloway1-StartUp_Ensign32_3 [From:WELL_DAILY] B WELL_DRILL_HISTORY:004 14-JUL-06 .0 9999.99 Install drill floor. Rotary table. Install plumbing on mud tanks. Install SCR house. Spot Dog house and Install drilling console. Bund Chubb security shack diesel tank. Santo's equipment arrived on site Operations For Period 0000 Hrs to 2400 Hrs on 14 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS P RM 0000 0600 6.00 0.0m Wait on daylight PS P RM 0600 1800 12.00 0.0m Held pre job safety meeting. Install drill floor. Rotary table. Install plumbing on mud tanks. Install SCR house. Spot Dog house and Install drilling console. Bund Chubb security shack diesel tank. Santo's equipment arrived on site Install # 1 generator. Total loads 67 Rigged moved 80% Rigged up 30% PS P RM 1800 2400 6.00 0.0m Wait on daylight Operations For Period 0000 Hrs to 0600 Hrs on 15 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS RM 0000 0600 6.00 0.0m Wait on daylight General Comments Comments Rig Requirements Chubb securities bulk fuel container is not double skinned and is in a critical enviromental location on the water way. Install liner and Bunded fuel tank area to take the total capacity of fully loaded tank. Bulk Stocks Name Unit In Used Adjust Balance KCl sx 0 0 0 0.0 Salt sx 0 0 0 0.0 Potable Water ltr 0 0 60000 60,000.0 Rig Fuel ltr 0 0 0 0.0 Camp Fuel ltr 0 0 4700 4,700.0 Santos.. Santos.. DRILLING MORNING REPORT # 4 Galloway 1 - Start Up 'Copyright IDS, 2006' AT 20060630, SANTOS_CBU_onshore_drllg Page 1 Printed on 17 Jul 2006 HSE Summary Events Date of Last Days Since Description Remarks Pre-Tour Meetings 14 Jul 2006 0 Days Pre tour safety meeting Held pre tour safety meeting.Topic discussed. Rigging and slinging, Traffic movement. Third party contractors on site . Level three Inductions to be completed by all ensign personal. Santos.. Santos.. DRILLING MORNING REPORT #... [From:WELL_DAILY] B WELL_DRILL_HISTORY:005 15-JUL-06 .0 9999.99 Install fuel tanks,Genset # 2. Install stair ways to rig floor and mud tanks. Install shaker,mud cleaner, degasser. Inventory santo's equipment. Operations For Period 0000 Hrs to 2400 Hrs on 15 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS P RM 0000 0600 6.00 0.0m Wait on daylight PS P RM 0600 1800 12.00 0.0m Held pre tour safety meeting. Install and bund rig diesel tank. Install shakers,degasser,mud cleaner,centrifuge. Install genset# 2 Continue with mud tank plumbing. Install handrail on rig floor. Install stairs to mud tanks and rig floor. Prepare derrick components for assembly Total loads 70 Rig moved 85% Rigged up 35% PS P RM 1800 2400 6.00 0.0m Wait on daylight. Operations For Period 0000 Hrs to 0600 Hrs on 16 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS RM 0000 0600 6.00 0.0m Wait on daylight General Comments Comments Rig Requirements Four truck load stuck in Moomba due to rainy conditions. Bulk Stocks Name Unit In Used Adjust Balance KCl sx 0 0 0 0.0 Salt sx 0 0 0 0.0 Potable Water ltr 0 8000 0 52,000.0 Rig Fuel ltr 0 0 0 0.0 Camp Fuel ltr 0 360 0 4,340.0 Santos.. Santos.. DRILLING MORNING REPORT # 5 Galloway 1 - Start Up 'Copyright IDS, 2006' AT 20060630, SANTOS_CBU_onshore_drllg Page 1 Printed on 17 Jul 2006 HSE Summary Events Date of Last Days Since Description Remarks Pre-Tour Meetings 15 Jul 2006 0 Days Pre tour safety meeting Held pre tour safety meeting.Topic discussed. Rigging and slinging, Traffic movement. Third party contractors on site . Rainy cold conditions 4 degrees.Extra care needed in these hazardious conditions. Santos.. Santos.. DRILLING MORNING REPORT # 5 Galloway 1 - Start Up 'Copyright IDS, 2006' AT 20060630, SANTOS_CBU_onshore_drllg Page 2 Printed on 17 Jul 2006 [FILE:/Galloway1-StartUp_Ensign32_5 [From:WELL_DAILY] B WELL_DRILL_HISTORY:006 16-JUL-06 .0 9999.99 Build derrick on racks.Install 'A' Leg section. Continue with lighting. Weld on 4" high pressure lines. Continue on shaker tank. Operations For Period 0000 Hrs to 2400 Hrs on 16 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS P RM 0000 0600 6.00 0.0m Wait on daylight PS P RM 0600 1800 12.00 0.0m Hold pre tour safety meeting and weekly safety meeting Build derrick sections on pipe racks. Continue to reinstall light .All bulbs where removed for the rig move . Continue with high pressure welding on Mud lines. Dig drains to sump. Continue with Santo's equipment inventories. 90% Rig Moved. 40% rigged up No loads Recieved today. PS P RM 1800 2400 6.00 0.0m Wait on daylight. Operations For Period 0000 Hrs to 0600 Hrs on 17 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS RM 0000 0600 6.00 0.0m Wait on Daylight. General Comments Comments Rig Requirements Lease poding water .Dig small drains to remove water. Bulk Stocks Name Unit In Used Adjust Balance KCl sx 0 0 0 0.0 Salt sx 0 0 0 0.0 Potable Water ltr 0 8000 0 44,000.0 Rig Fuel ltr 0 0 0 0.0 Camp Fuel ltr 0 360 0 3,980.0 Santos.. Santos.. DRILLING MORNING REPORT # 6 Galloway 1 - Start Up 'Copyright IDS, 2006' AT 20060630, SANTOS_CBU_onshore_drllg Page 1 Printed on 17 Jul 2006 HSE Summary Events Date of Last Days Since Description Remarks Pre-Tour Meetings 16 Jul 2006 0 Days Pre tour safety meeting Held pre tour safety meeting.Topic discussed. Rigging and slinging, Traffic movement. Third party contractors on site . Rainy cold conditions 4 degrees. care Extraneeded in these hazardious conditions. Weekly Safety Meeting 16 Jul 2006 0 Days Weekly meeting safety Santos.. Santos.. DRILLING MORNING REPORT # 6 Galloway 1 - Start Up 'Copyright IDS, 2006' AT 20060630, SANTOS_CBU_onshore_drllg Page 2 Pr... [From:WELL_DAILY] B WELL_DRILL_HISTORY:007 17-JUL-06 .0 9999.99 Continue to dress derrick. Install Mud pump#4 ,Transformer and aux gensets. Continue on mud tanks. Grade drain on lease to drain excess water. Operations For Period 0000 Hrs to 2400 Hrs on 17 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS P RM 0000 0600 6.00 0.0m Wait on Daylight. PS P RM 0600 1800 12.00 0.0m Held pre tour safety meeting. Continue to dress out derrick. Install standpipe line. Spot # 4 mud pump. Spot transformer and aux gensets. Grade new drain on location to displace water. Continue rigging up mud tanks. Continue to weld high pressure pipe work and fabricate suction lines on mud pump# 4. Rigged moved 90% Rigged up 40%. PS P RM 1800 2400 6.00 0.0m Wait on daylight Operations For Period 0000 Hrs to 0600 Hrs on 18 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS RM 0000 0600 6.00 0.0m Wait on daylight General Comments Comments Rig Requirements Willcox earthmovers made extra drains on location to remove excess rain water Bulk Stocks Name Unit In Used Adjust Balance KCl sx 0 0 0 0.0 Salt sx 0 0 0 0.0 Potable Water ltr 0 8000 0 36,000.0 Rig Fuel ltr 0 0 0 0.0 Camp Fuel ltr 0 360 0 3,620.0 HSE Summary Events Date of Last Days Since Description Remarks Pre-Tour Meetings 17 Jul 2006 0 Days Pre tour safety meeting Held pre tour safety meeting.Topic discussed. Rigging and slinging, Traffic movement. Working at heights discussed. Santos.. Santos.. DRILLING MORNING REPORT # 7 Galloway 1 - Start Up 'Copyright IDS, 2006' AT 20060630, SANTOS_CBU_onshore_drllg Page 1 Printed on 17 Jul 2006 Santos.. Santos.. DRILLING MORNING REPORT # 7 Galloway 1 - Start Up 'Copyright IDS, 2006' AT 20060630, SANTOS_CBU_onshore_drllg Page 2 Printed on 17 Jul 2006 [FILE:/Galloway1-StartUp_Ensign32_7 [From:WELL_DAILY] B WELL_DRILL_HISTORY:008 18-JUL-06 84.0 9999.99 Dress out derrick. String travelling blocks. Spot sperry shack. Install deriick onto sub base and headache rack. Rigged up 45%. Operations For Period 0000 Hrs to 2400 Hrs on 18 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS P RM 0000 0600 6.00 0.0m Wait on daylight PS P RM 0600 1800 12.00 0.0m Held pre tour safety meeting. Dress out derrick. String travelling blocks. Lift derrick and pin onto Sub Base. Continue to fabricate high pressure mud lines. Continue with electrical cables and lighting. Install septic holding tanks on rig site. Set up santo's office on rig site. Spot Sperry shacks. Rig moved 90% Rigged up 45% PS P RM 1800 2400 6.00 0.0m Wait on daylight. Operations For Period 0000 Hrs to 0600 Hrs on 19 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS RM 0000 0600 6.00 0.0m Wait on daylight General Comments Comments Rig Requirements Install grey water holding tanks on rig site. Complete communication hook up. Install extra santo's shack on rig site. Bulk Stocks Name Unit In Used Adjust Balance KCl sx 0 0 0 0.0 Salt sx 0 0 0 0.0 Potable Water ltr 0 8000 0 28,000.0 Rig Fuel ltr 0 0 0 0.0 Camp Fuel ltr 0 360 0 3,260.0 Santos.. Santos.. DRILLING MORNING REPORT # 8 Galloway 1 - Start Up 'Copyright IDS, 2006' AT 20060630, SANTOS_CBU_onshore_drllg Page 1 Printed on 18 Jul 2006 HSE Summary Events Date of Last Days Since Description Remarks Pre-Tour Meetings 18 Jul 2006 0 Days Pre tour safety meeting Held pre tour safety meeting.Topic discussed. Rigging and slinging, Traffic movement. Working at heights discussed.Pre job held prior to raising derrick ontp head ache rack. Santos.. Santos.. DRILLING MORNING REPORT # 8 Galloway 1 - Start Up 'Copyright IDS, 2006' AT 20060630, SANTOS_CBU_onshore_drllg Page 2 Printed on 18 Jul 2006 [From:WELL_DAILY] B WELL_DRILL_HISTORY:009 19-JUL-06 84.0 9999.99 Hold Pre tour safety meeting, Dress mud pumps to 6", Continue to dress out mast, Rig up sewage containment system to well site buildings, Continue with fabrication of suction line to T1000 mud pump, Commence make up of 13 5/8" BOP, Continue with general rig up. Operations For Period 0000 Hrs to 2400 Hrs on 19 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS P RM 0000 0600 6.00 0.0m Wait on daylight PS P RM 0600 1800 12.00 0.0m Hold Pre tour safety meeting, Dress mud pumps to 6", Continue to dress out mast, Rig up sewage containment system to well site buildings, Continue with fabrication of suction line to T1000 mud pump, Commence make up of 13 5/8" BOP, Continue with general rig up. PS P RM 1800 2400 6.00 0.0m Wait on day light. Operations For Period 0000 Hrs to 0600 Hrs on 20 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS RM 0000 0600 6.00 0.0m Wait on Daylight. Bulk Stocks Name Unit In Used Adjust Balance KCl sx 0 0 0 0.0 Salt sx 0 0 0 0.0 Potable Water ltr 0 0 0 28,000.0 Rig Fuel ltr 0 0 0 0.0 Camp Fuel ltr 0 0 0 3,260.0 HSE Summary Events Date of Last Days Since Description Remarks Pre-Tour Meetings 19 Jul 2006 0 Days Pre-tour safety meeting Discuss planned activities and associated hazards, Conditions wet and slippery use care when working at hight. Santos.. Santos.. DRILLING MORNING REPORT # 9 Galloway 1 - Start Up 'Copyright IDS, 2006' AT 20060630, SANTOS_CBU_onshore_drllg Page 1 Printed on 23 Jul 2006 Santos.. Santos.. DRILLING MORNING REPORT # 9 Galloway 1 - Start Up 'Copyright IDS, 2006' AT 20060630, SANTOS_CBU_onshore_drllg Page 2 Printed on 23 Jul 2006 [FILE:/Galloway1-StartUp_Ensign32_9 [From:WELL_DAILY] B WELL_DRILL_HISTORY:010 20-JUL-06 84.0 9999.99 W.O.D., Ensign & contractor personal to "Sale" for "Ice Breaker", W.O.D. Operations For Period 0000 Hrs to 2400 Hrs on 20 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS P RM 0000 0600 6.00 0.0m Wait on Daylight. PS P RM 0600 1800 12.00 0.0m Toolbox meeting, cont. rig up to 08:00hrs Attend "Galloway" Ice Breaker @ Hacenda Inn Conference room, Sale, with Ensign & contractor personal. Hold safety meeting. From 16:30hrs, Continue to assemble BOP, weld down stump. Rig moved 95% Rigged up 50% PS P RM 1800 2400 6.00 0.0m Wait on daylight Operations For Period 0000 Hrs to 0600 Hrs on 21 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS RM 0000 0600 6.00 0.0m Wait on daylight General Comments Comments Rig Requirements Ensign personal measured up for new winter jackets to be supplied by management. Bulk Stocks Name Unit In Used Adjust Balance KCl sx 0 0 0 0.0 Salt sx 0 0 0 0.0 Potable Water ltr 0 8000 0 20,000.0 Rig Fuel ltr 0 0 0 0.0 Camp Fuel ltr 0 360 0 2,900.0 Santos.. Santos.. DRILLING MORNING REPORT # 10 Galloway 1 - Start Up 'Copyright IDS, 2006' AT 20060630, SANTOS_CBU_onshore_drllg Page 1 Printed on 23 Jul 2006 Santos.. Santos.. DRILLING MORNING REPORT # 10 Galloway 1 - Start Up 'Copyright IDS, 2006' AT 20060630, SANTOS_CBU_onshore_drllg Page 2 Printed on 23 Jul 2006 [FILE:/Galloway1-StartUp_Ensign32_10 [From:WELL_DAILY] B WELL_DRILL_HISTORY:011 21-JUL-06 84.0 9999.99 WOD to 06:00hrs, Toolbox meeting, cont. rig up, off load equipment, WOD f/ 18:00 hrs Operations For Period 0000 Hrs to 2400 Hrs on 21 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS P RM 0000 0600 6.00 0.0m Wait on daylight PS P RM 0600 1800 12.00 0.0m Toolbox meeting, cont. nipple up BOP & spot in sub base, maint. to T1000 & 8P-80 mud pumps, off & back load trucks with equipment, pump rig diesol fuel into holding tank, spot Koomey walk ways, cable trays, stairs, commence to fit suction line to T1000 mud pump, commence to fit new disscharge lines to 8P-80 mud pump, fit pulsation dampner to T1000 mud pump, Haliburton bulk tanks arrived PS P RM 1800 2400 6.00 0.0m WOD Operations For Period 0000 Hrs to 0600 Hrs on 22 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS RM 0000 0600 6.00 0.0m Wait on daylight Bulk Stocks Name Unit In Used Adjust Balance KCl sx 0 0 0 0.0 Salt sx 0 0 0 0.0 Potable Water ltr 0 8000 0 12,000.0 Rig Fuel ltr 15950 1000 15650 30,600.0 Camp Fuel ltr 2450 350 0 5,000.0 HSE Summary Events Date of Last Days Since Description Remarks ToolBox Talk 21 Jul 2006 0 Days Disscussion on daily rig up Disscuss proposed daily rig up operations. Correct PPE to be worn. Clear hand signals to crane operator. Keep vehicles to a minimum @ rig site. Contractors use the bus f/ camp to travel to & from rig Santos.. Santos.. DRILLING MORNING REPORT # 11 Galloway 1 - Start Up 'Copyright IDS, 2006' AT 20060630, SANTOS_CBU_onshore_drllg Page 1 Printed on 23 Jul 2006 Santos.. Santos.. DRILLING MORNING REPORT # 11 Galloway 1 - Start Up 'Copyright IDS, 2006' AT 20060630, SANTOS_CBU_onshore_drllg Page 2 Printed on 23 Jul 2006 [FILE:/Galloway1-StartUp_Ensign32_11 [From:WELL_DAILY] B WELL_DRILL_HISTORY:012 22-JUL-06 84.0 9999.99 WOD, cont rig up drilling equipment, WOD Operations For Period 0000 Hrs to 2400 Hrs on 22 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS P RM 0000 0600 6.00 0.0m Wait on daylight PS P RM 0600 1800 12.00 0.0m Toolbox meeting, cont. with suction & discharge lines to T1000 & 8P-80 mud pumps, offload Top Drive, Ensign tool shed & handling equipment, Flare tank & accessories, install tempory rented blower heaters to main generators, cont. welding suction & disscharge lines on mud pumps, run electrical cables, flush out mud tanks, run fuel & air lines to mud pump #4 & #4 & #5 Generators, plump in Tesco System, hammer up BOP spacer spools, install turkeys nest pump, install shaker flow line, PS P RM 1800 2400 6.00 0.0m WOD Operations For Period 0000 Hrs to 0600 Hrs on 23 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS RM 0000 0600 6.00 0.0m Wait on daylight General Comments Comments Rig Requirements Local CFA & SES volunteers f/ Lock Sport to attend rig site to view if additional fire fighting equipment will be required on site tomorrow Sunday the 23-07-06 Tourist came in from the beach side today, through the bush in the sand dunes to view the rig. They were told to leave the area imediately, as it was a restricted area. They walked from the bush, alongside the outside of the fence by the mud chemicals. Bulk Stocks Name Unit In Used Adjust Balance Barite sx 0 0 0 0.0 KCl sx 0 0 0 0.0 Salt sx 0 0 0 0.0 Gel sx 0 0 0 0.0 Potable Water ltr 43000 8000 0 47,000.0 Rig Fuel ltr 10100 1100 0 39,600.0 Camp Fuel ltr 0 350 0 4,650.0 Santos.. Santos.. DRILLING MORNING REPORT # 12 Galloway 1 - Start Up 'Copyright IDS, 2006' AT 20060630, SANTOS_CBU_onshore_drllg Page 1 Printed on 23 Jul 2006 HSE Summary Events Date of Last Days Since Description Remarks ToolBox Talk 22 Jul 200... [From:WELL_DAILY] B WELL_DRILL_HISTORY:013 23-JUL-06 .0 9999.99 WOD, Toolbox meeting, cont. rig up drilling & contractor equipment Operations For Period 0000 Hrs to 2400 Hrs on 23 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS P RM 0000 0600 6.00 0.0m Wait on daylight PS P RM 0600 2400 18.00 0.0m Toolbox meeting, fill mud tanks & day tank with water, top up Turkeys nest, spot Haliburton cmt. bulker & cmt. unit, completed air throttle controll line to #4 mud pump, service all liner washers on all mud pumps, cont. weld in suction & discharge lines to mud pumps, drain water f/ day tank & repair hole in same, complete installation of lights to mud tanks & Mast, cont. blowing hot air into Generators, prepare B.H masher for modification to torque up 13-3/8" B.H., unload subs f/ crates & store in containor, weld in earth pionts & install cables, install 15ft Kelly hose extention, cont. rig up Crews break tours; crew #1 start @ 06:00hrs, finish @ 14:00hrs Crew #2 start @ 10:00hrs, finish @ 24:00hrs Operations For Period 0000 Hrs to 0600 Hrs on 24 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS RM 0000 0600 6.00 0.0m Toolbox meeting, re-arrange "Hazard" chemical storeage area & re-stack chemicals, complete making up Kelly hose, repair leak in day tank, cont. rig up General Comments Comments Rig Requirements Cement arriving Monday morning to fill Haliburton cmt. bulker @ rig site John Stracey water cartage; 19-07-07, 23000 lit. potable water to camp. John Stracy, 22-07-06,23000 lit. potable water to camp John Stracey, 23-07-06, #3 loads of water to rig site Turkeys (69000 lit.) = 8 hrs truck hire Bulk Stocks Name Unit In Used Adjust Balance Barite sx 0 0 0 0.0 KCl sx 0 0 0 0.0 Salt sx 0 0 0 0.0 Gel sx 0 0 0 0.0 Potable Water ltr 0 6000 0 41,000.0 Rig Fuel ltr 0 1000 0 38,600.0 Camp Fuel ltr 0 250 0 4,400.0 Santos.. Santos.. DRILLING MORNING REPORT # 13 Galloway ... [From:WELL_DAILY] B WELL_DRILL_HISTORY:014 24-JUL-06 .0 9999.99 Cont. rig up drilling & contractor equipment Operations For Period 0000 Hrs to 2400 Hrs on 24 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS P RM 0000 2400 24.00 0.0m Toolbox meeting, re-arrange "Hazard" chemical storeage area & re-stack chemicals, complete making up Kelly hose, repair leak in day tank, spot Haliburton mixing water tanks & 1/2 fill same with water, build pad to sit flare tank on, install drum spooler sheaves, open bonnets on BOP to check ram sizes, tention up blocks & drilling line, install monkey board, check all wires & equipment prior to raising Mast, noticed lease was too short to attach hold back wire line f/ Fork Lift to Mast, make out JSA to run hold back line though a snatch block back to the Fork Lift, ran out of time due to failing light & darkness, prepare equipment to raise Mast @ first light, cont. weld suction line on T1000 mud pump, comence to install 5-1/2" liners & pistons to 8P-80 mud pumps, run water lines for swimming pool, repairs to mud tank hand rails, attach lights & sensors to choke manifold, cont. rig up Operations For Period 0000 Hrs to 0600 Hrs on 25 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS RM 0000 0600 6.00 0.0m Replace 5" pipe rams in BOP with 4-1/2", cont. install 5-1/2" liners & pistons in 8P-80 mud pumps, replace wear plate in fluid end on mud pump #1, clean up rig site General Comments Comments Rig Requirements Willox Earthmoving; transport 23000lit. potable water, top up portable toilets = 2 hrs Orered in a truck load of small washed stone, to cover the electrical cable cross over section f/ the Generators to rig site offices. Used the remaining washed stone outside the smoko hut to create a dry standing area, due to the constant water lying on the lease. Ordered additional soil to create a base for the Flare tank location. All soil transported in, came from the same quarry the lease soil came from. Santos.. Sant... [From:WELL_DAILY] B WELL_DRILL_HISTORY:015 25-JUL-06 .0 9999.99 Cont. rig up, raise Mast @ 17:00hrs, cont. rig Operations For Period 0000 Hrs to 2400 Hrs on 25 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS P RM 0000 2400 24.00 0.0m Replace 5" pipe rams in BOP with 4-1/2", cont. install 5-1/2" liners & pistons in 8P-80 mud pumps, replace wear plate in fluid end on mud pump #1, clean up rig site, off load 22 pallets of chemicals, Review JSA to raise Mast, crews prepared to raise Mast, traction motor for Draworks down to earth, suspend operation, hook up blower heater to dry out motor, wait on new tong hanging sheaves to arrive, re-view JSA with new crew, raise Mast @ 17:00 hrs, pin same to "A" frame, power up lights, check out flashing warning light @ crown, all ok, erect new bunting for additional mud chemicals, rig up rig tongs, tuggers, tongs & rig floor equip., Cat walk, "V"-door, pipe racks. Note; intermittent rain showers all day Operations For Period 0000 Hrs to 0600 Hrs on 26 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS RM 0000 0600 6.00 0.0m Tie in Bridel lines, store away Wedding ring assembly, Cont. rig up drill floor equip., complete installation of fluid end equip. to 8P-80 mud pumps, cont. welding suction line on T1000 mud pump, complete storeing mud chemicals, cont. setting up pipe racks etc, hold JSA & Toolbox meeting with Top Drive rep. regarding installation, General Comments Comments Rig Requirements Willox Earthmoving; transport 3 loads of water, = 9hrs Inspect flashing lights on road over Esso pipe line @ 19:00hrs. All ok Santos.. Santos.. DRILLING MORNING REPORT # 15 Galloway 1 - Start Up 'Copyright IDS, 2006' AT 20060630, SANTOS_CBU_onshore_drllg Page 1 Printed on 25 Jul 2006 Bulk Stocks Name Unit In Used Adjust Balance Barite sx 0 0 0 0.0 KCl sx 0 0 0 0.0 Salt sx 0 0 0 0.0 Gel sx 0 0 0 0.0 Potable Water ltr 0 6000 0 29,000.0 Rig Fuel ... [From:WELL_DAILY] B WELL_DRILL_HISTORY:016 26-JUL-06 .0 9999.99 Cont. rig up, install Top Drive tracks & Top Drive unit, 75% completed, mega all mud pump elect. motors, all ok, cont. rig up drill floor equipment, off load 13-3/8" csg., complete bunting for waste oil tank & paint locker, general rig clean up, sort out tubulars on racks, complete T1000 mud pump suction line, Operations For Period 0000 Hrs to 2400 Hrs on 26 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS P RM 0000 2400 24.00 0.0m Tie in Bridel lines, store away Wedding ring assembly, Cont. rig up drill floor equip., complete installation of fluid end equip. to 8P-80 mud pumps, complete welding suction line on T1000 mud pump, complete storeing mud chemicals, set up pipe racks etc, hold JSA & Toolbox meeting with Top Drive rep. regarding installation, install Top Drive tracks & Top Drive unit, 75% completed, meg. all 8P-80 mud pumps, ok, off load 13-3/8" csg., complete bunting for waist oil tank & paint locker, run Emerg. escape line f/ Mast, anchor same, cont. rig up rig floor equip., commence to mix spud mud, spool wire line onto draworks winch, sort out tubulars on racks. Note; F/ 13:00hrs to 13:30hrs, shut down operations & hold a safety meeting & disscussion with all personal regarding the incident of the dropped jnt. of casing. Operations For Period 0000 Hrs to 0600 Hrs on 27 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS RM 0000 0600 6.00 0.0m Cont. mix spud mud, sort out tubulars, spot choke manifold, install racks for BHA, clean up rig site & store rubbish in skip, cont. rig up with rig floor equip., hang tongs etc., run air, water & Hyd. lines Bulk Stocks Name Unit In Used Adjust Balance Barite sx 0 0 0 0.0 KCl sx 0 0 0 0.0 Salt sx 0 0 0 0.0 Gel sx 0 0 0 0.0 Potable Water ltr 12000 7000 0 34,000.0 Rig Fuel ltr 0 1400 0 34,600.0 Camp Fuel ltr 0 350 0 3,350.0 Santos.. Santos.. DRILLING MORNING REPORT # 16 G... [From:WELL_DAILY] B WELL_DRILL_HISTORY:017 27-JUL-06 84.0 9999.99 Rig up drilling equipment Operations For Period 0000 Hrs to 2400 Hrs on 27 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS P RM 0000 2400 24.00 0.0m Complete mixing spud mud, spot choke manifold & rig up lighting, install racks for BHA, clean up rig site & store rubbish in skip, cont. rig up with rig floor equip., hang tongs etc., run air, water & Hyd. lines, raise JSA & install Top Drive service loop hoses, run Top Drive, all appears ok, need to ajust tracks to centre Top Drive over hole, Rep. out of hours & day light, 95% completed, complete arranging tubulars, weld in choke line support sadles, spot in choke line piping, pressure up all #4 Pulsation Dampners to 800 psi on mud pumps, pressure up Koomey bottles to 1000psi, attempt to install mouse hole, no go, 7 ft high, fit riser & 2" drain valve & weld in same, load drill pipe on racks & commence to clean same, spot BHA jewlery & measure same, clean BHA, connect flow line, fill riser with mud & check for leaks, commence to run mud pumps #1 check operation & pressure test lines to 2000psi Note; take measurements for the re-routing of 8" Blewy line f/ Poor Boy to Flare tank, order pipe & fittings, Operations For Period 0000 Hrs to 0600 Hrs on 28 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS RM 0000 0600 6.00 60.0m (IN PROGRESS) Run Geolograph line, rope & tape together Tesco hyd. lines, run & function test mud pump #2 ,#3 & #4, pressure test lines to 2000psi, pressure test stand pipe low 300psi, high 2000psi, perform weekly rig inspection, complete caliper BHA, clean drill pipe, raise JSA for Top Drive track alignment. General Comments Comments Rig Requirements Enviromentle inspection carried out by Mr. Daniel Moriarty of Enesar Consulting Pty Ltd. No major problems reported WBM Data Cost Today $ 1427 Cumulative Cost $ 1427 Mud Type: Spud Mud Viscosity: 45sec/qt API FL Loss: 13.5cc Cl 4000 Solids: 3 Depth... [From:WELL_DAILY] B WELL_DRILL_HISTORY:018 28-JUL-06 100.0 9999.99 Complete rigging up, Fire & Muster Drill, followed by Emerg. Response Drill, pick up mouse hole sock,attempt to wash down same, no success, re-drill mouse hole, run sock, Pre-Spud Check, repairs to crown o-matic, Rig accepted to SPUD @ 18:30hrs, make up stands of drill pipe & rack in Mast, make up 17-1/2" BHA Operations For Period 0000 Hrs to 2400 Hrs on 28 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description PS P RM 0000 0700 7.00 60.0m Run Geolograph line, rope & tape together Tesco hyd. lines, run & function test mud pump #2 ,#3 & #4, pressure test lines to 2000psi, pressure test stand pipe low 300psi, high 2000psi, perform weekly rig inspection, complete caliper BHA, clean drill pipe, raise JSA for Top Drive track alignment. PS P RM 0700 1030 3.50 60.0m Suspend alignment to Top drive tracks due to no power to hydraulic winches, cont. make up choke lines, remove 13-3/8" protectors, off load mud chemicals (Electrical supply cable for plug in receptical coroded on power supply for Hydraulic pump, repair same) PS P RM 1030 1130 1.00 60.0m Restored hydraulic power, cont. with alignment to Top Drive alignment PS P RM 1130 1200 0.50 60.0m Sound rig floor alarm, "Fire & Muster Drill" for Well Control, disscuss issues with drilling & third party personal. ( both crews on tour) PS P RM 1200 1230 0.50 60.0m "Hold Emergency Response Drill", fire coming towards rig, explain emergency proceedures & evacauation routes. load all personal into the bus & the Ensign Canter to establish we could remove all personal f/ the rig site to a safe place in the case of a emergency, no problems. Refere to HSE section. ( both crews on tour) PS P RM 1230 1300 0.50 60.0m Final checks on Top Drive, all ok PS P RM 1300 1700 4.00 60.0m R.M., Tesco, Driller & crews hold a JSA on making up drill pipe, make up #1 stand, run in mouse hole sock, stab in stand, & attempt to wash down, no success, POOH, lay out mouse hole ... [From:WELL_DAILY] B WELL_DRILL_HISTORY:019 29-JUL-06 192.0 9999.99 Drilled cmt. to 65m to 80m, open hole f/ 9-5/8" to 17-1/2" f/ 80m to 100m, drill f/ 100m to 120m, circ., POOH, Rig & run directional BHA with 1-1/2 deg. bend, wash & ream f/ 110m to 120m, no fill, Drill, steer & survey f/120m to 192m Operations For Period 0000 Hrs to 2400 Hrs on 29 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description SH P HBHA 0000 0430 4.50 65.0m Review JHA, cont. make up BHA, RIH, tag cement @ 65metres SH P DC 0430 0530 1.00 85.0m Spud Galloway-1 @ 04:30 on 29-July-06. Drill cement f/ 65m to 85m SH P DHO 0530 0600 0.50 100.0m Open 9-5/8" pilot hole f/ 85m to 100m SH P D 0600 0700 1.00 120.0m Drill 17-1/2" hole f/ 100m to 120m (615 gpm in sand) SH P CHC 0700 0800 1.00 120.0m Sweep 20bls Hi Vis, excessive sand over shakers, sweep additional 20bbls Hi Vis, spot 40bbls Hi Vis on bottom. SH P TO 0800 1130 3.50 120.0m POOH, break & lay out jewlery SH P TO 1130 1200 0.50 120.0m Clear rig floor, remove bow shackles & install #4 piece safety shackles in Tesco Top Drive SH P HBHA 1200 2000 8.00 120.0m Hold toolbox meeting , make up Directional BHA #2 with 1.5 deg. bend. SH P TI 2000 2100 1.00 120.0m RIH to 110m, shallow pulse test SH P RW 2100 2130 0.50 120.0m Wash & Ream f/ 110m to 120m, no fill SH P DM 2130 2400 2.50 192.0m Drill steer & survey f/ 120m to 192m ( survey @ 190.2 = 4.72 inc, 115.2 AZI ) Operations For Period 0000 Hrs to 0600 Hrs on 30 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description SH DM 0000 0500 5.00 320.0m Drill f/ 192m to 320m. ( TVD = 314.7m ) ( survey @ 303.7m, 23.67 inc, 118.68 AZI ) SH CHC 0500 0600 1.00 320.0m Sweep 10bls Hi Vis, circ. hole clean for wiper to shoe, spot 10 bbls Hi Vis WBM Data Cost Today $ 1162 Cumulative Cost $ 3688 Mud Type: Spud Mud Viscosity: 48sec/qt API FL Loss: 10.0cc Cl 5000 Solids: 3 Depth: 145.0m PV: 12cp Filter Cake: 2/32nd" K+: ... [From:WELL_DAILY] B WELL_DRILL_HISTORY:020 30-JUL-06 307.0 9999.99 Drill to 320m, circ. wiper to shoe, circ., POOH, rig & run 13-3/8" casing, circ. csg for cmt. job Operations For Period 0000 Hrs to 2400 Hrs on 30 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description SH P DM 0000 0500 5.00 320.0m Drill f/ 192m to 320m. ( TVD = 314.7m ) ( survey @ 303.7m, 23.67 inc, 118.68 AZI ) SH P CHC 0500 0600 1.00 320.0m Sweep 10bls Hi Vis, circ. hole clean for wiper to shoe, spot 10 bbls Hi Vis SC P WT 0600 0800 2.00 320.0m Wiper to shoe, hole good, RIH, to 307m SC P RW 0800 0830 0.50 320.0m Wash f/ 307m to 320m, last 5m fill SC P CHC 0830 0900 0.50 320.0m Circ. hole clean SC P TO 0900 1030 1.50 320.0m POOH to bit SC P HBHA 1030 1300 2.50 320.0m Break & lay out, jewlery, MWD etc., back out IBS f/ Down hole motor, clear rig floor SC P RRC 1300 1600 3.00 320.0m Install bale adapters & additional bales & elev. to Top Drive bales to check operation & clearence, ok, rig down Ensign bales f/ Tesco bales. Rig to run 13-3/8" surface casing, hold safety meeting & JSA SC P RC 1600 1900 3.00 320.0m Pick up jnt. #1, slip solid master bushing over pin end of 13-3/8" csg., raise bushing with tugger to 5m above rig floor, install #2 solid centralisers with stop rings, make up shoe, fill with mud, check flow thru., lower master bushing into rotory table, make up flt. collar, fill with mud, check flow thru, cont. run 13-3/8" csg. to shoe @ 60m SC P RC 1900 1930 0.50 320.0m Break circ. while rigging up bale adapter plates to second set of extention bales to allow enough clearence to install circulating swedge & Haliburton cmt. head. SC P RC 1930 2330 4.00 320.0m Cont. run 28 jnts x 13-3/8" x 54.5 lb/ft x J55 x BTC casing to 317m, shoe depth ( lost 20bbls to formation while running casing) SC P CIC 2330 2400 0.50 320.0m Circ. prior to cement job Operations For Period 0000 Hrs to 0600 Hrs on 31 Jul 2006 Phse Cls Op From To Hrs De... [From:WELL_DAILY] B WELL_DRILL_HISTORY:021 31-JUL-06 95.0 9999.99 Circ., Head up Halliburton, mix,pump & cmt. 13-3/8" csg., WOC, back out Landing jnt., rig down riser, install Braden Head, rig & run BOP, nipple up same Operations For Period 0000 Hrs to 2400 Hrs on 31 Jul 2006 Phse Cls Op From To Hrs Depth Activity Description SC P CIC 0000 0100 1.00 320.0m Circ. csg., pump 50bbls water ahead with rig pump SC P HU 0100 0130 0.50 320.0m Head up Halliburton SC P HU 0130 0200 0.50 320.0m Pump 5bbls water ahead, pressure test lines to 4000psi, pump 5bbls water spacer, release Bottom plug, pump 5bbls ahead, remove Hali. cmt. head cap & load Top plug. SC P CMC 0200 0400 2.00 320.0m Mix & pump 161bbls of 12.5ppg Lead cmt., followed by 90bbls of 15.8ppg Tail cmt., release Top plug, displace 158bbls water @ 4.7bpm, bump plug w/ 300psi, pressure up csg. to 1200psi for 10 minutes, good test, bleed back 1-1/2bbls, float holding SC P WOC 0400 0930 5.50 320.0m Wait On Cement. Perform Cmt. Top Up Job. Samples still soft after after 4hrs SC P RD 0930 1100 1.50 320.0m Slack off csg., ok, break off cement head, back out Landing Jnt., lay out same, lay out Riser, cut lower section of conductor, lay out same SC P RU 1100 1630 5.50 320.0m Pick up B.H. on tugger, position same on csg., make up Braden Head with chain tong, clear rig floor of csg. running equip., rig down double Bales & adapter plates, make up masher tool to a single 6-1/2" d.c., torque up Braden Head, break off masher & lay out same & dc. Cement leval droped off between 20" conductor & 13-3/8" csg., Run weight on string line, leval dropped to 24met. (17bbls), run string line & plumb bob f/ rig floor to centre 13-3/8" csg ( wind & rain effecting working conditions) SC U RU 1630 1700 0.50 320.0m Centre csg. & Braden Head w/ plumb bob, weld supports brackets on 20" conductor to centre B.H. with rotory table. ( Halliburton to perform Top Up cmt. job, tomorrow) SC P NUB 1700 2400 7.00 320.0m Write up JH... [From:WELL_DAILY] B WELL_DRILL_HISTORY:022 01-AUG-06 90.0 9999.99 Complete nipple up on BOP, pressure test same, pressure test surface equip., Safety meeting w/ crew change personal, muster drill & perform E.S.D., all functions ok, JSA on p.u. drill pipe, make up stands of drill pipe & rack in Mast Operations For Period 0000 Hrs to 2400 Hrs on 01 Aug 2006 Phse Cls Op From To Hrs Depth Activity Description SC P NUB 0000 0300 3.00 320.0m Cont. modifications to Bell nipple, nipple up Koomey lines, function test same, install Kill line, install HCR, load drill pipe onto racks, clean same SC P NUB 0300 0430 1.50 320.0m Pressure test casing to 200psi low > 1200psi to confirm B.H. connection, install Bell nipple & Flow line, SC P NUB 0430 0900 4.50 320.0m Make up Combination tool, RIH set same, pressure test BOP to 200psi low & 1700psi high, leak between spacer spools in seal area @ 1700 psi, re-torque up studs & nuts, cont. w/ pressure test. (Perform BOP accumulator test) ( short change w/crews today) SC P NUB 0900 1000 1.00 320.0m Pull Combination Tool, reverse tool, make up wear bushing, run & set same, POOH, lay out tool SC P NUB 1000 1400 4.00 320.0m Pressure test surface equipment. ( Haliburton performed 13bbl, top up job between 13-3/8" csg. & 20" conductor, filled csg. to cellar ) SC P SM 1400 1500 1.00 320.0m Hold Safety Meeting & Toolbox talk with new on coming crew & all personal SC P RMT 1500 1600 1.00 320.0m "Hold Muster Drill" " Test Emergency Shut Downs " all ok, all functions performed with in seconds. Restart Generators, rig back on line SC P SM 1600 1630 0.50 320.0m New crew, Review JSA, Toolbox talk, regarding making up stands of drill pipe & racking in Mast SC P HBHA 1630 2200 5.50 320.0m Pick up singles D.P., make up stands & rack in Mast SC P PT 2200 2230 0.50 320.0m Pressure test Geo Span on Sperry Sun equipment SC P HBHA 2230 2400 1.50 320.0m Cont. pick up singles D.P., make up stands & rack in Mast Operation... [From:WELL_DAILY] B WELL_DRILL_HISTORY:023 02-AUG-06 458.0 9999.99 Pick up a total of 42 std's D.P. & rack in Mast, make up Sperry Sun directional BHA, calibrate & test same, cont. RIH, tag cmt. @ 303m, drill cmt., shoe track & rat hole to 320m, with water, switch to new KCL/PHPA mud, drill new hole f/ 320m to 323m, circ. & condition mud, pull inside shoe, perform Leak Off Test, equiv. to 20.00ppg, drill ahead f/ 323m Operations For Period 0000 Hrs to 2400 Hrs on 02 Aug 2006 Phse Cls Op From To Hrs Depth Activity Description SC P HBHA 0000 0700 7.00 320.0m Cont. pick up singles drill pipe, make up & rack std's in Mast ( total in Mast = 52 stands) SC P HBHA 0700 0730 0.50 320.0m Sperry Sun calibrate Draworks / blocks SC P RS 0730 0900 1.50 320.0m Rig Service, raise JSA due to Top Drive addition SC P PT 0900 1000 1.00 320.0m nipple up x-o's, tighten break on Grey stab valve to pressure test same, ok, break down x-o's SC P HBHA 1000 1430 4.50 320.0m Raise JSA, make up 12-1/4" Sperry directional BHA, test MWD tools, failed SC P RO 1430 1530 1.00 320.0m Repair MWD connection & re-test, ok SC P HBHA 1530 1630 1.00 320.0m Cont. RIH to HWDP SC P PT 1630 1700 0.50 320.0m Shallow pulse test MWD SC P TI 1700 2000 3.00 320.0m Cont. RIH f/ HWDP, tag cmt. @ 303m. pick up off bottom SC P SM 2000 2030 0.50 320.0m Simulate well control drill, shut in well, close annular, sound alarm, close pipe rams, all non essential personal off the rig floor, muster checker checked off personal. Returned all the drilling crew to the rig floor & discussed how the well is controlled. circ. with water, pump thru, HCR, choke manifold, & Poor Boy, observe returns @ Poor Boy, end of drill, return manifold to drilling mode, clear rig floor, open rams & Annular Note; Problem with stroke counter on Swaco choke, elect. to repair before drilling out shoe SC P RR 2030 2100 0.50 320.0m Suction line leaking on #4 mud pump, repair same SC P DFS 2100 2300 2.00 320.0... [From:WELL_DAILY] B WELL_DRILL_HISTORY:024 03-AUG-06 636.0 9999.99 Drill, steer & survey 12-1/4" hole f/ 323m to 636m ( Survey @ 622.250= 70.37deg., AZI = 121.24) Circulate and condition well. Flow check .TRPO f/- 636m to 13 3/8 casing shoe. Flow check at 13 3/8 casing shoe (static) Continue to TRPO to BHA. 636.0m Lay out 6 1/2 DC and 6 1/2 drilling jars . Rack back 8 1/2 DC. Down load MWD data Lay out Bit# 3 and Mud Motor. Pick up geo pilot tool. Formation Tops Sequence Formation Name Top Depth (MD, (m)) Top Depth (TVD, (m)) Comment Wireline Depth (m) 1 Gippsland LMST 320.0 314.5 Operations For Period 0000 Hrs to 2400 Hrs on 03 Aug 2006 Phse Cls Op From To Hrs Depth Activity Description IH P DM 0000 1500 15.00 636.0m Drill, steer & survey 12-1/4" hole f/ 323m to 636m ( Survey @ 622.250= 70.37deg., AZI = 121.24) IH P CHC 1500 1630 1.50 636.0m Circulate and condition well. IH P TO 1630 1800 1.50 636.0m Flow check .TRPO f/- 636m to 13 3/8 casing shoe. Flow check at 13 3/8 casing shoe (static) Continue to TRPO to BHA. IH P HBHA 1800 1930 1.50 636.0m Lay out 6 1/2 DC and 6 1/2 drilling jars . Rack back 8 1/2 DC. IH P HBHA 1930 2000 0.50 636.0m Down load MWD data IH P HBHA 2000 2200 2.00 636.0m Lay out Bit# 3 and Mud Motor. Check guage on all stabilizers. Lay out Motor with crane. IH P HBHA 2200 2400 2.00 636.0m Pick up Geo pilot with crane. Pick up and m/up MWD assy as per directional drillers instructions. Operations For Period 0000 Hrs to 0600 Hrs on 04 Aug 2006 Phse Cls Op From To Hrs Depth Activity Description IH HBHA 0000 0030 0.50 636.0m Continue to M/UP MWD Tools IH HBHA 0030 0230 2.00 636.0m Attempt to install bit .Sperry's Bit breaker doesnt fit Ensign 32 rotary table. Welder had to modify. Hold Tap root investigation while modifing bit breaker. IH HBHA 0230 0430 2.00 636.0m Continue to m/up 12 1/4 BHA # 4. IH HBHA 0430 0500 0.50 636.0m Shallow test MWD . Geo Span skid on surface ... [From:WELL_DAILY] B WELL_DRILL_HISTORY:025 04-AUG-06 1273.0 9999.99 Continue to M/UP MWD Tools Attempt to install bit .Sperry's Bit breaker doesnt fit Ensign 32 rotary table. Welder had to modify. Hold Tap root investigation while modifing bit breaker. Continue to m/up 12 1/4 BHA # 4. Shallow test MWD . Geo Span skid on surface no working. Pick up 6 1/2 drilling jars and extra 4 1/2 HWDP and TRPI to 13 3/8 casing shoe. Change out tong hanging line sheaves. Replace 4 1/2 manual elevators(damaged) with Tesco hydraulic set. Attempt to function no good.regulator valve not working. Replace with second hand one also no go. Repaired manual elevators and reinstall. Continue to RIH from 13 3/8 to 626m wash down to 636m. No hang ups. Break circulation and circulate bottoms to break in Geo pilot tool Continue to drill 12 1/4 hole with rotary steerable assy.f/- 636m to 1099m Formation Tops Sequence Formation Name Top Depth (MD, (m)) Top Depth (TVD, (m)) Comment Wireline Depth (m) 1 Gippsland LMST 320.0 314.5 5.9L Operations For Period 0000 Hrs to 2400 Hrs on 04 Aug 2006 Phse Cls Op From To Hrs Depth Activity Description IH P HBHA 0000 0030 0.50 636.0m Continue to M/UP MWD Tools IH TP HBHA 0030 0230 2.00 636.0m Attempt to install bit .Sperry's Bit breaker doesnt fit Ensign 32 rotary table. Welder had to modify. Hold Tap root investigation while modifing bit breaker. IH P HBHA 0230 0430 2.00 636.0m Continue to m/up 12 1/4 BHA # 4. IH P HBHA 0430 0500 0.50 636.0m Shallow test MWD . Geo Span skid on surface no working. IH P HBHA 0500 0630 1.50 636.0m Pick up 6 1/2 drilling jars and extra 4 1/2 HWDP and TRPI to 13 3/8 casing shoe. IH TP RR 0630 0830 2.00 636.0m Change out tong hanging line sheaves. Wrote JHA prior to sheave change out. IH TP RR 0830 1030 2.00 636.0m Replace 4 1/2 manual elevators(damaged) with Tesco hydraulic set. Attempt to function no good.regulator valve not working. Replace with second hand one also no go. Repaired manual elevators an... [From:WELL_DAILY] B WELL_DRILL_HISTORY:026 05-AUG-06 1606.0 9999.99 Continue to drill 12 1/4 hole with Geo pilot steerable assy F/- 1099m to 1273m. Take survey every stand. Circulate and condition well while work on mud pump # 4 pop off. Continue to drill 12 1/4 with Geo pilot steerable assy F/-1273m to 1331m. Leaking wash pipe. Rack back one stand and replace washpipe. Continue to drill 12 1/4 F/- 1273m to 1571m. Take survey every stand. Add Radia green salt to active to reduce down hole torque Formation Tops Sequence Formation Name Top Depth (MD, (m)) Top Depth (TVD, (m)) Comment Wireline Depth (m) 1 Gippsland LMST 320.0 314.5 5.9L Operations For Period 0000 Hrs to 2400 Hrs on 05 Aug 2006 Phse Cls Op From To Hrs Depth Activity Description IH P DM 0000 0630 6.50 1273.0m Continue to drill 12 1/4 hole with Geo pilot steerable assy F/- 1099m to 1273m. Take survey every stand. IH TP RMT 0630 0730 1.00 1273.0m Circulate and condition well while work on mud pump # 4 pop off. IH P DM 0730 1030 3.00 1331.0m Continue to drill 12 1/4 with Geo pilot steerable assy F/-1273m to 1331m. IH TP RO 1030 1130 1.00 1331.0m Leaking wash pipe. Rack back one stand and replace washpipe. IH P DM 1130 2400 12.50 1571.0m Continue to drill 12 1/4 F/- 1273m to 1571m. Take survey every stand. Add Radia green salt to active to reduce down hole torque Operations For Period 0000 Hrs to 0600 Hrs on 06 Aug 2006 Phse Cls Op From To Hrs Depth Activity Description IH DM 0000 0230 2.50 1606.0m Continue to drill 12 1/4 hole F/-1571m to 1606m casing depth for 9 5/8. Take survery every stand. IH CMD 0230 0500 2.50 1606.0m Circulate and condition well prior to tripping out. IH TO 0500 0600 1.00 1606.0m Flow check . POOH to 1408m. Tight spot at 1408. Install TDU General Comments Comments Rig Requirements Removed 3 x 9000 ltr loads from sump to Sale refuge. Chemical study was performed prior to any sump fluid remove and dumped. Recieved 3 x l... [From:WELL_DAILY] B WELL_DRILL_HISTORY:027 06-AUG-06 1606.0 9999.99 Drill 12 1/4 hole to 1606m Casing depth Circulate and condition. Trip out to casing shoe. Tight at 1408,1138,1051,964. Work through casing shoe, Continue to trip out,layout geo pilot tools. M/up clean out assy . Trip in to casing shoe. Slip line. Continue to trip in to 502m at midnight. Formation Tops Sequence Formation Name Top Depth (MD, (m)) Top Depth (TVD, (m)) Comment Wireline Depth (m) 1 Gippsland LMST 320.0 314.5 5.9L Operations For Period 0000 Hrs to 2400 Hrs on 06 Aug 2006 Phse Cls Op From To Hrs Depth Activity Description IH P DM 0000 0230 2.50 1606.0m Continue to drill 12 1/4 hole F/-1571m to 1606m casing depth for 9 5/8. Take survery every stand. IH P CMD 0230 0500 2.50 1606.0m Circulate and condition well prior to tripping out. IH P TO 0500 0600 1.00 1606.0m Flow check . POOH to 1408m. Tight spot at 1408. Install TDU IH TP CMD 0600 0700 1.00 1606.0m Break circulation at 1408m .Work pipe while circulating IH P TO 0700 0830 1.50 1606.0m Continue POOH f/- 1408m to 1138m. Tight at 1138m IH TP CHC 0830 0930 1.00 1606.0m Break circulation at 1138m . Work pipe while circulating IH TP TO 0930 1300 3.50 1606.0m Continue to POOH Tight spot @ 1051 & 964m work clean.Continue to POOH to 326m. Stabilisers at shoe 317m.Unable to come into 13 3/8 shoe. IH TP CMD 1300 1430 1.50 1606.0m Install TDU. Break circulation. Flush around shoe. Work through shoe area with 10RPM, 3100 ftlbs, max OP 7k. Slowly work into shoe until Bit has passed through shoe Track. IH P TO 1430 1630 2.00 1606.0m Continue to POOH to MWD tools. IH P LOG 1630 1700 0.50 1606.0m Download MWD tool at surface. IH P TO 1700 1900 2.00 1606.0m Lay out MWD and Geo Pilot tools. IH P TI 1900 2230 3.50 1606.0m M/up bit #5 (9-7/8" mill-tooth) and BHA # 5, RIH to 13 3/8 casing shoe. IH P SC 2230 2300 0.50 1606.0m Slip 66' drilling line IH P RS 2300 2330 0.50 1606.0... [From:WELL_DAILY] B WELL_DRILL_HISTORY:102 08-AUG-06 1606.0 9999.99 Clear rig floor and rig up 9 5/8 casing equipment. Hold pre job safety meeting . JHA. M/up reaming shoe. and float . Check float for flow back no flow ok. Continue to Run casing as per programme to 1606m Run total 127 jnts 47 lb 9 5/8 casing .Floating string in . Fill up string venting casing string to atmosphere Install cement vhead and circulate hole while mixing cement chemicals Mix and pump cement 310bbls lead 27 bbls tail Displace and bump plug. Formation Tops Sequence Formation Name Top Depth (MD, (m)) Top Depth (TVD, (m)) Comment Wireline Depth (m) 1 Gippsland LMST 320.0 314.5 5.9L Operations For Period 0000 Hrs to 2400 Hrs on 08 Aug 2006 Phse Cls Op From To Hrs Depth Activity Description IH P CMC 0000 0100 1.00 1606.0m Clear rig floor and rig up 9 5/8 casing equipment. IH P CMC 0100 1500 14.00 1606.0m Hold pre job safety meeting . JHA. M/up W/ford reamer/guide shoe & float. Install torque rings and threadlock conn's. Check float for flow back no flow ok. Continue to run casing as per programme to 1606m Run total 127 jnts 47 lb 9 5/8 casing. Float string in. IH P CMC 1500 1630 1.50 1606.0m Fill up string venting casing string to atmosphere IH P CMC 1630 2100 4.50 1606.0m Install cement head and circulate hole while mixing cement chemicals IH P CMC 1900 2400 5.00 1606.0m Hold pre job safety meeting . Pump 5 bbls spacer. Pressure test lines to 2500psi 5mins ok. Pump 60 bbls tuned spacer. Drop bottom plug. pump 5bbls spacer. Load top plug. Mix and pump lead slurry 12.5 ppg 301 bbls. Mix and Pump tail slurry 15.6ppg 27.1 bbls. Drop bottom plug Displace with Halliburton 383 bbls Operations For Period 0000 Hrs to 0600 Hrs on 09 Aug 2006 Phse Cls Op From To Hrs Depth Activity Description IH CMC 0000 0100 1.00 1606.0m Continue to Displace cement actual pumped 389bbls.. Bump plug at 3 bpm w/- 500psi . Test casing at 1700psi for 10 mins.ok. IH CMC 0100 0500 4... [From:WELL_DAILY] B WELL_DRILL_HISTORY:203 11-AUG-06 1646.0 9999.99 Continue to drill out the through 1597m, Drill with 50 rpm, 560 gpm, ROP 0.5m/hr. Break through 1598m attempt to work back through 1597m . Sting stalled out. Stuck pipe at 1597m . No rotation 50k overpull. Install work single attempt to work through 1597 to 1598. Regain rotation . Drill NBS through 1597m .Work back through 1597m until torque reduced to 6500 ft/lbs. Continue to drill out rat hole to 1606m. Drill new 8 1/2 hole from 1606m to 1609m. Circulate and condition mud prior to LOT. 60% new formation in sample. Perform LOT at 803m TVD. Leak of pressure 1000psi w/-9.3ppg = EMW 16.4 ppg. Continue to drill 8 1/2 hole f/-1609 to 1619m. Circulate and condition mud. Pooh f/- 1619m to surface. No hang ups through float and shoe. Break out bit, stabs and lay out. M/up geo-pilot /MWD assy. Calibrate and test MWD Tools, OK. Continue to RIH to 1575m . Tagged float collar. Attempt to work through, no go past 1575m. Slip and cut 100' drilling. Sperry sun calibrate block height Formation Tops Sequence Formation Name Top Depth (MD, (m)) Top Depth (TVD, (m)) Comment Wireline Depth (m) 1 Gippsland LMST 320.0 314.5 5.9L Operations For Period 0000 Hrs to 2400 Hrs on 11 Aug 2006 Phse Cls Op From To Hrs Depth Activity Description IH TP RW 0000 0100 1.00 1606.0m Continue to drill out the shoe-track through 1597m, drill with 50rpm, 560gpm, ROP 0.5m/hr, break through 1598m attempt to work back through 1597m. Sting stalled out. IH TP WSP 0100 0230 1.50 1606.0m Stuck pipe at 1597m . No rotation 50k overpull. Install work single & attempt to work through 1597 to 1598m. Regain rotation . Drill NBS through 1597m. Work back through 1597m until torque reduced to 6500 ft/lbs. Continue to drill out rat hole to 1606m. PH P D 0230 0300 0.50 1609.0m Drill new 8 1/2 hole from 1606m to 1609m. PH P CMD 0300 0330 0.50 1609.0m Circulate and condition mud prior to LOT. 60% new formation in sample PH P LOT 0330 0430 1.00 1609... [From:WELL_DAILY] B WELL_DRILL_HISTORY:203 12-AUG-06 1660.0 9999.99 Attempt to set Geo pilot to Home (zero deflection) setting, unable to set. Change out down link choke size and set geo pilot at Home setting. Wash down f/-1575 to 1619m as per sperry parameters.Tool past float and shoe with no hang ups. Drill 8 1/2 hole f/-1619m to 1659m. Drill with 575gpm, 50rpm, WOB 10. Drill with these parameters until geo pilot tools are in open hole. ROP 12-15m/hr. TDU hydraulic pump over heated. Trouble shoot. POOH back to 9 5/8 casing shoe. Repair seals on TDU hydraulic pump. RIH and attempt to drill f/-1659m TDU Hydraulic pump overheated - 220 deg. POOH back inside 9 5/8 casing shoe and circulate while change out Tesco hydraulic pump. RIH and continue to drill 8 1/2 hole with rotary steerable assy. f/- 1659m to 1660m .Tesco hydraulic pump overheated - 220deg. POOH back inside 9 5/8 casing shoe. Source replacement pump for Tesco Hydraulic system. Pooh to surface Hold JHA for removing Radio active sources. Remove radio active sources, Formation Tops Sequence Formation Name Top Depth (MD, (m)) Top Depth (TVD, (m)) Comment Wireline Depth (m) 1 Gippsland LMST 320.0 314.5 5.9L Operations For Period 0000 Hrs to 2400 Hrs on 12 Aug 2006 Phse Cls Op From To Hrs Depth Activity Description PH P SC 0000 0030 0.50 1619.0m Continue to calibrate block height sensor with sperry sun PH TP CMD 0030 0130 1.00 1619.0m Attempt to set Geo Pilot to 'home' (zero deflection) setting unable to set. Change out down link choke size and set geo pilot at 'home' setting (zero deflection). PH P RW 0130 0300 1.50 1619.0m Wash down f/-1575 to 1619m as per sperry parameters. Tool past float and shoe with no hang ups. PH P DM 0300 0700 4.00 1646.0m Drill 8 1/2 hole f/-1619m to 1659m. Drill with 575gpm, 50rpm, WOB 10klbs. Drill with these parameters until Geo pilot tools are in open hole. ROP 12-15m/hr PH TP RO 0700 0730 0.50 1646.0m TDU hydraulic pump over heated. Trouble shoot. PH TP RO 0730 0... [From:WELL_DAILY] B WELL_DRILL_HISTORY:203 13-AUG-06 1660.0 9999.99 POOH rack geo pilot assy. RIH w/- cleanout assy and condition mud while wait on tesco hydraulic pump. POOH w/- clean out assy. M/UP geo assy ,change out CNP/SLD. Load radio active sources. RIH to 764m at midnight. Formation Tops Sequence Formation Name Top Depth (MD, (m)) Top Depth (TVD, (m)) Comment Wireline Depth (m) 1 Gippsland LMST 320.0 314.5 5.9L Operations For Period 0000 Hrs to 2400 Hrs on 13 Aug 2006 Phse Cls Op From To Hrs Depth Activity Description PH TP HBHA 0000 0100 1.00 1660.0m Down load geo pilot data. PH TP HBHA 0100 0200 1.00 1660.0m Rack Geo pilot in derrick. PH TP TI 0200 0600 4.00 1660.0m M/up BHA # 9 and RIH to 1590m PH TP CMD 0600 1500 9.00 1660.0m Circulate and condition while waiting on tesco parts. Continue to work on Tesco unit hydraulic system. Change filters ,check for blockages in lines. PH TP TO 1500 1900 4.00 1660.0m POOH to change BHA to rotary steerable assy. PH TP HBHA 1900 2100 2.00 1660.0m Layout CNP/SLD tool in Sperry Sun BHA assy. CNP/SLD tool failed. Install new CNP/SLD. PH TP HT 2100 2130 0.50 1660.0m M/up BHA #10. Install Radioactive source in tools. PH TP HT 2130 2230 1.00 1660.0m RIH to 118m w/- geo pilot. PH TP HT 2230 2300 0.50 1660.0m Test MWD tools PH TP TI 2300 2400 1.00 1660.0m Continue to RIH to 1571m, filling every 20 stands to 764m Operations For Period 0000 Hrs to 0600 Hrs on 14 Aug 2006 Phse Cls Op From To Hrs Depth Activity Description PH TI 0000 0430 4.50 1660.0m RIH w/- Geo Pilot assy to 1571m. Hydraulic pump arrived on location at 02:30 hrs. PH CHC 0430 0500 0.50 1660.0m Circulate and condition while install hydraulic pump on tesco unit. PH RO 0500 0600 1.00 1660.0m Test tesco hydraulic pump. Pre-charge pressure on Top drive started at 400psi normal. Started to rotate pre charge pressure dropped to 220psi. Continue to trouble shoot hydraulic system... [From:WELL_DAILY] B WELL_DRILL_HISTORY:303 15-AUG-06 2350.0 9999.99 POOH w/- BHA # 10. Check bit #9 balled up clean up bit and rerun in hole. Continue to 8 1/2 hole w/- GeoPilot f/-1680m to 1847m Formation Tops Sequence Formation Name Top Depth (MD, (m)) Top Depth (TVD, (m)) Comment Wireline Depth (m) 1 Gippsland LMST 320.0 314.5 5.9L Operations For Period 0000 Hrs to 2400 Hrs on 15 Aug 2006 Phse Cls Op From To Hrs Depth Activity Description PH TP TO 0000 0130 1.50 1680.0m Continue to POOH to 10m. PH TP HT 0130 0200 0.50 1680.0m Hold PJSM and unload radioactive source PH TP HT 0200 0230 0.50 1680.0m Download MWD data PH TP HBHA 0230 0330 1.00 1680.0m Lay out flex joint and pull Bit# 9. Bit balled up with 1x blocked jet. Clean up bit and remove and clean out jets. No junk damage on BHA. PH TP HT 0330 0430 1.00 1680.0m M/up bit# 9RR Pick up flex joint and Test MWD. OK. PH TP HT 0430 0500 0.50 1680.0m Hole PJSM. Install radioactive source. PH TP TI 0500 0600 1.00 1680.0m Continue to RIH w/- BHA#11 to 214m PH TP HT 0600 0630 0.50 1680.0m Shallow test sperry geo pilot ok. PH TP TI 0630 0830 2.00 1680.0m Continue to RIH to 9 5/8 casing shoe 1602m PH TP RW 0830 0930 1.00 1680.0m Wash and ream down f/- 1602m to 1680m PH P DM 0930 1200 2.50 1717.0m Drill 8 1/2 hole w/- 1680m to 1717m PH U RS 1200 1230 0.50 1717.0m Service Top drive PH P DM 1230 2400 11.50 1847.0m Continue to drill 8 1/2 hole to 1847m ,WOB,10-12k, RPM 140, SPM 255 = 650GPM, SPP=2650psi. Operations For Period 0000 Hrs to 0600 Hrs on 16 Aug 2006 Phse Cls Op From To Hrs Depth Activity Description PH DM 0000 0200 2.00 1881.0m Continue to drill 8 1/2 to 1881m At 1865m pressure increase 2700psi to 2850 psi. ROP decreased f/- 20m/hr to 4-6 m/hr. PH DM 0200 0600 4.00 1881.0m Suspect plugged jets. Pump several baracarb/KCl sweeps in attempt to clear jets. No change in pressure or ROP. Pull back to 1750m & perf... [From:WELL_DAILY] B WELL_DRILL_HISTORY:303 16-AUG-06 1881.0 9999.99 Drill to 1881m ROP reduced from 20m/hr to 3-4m/hr w/ corresponding increase in pump pressure. Pump baracarb sweeps to clear suspected balled bit, no change. POOH to check bit, 2 jets blocked & 2 flutes on extended gauge blocked. RIH w/- 8 1/2 mill tooth 117 bit . Cut drill line. Washing and reaming to bottom, 1617m. Formation Tops Sequence Formation Name Top Depth (MD, (m)) Top Depth (TVD, (m)) Comment Wireline Depth (m) 1 Gippsland LMST 320.0 314.5 5.9L Operations For Period 0000 Hrs to 2400 Hrs on 16 Aug 2006 Phse Cls Op From To Hrs Depth Activity Description PH P DM 0000 0200 2.00 1881.0m Continue to drill 8 1/2 to 1881m At 1865m pressure increase 2700psi to 2850 psi. ROP decreased f/- 20m/hr to 4-6 m/hr. Pump several baracarb/KCL sweeps.No change in pressure or ROP. PH TP DM 0200 0600 4.00 1881.0m Suspect plugged jets. Pump several baracarb/KCl sweeps in attempt to clear jets. No change in pressure or ROP. Pull back to 1750m & perform flow test. Circ rate decreased from 645gpm to 540gpm w/ similar circ pressure. Clean hole & POOH to inspect/change bit. PH TP RW 0600 0830 2.50 1881.0m Back ream F/-1881m to 1601m. Overpull and pump increase coming into the 9 5/8 shoe PH TP CMD 0830 1030 2.00 1881.0m Pump 20bbls baracarb 600 and attempt to clear bit. No change in pump pressure. Excessive cutting over shaker circulate clean. PH TP TO 1030 1400 3.50 1881.0m Flow check Pump slug. POOH to 32m PH TP HT 1400 1500 1.00 1881.0m Down load MWD and unload radioactive source. PH TP HBHA 1500 1600 1.00 1881.0m Continue to POOH w/- BHA # 11. Layout bit #9rr PH TP HBHA 1600 1630 0.50 1881.0m M/up bit# 10 and sleeve. RIH to 32m PH TP HT 1630 1730 1.00 1881.0m Load radioactive sources. PH TP TI 1730 1800 0.50 1881.0m RIH w/- BHA # 12 to 118m. PH TP HT 1800 1830 0.50 1881.0m Surface test MWD. PH TP TI 1830 2230 4.00 1881.0m RIH from 118m to 1600m. ... [From:WELL_DAILY] B WELL_DRILL_HISTORY:303 17-AUG-06 1986.0 9999.99 Wash and ream to 1881mMD. Pull into shoe to repair saver sub. RIH (wash and ream) to 1881m. Drill 8 1/2" hole with Geo Pilot Assembly from 1881m to 1986m Formation Tops Sequence Formation Name Top Depth (MD, (m)) Top Depth (TVD, (m)) Comment Wireline Depth (m) 1 Gippsland LMST 320.0 314.5 5.9L 2 Lakes Entrance 1880.0 962.1 Operations For Period 0000 Hrs to 2400 Hrs on 17 Aug 2006 Phse Cls Op From To Hrs Depth Activity Description PH P RW 0000 0330 3.50 1881.0m Wash and ream from 1617m to 1833m. Having to work bit through micro ledges. Observe mud saver valve leaking oil. Unable to continue in the hole. PH TP TO 0330 0430 1.00 1881.0m Pull back to shoe to repair mud saver valve. PH TP RO 0430 0630 2.00 1881.0m Repair Tesco mud saver valve test ok. PH TP TI 0630 0830 2.00 1881.0m RIH f/- 9 5/8 casing shoe to 1881m. Wash down last stand. PH TP CHC 0830 0930 1.00 1881.0m Pump 20bbls baralift sweep and circulate hole clean . Excessive cutting coming over the shakers. continue to circulate clean. SPP reduced 200psi after cleaning hole. PH P DM 0930 1430 5.00 1920.0m Continue to Drill 8 1/2 hole f/- 1881m to 1920m PH P RS 1430 1500 0.50 1920.0m Rig service (top drive) PH P DM 1500 2400 9.00 1986.0m Continue to drill 8 1/2 hole f/-1920m to 1986m. Pump sweeps at the end and middle of each stand to help clean hole. Operations For Period 0000 Hrs to 0600 Hrs on 18 Aug 2006 Phse Cls Op From To Hrs Depth Activity Description PH DM 0000 0600 6.00 2038.0m Drill from 1986m to 2038m. Gpm 555. Spp 2788. RPM 140. WOB 22k. Mud Weight 10.5 ppg. Torque 7400 off-Btm 9100 On-Btm General Comments Comments Rig Requirements Demin water for 7" cement job delievered. Santos.. Santos.. DRILLING MORNING REPORT # 38 GALLOWAY-1 'Copyright IDS, 2006' AT 20060630, SANTOS_CBU_onshore_drllg Page 1 Printed on 17 Aug 2006 WBM Data ... [From:WELL_DAILY] B WELL_DRILL_HISTORY:303 18-AUG-06 2080.0 9999.99 Drill from 1986m to 2080m (TVD 1133m). Circ as needed to clean hole. While making a connection, the top drive electrical control lines were pulled out of top drive unit after becoming caught in the derrick. Repair top drive. Wiper trip from 2074m to 2064m. Pooh into casing to change out main hyd motor on top drive. Hyd motor unabe to maintaine proper torque while drilling and reaming. Formation Tops Sequence Formation Name Top Depth (MD, (m)) Top Depth (TVD, (m)) Comment Wireline Depth (m) 1 Gippsland LMST 320.0 314.5 5.9L 2 Lakes Entrance 1880.0 962.1 3 Latrobe Coarse Clastics 2124.5 1171.8 1175.6 4 Latrobe N Asperus (Coal) 2196.0 1237.5 1247 Operations For Period 0000 Hrs to 2400 Hrs on 18 Aug 2006 Phse Cls Op From To Hrs Depth Activity Description PH P DM 0000 0600 6.00 2038.0m Drill from 1986m to 2038m. GPM 555. SPP 2788. RPM 140. WOB 22k. Mud Weight 10.5 ppg. Torque 7400 off-Btm 9100 On-Btm PH P CMD 0600 1000 4.00 2063.0m Circulate for 30mins prior to connection to unload hole PH P DM 1000 1230 2.50 2080.0m Continue dill 8 1/2 hole f/- 2063m to 2080m. High torque, GPM 555, RPM 135. MW 10.5ppg. Pump 10 bbl Baralift sweeps every 1/2 stand. PH TP DM 1230 1430 2.00 2080.0m Work on TDU. Electric control line caught up in derrick disabling the TDU unit. Repair and test ok. circulate with swedge while repairing TDU. PH TP RW 1430 1500 0.50 2080.0m Ream from 2064m to 2074m. Unable to get the proper torque from the top drive due to the fluid flow on top drive hydraulic motor not working properly. PH TP RW 1500 1830 3.50 2080.0m POOH into 9-5/8" casing shoe to change out hydraulic motor on top drive. Backream from 2074m to 1868m. High torque (9000 ft-lbs) and packing off. PH TP RW 1830 2000 1.50 2080.0m Pump out of hole from 1868m to 1581m. Max O/P 25klbs. No packing off. PH TP RO 2000 2400 4.00 2080.0m Change out main hydraulic motor on top drive... [From:WELL_DAILY] B WELL_DRILL_HISTORY:304 19-AUG-06 2202.0 9999.99 Repair hyd motor on top drive. Wash and ream to 2080. Circ hole clean. Drill ahead. Top of Latrobe Coarse Clastics at 2124.5m md (1175.6m tvd). 13 ohms max res, max gas 8u, Flour 5% Top of Latrobe N. Asperus (Coal) 2196m md (1247m tvd). Formation Tops Sequence Formation Name Top Depth (MD, (m)) Top Depth (TVD, (m)) Comment Wireline Depth (m) 1 Gippsland LMST 320.0 314.5 5.9L 2 Lakes Entrance 1880.0 962.1 3 Latrobe Coarse Clastics 2124.5 1171.8 1175.6 4 Latrobe N Asperus (Coal) 2196.0 1237.5 1247 Operations For Period 0000 Hrs to 2400 Hrs on 19 Aug 2006 Phse Cls Op From To Hrs Depth Activity Description PH TP RO 0000 0030 0.50 2080.0m Finish replacing hydraulic motor on top drive. PH TP TI 0030 0200 1.50 2080.0m Lay down circ swedge. RIH with 1 stand to 1601m. Top drive hydraulic malfunction. POOH into casing. PH TP RO 0200 0400 2.00 2080.0m Repair unloader valve on top drive. PH P TI 0400 0500 1.00 2080.0m RIH. Wash and ream 6 stands to bottom (1763m). PH P TI 0500 0600 1.00 2080.0m Circulate and condition mud due to exessive cutting. Hole unloading. PH P RW 0600 0830 2.50 2080.0m Continue to wash and ream f/- 1763m to 2080m (4m fill). PH P CMD 0830 0900 0.50 2080.0m Pump sweep at 2080m and circulate clean prior to drilling out. PH P RS 0900 0930 0.50 2080.0m Continue to circulate while performing rig service. PH P DM 0930 2400 14.50 2202.0m Continue to drill drill 8 1/2 hole w/- geo pilot. Top Lotrobe Course Clastics 2124.5m max resitivity 13 ohms. Max gas 8 units, fluro 5%. Drill thru coal bed from 2173m to 2202m. Drill from 2080m to 2202m, 14.5 hrs, Rop: 8.4 m/hr, PP: 2690 psi, GPM: 550, RPM: 70, WOB: 20-30 Operations For Period 0000 Hrs to 0600 Hrs on 20 Aug 2006 Phse Cls Op From To Hrs Depth Activity Description PH DM 0000 0600 6.00 2315.0m (IN PROGRESS) Drill from 2202m to 2315m. WOB: 20/30, RPM: 70, GPM... [From:WELL_DAILY] B WELL_DRILL_HISTORY:304 20-AUG-06 2315.0 9999.99 Drill from 2202m to 2315m. Pump baralift sweeps as required. Pump 3 sweeps and circ hole clean. Pump out of hole f/- 2315m to 9 5/8 casing shoe at 1601m. Pump slug, install wiper rubber and pooh from 1601m to 359m Formation Tops Sequence Formation Name Top Depth (MD, (m)) Top Depth (TVD, (m)) Comment Wireline Depth (m) 1 Gippsland LMST 320.0 314.5 5.9L 2 Lakes Entrance 1880.0 962.1 3 Latrobe Coarse Clastics 2124.5 1171.8 1175.6 4 Latrobe N Asperus (Coal) 2196.0 1237.5 1247 Operations For Period 0000 Hrs to 2400 Hrs on 20 Aug 2006 Phse Cls Op From To Hrs Depth Activity Description PH P DM 0000 1530 15.50 2315.0m Drill from 2202m to 2315m. WOB: 20/30, RPM: 70, GPM: 550, PP: 2650, Rop: 14 m/h, Gas 33 units. Pump baralift sweeps as required. PH P RW 1530 1730 2.00 2315.0m Pump 3 sweeps and circ hole clean. PH P TOB 1730 2130 4.00 2315.0m Pump out of hole f/- 2315m to 9 5/8 casing shoe at 1601m. Mas O/P: 25klbs PH P TOB 2130 2400 2.50 2315.0m Pump slug, install wiper rubber and POOH from 1601m to 359m. Operations For Period 0000 Hrs to 0600 Hrs on 21 Aug 2006 Phse Cls Op From To Hrs Depth Activity Description PH TOB 0000 0100 1.00 2315.0m POOH to change bit & L/O Geo-Pilot Rotary Steerable assy and P/U GeoTap formation pressure tool. PH HT 0100 0230 1.50 2315.0m Safety meeting. Unload radioactive source from LWD tool. Download logging information. PH HT 0230 0400 1.50 2315.0m Safety meeting. Rackback MWD tools. Break bit and lay down Geo-Pilot. PH HT 0400 0600 2.00 2315.0m Safety meeting. Pick up new BHA (PDC Bit and Geo-Tap). General Comments Comments Rig Requirements Back load TCP equipment. Santos.. Santos.. DRILLING MORNING REPORT # 41 GALLOWAY-1 'Copyright IDS, 2006' AT 20060630, SANTOS_CBU_onshore_drllg Page 1 Printed on 21 Aug 2006 WBM Data Cost Today $ 6817 Cumulative Cost $ 17676... [From:WELL_DAILY] B WELL_DRILL_HISTORY:304 21-AUG-06 2271.0 9999.99 Pooh to directional tools. Unload radioactive source from LWD tools & download logging information. Break-out bit and lay down Geo-Pilot. Pick up new BHA (bit and Geo-Tap on pendulum ass'y). Install new batteries in RLL Tool. Load radioactive source RIH w/- BHA to 186m & shallow test MWD tools OK. RIH to 9 5/8 casing shoe 1601m. Slip & cut drilling line. RIH from 1893m to 2123m. Wash and ream from 2123m to 2133m. Correlate from 2123m to 2133m. Take 11 pressure points with GeoTap tool from 2126m to 2282mMDRT. Formation Tops Sequence Formation Name Top Depth (MD, (m)) Top Depth (TVD, (m)) Comment Wireline Depth (m) 1 Gippsland LMST 235.0 234.2 5.9m Low 2 Lakes Entrance 1880.0 962.9 3.6m High 3 Latrobe Coarse Clastics 2124.5 1173.5 12m Low 4 Latrobe N Asperus (Coal) 2196.0 1243.7 18m Low Operations For Period 0000 Hrs to 2400 Hrs on 21 Aug 2006 Phse Cls Op From To Hrs Depth Activity Description PH P TOB 0000 0100 1.00 2315.0m POOH to directional tools. PH P HT 0100 0230 1.50 2315.0m Safety meeting. Unload radioactive source from directional tool. Download logging information. PH P HT 0230 0400 1.50 2315.0m Safety meeting. Rack back MWD tools. Break bit and lay down Geo-Pilot. PH P HT 0400 0600 2.00 2315.0m Safety meeting. Pick up new BHA (Bit and Geo-Tap). Install new batteries in RLL Tool. PH P HBHA 0600 0730 1.50 2315.0m M/up bit RR7, sleeve, stab and Geo-Tap. PH P HT 0730 0800 0.50 2315.0m Load MWD data. PH P HT 0800 0830 0.50 2315.0m Load radioactive source PH P HBHA 0830 0900 0.50 2315.0m RIH w/- BHA to 186m. PH P HT 0900 0930 0.50 2315.0m Shallow test MWD tools ok. PH P TI 0930 1300 3.50 2315.0m RIH to 9 5/8 casing shoe 1601m PH P SC 1300 1400 1.00 2315.0m Slip 66' drilling line. Cut 117' drilling line. PH P RS 1400 1430 0.50 2315.0m Rig service PH P TI 1430 1500 0.50 2315.0m RIH from 1893m to 2123m. ... [From:WELL_DAILY] B WELL_DRILL_HISTORY:304 22-AUG-06 1996.0 9999.99 Finish running pressure surveys with Geo-Tap tool. Pump slug, pooh and lay down bha . M/up 2 7/8 Cement stinger,rih and spot cmt plugs no.1 and no.2. Circ btms up. Spot 30 bbls of high vis mud at 1996m Formation Tops Sequence Formation Name Top Depth (MD, (m)) Top Depth (TVD, (m)) Comment Wireline Depth (m) 1 Gippsland LMST 320.0 314.5 5.9m low 2 Lakes Entrance 1880.0 962.9 3.6m high 3 Latrobe Coarse Clastics 2124.5 1173.5 12m low 4 Latrobe N Asperus (Coal) 2196.0 1243.7 18m low Operations For Period 0000 Hrs to 2400 Hrs on 22 Aug 2006 Phse Cls Op From To Hrs Depth Activity Description PH P LOG 0000 0030 0.50 2315.0m Finish running pressure surveys with Geo-Tap tool. PH P CIR 0030 0130 1.00 2315.0m Circ & cond mud. Wait-on orders to P&A. PH P TO 0130 0530 4.00 2315.0m Pump slug and POOH to BHA PH P LDP 0530 0700 1.50 2315.0m Layout out HWDP 15 jnts. PH P HT 0700 0800 1.00 2315.0m Down load MWD Data and remove radioactive sources. PH P HBHA 0800 1030 2.50 2315.0m Lay out Geo-Tap, MWD & 8-1/2" bit. PH P TI 1030 1200 1.50 2315.0m M/up 2 7/8" cement stinger and RIH to 212m PH P TI 1200 1600 4.00 2315.0m Continue to RIH w/- P & A stinger to 9 5/8 casing shoe, 1601m. PH P CMD 1600 1630 0.50 2315.0m Break circulation and condition mud. PH P TO 1630 1830 2.00 2315.0m Continue to RIH w/- cement stinger to TD 2315m. C&C mud. PH P CMP 1830 2100 2.50 2315.0m Safety meeting. Install circ swedge. Pump 5 bbls of spacer and test lines to 3000 psi. Pump 5 bbls of spacer. Mix and pump 183 cf of cmt. Displace cmt with 98.5 bbls of mud. Pooh to 2150. and circ btms up. PH P CMP 2100 2300 2.00 2315.0m Rih to 2198m.S afety meeting. Install circ swedge. Pump 5 bbls of spacer and test lines to 3000 psi. Pump 5 bbls of spacer. Mix and pump 182 cf of cmt. Displace cmt with 92.9 bbls of mud. Pooh to 1996m. PH P CIR 2300 2400 1.00 23... [From:WELL_DAILY] B WELL_DRILL_HISTORY:304 23-AUG-06 1996.0 9999.99 Lay down Drill Collars. Test 13 3/8" x 9 5/8" annulus to 500psi over 20 ppg EMW - OK. Set cmt plugs #3 (Lakes Entrance) and #4 (9-5/8" shoe). Lay down drillpipe. RIH and tag plug #4 at 1504m. Test casing and plug No.4 to 1600psi - OK. POOH laying down drillpipe. Formation Tops Sequence Formation Name Top Depth (MD, (m)) Top Depth (TVD, (m)) Comment Wireline Depth (m) 0 Gippsland LMST 320.0 314.5 5.9m Low 0 Lakes Entrance 1880.0 962.9 3.6m High 0 Latrobe Coarse Clastics 2124.5 1173.5 12m Low 0 Latrobe N Asperus (Coal) 2196.0 1243.7 18m Low Operations For Period 0000 Hrs to 2400 Hrs on 23 Aug 2006 Phse Cls Op From To Hrs Depth Activity Description PA P TO 0000 0100 1.00 2315.0m POOH from 1996m to 1588m. PA P LDP 0100 0230 1.50 2315.0m RIH with 6 1/4" drill collars from 1588m to 1645m. POOH laying down drill collars. PA TP CIR 0230 0830 6.00 2315.0m Circulate and condition mud wait on cement. PA P CAT 0830 0900 0.50 2315.0m Pressure test 13 3/8" x 9 5/8" annulus to 1600 psi (500 psi over LOT) for 10 mins - OK. PH P CIR 0900 1000 1.00 2315.0m RIH to 1895m break circulation PA P CMP 1000 1100 1.00 2315.0m Hold PJSM. Pump 5 bbls spacer, test surface lines to 3000psi ok, pump 5 bbls spacer. Mix and pump 94.5 cu/ft 15.8ppg slurry, displace w/-79.3 bbls. Check back flow - static. PA P TO 1100 1130 0.50 2315.0m POOH f/- 1895m to 1750m . PA P CMD 1130 1200 0.50 2315.0m Circulate bottoms up at 1750m. PA P CMD 1200 1230 0.50 2315.0m Spot 30 bbl high vis spacer under plug #4. POOH to 1627m PA P CMP 1230 1330 1.00 2315.0m Hold PJSM. Install cement swedge.Pump 5 bbls spacer. Test surface lines to 3000psi - OK. Pump 5 bbls spacer. Mix and pump 303cu/ft 15.8ppg slurry. Displace w/-64.6 bbls. Check back flow - static PA P TO 1330 1400 0.50 2315.0m POOH F/-1627m to 1400m PA P CMD 1400 1500 1.00 2315.0m Circulate 2 x bottoms up PA ... [From:WELL_DAILY]
--- LISTING OF GEOGRAPHICALLY CLOSE WELLS TO THIS WELL ---
DISTANCE= 01.5 km (very approx) Onshore?=Y WELL_NAME= EAST REEVE-1 DISTANCE= 02.5 km (very approx) Onshore?=Y WELL_NAME= EAST SEACOMBE-1 DISTANCE= 06.7 km (very approx) Onshore?=Y WELL_NAME= SEACOMBE-1 DISTANCE= 07.6 km (very approx) Onshore?=Y WELL_NAME= PELICAN POINT-1 DISTANCE= 07.9 km (very approx) Onshore?=Y WELL_NAME= SEACOMBE SOUTH-1 DISTANCE= 08.0 km (very approx) Onshore?=Y WELL_NAME= SPOON BAY-1 DISTANCE= 08.5 km (very approx) Onshore?=Y WELL_NAME= GOON NURE-1 DISTANCE= 08.7 km (very approx) Onshore?=Y WELL_NAME= HOLLANDS LANDING-1 DISTANCE= 09.2 km (very approx) Onshore?=Y WELL_NAME= WRIXONDALE-1 DISTANCE= 09.9 km (very approx) Onshore?=N WELL_NAME= SEALION-1 DISTANCE= 10.2 km (very approx) Onshore?=Y WELL_NAME= ROMAWI-1 DISTANCE= 10.7 km (very approx) Onshore?=N WELL_NAME= WEST SEAHORSE-2 DISTANCE= 11.0 km (very approx) Onshore?=N WELL_NAME= WEST SEAHORSE-1 DISTANCE= 11.1 km (very approx) Onshore?=N WELL_NAME= WARDIE-1 DISTANCE= 11.1 km (very approx) Onshore?=N WELL_NAME= WEST SEAHORSE-3 DISTANCE= 12.3 km (very approx) Onshore?=Y WELL_NAME= WEST SEACOMBE-1 DISTANCE= 12.4 km (very approx) Onshore?=N WELL_NAME= SEAHORSE-2 DISTANCE= 12.4 km (very approx) Onshore?=Y WELL_NAME= OIL SEARCH BENGWORDEN-2 DISTANCE= 12.9 km (very approx) Onshore?=N WELL_NAME= SEAHORSE-1 DISTANCE= 14.1 km (very approx) Onshore?=Y WELL_NAME= DUCK BAY-1 DISTANCE= 14.4 km (very approx) Onshore?=Y WELL_NAME= FAIRHOPE-1 DISTANCE= 14.7 km (very approx) Onshore?=Y WELL_NAME= OIL SEARCH BENGWORDEN-1 DISTANCE= 14.8 km (very approx) Onshore?=Y WELL_NAME= INVESTIGATOR-1 DISTANCE= 15.3 km (very approx) Onshore?=N WELL_NAME= HARLEQUIN-1 DISTANCE= 15.3 km (very approx) Onshore?=Y WELL_NAME= COMLEY-1 DISTANCE= 15.4 km (very approx) Onshore?=Y WELL_NAME= SPERM WHALE HEAD-1 DISTANCE= 16.1 km (very approx) Onshore?=Y WELL_NAME= WELLINGTON PARK-1
DISTANCE to non-petroleum deep borehole= 02.1 km (very approx) BOREHOLE_SITE_ID=SIT90613 : BOREHOLE_NAME=SEACOMBE 6 (Depth=148.1) DISTANCE to non-petroleum deep borehole= 08.0 km (very approx) BOREHOLE_SITE_ID=SIT90614 : BOREHOLE_NAME=SEACOMBE 7 (Depth=1246.39) DISTANCE to non-petroleum deep borehole= 08.6 km (very approx) BOREHOLE_SITE_ID=SIT49508 : BOREHOLE_NAME=BENGWORDEN SOUTH 3 (Depth=140.208) DISTANCE to non-petroleum deep borehole= 08.7 km (very approx) BOREHOLE_SITE_ID=SIT65761 : BOREHOLE_NAME=GOON NURE 5 (Depth=173) DISTANCE to non-petroleum deep borehole= 08.8 km (very approx) BOREHOLE_SITE_ID=SIT65760 : BOREHOLE_NAME=GOON NURE 4 (Depth=174) DISTANCE to non-petroleum deep borehole= 09.7 km (very approx) BOREHOLE_SITE_ID=SIT49443 : BOREHOLE_NAME=BENGWORDEN 5 (Depth=155) DISTANCE to non-petroleum deep borehole= 10.9 km (very approx) BOREHOLE_SITE_ID=SIT65763 : BOREHOLE_NAME=GOON NURE 9 (Depth=1031.75) DISTANCE to non-petroleum deep borehole= 11.0 km (very approx) BOREHOLE_SITE_ID=SIT65764 : BOREHOLE_NAME=GOON NURE 10 (Depth=123.8) DISTANCE to non-petroleum deep borehole= 11.4 km (very approx) BOREHOLE_SITE_ID=SIT49511 : BOREHOLE_NAME=BENGWORDEN SOUTH 6 (Depth=1234) DISTANCE to non-petroleum deep borehole= 11.9 km (very approx) BOREHOLE_SITE_ID=SIT65759 : BOREHOLE_NAME=GOON NURE 3 (Depth=121.92) DISTANCE to non-petroleum deep borehole= 12.0 km (very approx) BOREHOLE_SITE_ID=SIT49442 : BOREHOLE_NAME=BENGWORDEN 4 (Depth=123.444) DISTANCE to non-petroleum deep borehole= 12.9 km (very approx) BOREHOLE_SITE_ID=SIT49509 : BOREHOLE_NAME=BENGWORDEN SOUTH 4 (Depth=123.444) DISTANCE to non-petroleum deep borehole= 13.3 km (very approx) BOREHOLE_SITE_ID=SIT951158 : BOREHOLE_NAME=MOORMURNG 20004 (Depth=118) DISTANCE to non-petroleum deep borehole= 13.5 km (very approx) BOREHOLE_SITE_ID=SIT320334 : BOREHOLE_NAME=MOORMURNG 8042 (Depth=118) DISTANCE to non-petroleum deep borehole= 14.0 km (very approx) BOREHOLE_SITE_ID=SIT46967 : BOREHOLE_NAME=BAIRNSDALE 8 (Depth=111.2) DISTANCE to non-petroleum deep borehole= 15.2 km (very approx) BOREHOLE_SITE_ID=SIT46966 : BOREHOLE_NAME=BAIRNSDALE 7 (Depth=121.92) DISTANCE to non-petroleum deep borehole= 15.3 km (very approx) BOREHOLE_SITE_ID=SIT46994 : BOREHOLE_NAME=BAIRNSDALE 10002 (Depth=106.68) DISTANCE to non-petroleum deep borehole= 15.6 km (very approx) BOREHOLE_SITE_ID=SIT49507 : BOREHOLE_NAME=BENGWORDEN SOUTH 2 (Depth=139.294) DISTANCE to non-petroleum deep borehole= 15.7 km (very approx) BOREHOLE_SITE_ID=SIT300999 : BOREHOLE_NAME=BAIRNSDALE 4 (Depth=435.86) DISTANCE to non-petroleum deep borehole= 15.8 km (very approx) BOREHOLE_SITE_ID=SIT46974 : BOREHOLE_NAME=BAIRNSDALE 8007 (Depth=166.12) DISTANCE to non-petroleum deep borehole= 15.8 km (very approx) BOREHOLE_SITE_ID=SIT47063 : BOREHOLE_NAME=BAIRNSDALE 15005 (Depth=619.25) DISTANCE to non-petroleum deep borehole= 16.1 km (very approx) BOREHOLE_SITE_ID=SIT47016 : BOREHOLE_NAME=BAIRNSDALE 10024 (Depth=137.19)
SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = GB81A-06A SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = GB82A-06A SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = GWS65B-IV-1 SDO: HISTORICAL TITLES: 1. ENCLOSING GALLOWAY-1 : TITLE_NAME=GEP06-27 SDO: HISTORICAL TITLES: 1. ENCLOSING GALLOWAY-1 : TITLE_NAME=GEP24 SDO: HISTORICAL TITLES: 1. ENCLOSING GALLOWAY-1 : TITLE_NAME=PEP137 SDO: HISTORICAL TITLES: 1. ENCLOSING GALLOWAY-1 : TITLE_NAME=PEP157 SDO: HISTORICAL TITLES: 2. NEAR GALLOWAY-1 : TITLE_NAME=CRAP2 : Distance=8.83 SDO: HISTORICAL TITLES: 2. NEAR GALLOWAY-1 : TITLE_NAME=GEP06-27 : Distance=0 SDO: HISTORICAL TITLES: 2. NEAR GALLOWAY-1 : TITLE_NAME=GEP24 : Distance=0 SDO: HISTORICAL TITLES: 2. NEAR GALLOWAY-1 : TITLE_NAME=PEP107 : Distance=3.47 SDO: HISTORICAL TITLES: 2. NEAR GALLOWAY-1 : TITLE_NAME=PEP136 : Distance=.44 SDO: HISTORICAL TITLES: 2. NEAR GALLOWAY-1 : TITLE_NAME=PEP137 : Distance=0 SDO: HISTORICAL TITLES: 2. NEAR GALLOWAY-1 : TITLE_NAME=PEP156 : Distance=.44 SDO: HISTORICAL TITLES: 2. NEAR GALLOWAY-1 : TITLE_NAME=PEP157 : Distance=0 SDO: HISTORICAL TITLES: 2. NEAR GALLOWAY-1 : TITLE_NAME=PEP38 : Distance=13.73 SDO: HISTORICAL TITLES: 2. NEAR GALLOWAY-1 : TITLE_NAME=PEP42 : Distance=.5 SDO: HISTORICAL TITLES: 2. NEAR GALLOWAY-1 : TITLE_NAME=VIC/L18 : Distance=12.78 SDO: HISTORICAL TITLES: 2. NEAR GALLOWAY-1 : TITLE_NAME=VIC/P1 : Distance=13.84 SDO: HISTORICAL TITLES: 2. NEAR GALLOWAY-1 : TITLE_NAME=VIC/P1 : Distance=13.97 SDO: HISTORICAL TITLES: 2. NEAR GALLOWAY-1 : TITLE_NAME=VIC/P11 : Distance=.5 SDO: HISTORICAL TITLES: 2. NEAR GALLOWAY-1 : TITLE_NAME=VIC/P11 : Distance=6.04 SDO: HISTORICAL TITLES: 2. NEAR GALLOWAY-1 : TITLE_NAME=VIC/P11(V) : Distance=.5 SDO: HISTORICAL TITLES: 2. NEAR GALLOWAY-1 : TITLE_NAME=VIC/P27 : Distance=8.82 SDO: HISTORICAL TITLES: 2. NEAR GALLOWAY-1 : TITLE_NAME=VIC/P27(V) : Distance=8.88 SDO: HISTORICAL TITLES: 2. NEAR GALLOWAY-1 : TITLE_NAME=VIC/P39(V) : Distance=.39 SDO: HISTORICAL TITLES: 2. NEAR GALLOWAY-1 : TITLE_NAME=VIC/P40 : Distance=5.98 SDO: HISTORICAL TITLES: 2. NEAR GALLOWAY-1 : TITLE_NAME=VIC/P57 : Distance=6.03 SDO: HISTORICAL TITLES: 2. NEAR GALLOWAY-1 : TITLE_NAME=VIC/P8 : Distance=.5 SDO: HISTORICAL TITLES: 2. NEAR GALLOWAY-1 : TITLE_NAME=VIC/RL1(V) : Distance=10.3 SDO: HISTORICAL TITLES: 2. NEAR GALLOWAY-1 : TITLE_NAME=VIC/RL1(V) : Distance=10.31
ASSETS (DETAIL) GENERAL ESUBS_CD_DVD PE911536 a DDRs, Well & Permit Data 2005 to 2007 [DVD] (3259 DIGITAL FILES) ASSETS (DETAIL) GENERAL ESUBS_CD_DVD PE911536 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes) ASSETS (DETAIL) GENERAL ESUBS_CD_DVD PE911536 c DESC=Daily Drilling reports, Well Data & Permit Data for the years 2005 to 2007. Reports submitted via email to DPI. Saved by Kourosh Mehin, Mary Jane, Hannah Wallace. NOTE! Some files corrupted. See Remarks. ASSETS (DETAIL) GENERAL REGISTRY_FILE F7705129 a VIC/P39(V)/3/A 1 Registry File [PAPER] ASSETS (DETAIL) GENERAL REGISTRY_FILE F7705129 b (located in::RECFINDD= SEE RECFIND DATABASE) ASSETS (DETAIL) GENERAL REGISTRY_FILE F7705129 c DESC=VIC/P39(V)/3/A 1 OFFSHORE EXPLORATION PERMIT VIC/P39(V) PETROLEUM (SUBMERGED LANDS) ACT 1982 (Vic) YEAR 3 WELL A GALLOWAY-1 ASSETS (DETAIL) GENERAL REGISTRY_FILE F7705129 d WELL_NAME=GALLOWAY-1 ASSETS (DETAIL) GENERAL REGISTRY_FILE F7743121 a IR/04/0292 Registry File [PAPER] ASSETS (DETAIL) GENERAL REGISTRY_FILE F7743121 b (located in::COMPACTUS_1= COMPACTUS_1 55 Collins St) ASSETS (DETAIL) GENERAL REGISTRY_FILE F7743121 c DESC=IR/04/0292 Registry File: INDUSTRY REGULATION LICENSING, LEASING AND PERMITS PETROLEUM EXPLORATION WELL VIC/P39(V) GALLOWAY-1 (W1474) ASSETS (DETAIL) GENERAL REGISTRY_FILE F7743121 d WELL_NAME=GALLOWAY-1 ASSETS (DETAIL) TITLE ANNUAL_RPT PE501019 a VIC/P39(v) Permit Year 4 Annual Report [CD] ASSETS (DETAIL) TITLE ANNUAL_RPT PE501019 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes) ASSETS (DETAIL) TITLE ANNUAL_RPT PE501019 c DESC=VIC/P39(v) Permit Year 4 Annual Report For Year to 20 April 07 to 19-Apr-0816 June 1998 with Geological and Geophysical Studies. For Santos. 1st Apr 08. Plus GALLOWAY-1 Petrophysical Report ASSETS (DETAIL) TITLE ANNUAL_RPT PE501019 d WELL_NAME=GALLOWAY-1 ASSETS (DETAIL) WELL DAILY_RPT PE911536_5 a Daily Drilling, Geol, Workover, Mud Rpts [DVD] (3259 DIGITAL FILES) ASSETS (DETAIL) WELL DAILY_RPT PE911536_5 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007) ASSETS (DETAIL) WELL DAILY_RPT PE911536_5 c DESC=Daily Drilling, Geol, Workover, Mud Reports, 2005-2007. ASSETS (DETAIL) WELL DAILY_RPT PE915276 a GALLOWAY-1 Drilling & Workover Rpts [CD] (279 DIGITAL FILES) ASSETS (DETAIL) WELL DAILY_RPT PE915276 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes) ASSETS (DETAIL) WELL DAILY_RPT PE915276 c DESC=GALLOWAY-1 Daily Drilling, Daily Geology, Well Logs & Workover Reports. July 2006. Santos ASSETS (DETAIL) WELL DAILY_RPT PE915276 d WELL_NAME=GALLOWAY-1 ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 a Geodetic Survey Data [DVD] (3259 DIGITAL FILES) ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007) ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 c DESC=Geodetic Survey Data. ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=BASKER-2 ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=BASKER-4 ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=BASKER-5 ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=BREAM-A19A ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=BREAM-A6A ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=BREAM-A9B ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=GALLOWAY-1 ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=GLENAIRE-1 ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=GLENAIRE-1 ST1 ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=HAZELWOOD-1 ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=LONGTOM-3 ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=LONGTOM-3 ST1 ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=LONGTOM-3H ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=LONGTOM-3P ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=MANTA-2A ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=WEST KINGFISH-W18A ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=WEST KINGFISH-W19A ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=WEST KINGFISH-W20A ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=WEST KINGFISH-W21A ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=WEST KINGFISH-W23A ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=WEST KINGFISH-W31A ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=WEST KINGFISH-W6A ASSETS (DETAIL) WELL DIRECTIONAL PE912197_045 a GALLOWAY-1 deviation survey data [CD] PE912197__((_GALLOWAY-1_WCR_BASIC_DATA_))_.TAR.GZ(25.4m)......... PE912197__((_GALLOWAY-1_WCR_BASIC_DATA_))_.TAR.GZ(25.4m)......... SAM2_381_PE912197__((_GALLOWAY-1_WCR_BASIC_DATA_))_I_MEDIA_LABELLING.JPG(2.7m)......... PE912197__((_GALLOWAY-1_WCR_BASIC_DATA_))__FILES_LISTING.TXT(0.0m)......... PE912197__((_GALLOWAY-1_WCR_BASIC_DATA_))__FILES_LISTING.TXT(0.0m)......... ASSETS (DETAIL) WELL DIRECTIONAL PE912197_045 b (located in::PE912197= WCR Gallaway-1) ASSETS (DETAIL) WELL DIRECTIONAL PE912197_045 c DESC=GALLOWAY-1 deviation survey data, 3 pages, 99 rows of data ASSETS (DETAIL) WELL DIRECTIONAL PE912197_045 d WELL_NAME=GALLOWAY-1 ASSETS (DETAIL) WELL DRILL_RPT PE911536_9 a Drilling Data, Logs, TD Curves & Reports [DVD] (3259 DIGITAL FILES) ASSETS (DETAIL) WELL DRILL_RPT PE911536_9 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007) ASSETS (DETAIL) WELL DRILL_RPT PE911536_9 c DESC=Drilling Data, Logs, TD Curves & Reports. ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 a Digital Well Logs [DVD] (3259 DIGITAL FILES) ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007) ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 c DESC=Digital Well Logs. In LAS format. ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=BREAM-A19A ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=BREAM-A6A ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=BREAM-A9B ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=CHILDERS COVE-1 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=CRC-1 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=FUR SEAL-1 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=GALLOWAY-1 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=GILBERT-1 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=GLENAIRE-1 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=GLENAIRE-1 ST1 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=LONGTOM-3 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=LONGTOM-3 ST1 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=LONGTOM-3H ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=LONGTOM-3P ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=MACLEAN-1 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=MEGASCOLIDES-1 RE ST1 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=PATROBUS-1 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=WEST KINGFISH-W18A ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=WEST KINGFISH-W19A ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=WEST KINGFISH-W20A ASSETS (DETAIL) WELL PETROLOGY_RPT PE501019_1 a GALLOWAY-1 Petrophysics Analysis [CD] ASSETS (DETAIL) WELL PETROLOGY_RPT PE501019_1 b (located in::PE501019= VIC/P39(v) Permit Year 4 Annual Report) ASSETS (DETAIL) WELL PETROLOGY_RPT PE501019_1 c DESC=GALLOWAY-1 Petrophysics Analysis Santos Sep 2006 ASSETS (DETAIL) WELL PETROLOGY_RPT PE501019_1 d WELL_NAME=GALLOWAY-1 ASSETS (DETAIL) WELL PROPOSAL_RPT PE907846 a Logistics Proposal Rig 32 Relocation [PAPER] ASSETS (DETAIL) WELL PROPOSAL_RPT PE907846 b (located in::PE182177= Exploration Well Box 11) ASSETS (DETAIL) WELL PROPOSAL_RPT PE907846 c DESC=Logistics Proposal for Ensign International Energy Services Rig #32 Relocation: Fly Lake to Galloway; Glenaire to Galloway; Adelaide to Galloway; Galloway to Glenaire. Neil Mansell Transport ASSETS (DETAIL) WELL PROPOSAL_RPT PE907846 d WELL_NAME=GALLOWAY-1 ASSETS (DETAIL) WELL PROPOSAL_RPT PE907846 d WELL_NAME=GLENAIRE-1 ASSETS (DETAIL) WELL RPT PE911536_13 a Abandonment Programs, P&A Approvals [DVD] (3259 DIGITAL FILES) ASSETS (DETAIL) WELL RPT PE911536_13 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007) ASSETS (DETAIL) WELL RPT PE911536_13 c DESC=Abandonment Programs, Suspensions and P&A Approval Letters. In DOC & PDF formats. ASSETS (DETAIL) WELL RPT PE911536_13 d WELL_NAME=BANJO-1 ASSETS (DETAIL) WELL RPT PE911536_13 d WELL_NAME=CHILDERS COVE-1 ASSETS (DETAIL) WELL RPT PE911536_13 d WELL_NAME=FUR SEAL-1 ASSETS (DETAIL) WELL RPT PE911536_13 d WELL_NAME=GALLOWAY-1 ASSETS (DETAIL) WELL RPT PE911536_13 d WELL_NAME=LOY YANG-2 ASSETS (DETAIL) WELL RPT PE911536_13 d WELL_NAME=MANTA-2 ASSETS (DETAIL) WELL RPT PE911536_13 d WELL_NAME=MEGASCOLIDES-1 RE ST1 ASSETS (DETAIL) WELL RPT PE911536_13 d WELL_NAME=MEGASCOLIDES-2 ASSETS (DETAIL) WELL WCR_RPT PE912197 a GALLOWAY-1 WCR Basic Data [CD] PE912197__((_GALLOWAY-1_WCR_BASIC_DATA_))_.TAR.GZ(25.4m)......... PE912197__((_GALLOWAY-1_WCR_BASIC_DATA_))_.TAR.GZ(25.4m)......... SAM2_381_PE912197__((_GALLOWAY-1_WCR_BASIC_DATA_))_I_MEDIA_LABELLING.JPG(2.7m)......... PE912197__((_GALLOWAY-1_WCR_BASIC_DATA_))__FILES_LISTING.TXT(0.0m)......... PE912197__((_GALLOWAY-1_WCR_BASIC_DATA_))__FILES_LISTING.TXT(0.0m)......... ASSETS (DETAIL) WELL WCR_RPT PE912197 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes) ASSETS (DETAIL) WELL WCR_RPT PE912197 c DESC=GALLOWAY-1 Santos. Well Completion Report. Basic Well Data. ASSETS (DETAIL) WELL WCR_RPT PE912197 d WELL_NAME=GALLOWAY-1 ASSETS (DETAIL) WELL WCR_RPT PE912197 d WELL_NAME=GALLOWAY-1 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL WCR_RPT PE912198 a GALLOWAY-1 WCR Interpreted Data [CD] PE912198__((_GALLOWAY-1_WCR_INTERPRETED_DATA_))_.TAR.GZ(10.1m)......... SAM2_382_PE912198__((_GALLOWAY-1_WCR_INTERPRETED_DATA_))_I_MEDIA_LABELLING.JPG(2.7m)......... PE912198__((_GALLOWAY-1_WCR_INTERPRETED_DATA_))__FILES_LISTING.TXT(0.0m)......... ASSETS (DETAIL) WELL WCR_RPT PE912198 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes) ASSETS (DETAIL) WELL WCR_RPT PE912198 c DESC=GALLOWAY-1 Santos. Well Completion Report. Interpreted Well Data. ASSETS (DETAIL) WELL WCR_RPT PE912198 d WELL_NAME=GALLOWAY-1 ASSETS (DETAIL) WELL WELL_LOG PE911536_14 a Well Log Images [DVD] (3259 DIGITAL FILES) ASSETS (DETAIL) WELL WELL_LOG PE911536_14 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007) ASSETS (DETAIL) WELL WELL_LOG PE911536_14 c DESC=Well Log Images.
GALLOWAY_1_DIR OIL_CO_DATA:1: DEVIATION SRVY 01 SURVEY_ID =GALLOWAY_1_DIR GALLOWAY_1_DIR OIL_CO_DATA:1: DEVIATION SRVY 02 SURVEY_COMPANY =Halliburton GALLOWAY_1_DIR OIL_CO_DATA:1: DEVIATION SRVY 03 SURVEY_DATE =22-AUG-06 GALLOWAY_1_DIR OIL_CO_DATA:1: DEVIATION SRVY 05 SURVEY_TYPE =DIR GALLOWAY_1_DIR OIL_CO_DATA:1: DEVIATION SRVY 06 STORAGE_UNIT =Metres GALLOWAY_1_DIR OIL_CO_DATA:1: DEVIATION SRVY 09 COMPUTE_METHOD =MC GALLOWAY_1_DIR OIL_CO_DATA:1: DEVIATION SRVY 10 EW_MAGNETIC_DECLINATION =U GALLOWAY_1_DIR OIL_CO_DATA:1: DEVIATION SRVY 11 MAGNETIC_DECLINATION =13.14 GALLOWAY_1_DIR OIL_CO_DATA:1: DEVIATION SRVY 13 AZIMUTH_NORTH_TYPE =G GALLOWAY_1_DIR OIL_CO_DATA:1: DEVIATION SRVY 14 TOP_DEPTH =68.73 GALLOWAY_1_DIR OIL_CO_DATA:1: DEVIATION SRVY 16 BASE_DEPTH =2315 GALLOWAY_1_DIR OIL_CO_DATA:1: DEVIATION SRVY 18 SOURCE =OIL_CO_DATA GALLOWAY_1_DIR OIL_CO_DATA:1: DEVIATION SRVY 20 REMARK =Data Source PE912197 page 45. 99 Points. GALLOWAY_1_DIR OIL_CO_DATA:1: DEVIATION SRVY 21 POINT COUNT = 99 GALLOWAY_1_DIR OIL_CO_DATA:2: DEVIATION SRVY STATION_MD INCLINATION AZIMUTH STATION_ID STATION_TVD X_OFFSET Y_OFFSET VERTICAL_SECTION NS_DIRECTION EW_DIRECTION DOG_LEG_SEVERITY REMARK GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0069 68.7 .22 154.7 68.72983 .06 .12 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0090 89.7 .64 277.76 89.73943 .04 .14 S W GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0118 118.3 .63 112.18 118.30882 .06 .18 S W GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0125 125.3 .31 210.53 125.38865 .03 .21 S W GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0147 146.5 1.33 135.42 146.54654 .11 .43 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0163 163.2 2.41 112.53 163.18764 .57 .7 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0176 175.9 2.7 134.29 175.8753 1.03 1.02 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0190 190.2 4.4 115.22 190.14781 1.77 1.49 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0205 204.7 5.78 113.55 204.62017 2.95 2.01 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0220 219.7 8.44 111.19 219.47375 4.66 2.71 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0234 233.5 10.9 113.04 233.15552 6.82 3.6 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0248 247.7 13.99 113.35 246.94207 9.62 4.79 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0262 261.5 16.6 112.23 260.33897 12.99 6.21 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0277 276.5 19.07 117.09 274.55116 17.14 8.13 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0291 291.2 21.66 120.03 288.36903 21.64 10.59 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0304 303.7 23.23 118.68 299.86637 25.78 12.91 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0325 325.2 22.4 120.78 319.69455 33.02 17.05 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0334 334.1 23.32 120.73 327.88529 35.99 18.81 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0342 341.6 24.17 120.94 334.77779 38.6 20.37 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0354 354.3 25.45 121.32 346.35986 43.18 23.14 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0369 368.8 26.91 120.74 359.32714 48.64 26.42 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0383 382.5 29.25 120.44 371.43134 54.2 29.71 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0399 398.5 32.8 120.73 385.08883 61.27 33.89 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0412 411.7 34.8 121.09 396.13206 67.61 37.69 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0426 426.3 36.07 120.21 408.00315 74.88 41.99 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0442 441.5 39.04 119.3 420.04405 82.92 46.58 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0454 454.1 41.35 119.26 429.69085 90.03 50.57 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0470 470.2 44.59 118.69 441.41866 99.59 55.86 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0484 483.6 47.79 188.33 451.35347 103.24 63.54 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0498 498.4 50.43 118.3 461.71246 107.76 72.23 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0512 512.2 53.16 117.92 470.24665 117.32 77.34 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0528 527.6 56.02 117.93 479.15726 128.4 83.21 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0541 541.3 58.57 119.1 486.58074 138.56 88.73 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0556 556.0 60.63 119.75 493.98873 149.55 94.93 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0571 570.6 62.05 120.65 501.01017 160.66 101.4 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0585 584.8 64.27 121.3 507.44371 171.56 107.94 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0599 598.8 66.35 122.11 513.28721 182.37 114.62 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0614 613.5 68.65 121.68 518.9123 193.9 121.8 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0622 622.2 70.37 121.24 521.94708 200.83 126.03 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0655 654.8 71.72 121.17 532.52315 227.16 141.99 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0684 683.7 70.55 121.69 541.89342 250.56 156.29 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0713 712.7 70.35 122.39 551.58439 273.7 170.77 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0742 741.7 71.06 123.87 561.15742 296.59 185.71 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0771 770.6 71.98 125.52 570.33111 319.16 201.33 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0800 799.6 73.81 126.25 578.84867 341.58 217.56 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0829 828.5 73.62 125.41 586.96122 364.1 233.81 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0857 857.4 72.83 124.33 595.31387 386.83 249.65 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0886 886.4 71.86 122.55 604.09147 409.84 264.85 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0915 915.3 70.94 122.36 613.31887 432.98 279.57 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0944 944.3 71.53 122.47 622.64455 456.15 294.28 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 0973 973.2 72.75 121.46 631.51413 479.5 308.85 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1002 1002.2 72.51 119.57 640.16656 503.33 322.89 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1031 1031.2 72.38 117.86 648.89908 527.53 336.15 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1060 1060.1 71.85 117 657.79303 551.99 348.85 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1089 1089.0 71.39 116.01 666.9122 576.55 361.1 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1118 1118.0 71.67 115.22 676.08709 601.32 372.97 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1147 1147.0 71.72 114.43 685.18598 626.28 384.52 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1176 1175.9 71.38 114.73 694.34483 651.25 395.94 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1205 1204.9 71.66 115.31 703.53078 676.15 407.57 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1234 1233.8 71.8 114.62 712.60343 701.07 419.16 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1263 1262.8 72.05 114.78 721.5793 726.05 430.66 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1292 1291.7 72.51 114.84 730.39675 751.1 442.24 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1321 1320.7 72 115.71 739.21419 776.02 454 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1350 1349.5 71.48 115.11 748.26006 800.78 465.76 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1378 1378.3 70.75 115.43 757.58171 825.42 477.4 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1407 1407.2 70.63 115.67 767.1185 849.98 489.13 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1436 1436.0 70.95 116.59 776.60794 874.43 501.13 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1465 1464.9 71.22 116.99 785.96013 898.79 513.43 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1494 1493.7 71.07 117.29 795.27403 923.06 525.87 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1523 1522.5 71.02 117.07 804.64525 947.34 538.33 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1551 1551.4 70.95 118.07 814.03873 971.5 550.95 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1580 1580.2 71.07 117.93 823.4136 995.55 563.74 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1596 1596.1 71.07 117.39 828.56855 1008.86 570.72 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1620 1620.1 71.72 118.44 836.24485 1029.01 581.39 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1648 1647.7 69.84 118.53 845.34014 1051.94 593.83 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1677 1677.3 67.72 119.25 856.03889 1076.07 607.15 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1706 1706.3 64.96 118.42 867.65582 1099.29 619.93 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1735 1735.2 61.92 118.32 880.60332 1122.08 632.24 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1764 1764.1 58.81 117.25 894.90204 1144.32 643.96 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1793 1793.1 55.54 117.44 910.59841 1165.93 655.14 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1822 1822.1 51.89 116.24 927.74043 1186.76 665.68 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1851 1851.0 47.98 115.64 946.36432 1206.67 675.37 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1880 1880.0 44.71 114.61 966.3672 1225.65 684.28 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1909 1908.9 41.14 113.88 987.5551 1243.62 692.38 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1938 1937.9 37.77 114.06 1009.88943 1260.41 699.84 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1967 1966.8 33.71 114.22 1033.39877 1275.85 706.76 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 1996 1995.7 30.21 114.36 1057.90575 1289.79 713.05 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 2025 2024.6 26.31 113.76 1083.34744 1302.27 718.63 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 2053 2053.4 22.08 113.22 1109.6116 1313.1 723.34 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 2082 2082.2 19.06 112.8 1136.60975 1322.42 727.3 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 2111 2111.1 15.99 111.66 1164.10795 1330.45 730.59 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 2140 2139.9 13.1 108.53 1192.03081 1337.25 733.1 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 2169 2168.7 9.86 104.21 1220.2612 1342.74 734.74 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 2198 2197.6 6.92 99.24 1248.79968 1346.85 735.63 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 2226 2226.4 3.33 92.87 1277.50993 1349.4 735.95 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 2255 2255.2 1.11 90.43 1306.28652 1350.51 735.99 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 2284 2284.1 .92 88.16 1335.11198 1351.03 735.99 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 2304 2303.7 1.19 92.86 1354.74864 1351.39 735.99 S E GALLOWAY_1_DIR OIL_CO_DATA:3: DEVIATION SRVY 2315 2315.0 1.19 92.86 1366.00621 1351.62 736 S E GALLOWAY_1_MASTER MASTER:1: DEVIATION SRVY 01 SURVEY_ID =GALLOWAY_1_MASTER GALLOWAY_1_MASTER MASTER:1: DEVIATION SRVY 02 SURVEY_COMPANY =Halliburton GALLOWAY_1_MASTER MASTER:1: DEVIATION SRVY 03 SURVEY_DATE =22-AUG-06 GALLOWAY_1_MASTER MASTER:1: DEVIATION SRVY 05 SURVEY_TYPE =DIR GALLOWAY_1_MASTER MASTER:1: DEVIATION SRVY 06 STORAGE_UNIT =Metres GALLOWAY_1_MASTER MASTER:1: DEVIATION SRVY 09 COMPUTE_METHOD =MC GALLOWAY_1_MASTER MASTER:1: DEVIATION SRVY 10 EW_MAGNETIC_DECLINATION =U GALLOWAY_1_MASTER MASTER:1: DEVIATION SRVY 11 MAGNETIC_DECLINATION =13.14 GALLOWAY_1_MASTER MASTER:1: DEVIATION SRVY 13 AZIMUTH_NORTH_TYPE =G GALLOWAY_1_MASTER MASTER:1: DEVIATION SRVY 14 TOP_DEPTH =68.73 GALLOWAY_1_MASTER MASTER:1: DEVIATION SRVY 16 BASE_DEPTH =2315 GALLOWAY_1_MASTER MASTER:1: DEVIATION SRVY 18 SOURCE =MASTER GALLOWAY_1_MASTER MASTER:1: DEVIATION SRVY 18 SOURCE =MASTER [Note: surveys with a SOURCE of MASTER should usually be just a copy of one of the original surveys run in the well. The MASTER survey is used by the database to display/calculate well paths etc] GALLOWAY_1_MASTER MASTER:1: DEVIATION SRVY 20 REMARK =Data Source PE912197 page 45. 99 Points. GALLOWAY_1_MASTER MASTER:1: DEVIATION SRVY 21 POINT COUNT = 99 GALLOWAY_1_MASTER MASTER:2: DEVIATION SRVY STATION_MD INCLINATION AZIMUTH STATION_ID STATION_TVD X_OFFSET Y_OFFSET VERTICAL_SECTION NS_DIRECTION EW_DIRECTION DOG_LEG_SEVERITY REMARK GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0069 68.7 .22 154.7 68.72983 .06 .12 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0090 89.7 .64 277.76 89.73943 .04 .14 S W GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0118 118.3 .63 112.18 118.30882 .06 .18 S W GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0125 125.3 .31 210.53 125.38865 .03 .21 S W GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0147 146.5 1.33 135.42 146.54654 .11 .43 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0163 163.2 2.41 112.53 163.18764 .57 .7 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0176 175.9 2.7 134.29 175.8753 1.03 1.02 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0190 190.2 4.4 115.22 190.14781 1.77 1.49 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0205 204.7 5.78 113.55 204.62017 2.95 2.01 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0220 219.7 8.44 111.19 219.47375 4.66 2.71 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0234 233.5 10.9 113.04 233.15552 6.82 3.6 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0248 247.7 13.99 113.35 246.94207 9.62 4.79 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0262 261.5 16.6 112.23 260.33897 12.99 6.21 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0277 276.5 19.07 117.09 274.55116 17.14 8.13 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0291 291.2 21.66 120.03 288.36903 21.64 10.59 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0304 303.7 23.23 118.68 299.86637 25.78 12.91 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0325 325.2 22.4 120.78 319.69455 33.02 17.05 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0334 334.1 23.32 120.73 327.88529 35.99 18.81 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0342 341.6 24.17 120.94 334.77779 38.6 20.37 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0354 354.3 25.45 121.32 346.35986 43.18 23.14 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0369 368.8 26.91 120.74 359.32714 48.64 26.42 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0383 382.5 29.25 120.44 371.43134 54.2 29.71 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0399 398.5 32.8 120.73 385.08883 61.27 33.89 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0412 411.7 34.8 121.09 396.13206 67.61 37.69 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0426 426.3 36.07 120.21 408.00315 74.88 41.99 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0442 441.5 39.04 119.3 420.04405 82.92 46.58 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0454 454.1 41.35 119.26 429.69085 90.03 50.57 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0470 470.2 44.59 118.69 441.41866 99.59 55.86 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0484 483.6 47.79 188.33 451.35347 103.24 63.54 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0498 498.4 50.43 118.3 461.71246 107.76 72.23 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0512 512.2 53.16 117.92 470.24665 117.32 77.34 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0528 527.6 56.02 117.93 479.15726 128.4 83.21 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0541 541.3 58.57 119.1 486.58074 138.56 88.73 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0556 556.0 60.63 119.75 493.98873 149.55 94.93 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0571 570.6 62.05 120.65 501.01017 160.66 101.4 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0585 584.8 64.27 121.3 507.44371 171.56 107.94 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0599 598.8 66.35 122.11 513.28721 182.37 114.62 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0614 613.5 68.65 121.68 518.9123 193.9 121.8 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0622 622.2 70.37 121.24 521.94708 200.83 126.03 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0655 654.8 71.72 121.17 532.52315 227.16 141.99 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0684 683.7 70.55 121.69 541.89342 250.56 156.29 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0713 712.7 70.35 122.39 551.58439 273.7 170.77 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0742 741.7 71.06 123.87 561.15742 296.59 185.71 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0771 770.6 71.98 125.52 570.33111 319.16 201.33 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0800 799.6 73.81 126.25 578.84867 341.58 217.56 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0829 828.5 73.62 125.41 586.96122 364.1 233.81 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0857 857.4 72.83 124.33 595.31387 386.83 249.65 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0886 886.4 71.86 122.55 604.09147 409.84 264.85 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0915 915.3 70.94 122.36 613.31887 432.98 279.57 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0944 944.3 71.53 122.47 622.64455 456.15 294.28 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 0973 973.2 72.75 121.46 631.51413 479.5 308.85 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1002 1002.2 72.51 119.57 640.16656 503.33 322.89 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1031 1031.2 72.38 117.86 648.89908 527.53 336.15 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1060 1060.1 71.85 117 657.79303 551.99 348.85 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1089 1089.0 71.39 116.01 666.9122 576.55 361.1 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1118 1118.0 71.67 115.22 676.08709 601.32 372.97 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1147 1147.0 71.72 114.43 685.18598 626.28 384.52 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1176 1175.9 71.38 114.73 694.34483 651.25 395.94 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1205 1204.9 71.66 115.31 703.53078 676.15 407.57 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1234 1233.8 71.8 114.62 712.60343 701.07 419.16 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1263 1262.8 72.05 114.78 721.5793 726.05 430.66 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1292 1291.7 72.51 114.84 730.39675 751.1 442.24 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1321 1320.7 72 115.71 739.21419 776.02 454 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1350 1349.5 71.48 115.11 748.26006 800.78 465.76 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1378 1378.3 70.75 115.43 757.58171 825.42 477.4 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1407 1407.2 70.63 115.67 767.1185 849.98 489.13 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1436 1436.0 70.95 116.59 776.60794 874.43 501.13 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1465 1464.9 71.22 116.99 785.96013 898.79 513.43 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1494 1493.7 71.07 117.29 795.27403 923.06 525.87 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1523 1522.5 71.02 117.07 804.64525 947.34 538.33 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1551 1551.4 70.95 118.07 814.03873 971.5 550.95 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1580 1580.2 71.07 117.93 823.4136 995.55 563.74 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1596 1596.1 71.07 117.39 828.56855 1008.86 570.72 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1620 1620.1 71.72 118.44 836.24485 1029.01 581.39 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1648 1647.7 69.84 118.53 845.34014 1051.94 593.83 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1677 1677.3 67.72 119.25 856.03889 1076.07 607.15 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1706 1706.3 64.96 118.42 867.65582 1099.29 619.93 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1735 1735.2 61.92 118.32 880.60332 1122.08 632.24 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1764 1764.1 58.81 117.25 894.90204 1144.32 643.96 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1793 1793.1 55.54 117.44 910.59841 1165.93 655.14 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1822 1822.1 51.89 116.24 927.74043 1186.76 665.68 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1851 1851.0 47.98 115.64 946.36432 1206.67 675.37 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1880 1880.0 44.71 114.61 966.3672 1225.65 684.28 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1909 1908.9 41.14 113.88 987.5551 1243.62 692.38 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1938 1937.9 37.77 114.06 1009.88943 1260.41 699.84 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1967 1966.8 33.71 114.22 1033.39877 1275.85 706.76 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 1996 1995.7 30.21 114.36 1057.90575 1289.79 713.05 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 2025 2024.6 26.31 113.76 1083.34744 1302.27 718.63 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 2053 2053.4 22.08 113.22 1109.6116 1313.1 723.34 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 2082 2082.2 19.06 112.8 1136.60975 1322.42 727.3 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 2111 2111.1 15.99 111.66 1164.10795 1330.45 730.59 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 2140 2139.9 13.1 108.53 1192.03081 1337.25 733.1 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 2169 2168.7 9.86 104.21 1220.2612 1342.74 734.74 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 2198 2197.6 6.92 99.24 1248.79968 1346.85 735.63 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 2226 2226.4 3.33 92.87 1277.50993 1349.4 735.95 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 2255 2255.2 1.11 90.43 1306.28652 1350.51 735.99 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 2284 2284.1 .92 88.16 1335.11198 1351.03 735.99 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 2304 2303.7 1.19 92.86 1354.74864 1351.39 735.99 S E GALLOWAY_1_MASTER MASTER:3: DEVIATION SRVY 2315 2315.0 1.19 92.86 1366.00621 1351.62 736 S E
PPDM_AUDIT_HISTORY: WELL_NAME=HISTWELL200006051037