Earth Resources Policy and Programs : dbMap DATABASE DUMP
BASKER2
*** BASKER2 ***
basker2 000 LINKS HYPERLINKAGESGIPPSLAND_OFFSHORE_EXPLO_WELLSGIPPSLAND_OFFSHORE_DEVEL_WELLS
LINKS HYPERLINKAGESGIPPSLAND_WELLSGIPPSLAND_ON_SHORE_WELLSGIPPSLAND_OFFSHORE_WELLS
Geoscience Australia may also have other information: (see the GA Well Summary page for the well with this ENO (353616):
Geoscience Australia may also have other information: (see the GA well search page: http://dbforms.ga.gov.au/www/npm.well.search ) *** ENO=353616 -- BASKER 2
HDR WELL_NAME = BASKER-2
HDR A GEOGRAPHICALLY VERY CLOSE WELL TO THIS WELL: WELL_NAME= BASKER-3
HDR A GEOGRAPHICALLY VERY CLOSE WELL TO THIS WELL: WELL_NAME= BASKER-4
HDR A GEOGRAPHICALLY VERY CLOSE WELL TO THIS WELL: WELL_NAME= BASKER-5
HDR A GEOGRAPHICALLY VERY CLOSE WELL TO THIS WELL: WELL_NAME= BASKER-7
HDR DATE 1: SPUD_DATE = 14-AUG-05
HDR DATE 3: RIG_RELEASE_DATE = 02-OCT-05
HDR DATE 4: DB_ENTRY_BY = EF03_SW (database header data entry)
HDR DATE 4: DB_ENTRY_DATE = 30-SEP-05 (database header data entry date)
HDR DATE 5: DB_ROW_UPDATER = EF03_TW (database header data entry last updated by)
HDR DATE 5: DB_ROW_UPDATE_DATE = 11-OCT-07 (database header data entry last update date)
HDR DATE 6: THEORETICAL OPENFILE INTERPRETIVE DATE= 02-NOV-10
HDR DEVIATION_IND = Y (i.e. has this hole been deviated?)
HDR LOC: BASIN DESCRIPTION= Gippsland Basin
HDR LOC: BASIN_CODE = GIPPSLAND
HDR LOC: COUNTRY = AUSTRALIA
HDR LOC: FIELD_NAME = BASKER-MANTA FIELD
HDR LOC: ONSHORE_IND = N
HDR LOC: PROVINCE_STATE = VIC
HDR LOC: TITLE_NAME = VIC/RL6
HDR LOC: TITLE_NAME: SDO: CURRENT TITLE (Current as at 23-FEB-12) BY LOCATION: ENCLOSING BASKER-2 : TITLE_NAME=VIC/L26
HDR OPERATOR = Anzon Australia Limited
HDR PLATFORM_IND = N (i.e. is this hole off a platform?)
HDR SIDETRACK_IND = N (i.e. is this hole a sidetrack?)
HDR DPH GREATEST OF DEPTHS = 3414
HDR DPH: DRILL_TD = 3414
HDR DPH: DRILL_TD = DRILLERS TOTAL DEPTH: Total or maximum depth of the well as reported by the operator/driller (PPDM definition).
HDR DPH: FINAL_TD = 3414
HDR DPH: FINAL_TD = FINAL TOTAL DEPTH: The actual measurement along the well path from the reference datum to the bottom of the well (PPDM definition).
HDR DPH: MAX_TVD = 3344
HDR DPH: MAX_TVD = MAXIMUM TRUE VERTICAL DEPTH: The maximum true vertical depth from the surface datum reference to the final total depth or deepest point, measured on a straight line (PPDM definition).
HDR ELEV: DEPTH_DATUM = RT
HDR ELEV: DEPTH_DATUM LONGNM= Rotary Table
HDR ELEV: DEPTH_DATUM_ELEV = 21.5
HDR ELEV: ELEVATION_REF = RT
HDR ELEV: ELEVATION_REF LN = Rotary Table
HDR ELEV: REF_ELEV = 21.5
HDR ELEV: RT_ELEV = 21.5
HDR ELEV: WATER_DEPTH = -155
HDR STORAGE_UNIT = Metres
HDR CURRENT_CLASS = D_HC_PROD
HDR CURRENT_CLASS LONG_NAME = Development Well --Hydrocarbon PRODUCTION Well
HDR CURRENT_STATUS = PRODUCER
HDR CURRENT_STATUS LONG_NAME= Producing Well
HDR INITIAL_CLASS = D_APPRAISAL
HDR INITIAL_CLASS LONG_NAME = Development Well -- Appraisal
HDR PLOT SYMBOL DESCRIPTION = --- OIL WELL
HDR PLOT_SYMBOL = 136
WELL_ALIAS BOREHOLE_NAME = UNKNOWN PARISH-0 : [WELL_BORE] WELL_BORE: the BOREHOLE and BORE NUMBER of the well
WELL_ALIAS BOREHOLE_SITE_ID=SIT958882 : equivalent BOREHOLE_NAME=UNKNOWN PARISH 0
WELL_ALIAS PLOT_NAME= BASKER-2
WELL_ALIAS UWI= 200004738944
WELL_ALIAS WELL_NAME= 353616 : [WELL_PEDIN_E] WELL_PEDIN_ENO Geoscience Australia ENO
WELL_ALIAS WELL_NAME= 958882 : [WELL_SITE_ID] WELL_SITE_ID -- GEDIS Boreholes Database SITE ID
WELL_ALIAS WELL_NAME= BASKER-2 : [WELL_GENERIC] WELL_GENERIC -- a generic wellname
WELL_ALIAS WELL_NAME= W1444 : [WELL_BOX_NO] WELL_BOX_NO: the W Number (Well Box No) of the well
WELL_ALIAS WELL_NAME= W3200599 : [WELL_PEDIN] WELL_PEDIN -- the PEDIN AGSO database UNO
NODE_COORD BOTTOM HOLE LAT & LONG = -38.299586 148.706867
NODE_COORD SURFACE LAT & LONG = -38.299586 148.706867
NODE_COORD DATUM = COORD_SYSTEM_ID=218 GEODETIC_DATUM_ID=4283
FORMATION_TOPS SOURCE=WCR 0177 FORM_ID= GIPPSLAND LIMESTONE TOP_DEPTH= 177 BASE_DEPTH= Gippsland Limestone (Age:Tertiary ) ...Member of....SEASPRAY GROUP >>> REMARK =From PE915237 Page 7 (WCR=Well Completion Report)
FORMATION_TOPS SOURCE=WCR 1266 FORM_ID= HIGH VELOCITY WEDGE TOP_DEPTH= 1266 BASE_DEPTH= High Velocity Wedge (Age:undisclosed ) >>> REMARK =From PE915237 Page 7 (WCR=Well Completion Report)
FORMATION_TOPS SOURCE=WCR 1359 FORM_ID= INTRA-MIO.DOWNLAP SF TOP_DEPTH= 1359 BASE_DEPTH= Intra-Miocene Downlap Surface (Age:undisclosed ) >>> REMARK =From PE915237 Page 7 (WCR=Well Completion Report)
FORMATION_TOPS SOURCE=WCR 1755 FORM_ID= LAKES ENTRANCE FM TOP_DEPTH= 1755 BASE_DEPTH= Lakes Entrance Formation (Age:Tertiary ) ...Member of....SEASPRAY GROUP (WCR=Well Completion Report)
FORMATION_TOPS SOURCE=WCR 2088 FORM_ID= LATROBE GROUP TOP_DEPTH= 2088 BASE_DEPTH= Latrobe Group (Age:Cretaceous ) (WCR=Well Completion Report)
FORMATION_TOPS SOURCE=WCR 2162 FORM_ID= BASE TUNA-FLOUN CHAN TOP_DEPTH= 2161.5 BASE_DEPTH= Base Tuna-Flounder Channe (Age:undisclosed ) (WCR=Well Completion Report)
FORMATION_TOPS SOURCE=WCR 2613 FORM_ID= K2 SANDSTONE TOP_DEPTH= 2613 BASE_DEPTH= K2 Sandstone (Age:undisclosed ) >>> REMARK =From PE915237 Page 7 (WCR=Well Completion Report)
FORMATION_TOPS SOURCE=WCR 2878 FORM_ID= MA2 SANDSTONE TOP_DEPTH= 2878 BASE_DEPTH= MA2 Sandstone (Age:undisclosed ) >>> REMARK =From PE915237 Page 7 (WCR=Well Completion Report)
FORMATION_TOPS SOURCE=WCR 3053 FORM_ID= ZC1 SEISMIC MARKER TOP_DEPTH= 3052.7 BASE_DEPTH= ZC1 Seismic Marker (Age:undisclosed ) >>> REMARK =From PE915237 Page 7 (WCR=Well Completion Report)
FORMATION_TOPS SOURCE=WCR 3119 FORM_ID= ZONE 2 RESERVOIR TOP_DEPTH= 3118.7 BASE_DEPTH= ZONE 2 RESERVOIR (Age:CRETATEOUS ) >>> REMARK =From PE915237 Page 7 (WCR=Well Completion Report)
FORMATION_TOPS SOURCE=WCR 3233 FORM_ID= ZONE 5 RESERVOIR TOP_DEPTH= 3232.9 BASE_DEPTH= ZONE 5 RESERVOIR (Age:CRETATEOUS ) >>> REMARK =From PE915237 Page 7 (WCR=Well Completion Report)
FORMATION_TOPS SOURCE=WCR 3321 FORM_ID= VOLCANICS UNIT 1 TOP_DEPTH= 3320.9 BASE_DEPTH= VOLCANICS UNIT 1 (Age:CRETATEOUS ) >>> REMARK =From PE915237 Page 7 (WCR=Well Completion Report)
ASSETS (BRIEF) DATA_TYPE DATA_SUB_TYPE BARCODE ITEM_NAME [MEDIA_TYPE] SCANNED_OR_DIGITAL_FILES
ASSETS (BRIEF) GENERAL DATA_CD_DVD PE012855 BASKER-2 Log Data CD [CD] 2006 PE012855__((_BASKER-2_LOG_DATA_CD_))_.TAR.GZ(795.2m).........SAM0_685_PE012855__((_BASKER-2_LOG_DATA_CD_))_I_MEDIA_LABELLING.JPG(2.9m).........PE012855__((_BASKER-2_LOG_DATA_CD_))__FILES_LISTING.TXT(0.0m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) GENERAL DATA_CD_DVD PE915238 BASKER-2 Final Well Rpt and Data [CD] 2006 PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))_.TAR.GZ(177.2m).........PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))_.TAR.GZ(177.2m).........F7746698_068_PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))__MEDIA_LABELLING.PDF(0.7m).........SAM2_196_PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))__MEDIA_LABELLING.JPG(2.8m).........PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))__FILES_LISTING.TXT(0.0m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) GENERAL DATA_CD_DVD PE915239 BASKER-2 End of Well Report and Data [CD] 2006 PE915239__((_BASKER-2_END_OF_WELL_REPORT_AND_DATA_))_.TAR.GZ(12.7m).........SAM2_197_PE915239__((_BASKER-2_END_OF_WELL_REPORT_AND_DATA_))_I_MEDIA_LABELLING.JPG(2.7m).........PE915239__((_BASKER-2_END_OF_WELL_REPORT_AND_DATA_))__FILES_LISTING.TXT(0.0m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) GENERAL DATA_CD_DVD PE915240 BASKER-2 Velocity Survey Reports & Data [CD] 2006 PE915240__((_BASKER-2_VELOCITY_SURVEY_REPORTS___DATA_))_.TAR.GZ(156.3m).........SAM2_198_PE915240__((_BASKER-2_VELOCITY_SURVEY_REPORTS___DATA_))_I_MEDIA_LABELLING.JPG(2.7m).........PE915240__((_BASKER-2_VELOCITY_SURVEY_REPORTS___DATA_))__FILES_LISTING.TXT(0.0m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) GENERAL ESUBS_CD_DVD PE907809 Well Data - Electronic Submissions 2009 [DVD] 2009 (2978 DIGITAL FILES) in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) GENERAL ESUBS_CD_DVD PE911536 DDRs, Well & Permit Data 2005 to 2007 [DVD] 2007 (3259 DIGITAL FILES) in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) WELL DAILY_RPT PE907806 Daily Drilling Reports. Various Wells. [CD] 2006 PE907806__((_DAILY_DRILLING_REPORTS._VARIOUS_WELLS._))_.TAR.GZ(383.8m).........SAM1_579_PE907806__((_DAILY_DRILLING_REPORTS._VARIOUS_WELLS._))_I_MEDIA_LABELLING.JPG(2.8m).........PE907806__((_DAILY_DRILLING_REPORTS._VARIOUS_WELLS._))__FILES_LISTING.TXT(0.4m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) WELL DAILY_RPT PE909652 BASKER-2 Daily Drilling & Workover Rpts [CD] 2006 (235 DIGITAL FILES) in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) WELL DAILY_RPT PE915095 Multiple Wells Drill Reports/Mud Logs CD [CD] 2006 PE915095__((_MULTIPLE_WELLS_DRILL_REPORTS_MUD_LOGS_CD_))_.TAR.GZ(383.6m).........SAM3_345_PE915095__((_MULTIPLE_WELLS_DRILL_REPORTS_MUD_LOGS_CD_))__MEDIA_LABELLING.JPG(2.6m).........PE915095__((_MULTIPLE_WELLS_DRILL_REPORTS_MUD_LOGS_CD_))__BASKER-5_BASKER-5_12__MWD_SURVEYS.TXT(0.0m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) WELL DATA_CD_DVD PE012753 BASKER-2 Wireline log data CD [CD] 2005 PE012753__((_BASKER-2_WIRELINE_LOG_DATA_CD_))_.TAR.GZ(8.4m).........F7746696_033_PE012753__((_BASKER-2_WIRELINE_LOG_DATA_CD_))_I_MEDIA_LABELLING.PDF(0.7m).........SAM0_942_PE012753__((_BASKER-2_WIRELINE_LOG_DATA_CD_))_I_MEDIA_LABELLING.JPG(3.0m).........PE012753__((_BASKER-2_WIRELINE_LOG_DATA_CD_))__FILES_LISTING.TXT(0.0m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) WELL LOG_TAPE_OR_DISK PE012053 Selected Wells, Gippsland & Otway Basin [CD] 2007 in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) WELL LOG_TAPE_OR_DISK PE012305 BASKER-2 TD Wireline Log Data CD [DVD] 2005 PE012305__((_BASKER-2__TD_WIRELINE_LOG_DATA_CD_))_.ISO.GZ(519.0m).........PE012305__((_BASKER-2__TD_WIRELINE_LOG_DATA_CD_))__MEDIA_LABELLING.PDF(0.1m)......... in: COMPACTUS COMPACTUS_1 55 Collins St
ASSETS (BRIEF) WELL RPT PE909713 BASKER-2 Workover 1 Clean-up Test [CD] 2006 PE909713__((_BASKER-2_WORKOVER_1_CLEAN-UP_TEST_))_.TAR.GZ(2.1m).........SAM1_692_PE909713__((_BASKER-2_WORKOVER_1_CLEAN-UP_TEST_))_I_MEDIA_LABELLING.JPG(3.0m).........PE909713__((_BASKER-2_WORKOVER_1_CLEAN-UP_TEST_))__FILES_LISTING.TXT(0.0m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) WELL WCR_RPT PE911503 BASKER-2 WCR on CD [CD] 2006 PE911503__((_BASKER-2_WCR_ON_CD_))_.TAR.GZ(25.5m).........BASKER-2 WCR VOLUME 1 BASIC DATA MARCH 2006.PDF(28.7m).........SAM2_080_PE911503__((_BASKER-2_WCR_ON_CD_))_I_MEDIA_LABELLING.JPG(2.8m).........PE911503__((_BASKER-2_WCR_ON_CD_))__FILES_LISTING.TXT(0.0m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) WELL WCR_RPT PE915237 BASKER-2 WCR Vol.2 (interpretive) [CD] 2006 PE915237__((_BASKER-2_WCR_VOL.2__INTERPRETIVE__))_.TAR.GZ(72.4m).........PE915237__((_BASKER-2_WCR_VOL.2__INTERPRETIVE__))_.TAR.GZ(72.4m).........SAM2_195_PE915237__((_BASKER-2_WCR_VOL.2__INTERPRETIVE__))_I_MEDIA_LABELLING.JPG(2.6m).........PE915237__((_BASKER-2_WCR_VOL.2__INTERPRETIVE__))__FILES_LISTING.TXT(0.0m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) WELL WELL_WOMP PE913297 BASKER-2 Drilling & Completion Programme [CD] 2005 PE913297__((_BASKER-2_DRILLING___COMPLETION_PROGRAMME_))_.ISO.GZ(33.4m).........PE913297__((_BASKER-2_DRILLING___COMPLETION_PROGRAMME_))__MEDIA_LABELLING.PDF(0.1m)......... in: COMPACTUS COMPACTUS_1 55 Collins St
ASSETS (BRIEF) WELL DAILY_RPT PE911536_5 Daily Drilling, Geol, Workover, Mud Rpts [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007
ASSETS (BRIEF) WELL DIRECTIONAL PE911503_112BASKER-2 deviation survey data [CD] 2007 PE911503__((_BASKER-2_WCR_ON_CD_))_.TAR.GZ(25.5m).........BASKER-2 WCR VOLUME 1 BASIC DATA MARCH 2006.PDF(28.7m).........SAM2_080_PE911503__((_BASKER-2_WCR_ON_CD_))_I_MEDIA_LABELLING.JPG(2.8m).........PE911503__((_BASKER-2_WCR_ON_CD_))__FILES_LISTING.TXT(0.0m)......... in: WCR_RPT BASKER-2 Well Completion Report on CD
ASSETS (BRIEF) WELL DIRECTIONAL PE911536_8 Geodetic Survey Data [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007
ASSETS (BRIEF) WELL DRILL_RPT PE911536_9 Drilling Data, Logs, TD Curves & Reports [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007
ASSETS (BRIEF) WELL ENVIRO_RPT PE907809_16 Well Environment Reports 2009 [DVD] 2009 (2978 DIGITAL FILES) in: DVD Well Data - Electronic Submissions 2009
ASSETS (BRIEF) WELL EOW_RPT PE915239_1 BASKER-2 End of Well Report [CD] 2006 PE915239__((_BASKER-2_END_OF_WELL_REPORT_AND_DATA_))_.TAR.GZ(12.7m).........SAM2_197_PE915239__((_BASKER-2_END_OF_WELL_REPORT_AND_DATA_))_I_MEDIA_LABELLING.JPG(2.7m).........PE915239__((_BASKER-2_END_OF_WELL_REPORT_AND_DATA_))__FILES_LISTING.TXT(0.0m)......... in: CD BASKER-2 End of Well Report and Data
ASSETS (BRIEF) WELL FWR_RPT PE915238_3 BASKER-2 Final Well Report [CD] 2006 PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))_.TAR.GZ(177.2m).........PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))_.TAR.GZ(177.2m).........F7746698_068_PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))__MEDIA_LABELLING.PDF(0.7m).........SAM2_196_PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))__MEDIA_LABELLING.JPG(2.8m).........PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))__FILES_LISTING.TXT(0.0m)......... in: CD BASKER-2 Final Well Rpt and Data
ASSETS (BRIEF) WELL FWR_RPT_AND_ASSOC PE911536_15 Various Data and Reports [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007
ASSETS (BRIEF) WELL GEOCHEM PE911503_851BASKER-2 Hydrocarbon Properties Summary [CD] 2007 PE911503__((_BASKER-2_WCR_ON_CD_))_.TAR.GZ(25.5m).........BASKER-2 WCR VOLUME 1 BASIC DATA MARCH 2006.PDF(28.7m).........SAM2_080_PE911503__((_BASKER-2_WCR_ON_CD_))_I_MEDIA_LABELLING.JPG(2.8m).........PE911503__((_BASKER-2_WCR_ON_CD_))__FILES_LISTING.TXT(0.0m)......... in: WCR_RPT BASKER-2 Well Completion Report on CD
ASSETS (BRIEF) WELL GEOCHEM PE911536_11 Basker-Manta-Gummy Gas Compositions [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007
ASSETS (BRIEF) WELL LITHOLOGY_LOG PE911536_7 Lithology Logs and Cuttings Descriptions [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007
ASSETS (BRIEF) WELL LOG_TAPE_OR_DISK PE012753_1 BASKER-2 Wireline Log Data CD [CD] 2005 PE012753__((_BASKER-2_WIRELINE_LOG_DATA_CD_))_.TAR.GZ(8.4m).........F7746696_033_PE012753__((_BASKER-2_WIRELINE_LOG_DATA_CD_))_I_MEDIA_LABELLING.PDF(0.7m).........SAM0_942_PE012753__((_BASKER-2_WIRELINE_LOG_DATA_CD_))_I_MEDIA_LABELLING.JPG(3.0m).........PE012753__((_BASKER-2_WIRELINE_LOG_DATA_CD_))__FILES_LISTING.TXT(0.0m)......... in: CD BASKER-2 Wireline log data CD
ASSETS (BRIEF) WELL LOG_TAPE_OR_DISK PE915238_2 BASKER-2 Wireline Log Data [CD] 2006 PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))_.TAR.GZ(177.2m).........PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))_.TAR.GZ(177.2m).........F7746698_068_PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))__MEDIA_LABELLING.PDF(0.7m).........SAM2_196_PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))__MEDIA_LABELLING.JPG(2.8m).........PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))__FILES_LISTING.TXT(0.0m)......... in: CD BASKER-2 Final Well Rpt and Data
ASSETS (BRIEF) WELL LOG_TAPE_OR_DISK PE915239_2 BASKER-2 End of Well Report ASCII data [CD] 2006 PE915239__((_BASKER-2_END_OF_WELL_REPORT_AND_DATA_))_.TAR.GZ(12.7m).........SAM2_197_PE915239__((_BASKER-2_END_OF_WELL_REPORT_AND_DATA_))_I_MEDIA_LABELLING.JPG(2.7m).........PE915239__((_BASKER-2_END_OF_WELL_REPORT_AND_DATA_))__FILES_LISTING.TXT(0.0m)......... in: CD BASKER-2 End of Well Report and Data
ASSETS (BRIEF) WELL MUD_LOG PE911536_6 Mudlogs [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007
ASSETS (BRIEF) WELL PROD_RPT PE911536_10 Basker-Manta-Gummy Reserves Review [DVD] 2006 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007
ASSETS (BRIEF) WELL RPT PE911536_12 Basker-Manta-Gummy Intgtd Field Dev Plan [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007
ASSETS (BRIEF) WELL SRVY_RPT PE915240_1 BASKER-2 Velocity Survey Reports [CD] 2006 PE915240__((_BASKER-2_VELOCITY_SURVEY_REPORTS___DATA_))_.TAR.GZ(156.3m).........SAM2_198_PE915240__((_BASKER-2_VELOCITY_SURVEY_REPORTS___DATA_))_I_MEDIA_LABELLING.JPG(2.7m).........PE915240__((_BASKER-2_VELOCITY_SURVEY_REPORTS___DATA_))__FILES_LISTING.TXT(0.0m)......... in: CD BASKER-2 Velocity Survey Reports & Data
ASSETS (BRIEF) WELL VELOCITY PE915240_3 BASKER-2 Velocity Survey Report Data [CD] 2006 PE915240__((_BASKER-2_VELOCITY_SURVEY_REPORTS___DATA_))_.TAR.GZ(156.3m).........SAM2_198_PE915240__((_BASKER-2_VELOCITY_SURVEY_REPORTS___DATA_))_I_MEDIA_LABELLING.JPG(2.7m).........PE915240__((_BASKER-2_VELOCITY_SURVEY_REPORTS___DATA_))__FILES_LISTING.TXT(0.0m)......... in: CD BASKER-2 Velocity Survey Reports & Data
ASSETS (BRIEF) WELL WELL_LOG PE012753_2 BASKER-2 Wireline log data CD [CD] 2005 PE012753__((_BASKER-2_WIRELINE_LOG_DATA_CD_))_.TAR.GZ(8.4m).........F7746696_033_PE012753__((_BASKER-2_WIRELINE_LOG_DATA_CD_))_I_MEDIA_LABELLING.PDF(0.7m).........SAM0_942_PE012753__((_BASKER-2_WIRELINE_LOG_DATA_CD_))_I_MEDIA_LABELLING.JPG(3.0m).........PE012753__((_BASKER-2_WIRELINE_LOG_DATA_CD_))__FILES_LISTING.TXT(0.0m)......... in: CD BASKER-2 Wireline log data CD
ASSETS (BRIEF) WELL WELL_LOG PE012855_1 BASKER-2 Logs [CD] 2006 PE012855__((_BASKER-2_LOG_DATA_CD_))_.TAR.GZ(795.2m).........SAM0_685_PE012855__((_BASKER-2_LOG_DATA_CD_))_I_MEDIA_LABELLING.JPG(2.9m).........PE012855__((_BASKER-2_LOG_DATA_CD_))__FILES_LISTING.TXT(0.0m)......... in: CD BASKER-2 Log Data CD
ASSETS (BRIEF) WELL WELL_LOG PE012855_2 BASKER-2 Log Data [CD] 2006 PE012855__((_BASKER-2_LOG_DATA_CD_))_.TAR.GZ(795.2m).........SAM0_685_PE012855__((_BASKER-2_LOG_DATA_CD_))_I_MEDIA_LABELLING.JPG(2.9m).........PE012855__((_BASKER-2_LOG_DATA_CD_))__FILES_LISTING.TXT(0.0m)......... in: CD BASKER-2 Log Data CD
ASSETS (BRIEF) WELL WELL_LOG PE911536_14 Well Log Images [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007
ASSETS (BRIEF) WELL WELL_LOG PE915238_1 BASKER-2 Wireline Log Images [CD] 2006 PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))_.TAR.GZ(177.2m).........PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))_.TAR.GZ(177.2m).........F7746698_068_PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))__MEDIA_LABELLING.PDF(0.7m).........SAM2_196_PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))__MEDIA_LABELLING.JPG(2.8m).........PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))__FILES_LISTING.TXT(0.0m)......... in: CD BASKER-2 Final Well Rpt and Data
ASSETS (BRIEF) WELL WELL_LOG PE915240_2 BASKER-2 Velocity Survey Logs [CD] 2006 PE915240__((_BASKER-2_VELOCITY_SURVEY_REPORTS___DATA_))_.TAR.GZ(156.3m).........SAM2_198_PE915240__((_BASKER-2_VELOCITY_SURVEY_REPORTS___DATA_))_I_MEDIA_LABELLING.JPG(2.7m).........PE915240__((_BASKER-2_VELOCITY_SURVEY_REPORTS___DATA_))__FILES_LISTING.TXT(0.0m)......... in: CD BASKER-2 Velocity Survey Reports & Data
ASSETS (BRIEF) WELL SRVY_RPT PE903466 BASKER SOUTH-1,BASKER-2 SSSonar Srvy Rpt [PAPER] 1983 PE903466__((_BASKER_SOUTH-1,BASKER-2_SSSONAR_SRVY_RPT_))_.TIF(0.6m)......... in:WELL_BOX BASKER SOUTH-1 W839 box 1/2
ASSETS (BRIEF) WELL HYDROCARBON_SAMPLE NOTE3694 BASKER-2 liquid hydrocarbon sample [SAMPLE] 2006 in:BUILDING AGSO - CANBERRA (Geoscience Australia)
ASSETS (BRIEF) WELL MAP PE903467 BASKER SOUTH-1,BASKER-2 Seabed features [PAPER] 1983 PE903467__((_BASKER_SOUTH-1,BASKER-2_SEABED_FEATURES_))_.TIF(0.4m)......... in:SRVY_RPT BASKER SOUTH-1,BASKER-2 SSSonar Srvy Rpt
ASSETS (BRIEF) GENERAL FIELD_DEV PE805508 Basker Manta Gummy Development Update [PAPER] 2008 in:FIELD_BOX Recent Fields Box 3 of 3 All Basins
ASSETS (BRIEF) GENERAL REGISTRY_FILE F7703302 PE/16/0535(Part-1) Registry File [PAPER] 2005 in:COMPACTUS COMPACTUS_1 55 Collins St
ASSETS (BRIEF) TITLE DMP_ACCEPTED PE801522 Anzon BASKER-2 VIC/RL6 DMP (2004) [PAPER] 2004 PE801522__((_ANZON_BASKER-2_VIC_RL6_DMP__2004__))_.PDF(0.3m)......... in:REGISTRY_FILE PE/35/0145 /2 Registry File (DMPs) 2004
ASSETS (BRIEF) TITLE FIELD_RPT PE802633 Presentation to DPI by Anzon [PAPER] 2006 in:WELL_BOX Well Box - Recent Wells 1
ASSETS (BRIEF) TITLE FIELD_RPT PE802634 Basker Manta Update [PAPER] 2006 in:WELL_BOX Well Box - Recent Wells 1
ASSETS (BRIEF) TITLE FIELD_RPT PE802635 Basker Manta Gummy Project [PAPER] 2006 in:WELL_BOX Well Box - Recent Wells 1
ASSETS (BRIEF) TITLE FIELD_RPT PE802637 Basker Manta Project [PAPER] 2006 in:WELL_BOX Well Box - Recent Wells 1
ASSETS (BRIEF) TITLE FIELD_RPT PE802638 Basker Manta Update [PAPER] 2006 in:WELL_BOX Well Box - Recent Wells 1
ASSETS (viaENC)GENERAL REGISTRY_FILE F3112020 PE/35/0145 /2 Registry File (DMPs) 2004 [PAPER] (?2005) (this is a report with at least one enclosure related to BASKER-2)
LINKS HYPERLINKAGESCOPYRIGHT_DISCLAIMERABOUT_DBMAPHOW_TO_GET_OR_SUBMIT_DATA This data has been dumped from Victorian Govt (http://www.dpi.vic.gov.au) dbMap database on 23-FEB-12
ASSETS *** ALSO: Search the Geoscience Australia database for other information: (see http://dbforms.ga.gov.au/www/npm.well.search ) *** ENO=353616 BASKER-2
CORE/CUTTINGS Basker 2 : SAMPLE_TYPE=CUTT 01010 DEPTH_RANGE= 1010.000 TO 3414.000M STORAGE_BAY=232 ROW=ZZ TO ZZ #TRAYS=11 [ <--this shows the actual cores and cuttings that DPI has stored in the DPI Werribee core shed ]
ASSET Counts Summary: GENERAL DATA_CD_DVD [CD] 4
ASSET Counts Summary: GENERAL ESUBS_CD_DVD [DVD] 2
ASSET Counts Summary: GENERAL FIELD_DEV [PAPER] 1
ASSET Counts Summary: GENERAL REGISTRY_FILE [PAPER] 1
ASSET Counts Summary: TITLE DMP_ACCEPTED [PAPER] 1
ASSET Counts Summary: TITLE FIELD_RPT [PAPER] 5
ASSET Counts Summary: WELL DAILY_RPT [CD] 3
ASSET Counts Summary: WELL DAILY_RPT [DVD] 1
ASSET Counts Summary: WELL DATA_CD_DVD [CD] 1
ASSET Counts Summary: WELL DIRECTIONAL [CD] 1
ASSET Counts Summary: WELL DIRECTIONAL [DVD] 1
ASSET Counts Summary: WELL DRILL_RPT [DVD] 1
ASSET Counts Summary: WELL ENVIRO_RPT [DVD] 1
ASSET Counts Summary: WELL EOW_RPT [CD] 1
ASSET Counts Summary: WELL FWR_RPT [CD] 1
ASSET Counts Summary: WELL FWR_RPT_AND_ASSOC [DVD] 1
ASSET Counts Summary: WELL GEOCHEM [CD] 1
ASSET Counts Summary: WELL GEOCHEM [DVD] 1
ASSET Counts Summary: WELL HYDROCARBON_SAMPLE[SAMPLE] 1
ASSET Counts Summary: WELL LITHOLOGY_LOG [DVD] 1
ASSET Counts Summary: WELL LOG_TAPE_OR_DISK [CD] 4
ASSET Counts Summary: WELL LOG_TAPE_OR_DISK [DVD] 1
ASSET Counts Summary: WELL MAP [PAPER] 1
ASSET Counts Summary: WELL MUD_LOG [DVD] 1
ASSET Counts Summary: WELL PROD_RPT [DVD] 1
ASSET Counts Summary: WELL RPT [CD] 1
ASSET Counts Summary: WELL RPT [DVD] 1
ASSET Counts Summary: WELL SRVY_RPT [CD] 1
ASSET Counts Summary: WELL SRVY_RPT [PAPER] 1
ASSET Counts Summary: WELL VELOCITY [CD] 1
ASSET Counts Summary: WELL WCR_RPT [CD] 2
ASSET Counts Summary: WELL WELL_LOG [CD] 5
ASSET Counts Summary: WELL WELL_LOG [DVD] 1
ASSET Counts Summary: WELL WELL_WOMP [CD] 1
A WELL_DRILL_HISTORY: DRILL_OBS_NO DRILL_DATE DEPTH DEPTH_TVD HOLE_IND MUD_WT REMARK source
B WELL_DRILL_HISTORY:001 06-AUG-05 600.0 9999.99 Operations For Period 0000 Hrs to 2400 Hrs on 06 Aug 2005 Operations For Period 0000 Hrs to 2400 Hrs on 06 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description RM P RM 0430 1330 9.00 0.0m Last anchor on rack at o4:22 am. Dip fuel and prepare statement. Pacific Wrangler on tow bridle. Far Grip following. Tow at 4.5 knts. RM TP (RE) RM 1330 1500 1.50 0.0m Towline shackle (85ton) parted at fishplate. Wrangler recover tow line. Rig recover fishplate. RM TP (RE) RM 1500 1630 1.50 0.0m Pass secondary tow bridle to Pacific Wrangler and attach 2nd tow bridle. Port leg of tackle broke behind thimble when loaded. (Leg had twisted previously during attachment process). RM TP (RE) RM 1630 1700 0.50 0.0m Drop #5 anchor to hold rig stern-to-weather. Pay out 600m of chain. Weather deteriorating. Wind 30 knts gusting 40 knts. Position 39� 18.19' S 143� 26.6" E RM TP (RE) RM 1700 1900 2.00 0.0m Attempt to attach re-built primary tow bridle. Wind 40 knts+. RM TP (RE) RM 1900 2400 5.00 0.0m Shut down due to sea height and darkness. Danger of losing seamen overboard. Rig is clear of shipping lanes. Far Grip and Wrangler maintain watch for shipping. Ballast down to storm draught to stabilize rig as #8 anchor being moved on bolster by sea. Operations For Period 0000 Hrs to 0600 Hrs on 07 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description RM TP (RE) RM 0000 0600 6.00 0.0m Wait on daylight. Weather moderating. Phase Data to 2400hrs, 06 Aug 2005 Phase Phase Hrs Start On Finish On Cum Hrs Cum Days Max Depth RIG MOVE/RIG-UP/PRESPUD(RM) 19.5 06 Aug 2005 06 Aug 2005 19.50 0.812 0.0m Personnel On Board Company Pax DIAMOND OFFSHORE (AUSTRALIA) LLC 50 DIAMOND OFFSHORE (AUSTRALIA) LLC 1 UPSTREAM PETROLEUM 2 ESS 8 DOWELL SCHLUMBERGER 2 GEOSERVICES OVERSEAS S.A. 2 FUGRO SURVEY LTD 5 M-1 AUSTRALIA PTY LTD 1 MO47 CREW 9 MARCOM 1 CAM... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:002 07-AUG-05 .0 9999.99 Re-establish tow. Helicopter for DODI welder. Father badly injured in automobile accident. Operations For Period 0000 Hrs to 2400 Hrs on 07 Aug 2005 Re-establish tow. Helicopter for DODI welder. Father badly injured in automobile accident. Operations For Period 0000 Hrs to 2400 Hrs on 07 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description RM TP (RE) RM 0000 0600 6.00 0.0m Wait on daylight. Weather moderating. RM TP (RE) RM 0600 1100 5.00 0.0m De-ballast rig to transit draught. Prepare to reinstate tow. RM TU (RE) RM 1100 1200 1.00 0.0m Pass messenger line / tow bridle to Pacific Wrangler. Secure tow. Lift #5 anchor. RM P RM 1200 2400 12.00 0.0m Under tow to Basker #2. Operations For Period 0000 Hrs to 0600 Hrs on 08 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description RM P RM 0000 0600 6.00 0.0m (IN PROGRESS) On tow to Basker #2. Time Position Speed. Dist trav. Dist to go. Course 06:00 39deg 16.4'S, 144deg 39.3'E 4.16 kts 111.3 198.8 090 12:00 39deg 17.6'S, 145deg 36.0'E 4.80 Kts 140.3 169.8 090 18:00 39deg 17.8'S, 146deg 14.9'E 4.95 Kts 170.0 140.1 090 24:00 39deg 12.2'S, 146deg 48.0'E 4.50 Kts 197.1 113.0 000 Phase Data to 2400hrs, 07 Aug 2005 Phase Phase Hrs Start On Finish On Cum Hrs Cum Days Max Depth RIG MOVE/RIG-UP/PRESPUD(RM) 43.5 06 Aug 2005 07 Aug 2005 43.50 1.812 0.0m Personnel On Board Company Pax DIAMOND OFFSHORE (AUSTRALIA) LLC 49 DIAMOND OFFSHORE (AUSTRALIA) LLC 1 UPSTREAM PETROLEUM 2 ESS 8 DOWELL SCHLUMBERGER 2 GEOSERVICES OVERSEAS S.A. 2 FUGRO SURVEY LTD 5 M-1 AUSTRALIA PTY LTD 1 MO47 CREW 9 MARCOM 1 CAMERON AUSTRALIA PTY LTD 1 Total 81 'Copyright IDS 2005', TF 20050803, ANZON_AU_drllg Page 1 Printed on 11 Aug 2005 [FILE:/02 07-08-2005 DDR BASKER-2 [From:WELL_DAILY]
B WELL_DRILL_HISTORY:003 08-AUG-05 .0 9999.99 Operations For Period 0000 Hrs to 2400 Hrs on 08 Aug 2005 Operations For Period 0000 Hrs to 2400 Hrs on 08 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description RM P RM 0000 2400 24.00 0.0m On tow to Basker #2. Time Position Speed. Dist trav. Dist to go. Course 06:00 39deg 16.4'S, 144deg 39.3'E 4.16 kts 111.3 198.8 090 12:00 39deg 17.6'S, 145deg 36.0'E 4.80 Kts 140.3 169.8 090 18:00 39deg 17.8'S, 146deg 14.9'E 4.95 Kts 170.0 140.1 090 24:00 39deg 12.2'S, 146deg 48.0'E 4.50 Kts 197.1 113.0 000 Operations For Period 0000 Hrs to 0600 Hrs on 09 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description RM P RM 0000 0600 6.00 0.0m (IN PROGRESS) On tow to Basker - 2 well Time Position Speed Dist trav. Dist to go. Course 06:00 39deg 45.5'S 147deg 20.1'E, 4.36 kts, 223.4nm, 86.7nm, 070 deg 12:00 39deg 54.4'S 147deg 49.8'E, 4.18 kts, 248.5nm, 61.6nm, 069 deg 18:00 38deg 45.5'S 148deg 20.1'E, 4.36 kts, 274.7nm, 32.4nm, 049 deg 24:00 38deg 31.2'S 148deg 37.5'E 2.50 kts, 289.4nm, 17.6nm, 021 deg Phase Data to 2400hrs, 08 Aug 2005 Phase Phase Hrs Start On Finish On Cum Hrs Cum Days Max Depth RIG MOVE/RIG-UP/PRESPUD(RM) 67.5 06 Aug 2005 08 Aug 2005 67.50 2.812 0.0m Personnel On Board Company Pax DIAMOND OFFSHORE (AUSTRALIA) LLC 49 DIAMOND OFFSHORE (AUSTRALIA) LLC 1 UPSTREAM PETROLEUM 2 ESS 8 DOWELL SCHLUMBERGER 2 GEOSERVICES OVERSEAS S.A. 2 FUGRO SURVEY LTD 5 M-1 AUSTRALIA PTY LTD 1 MO47 CREW 9 MARCOM 1 CAMERON AUSTRALIA PTY LTD 1 Total 81 'Copyright IDS 2005', TF 20050803, ANZON_AU_drllg Page 1 Printed on 11 Aug 2005 [FILE:/03 08-08-2005 DDR BASKER-2 [From:WELL_DAILY]
B WELL_DRILL_HISTORY:004 09-AUG-05 .0 9999.99 On tow to Basker - 2 well Operations For Period 0000 Hrs to 2400 Hrs on 09 Aug 2005 On tow to Basker - 2 well Operations For Period 0000 Hrs to 2400 Hrs on 09 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description RM P RM 0000 2400 24.00 0.0m On tow to Basker - 2 well Time Position Speed Dist trav. Dist to go. Course 06:00 39deg 45.5'S 147deg 20.1'E, 4.36 kts, 223.4nm, 86.7nm, 070 deg 12:00 39deg 54.4'S 147deg 49.8'E, 4.18 kts, 248.5nm, 61.6nm, 069 deg 18:00 38deg 45.5'S 148deg 20.1'E, 4.36 kts, 274.7nm, 32.4nm, 049 deg 24:00 38deg 31.2'S 148deg 37.5'E 2.50 kts, 289.4nm, 17.6nm, 021 deg Operations For Period 0000 Hrs to 0600 Hrs on 10 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description RM TP (WOW) RM 0000 0500 5.00 0.0m Attempt run-in to location. 2 nm from location. Rough weather pulling Rig and Pacific Wrangler backward (East) at 1.5 knts). Wind 25knts gusting 35 knts. Seas 3m. 70-75 ton pull on towline. RM TP (WOW) RM 0500 0600 1.00 0.0m (IN PROGRESS) Weather deteriorating. Wind and sea rising 40 knts 4 -5 m. Unable to make way. Travelling east at 2 knts. Phase Data to 2400hrs, 09 Aug 2005 Phase Phase Hrs Start On Finish On Cum Hrs Cum Days Max Depth RIG MOVE/RIG-UP/PRESPUD(RM) 91.5 06 Aug 2005 09 Aug 2005 91.50 3.812 0.0m Bulk Stocks Name Unit In Used Adjust Balance Barite Bulk MT 56.65 56.6 Bentonite Bulk MT 35.27 35.3 Diesel m3 311.7 2.9 308.8 Fresh Water m3 363.5 12.5 351.0 Drill Water m3 156.3 17.7 138.6 Cement G MT 47.11 47.1 Pumps Pump Data - Last 24 Hrs Slow Pump Data No. Type Liner (in) MW (ppg) Eff (%) SPM (SPM) SPP (psi) Flow (gpm) Depth (m) SPM1 (SPM) SPP1 (psi) Flow1(gpm) SPM2 (SPM) SPP2 (psi) Flow2 (gpm) SPM3 (SPM) SPP3 (psi) Flow3 (gpm) 1 National 12P160 6.50 0 'Copyright IDS 2005', TF 20050803, ANZON_AU_drllg Page 1... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:005 10-AUG-05 650.0 9999.99 Towed rig to within 10nm of Basker - 2 location. Unable to make headway into weather for run-in to drop anchor. Moved rig to shallow water to drop #8 anchor and waiting on wind and swell to drop before moving location and anchoring Operations For Period 0000 Hrs to 2400 Hrs on 10 Aug 2005 Towed rig to within 10nm of Basker - 2 location. Unable to make headway into weather for run-in to drop anchor. Moved rig to shallow water to drop #8 anchor and waiting on wind and swell to drop before moving location and anchoring Operations For Period 0000 Hrs to 2400 Hrs on 10 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description RM TP (WOW) RM 0000 0500 5.00 0.0m Attempt run-in to location. 2 nm from location. Rough weather pulling Rig and Pacific Wrangler backward (East) at 1.5 knts). Wind 25knts gusting 35 knts. Seas 3m. 70-75 ton pull on towline. RM TP (WOW) RM 0500 0830 3.50 0.0m Weather deteriorating. Wind and sea rising 40 knts 4 -5 m. Unable to make way. Travelling east at 2 knts. RM TP (WOW) RM 0830 0930 1.00 0.0m Drop #8 anchor and pay out 650m chain. Anchor holding. Position 38� 12' 26.6 S 148� 58' 07.1 E RM TP (WOW) RM 0930 2400 14.50 0.0m Rig heading 273�. Deballast rig to storm draught. 0800 hrs, 40kt wind, seas 2.0m, swell 2.0m, pitch 2.5 deg, roll 3.0 deg 1200 hrs, 40kt wind, seas 3.0m, swell 3.0m, pitch 2.5 deg, roll 3.0 deg 1800 hrs 45kt wind, seas 2.5m, swell 5.0m, pitch 3.0 deg, roll 2.0 deg 2400 hrs 40kt wind, seas 3.0m, swell 3.0m, pitch 3.0 deg, roll 2.0 deg Operations For Period 0000 Hrs to 0600 Hrs on 11 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description RM TP (WOW) RM 0000 0600 6.00 0.0m Continue to wait on weather to abate off location before anchoring operations can continue. 0600 hrs wind 45kts, seas 2.5m, swell 5.0m, pitch 2.5 deg, roll 2.5 deg Phase Data to 2400hrs, 10 Aug 2005 Phase Phase Hrs Start On Finish On Cum Hrs Cum Days Max... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:006 11-AUG-05 20.0 81.00 Waited on weather to subside to continue rig tow to Basker - 2 location. Started deballasting rig from survival draft in preparation to continue tow to Basker - 2 location Operations For Period 0000 Hrs to 2400 Hrs on 11 Aug 2005 Waited on weather to subside to continue rig tow to Basker - 2 location. Started deballasting rig from survival draft in preparation to continue tow to Basker - 2 location Operations For Period 0000 Hrs to 2400 Hrs on 11 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description RM TP (WOW) RM 0000 2300 23.00 0.0m Continue to wait on weather to abate off location before anchoring operations can continue. 0600 hrs wind 45kts, seas 2.5m, swell 5.0m, pitch 2.5 deg, roll 2.5 deg 1200 hrs wind 40kts, seas 3.0m, swell 3.0m, pitch 2.0 deg, roll 2.0 deg 1800 hrs wind 33kts, seas 3.0m, swell 3.0m, pitch 2.0 deg, roll 2.0 deg 2200 hrs wind 26kts, seas 3.0m, swell 2.0m, pitch 2.0 deg, roll 2.0 deg RM TP (WOW) RM 2300 2400 1.00 0.0m Start deballasting rig from survival draft of 20m to moving draft of 10.7m Operations For Period 0000 Hrs to 0600 Hrs on 12 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description RM TP (WOW) RM 0000 0600 6.00 0.0m Continue deballasting rig from survival draft of 20m to moving draft of 10.7m Phase Data to 2400hrs, 11 Aug 2005 Phase Phase Hrs Start On Finish On Cum Hrs Cum Days Max Depth RIG MOVE/RIG-UP/PRESPUD(RM) 139.5 06 Aug 2005 11 Aug 2005 139.50 5.812 0.0m Bulk Stocks Name Unit In Used Adjust Balance Barite Bulk MT 0 56.6 Bentonite Bulk MT 0 35.3 Diesel m3 0 10.4 294.9 Fresh Water m3 25 24.1 356.6 Drill Water m3 0 0 132.7 Cement G MT 0 47.1 Pumps Pump Data - Last 24 Hrs Slow Pump Data No. Type Liner (in) MW (ppg) Eff (%) SPM (SPM) SPP (psi) Flow (gpm) Depth (m) SPM1 (SPM) SPP1 (psi) Flow1(gpm) SPM2 (SPM) SPP2 (psi) Flow2 (gpm) ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:007 12-AUG-05 200.0 81.00 Deballasted rig at standby location. Picked up # 8 anchor. Towed rig to Basker 2 location. Far Grip set # 4 anchor. Far grip running # 8 anchor Operations For Period 0000 Hrs to 2400 Hrs on 12 Aug 2005 Deballasted rig at standby location. Picked up # 8 anchor. Towed rig to Basker 2 location. Far Grip set # 4 anchor. Far grip running # 8 anchor Operations For Period 0000 Hrs to 2400 Hrs on 12 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description RM TP (WOW) RM 0000 0730 7.50 0.0m Continue deballasting rig from survival draft of 20m to moving draft of 10.7m to resume tow to Basker - 2 location. 0600 hrs - Rig hauled in on # 8 anchor and lifted same while completing deballast 0715 hrs - Anchor # 8 racked. Rig stripping tanks to complete deballast to transit draft RM P RM 0730 1500 7.50 0.0m Continue tow rig to Basker 2 location 1200 hrs 38deg 15.4'S, 148deg 49.1'E, Speed 2.1kts, Travelled 317.3nm, To go 3.6nm RM TP (OTH) AH 1500 1630 1.50 0.0m Far Grip alongside rig to pick up anchor # 4 PCC PCC fouled on rig pontoon Far Grip unfoul PCC from rig pontoon and secure anchor # 4 PCC to boat RM P AH 1630 2045 4.25 0.0m Rig payed out 200m of chain on anchor # 4 Far Grip following rig holding onto anchor # 4 RM P AH 2045 2115 0.50 0.0m At anchor # 4 drop point, Far Grip puts # 4 anchor on bottom at 20:50 hrs Rig continues to be towed to Basker 2 location while rig pays out on # 4 anchor chain RM TP (VE) AH 2115 2215 1.00 0.0m Problems with Nav equipment screen on Far Grip. Far Grip unable to strip back PCC to rig until Nav screen fixed Fugro on rig work with Far Grip to fix Nav screen RM P AH 2215 2400 1.75 0.0m Far Grip strip back # 4 PCC to rig # 4 PCC to rig - 2307 hrs Anchor # 8, MV Far Grip PCC to boat - 2337 hrs Run anchor - 2342 hrs Operations For Period 0000 Hrs to 0600 Hrs on 13 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description RM P AH 0000 0600... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:008 13-AUG-05 1000.0 81.00 Continued to run anchors and pretensioned. Moved rig onto location and ballasted down to drilling draft. Started to pick up tubulars for spudding well. Operations For Period 0000 Hrs to 2400 Hrs on 13 Aug 2005 Continued to run anchors and pretensioned. Moved rig onto location and ballasted down to drilling draft. Started to pick up tubulars for spudding well. Operations For Period 0000 Hrs to 2400 Hrs on 13 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description RM P AH 0000 0600 6.00 0.0m Anchor # 8, MV Far Grip 0020 hrs - Anchor on bottom 0111 hrs - PCC passed to rig Anchor # 1, MV Far Grip 0145 hrs - PCC passed to boat 0206 hrs - running out anchor 0240 hrs - anchor on bottom - Boat reports PCC parted 4m from boat end Anchor # 5, MV Far Grip 0330 hrs - PCC passed to boat 0402 hrs - running out anchor 0433 hrs - anchor on bottom 0550 hrs - PCC back to rig Anchor # 1 slipping at at 123 tonne tension, indicating wrong orientation RM TP (RE) AH 0600 1145 5.75 0.0m MV Far Grip Rigging up "J" Hook to chase out anchor # 1 0715 hrs - Far Grip "J" hooks # 1 chain and begins chasing back to anchor 0815 hrs - Far Grip reports "J" hook come off chain 0837 hrs - Far Grip hooked chain again, chasing out to anchor 1001 hrs - Far Grip reports "J" hook at anchor 1010 hrs - Anchor # 1 off bottom 1032 hrs - Anchor # 1 at Far Grip roller, wrong way round - unable to get to get anchor on deck of boat 1100 hrs - Far Grip advised that decision made to run anchor "as is" without installing new PCC 1135 hrs - Anchor # 1 on bottom 1147 hrs - Far Grip chasing back to rig with "J" hook RM P AH 1145 2300 11.25 0.0m 1147 hrs - MV Wrangler shortens tow wire 1222 hrs - Rig retreived tow wire MV Wrangler rigged down tow system, rigged up to run anchors MV Far Grip rigged down "J" hook gear, rigged up to run anchors Anchor # 2, MV Far Grip 1320 hrs - PCC secured on boat - anchor upside down - correct orientation of anchor 1434 hrs - Run out # ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:009 14-AUG-05 1000.0 208.00 Continued to pick up tubulars for spudding well. Picked up 36" BHA and ran in hole. Spudded well and drilled to 208m. Filled hole with PHG. POOH and racked back BHA. Ran 30 x 20" conductor leaving PGB 2.5m above seabed Operations For Period 0000 Hrs to 2400 Hrs on 14 Aug 2005 Continued to pick up tubulars for spudding well. Picked up 36" BHA and ran in hole. Spudded well and drilled to 208m. Filled hole with PHG. POOH and racked back BHA. Ran 30 x 20" conductor leaving PGB 2.5m above seabed Operations For Period 0000 Hrs to 2400 Hrs on 14 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description SH P PUP 0000 0730 7.50 0.0m Continue pick up 5" DP - total of 1000m of DP picked up Made up 30" cementing stand and running tool. ROV completed 70m radius from well centre seabed scan on video SH P HBHA 0730 1100 3.50 176.0m Picked up 36" BHA. RIH to seafloor. Checked Anderdrift OK. 0�. Water depth confirmed at 154.5m RKB to Mudline at drilling draft of 23.5m = 176m LAT Rig position at 1.3m @ 70deg off location SH P TI 1100 1200 1.00 176.0m ROV observed tag. 177m RKB. Air gap 21.5m. Tide +1.0m. SH P DA 1200 1330 1.50 208.0m Drilled 36" hole to 208m. Pumped 75 bbls of PHG every half stand SH P CHC 1330 1430 1.00 208.0m Took Anderdrift survey at TD = 1.5 deg Circulated 100 bbl PHG out of hole then spotted 230 bbls of PHG in hole SH P TO 1430 1530 1.00 208.0m Pulled out of hole with 36" BHA. No drag noted. Racked back BHA SH P CRN 1530 2200 6.50 208.0m Moved PGB under rotary table. Rigged up and ran 30" conductor through PGB Latched conductor into PGB and installed guidelines Ran in hole with conductor on landing string until 20" shoe at seabed SH TP (OTH) RM 2200 2230 0.50 208.0m 20" shoe approx 2m forward of hole centre. ROV unable to push pipe into hole. Reposition rig so that casing shoe above hole centre SH P CRN 2230 2300 0.50 208.0m Ran in hole with 30" conductor and land... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:010 15-AUG-05 1000.0 472.00 Cemented 30" conductor in place Waited on cement to harden Pulled 30" running tool Laid down 36" BHA Picked up 17 1/2" BHA Ran in hole, drilled out shoe Drilled 17 1/2" hole to 472m Operations For Period 0000 Hrs to 2400 Hrs on 15 Aug 2005 Cemented 30" conductor in place Waited on cement to harden Pulled 30" running tool Laid down 36" BHA Picked up 17 1/2" BHA Ran in hole, drilled out shoe Drilled 17 1/2" hole to 472m Operations For Period 0000 Hrs to 2400 Hrs on 15 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description CH P CMC 0000 0130 1.50 208.0m Cemented 30" conductor in place as per program. Pumped 50 bbls preflush with fluoresene dye added Mixed and pumped 173 bbls of 15.8 ppg cement slurry at 5 bpm Displaced cement with 35.5 bbls seawater. Fluoresene dye observed in returns at seabed CH P WOC 0130 0730 6.00 208.0m Wait on cement to harden Note - 0n 0-5 deg bulls eye - 0.75 deg to starboard; on 0-2 deg bulls eye - 0.5 deg to starboard CH P CRN 0730 0830 1.00 208.0m Released 30" running tool with 5 turns LH and pulled out of hole with tool No change to PGB bullseyes reading. SLM out of hole. No change to top of PGB measurement = 174.5m MSL CH P CRN 0830 1030 2.00 208.0m Torque up service breaks on Cameron 18 3/4" running tools. M/U one running tool to stand of 5" DP and rack back same M/U second running tool to 2m pup joint and lay down on deck CH P HBHA 1030 1130 1.00 208.0m Hold JSA and lay down BHA from 36" hole section SH P HBHA 1130 1530 4.00 208.0m Held JSA and picked up BHA for 17 1/2" hole section SH P HBHA 1530 1630 1.00 208.0m Stabbed into 30" wellhead with 17 1/2" bit and tested MWD - OK SH P DFS 1630 1730 1.00 208.0m Tagged top of cement at 206m. Drilled cement and shoe to 209m SH P DA 1730 2400 6.50 472.0m Drill 17 1/2" hole from 209 - 472m Operations For Period 0000 Hrs to 0600 Hrs on 16 Aug 2005 Phse Cls (RC) Op From To Hrs Depth... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:011 16-AUG-05 1006.0 1006.00 Drilled from 472 - 1006m MSL. Swept hole with 150 bbls PHG Spotted 1.5 times hole volume of PHG in hole Pulled out of hole Operations For Period 0000 Hrs to 2400 Hrs on 16 Aug 2005 Drilled from 472 - 1006m MSL. Swept hole with 150 bbls PHG Spotted 1.5 times hole volume of PHG in hole Pulled out of hole Operations For Period 0000 Hrs to 2400 Hrs on 16 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description SH P DA 0000 1900 19.00 996.0m Drilled 17 1/2" hole from 472 - 996m. Pumped 30 bbls PHG every half stand. Spotted 50 bbls PHG around BHA at connections. SH TP (RE) RR 1900 1930 0.50 996.0m Circulated at 100 SPM with # 1 mud pump while repairing # 2 mud pump. Mud pump # 3 still not available SH P DA 1930 2030 1.00 1,006.0m Continued to drill 17 1/2" hole from 996 - 1006m Tide corrected MSL depth Pumped 30 bbl PHG every half stand Spotted 50 bbl PHG around BHA at connections SH P CHC 2030 2130 1.00 1,006.0m Pumped 150 bbls PHG and swept out of hole with seawater. Displaced hole with 925 bbls of 8.6 ppg PHG followed by 250 bbls of 9.5 ppg weighted gel kill mud. SH P TO 2130 2400 2.50 1,006.0m Pulled out of hole from 1006m MSL 30K overpull at 836 and 786m Wiped hole once with no further overpull Operations For Period 0000 Hrs to 0600 Hrs on 17 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description SH P TO 0000 0200 2.00 1,006.0m Continued to POOH from section TD No more overpull encountered Jetted top of wellhead on way out of hole SH P HBHA 0200 0300 1.00 1,006.0m Laid down MWD, stabs, pony DC and bit SH P HT 0300 0330 0.50 1,006.0m Laid down 30" CART stand SH P RRC 0330 0430 1.00 1,006.0m Made up Dowell DeepSea Express cement head to stand of HWDP and racked back in derrick SH P CRN 0430 0600 1.50 1,006.0m Held JSA Rigged up for and ran 13 3/8" casing Phase Data to 2400hrs, 16 Aug 2005 Phase Phase Hrs Start On Finish On ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:012 17-AUG-05 1006.0 1006.00 Operations For Period 0000 Hrs to 2400 Hrs on 17 Aug 2005 Operations For Period 0000 Hrs to 2400 Hrs on 17 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description SC P TO 0000 0200 2.00 1,006.0m Continued to POOH from section TD No more overpull encountered Jetted top of wellhead on way out of hole SC P HBHA 0200 0300 1.00 1,006.0m Laid down MWD, stabs, pony DC and bit SC P HT 0300 0330 0.50 1,006.0m Laid down 30" CART stand SC P RRC 0330 0430 1.00 1,006.0m Made up Dowell DeepSea Express cement head to stand of HWDP and racked back in derrick SC P CRN 0430 0500 0.50 1,006.0m Held JSA Rig up for and run 13 3/8" casing. SC P CRN 0500 1200 7.00 1,006.0m Picked up shoe track and test float and shoe. Run 13 3/8" csg. SC P CRN 1200 1300 1.00 1,006.0m Made up Deep Sea Express head SC P CRN 1300 1400 1.00 1,006.0m Ran in with landing string and landed out 18 3/4" Wellhead housing into 30" housing. Confirmed locked in with 60k overpull. SC P CMC 1400 1500 1.00 1,006.0m Hold JSA with cementer and crew. Rigged up and tested cement line with 3500 psi. SC P CIC 1500 1600 1.00 1,006.0m Circulated casing capacity at 95 SPM and 400 psi. SC P CMC 1600 1800 2.00 1,006.0m Mixed and pump cement as per program. Lead @ 12.5 ppg total slurry 348 bbls. Tail @ 15.8 ppg total slurry 175 bbls. Good returns noted at sea bed with ROV while cementing. SC P CMC 1800 1900 1.00 1,006.0m Displaced cement with rig pump and bumped plug with 3248 stks and 1400 psi. Hold for 10 minutes , good test ( 500 psi over final circulating pressure ) Check float holding. Good returns of cement noted at sea bed with ROV while displacing cement. SC P CMC 1900 1930 0.50 1,006.0m Rigged down cement lines. SC P TO 1930 2030 1.00 1,006.0m Released wellhead running tool and POOH same. SC P TO 2030 2100 0.50 1,006.0m Service break and lay down Deepsea Express. BOP P BOP ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:013 18-AUG-05 1006.0 1006.00 Operations For Period 0000 Hrs to 2400 Hrs on 18 Aug 2005 Operations For Period 0000 Hrs to 2400 Hrs on 18 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description BOP P BOP 0000 1330 13.50 1,006.0m Continue to run BOP'S on marine riser. Test choke and kill lines each 4 joints, 250psi / 5000psi BOP P BOP 1330 1500 1.50 1,006.0m Made up slip joint and landing joint. BOP P BOP 1500 1800 3.00 1,006.0m Made up choke and kill lines and booster lines to slip joint, via goosenecks. BOP P BOP 1800 1830 0.50 1,006.0m Latch tensioner landing ring to slip joint. BOP TU (RE) BOP 1830 1930 1.00 1,006.0m Troubleshoot tensioner landing ring ( SDL ring ). 1 x hydraulic Locking Dog failed to operate, freed up same. BOP P BOP 1930 2200 2.50 1,006.0m Pressure up on tensioners. Attached storm saddles, to Pod wireline for Pod hoses. Position rig back over location. BOP P BOP 2200 2400 2.00 1,006.0m Land and latch BOP, took 50 kips overpull on both Pods. Secured Pod hoses in storm saddles. Secured compensator line to slip joint for wireline. NOTE # BULLSEYE READINGS. Prior landing , BOP 3/4 stb fwd, riser 1/4 stb. After landing , BOP 3/4 stb, riser 1/2 stb Operations For Period 0000 Hrs to 0600 Hrs on 19 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description IH P BOP 0000 0130 1.50 1,006.0m Release landing joint and stroke out slip joint. IH P BOP 0130 0230 1.00 1,006.0m Pick up and install divertor. IH P BOP 0230 0300 0.50 1,006.0m Rig down riser running equipment. IH P BOP 0300 0430 1.50 1,006.0m Made up CART tool and ran in hole and seated same. IH P BOP 0430 0530 1.00 1,006.0m Perform connection test,250psi/5000psi. Pressure tested on both Pods. IH P BOP 0530 0600 0.50 1,006.0m Unseat CART tool and pull out same. Phase Data to 2400hrs, 18 Aug 2005 Phase Phase Hrs Start On Finish On Cum Hrs Cum Days Max Depth RI... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:014 19-AUG-05 1006.0 1006.00 Attempted to run velocity survey. Engine of wireline unit failed at 40m. Pulled out of hole and rigged down wireline. Began to pick up BHA and make up drillpipe. Operations For Period 0000 Hrs to 2400 Hrs on 19 Aug 2005 Attempted to run velocity survey. Engine of wireline unit failed at 40m. Pulled out of hole and rigged down wireline. Began to pick up BHA and make up drillpipe. Operations For Period 0000 Hrs to 2400 Hrs on 19 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description BOP P BOP 0000 0130 1.50 1,006.0m Release landing joint and stroke out slip joint. BOP P BOP 0130 0230 1.00 1,006.0m Pick up and install divertor. BOP P BOP 0230 0300 0.50 1,006.0m Rig down riser running equipment. BOP P BOP 0300 0430 1.50 1,006.0m Made up CART tool and ran in hole and seated same. BOP P BOP 0430 0530 1.00 1,006.0m Perform connection test,250psi/5000psi. Pressure tested on both Pods. BOP TU (BORC) BOP 0530 0800 2.50 1,006.0m Unseat CART tool and attempt to pull out same. Hanging up on middle pipe rams, function rams and work through. Pull out and laid down same. E1 P RP 0800 1030 2.50 1,006.0m Hold JSA and rigged up wireline. Made up and ran Log #1, Velocity survey E1 TU (OTH) RP 1030 1200 1.50 1,006.0m Pulled out Velocity survey tools and laid down same. Rigged down wireline, due to Unit failure. Unit main engine problem. IH P PLD 1200 1300 1.00 1,006.0m Hold JSA and laid down 9" DC IH P HBHA 1300 1500 2.00 1,006.0m Make up 12 1/4" Directional BHA, DHM set at 1.15 degrees. IH P HT 1500 1600 1.00 1,006.0m Upload MWD IH P HBHA 1600 1800 2.00 1,006.0m Cont make-up 12 1/4" BHA to 200m IH P PUP 1800 2000 2.00 1,006.0m Hold JSA and pick up 5" drill pipe, cont run in from 200m to 344m. Total 144m of pipe picked up. IH P TO 2000 2130 1.50 1,006.0m Pull out from 344m to 200m and rack pipe in derrick. IH P HT 2130 2230 1.00 1,006.0m ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:015 20-AUG-05 1689.0 1539.00 Drilled ahead in Mars and interbedded Calcarenites of the Gippsland Limestone Formation. Backgroung gas averaging C1 1000ppg, C2 15ppm, C3 10ppm, no noticeable gas peaks. Average ROP 40m/hr. Operations For Period 0000 Hrs to 2400 Hrs on 20 Aug 2005 Drilled ahead in Mars and interbedded Calcarenites of the Gippsland Limestone Formation. Backgroung gas averaging C1 1000ppg, C2 15ppm, C3 10ppm, no noticeable gas peaks. Average ROP 40m/hr. Operations For Period 0000 Hrs to 2400 Hrs on 20 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description IH P SM 0000 0100 1.00 1,006.0m Simulate well kick and perform choke drill. Record CLFL. Simulate bringing pumps on line and shutting pumps down during kill. IH P PUP 0100 0330 2.50 1,066.0m Continue to pick up 5" drill pipe from 344m to 889m. IH P TI 0330 0400 0.50 1,006.0m Run in hole from 889m to TOC at 982m IH P DFS 0400 0630 2.50 1,006.0m Drill cement and plugs and float equipment. Start to displace to 8.74ppg mud while drilling shoe track. IH P DM 0630 0700 0.50 1,066.0m Drill 12�" hole f/ 1005m to 1008m. Circulate clean. IH P LOT 0700 0730 0.50 1,066.0m POOH f/ 1008m to csg shoe @1000m. LOT w/ 8.5 ppg. 622psi equivalent to 12.5ppg. IH P CMD 0730 0800 0.50 1,066.0m SCRs @ 1000m #2 pump 30spm 150psi. 40 spm 190psi, 50 spm 210 psi. #3 pump 30spm 140psi, 40spm 170psi, 50 spm 200psi. IH P DM 0800 2400 16.00 1,539.0m Drill 12�" hole f/ 1008m to 1539m. Operations For Period 0000 Hrs to 0600 Hrs on 21 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description IH P DM 0000 0500 5.00 1,689.0m Cont drill 12 1/4" hole to 1689m IH P CHC 0500 0600 1.00 1,689.0m (IN PROGRESS) Circulate hole clean, flow check and slug pipe. Phase Data to 2400hrs, 20 Aug 2005 Phase Phase Hrs Start On Finish On Cum Hrs Cum Days Max Depth RIG MOVE/RIG-UP/PRESPUD(RM) 154.5 06 Aug 2005 12 Aug 2005 154.50 6.438 ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:016 21-AUG-05 1989.0 1893.00 Drill ahead in the Gippsland Limestone and into the Lakes Entrance Formation. Lakes Entrance at 1755m MD 1733.5m SS. Operations For Period 0000 Hrs to 2400 Hrs on 21 Aug 2005 Drill ahead in the Gippsland Limestone and into the Lakes Entrance Formation. Lakes Entrance at 1755m MD 1733.5m SS. Operations For Period 0000 Hrs to 2400 Hrs on 21 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description IH P DM 0000 0500 5.00 1,689.0m Cont drill 12 1/4" hole to 1689m IH P CHC 0500 0630 1.50 1,689.0m Circulate hole clean, flow check and slug pipe. IH P TO 0630 0830 2.00 1,689.0m Pulled out of hole from 1690m to 716m. IH P PUP 0830 1000 1.50 1,689.0m Pick up drill pipe from 716m to 1004m. IH P TO 1000 1030 0.50 1,689.0m Pulled out of hole from 1004m to 716m. IH P PUP 1030 1200 1.50 1,689.0m Pick up drill pipe from 716m to 1004m. IH P TO 1200 1230 0.50 1,689.0m Pulled out of hole from 1004m to 716m. IH P PUP 1230 1430 2.00 1,689.0m Pick up drill pipe from 716m to 1090m. IH P TI 1430 1600 1.50 1,689.0m Run in hole with pipe from derrick from 1090m to 1689m. No fill recorded. IH P DA 1600 1930 3.50 1,783.0m Drill 12 1/4" hole from 1689m to 1783m. IH P DM 1930 2030 1.00 1,789.0m Slide from 1783m to 1789m. IH P DA 2030 2400 3.50 1,893.0m Drill 12 1/4" hole from 1789m to 1893m. Operations For Period 0000 Hrs to 0600 Hrs on 22 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description IH P DA 0000 0600 6.00 2,007.0m Drill 12 1/4" hole from 1893m to 2007m. Slide from 1928m to 1938m.( 1hr ) Slide from 1956m to 1959m. ( .5hr) Slide from 1985m to 1989m ( .5hr) Phase Data to 2400hrs, 21 Aug 2005 Phase Phase Hrs Start On Finish On Cum Hrs Cum Days Max Depth RIG MOVE/RIG-UP/PRESPUD(RM) 154.5 06 Aug 2005 12 Aug 2005 154.50 6.438 0.0m ANCHORING(A) 32 12 Aug 2005 13 Aug 2005 186.50 7.771 0.0m PRESPUD(PS) 8.5 13... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:017 22-AUG-05 2497.0 1006.00 Rotary/slide drilling 12-1/4" hole 1893 - 2438m Operations For Period 0000 Hrs to 2400 Hrs on 22 Aug 2005 Rotary/slide drilling 12-1/4" hole 1893 - 2438m Operations For Period 0000 Hrs to 2400 Hrs on 22 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description IH P DA 0000 2400 24.00 2,438.0m Drill 12 1/4" hole from 1893m to 2438m. Slide from 1928m to 1938m.( 1hr ) Slide from 1956m to 1959m. ( .5hr) Slide from 1985m to 1989m ( .5hr) Flow check @ 2166m Operations For Period 0000 Hrs to 0600 Hrs on 23 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description IH P DA 0000 0500 5.00 2,497.0m Drill 12 1/4" hole from 2438m to 2497m Slide from 2465m to 2476m ( 1 hr ) Slide from 2482m to 2497m ( 2 hr ) Unable to set tool face, pipe stacking, 100psi DHM Diff on last slide. ( Last survey @ 2472m, inc 2.07, az 337.28 ) IH U TO 0500 0600 1.00 2,497.0m Flow check and pull out of hole from 2497m Phase Data to 2400hrs, 22 Aug 2005 Phase Phase Hrs Start On Finish On Cum Hrs Cum Days Max Depth RIG MOVE/RIG-UP/PRESPUD(RM) 154.5 06 Aug 2005 12 Aug 2005 154.50 6.438 0.0m ANCHORING(A) 32 12 Aug 2005 13 Aug 2005 186.50 7.771 0.0m PRESPUD(PS) 8.5 13 Aug 2005 14 Aug 2005 195.00 8.125 0.0m CONDUCTOR CASING(CC) 9.5 14 Aug 2005 14 Aug 2005 204.50 8.521 209.0m CONDUCTOR HOLE(CH) 18.5 14 Aug 2005 15 Aug 2005 223.00 9.292 209.0m SURFACE HOLE(SH) 33 15 Aug 2005 16 Aug 2005 256.00 10.667 1,006.0m SURFACE CASING(SC) 24.5 16 Aug 2005 17 Aug 2005 280.50 11.688 1,006.0m RISER AND BOP STACK(BOP) 35 17 Aug 2005 19 Aug 2005 315.50 13.146 1,006.0m EVALUATION PHASE (1)(E1) 4 19 Aug 2005 19 Aug 2005 319.50 13.312 1,006.0m INTERMEDIATE HOLE(IH) 84 19 Aug 2005 22 Aug 2005 403.50 16.812 2,438.0m General Comments 00:00 TO 24:00 Hrs ON 22 Aug 2005 'Copyright IDS 2005', TF/JG 20050815, ANZON_AU_drllg Page 1 Printed on 23 Aug 2005 WBM Dat... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:018 23-AUG-05 2497.0 2497.00 Drilled ahead to 2497 mMDRT. Pulled out of hole to change bit. Hung up at BOPs on the way out of hole. Suspected problem with the BOP rams or wear-bushing. Attempted to get free. Operations For Period 0000 Hrs to 2400 Hrs on 23 Aug 2005 Drilled ahead to 2497 mMDRT. Pulled out of hole to change bit. Hung up at BOPs on the way out of hole. Suspected problem with the BOP rams or wear-bushing. Attempted to get free. Operations For Period 0000 Hrs to 2400 Hrs on 23 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description IH P DA 0000 0500 5.00 2,497.0m Drill 12 1/4" hole from 2438m to 2497m Slide from 2465m to 2476m ( 1 hr ) Slide from 2482m to 2497m ( 2 hr ) Unable to set tool face, pipe stacking, 100psi DHM Diff on last slide. ( Last survey @ 2472m, inc 2.07, az 337.28 ) IH U TO 0500 1030 5.50 2,497.0m Flow check and pull out of hole from 2497m to 200m IH TU (BORC) TO 1030 1900 8.50 2,497.0m Pulled from 200m to 197m and top stabilizer hang up in middle pipe ram. Total recorded overpull 710kips. Attempt to work pipe free. ( Ballast and de-ballast rig as required to keep tool joint at table ) IH TU (BORC) TO 1900 2000 1.00 2,497.0m Perform well bore integrity test with 10ppg mud. Surface pressure 500 psi , good test. IH TU (BORC) TO 2000 2030 0.50 2,497.0m De-ballast rig to 22m draft. IH TU (BORC) TO 2030 2130 1.00 2,497.0m Pumped down choke and kill lines @ 95 SPM= 200psi, to check for restrictive flow under middle pipe rams. Same pressure above and below, indicates no full bore tool across middle pipe ram. IH TU (BORC) TO 2130 2200 0.50 2,497.0m Function middle pipe ram at full operating pressure both close and open. Ram failed to take correct operating fluid, all surface indications are ram failed to move in any direction. IH TU (BORC) TO 2200 2230 0.50 2,497.0m Picked up 8" drill collar and hammered stuck 5" drill pipe elevators free from tool joint. IH U (BORC) TO 2230 ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:019 24-AUG-05 2497.0 2497.00 Attempted to jar down and get BHA free from BOPs, no success. Rigged up Schlumberger wireline back-off shot. Backed-off string, leaving one joint of HWDP on fish. Pulled out of hole with drillpipe above backed-off point. Operations For Period 0000 Hrs to 2400 Hrs on 24 Aug 2005 Attempted to jar down and get BHA free from BOPs, no success. Rigged up Schlumberger wireline back-off shot. Backed-off string, leaving one joint of HWDP on fish. Pulled out of hole with drillpipe above backed-off point. Operations For Period 0000 Hrs to 2400 Hrs on 24 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description IH TU (BORC) TO 0000 0100 1.00 2,497.0m Make up bumper sub and x/o's and 2 joints of 8" drill collars. IH TU (BORC) TO 0100 0300 2.00 2,497.0m Attempt to hammer / bump down using bumper sub. Unable to close mandrel. Back out and lubricate mandrel and hammer close and pull open on rotary table. IH TU (BORC) TO 0300 0900 6.00 2,497.0m Using drilling jars, jar down on stuck pipe. 8 minute firing time from jar cocking. IH TU (BORC) FSH 0900 1000 1.00 2,497.0m Cease jarring operations. ROV to observe BOP hoses for " hose jump " as BOP functioned. Nothing untoward noted. IH TU (BORC) FSH 1000 1300 3.00 2,497.0m Continue to jar down . IH TU (BORC) FSH 1300 1330 0.50 2,497.0m Laid down 2 x DC and bumper sub. IH TU (BORC) FSH 1330 1830 5.00 2,497.0m Induct wireline crew. Prepare JSA's. Prepare for hanging of wireline sheave at crown. IH TU (BORC) FSH 1830 1930 1.00 2,497.0m Rig up wireline sheave at crown IH TU (BORC) FSH 1930 2100 1.50 2,497.0m Make up 6 string shot back off charge and run in and correlate to leave 1 jnt 5" HWDP on fish @ 125m IH TU (BORC) FSH 2100 2130 0.50 2,497.0m Apply 18000ftlbs of left hand torque and fire shot. Positive surface indications of back off. Recover wireline. IH TU (BORC) FSH 2130 2200 0.50 2,497.0m Rig down lower wireline sheave ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:020 25-AUG-05 2497.0 2497.00 POOH with BHA. Downloaded LWD memory data. Rigged up and RIH with storm-packer on drillpipe. Set and tested storm packer. Pulled out of hole and prepared for pulling the stack. Operations For Period 0000 Hrs to 2400 Hrs on 25 Aug 2005 POOH with BHA. Downloaded LWD memory data. Rigged up and RIH with storm-packer on drillpipe. Set and tested storm packer. Pulled out of hole and prepared for pulling the stack. Operations For Period 0000 Hrs to 2400 Hrs on 25 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description IH TU (BORC) FSH 0000 0500 5.00 2,497.0m Hold JSA, pick up and make up fishing assy. Skirted screw in sub,bumpersub, 4x91/2"DC, 6X8"DC. IH TU (BORC) FSH 0500 0530 0.50 2,497.0m Tag and engage fish. Screw into fish with 18000ftlbs and confirm same with 50kips overpull. IH TU (BORC) FSH 0530 0600 0.50 2,497.0m Commence to jar down on fish, unable to get sufficient jarring action with top drive connected. Back out top drive and continue to jar down on fish. Jarred down twice with Top Drive and three times without top drive connected. Fish jarred free. IH TU (BORC) FSH 0600 0730 1.50 2,497.0m Run in hole with fish to position single of 5" HWDP across middle pipe rams to enable full travel on ram during functioning. IH TU (BORC) FSH 0730 0930 2.00 2,497.0m Tag up on obstruction, jars @ middle pipe ram, suspect one ram block not functioning correctly on middle pipe rams. IH TU (BORC) FSH 0930 1000 0.50 2,497.0m Space out to put 8" DC across rams, closed upper and lower pipe rams in a effort to push the non functioning ram block back into the ram cavity on the middle pipe rams. Confirm obstruction cleared. IH TU (BORC) FSH 1000 1600 6.00 2,497.0m Pull out of hole with fish and break down same. Confirm damage to upper stabilizer. Laid down fishing assy. IH TU (BORC) TI 1600 2030 4.50 2,497.0m Run in hole open ended pipe to 542m, pick up RTTS packer and set same. Packer setti... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:021 26-AUG-05 2497.0 2497.00 Pulled stack. Examined BOPs for damage. Operations For Period 0000 Hrs to 2400 Hrs on 26 Aug 2005 Pulled stack. Examined BOPs for damage. Operations For Period 0000 Hrs to 2400 Hrs on 26 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description IH TU (BORC) BOP 0000 0100 1.00 2,497.0m Install divertor running tool and pull divertor, lay down same. IH TU (BORC) BOP 0100 0230 1.50 2,497.0m Pick up landing joint and lock up slip joint. IH TU (BORC) BOP 0230 0300 0.50 2,497.0m Observe un-latch of BOP with ROV. IH TU (BORC) BOP 0300 0600 3.00 2,497.0m Rig down storm loops and saddles, remove choke and kill lines. Move rig off location. IH TU (BORC) BOP 0600 1200 6.00 2,497.0m Lay down landing joint and slip joint and pull marine riser. Landout BOP on carrier. ( ROV install dust cover on wellhead ) IH TU (BORC) BOP 1200 1500 3.00 2,497.0m Remove guide lines from BOP, move BOP stb on carrier. IH TU (BORC) BOP 1500 1600 1.00 2,497.0m Open middle pipe ram bonnet's. IH TU (BORC) BOP 1600 2400 8.00 2,497.0m Remove middle pipe ram blocks and inspect cavity. Trouble shoot BOP functions. ( Laid down excess BHA from derrick and M/U next 12 1/4" bit run ) NOTE, ram block damage indicates possible junk in hole. Ram blocks not serviceable. Middle ram cavity is servicable. Operations For Period 0000 Hrs to 0600 Hrs on 27 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description IH TU (BORC) BOP 0000 0600 6.00 2,497.0m Open shear rams, VPR and lower pipe rams and inspect same. Check ram cavities. No defects noted. Unable to trouble shoot control system, as BOP bled down for cleaning/inspection operations. Phase Data to 2400hrs, 26 Aug 2005 Phase Phase Hrs Start On Finish On Cum Hrs Cum Days Max Depth RIG MOVE/RIG-UP/PRESPUD(RM) 154.5 06 Aug 2005 12 Aug 2005 154.50 6.438 0.0m ANCHORING(A) 32 12 Aug 2005 13 Aug 2005 186.50 7.771 0.0m PRES... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:102 01-SEP-05 2690.0 2664.10 Drilled ahead directionally from 2575 mMDRT. Continued to slide to build angle following kick-off. Drilled through abundant thinly interbedded pyritised and dolomitised stringers within the K2 Sand from 2613-2664 mMDRT. Operations For Period 0000 Hrs to 2400 Hrs on 01 Sep 2005 Drilled ahead directionally from 2575 mMDRT. Continued to slide to build angle following kick-off. Drilled through abundant thinly interbedded pyritised and dolomitised stringers within the K2 Sand from 2613-2664 mMDRT. Operations For Period 0000 Hrs to 2400 Hrs on 01 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description IH P DM 0000 0830 8.50 2,619.0m Continued to slide drill 12 1/4" hole from 2575m to 2619m IH TU (RE) DM 0830 1030 2.00 2,619.0m Circulate on pump # 1, due to electrical fault on blower motors for pumps #2 & #3. Trouble shoot same. IH P DM 1030 1500 4.50 2,632.0m Contine to slide drill 12 1/4" hole from 2619m to 2632m, using pumps #1 & #3. IH TU (RE) DM 1500 1600 1.00 2,632.0m Circulate on pump #3, due to swab failure on pump #1 and electrical fault on pump #2 still unresolved. IH P DM 1600 2330 7.50 2,665.0m Continue to slide drill 12 1/4" hole from 2632m to 2665m, using pumps #1 & #3. IH P RW 2330 2400 0.50 2,665.0m Stuck on bottom, cock and fire jars once with 70 kips o/pull, pipe free. Work stand from 2665m to 2642m Operations For Period 0000 Hrs to 0600 Hrs on 02 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description IH P RW 0000 0030 0.50 2,665.0m Continued to wipe and backream stand, from 2665m to 2642m. Hole cleaned up, off bottom rotary torque 5000ft/lbs. IH P DA 0030 0130 1.00 2,671.0m Rotary drill 12 1/4" hole from 2665m to 2671m IH P DM 0130 0230 1.00 2,671.0m Attempt to slide drill 12 1/4" hole @ 2671m, unsuccessful. IH P DA 0230 0300 0.50 2,675.0m Rotary drill 12 1/4" hole from 2671m to 2675m IH P DM 0300 0600 3.00 2,690.... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:102 28-AUG-05 2497.0 2497.00 Function test BOP's. Trouble shoot operating system Operations For Period 0000 Hrs to 2400 Hrs on 28 Aug 2005 Function test BOP's. Trouble shoot operating system Operations For Period 0000 Hrs to 2400 Hrs on 28 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description IH TU (BORC) BOP 0000 1200 12.00 2,497.0m Start to function test BOP. Trouble shoot operating system during function testing. P/Test LPR,UPR,MPR, 5/10min, 250/5000psi. Monitor middle pipe ram closing pressure.All testing done in full drilling mode in an attempt to re-create previous problem. No faults in the operating system were noted. New MPR ram blocks,5"DP packers, top seals and side packers installed. IH TU (BORC) BOP 1200 2400 12.00 2,497.0m Continued to test BOP rams and fail safe valves.Test Annulars to 3500psi. Lower outer kill failsafe failed to test. Strip and re-build same. Move BOP from carrier and stow on main deck to clean test stump after cuttings plugged up test stump from Annular test. Re-install BOP on carrier, install blind cap for shear ram test. Operations For Period 0000 Hrs to 0600 Hrs on 29 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description IH TU (BORC) BOP 0000 0600 6.00 2,497.0m Failsafe on kill line failed again re-build same. Installed new gate and seat and re-build kit into failsafe valve. Re-installing failsafe @ 0600hrs. SPM valves and Yellow pod regulator still to be changed. Shear ram and failsafe still to be tested. Phase Data to 2400hrs, 28 Aug 2005 Phase Phase Hrs Start On Finish On Cum Hrs Cum Days Max Depth RIG MOVE/RIG-UP/PRESPUD(RM) 154.5 06 Aug 2005 12 Aug 2005 154.50 6.438 0.0m ANCHORING(A) 32 12 Aug 2005 13 Aug 2005 186.50 7.771 0.0m PRESPUD(PS) 8.5 13 Aug 2005 14 Aug 2005 195.00 8.125 0.0m CONDUCTOR CASING(CC) 9.5 14 Aug 2005 14 Aug 2005 204.50 8.521 209.0m CONDUCTOR HOLE(CH) 18.5 14 Aug 2005 15 Aug 2005 223.00 9.292 209.0m SURFACE... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:102 29-AUG-05 2497.0 2497.00 Trouble shoot BOPs. Pressure test BOP's. Run BOP's on marine riser. Operations For Period 0000 Hrs to 2400 Hrs on 29 Aug 2005 Trouble shoot BOPs. Pressure test BOP's. Run BOP's on marine riser. Operations For Period 0000 Hrs to 2400 Hrs on 29 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description IH TU (BORC) BOP 0000 1200 12.00 2,497.0m Failsafe on kill line failed again re-build same. Installed new gate and seat and re-build kit into failsafe valve. Re-test failsafe and shear rams. Complete full BOP pressure test, 250/5000psi , 5/10mins. IH TU (BORC) BOP 1200 1800 6.00 2,497.0m Install new regulator on yellow pod. Install new open and close SPM valves on yellow pod middle pipe ram. Install new hose on close side middle pipe ram. Perform full function test on both pods. ( P/U double of riser ) IH TU (BORC) BOP 1800 1930 1.50 2,497.0m Move BOP on carrier under rotary table and install guide lines. IH TU (BORC) BOP 1930 2030 1.00 2,497.0m Connect double of riser to BOP, lift and remove carrier. Run down double and land in spider. IH TU (BORC) BOP 2030 2130 1.00 2,497.0m Pressure test double with 250/5000 psi, 5/10mins using cement unit. IH TU (BORC) BOP 2130 2400 2.50 2,497.0m Run BOP on marine riser. Operations For Period 0000 Hrs to 0600 Hrs on 30 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description IH TU (BORC) BOP 0000 0200 2.00 2,497.0m Continue to run BOP on marine riser. IH TU (BORC) BOP 0200 0230 0.50 2,497.0m P/U slip joint and landing joint. IH TU (BORC) BOP 0230 0400 1.50 2,497.0m Install choke and kill lines onto slip joint and pressure test same. 250/5000psi , 5/10mins. IH TU (BORC) BOP 0400 0600 2.00 2,497.0m Latch tensioner ring onto slipjoint. Weight transfer from travelling block to riser tensioners, while moving rig back onto location. ( Jump ROV and remove dust cover from wellhead ) Phase Data to 2400hr... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:102 30-AUG-05 2497.0 2497.00 Ran Bop's on Riser and latched . Pressure tested connections. Pulled storm packer. Displace riser to 10ppg mud. Started picking up BHA. Operations For Period 0000 Hrs to 2400 Hrs on 30 Aug 2005 Ran Bop's on Riser and latched . Pressure tested connections. Pulled storm packer. Displace riser to 10ppg mud. Started picking up BHA. Operations For Period 0000 Hrs to 2400 Hrs on 30 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description IH TU (BORC) BOP 0000 0200 2.00 2,497.0m Continue to run BOP on marine riser. IH TU (BORC) BOP 0200 0400 2.00 2,497.0m P/U slip joint and landing joint. Install choke and kill lines onto slip joint and pressure test same 250/5000psi , 5/10mins. IH TU (BORC) BOP 0400 0500 1.00 2,497.0m Latch tensioner ring onto slipjoint. Weight transfer from travelling block to riser tensioners, while moving rig back onto location. ( Jump ROV and remove dust cover from wellhead ) IH TU (BORC) BOP 0500 0600 1.00 2,497.0m Rig up storm saddles for pod hoses. IH TU (BORC) BOP 0600 0700 1.00 2,497.0m Land and latch BOP , confirm same with 50kips overpull on connector on both pods. IH TU (BORC) BOP 0700 0800 1.00 2,497.0m Un-lock inner barrel on slip joint while establishing storm loops in pod hoses. IH TU (BORC) BOP 0800 1000 2.00 2,497.0m Lay out landing joint and pick up and install divertor. IH TU (BORC) BOP 1000 1100 1.00 2,497.0m Rig down marine riser running equipment. IH TU (BORC) BOP 1100 1330 2.50 2,497.0m Pick up and run WSTT tool for connector pressure test. IH TU (BORC) BOP 1330 1500 1.50 2,497.0m Perform connector pressure against upper rams, 250/5000psi , 5/10mins. Perform full function test using both pods to check operating time within API spec, with subsea accumulators isolated. Good function and pressure test. IH TU (BORC) BOP 1500 1600 1.00 2,497.0m Pull out and lay down WSTT tool. IH TU (BORC) TI 1600 1830 2.50 2,497.0... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:102 31-AUG-05 2607.0 2574.80 POOH drill pipe from below storm packer. Make up BHA, initialize LWD and RIH. Shallow test LWD at 100m. RIH to 2497m, circulate and condition mud. Directionally drilled ahead from 2497 mMDRT alternating between sliding and rotating fir directional control. Operations For Period 0000 Hrs to 2400 Hrs on 31 Aug 2005 POOH drill pipe from below storm packer. Make up BHA, initialize LWD and RIH. Shallow test LWD at 100m. RIH to 2497m, circulate and condition mud. Directionally drilled ahead from 2497 mMDRT alternating between sliding and rotating fir directional control. Operations For Period 0000 Hrs to 2400 Hrs on 31 Aug 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description IH TU (BORC) TO 0000 0030 0.50 2,497.0m Continue to pull out of hole with open ended DP. IH TU (BORC) HBHA 0030 0500 4.50 2,497.0m M/U 12 1/4" BHA, picked up MWD initialise same. Set and orientate motor to MWD. Run in hole BHA to BOP. IH P TI 0500 0700 2.00 2,497.0m Run in hole to 1000m for shallow pulse test MWD at shoe, circ 15 mins. IH P TI 0700 1100 4.00 2,497.0m Continued to run in hole from 1000m to 2497m. No hole problems encountered. IH P CMD 1100 1200 1.00 2,497.0m Circulate and condition mud, maintain 10ppg. Took SCR'S IH P DA 1200 1330 1.50 2,509.0m Drill in rotary 12 1/4" hole from 2497m to 2509m IH P DM 1330 1830 5.00 2,542.0m Slide drill 12 1/4" hole from 2509m to 2542m IH P DA 1830 1930 1.00 2,554.0m Drill in rotary 12 1/4" hole from 2542m to2554m IH P DM 1930 2400 4.50 2,575.0m Slide drill 12 1/4" hole from 2554m to 2575m Operations For Period 0000 Hrs to 0600 Hrs on 01 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description IH P DM 0000 0600 6.00 2,607.0m Continued to slide drill 12 1/4" hole from 2575m to 2607m Phase Data to 2400hrs, 31 Aug 2005 Phase Phase Hrs Start On Finish On Cum Hrs Cum Days Max Depth RIG MOVE/RIG-UP/PRESPUD(RM) ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:202 03-SEP-05 2741.0 2739.50 Operations For Period 0000 Hrs to 2400 Hrs on 03 Sep 2005 Operations For Period 0000 Hrs to 2400 Hrs on 03 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description IH P TO 0000 0230 2.50 2,741.0m Flow check 15 min @ shoe, Pull out of hole from 1207m to 202m IH P TO 0230 0400 1.50 2,741.0m Flow check @ BOP'S and pull out with 12 1/4" BHA, break out bit and plug into MWD to enable a download while racked in derrick. IH P HT 0400 0600 2.00 2,741.0m Make up deepsea express cement head and rack back same. Make up 9 5/8" Hanger and CHSART, install wiper plugs. Phase Data to 2400hrs, 03 Sep 2005 Phase Phase Hrs Start On Finish On Cum Hrs Cum Days Max Depth RIG MOVE/RIG-UP/PRESPUD(RM) 154.5 06 Aug 2005 12 Aug 2005 154.50 6.438 0.0m ANCHORING(A) 32 12 Aug 2005 13 Aug 2005 186.50 7.771 0.0m PRESPUD(PS) 8.5 13 Aug 2005 14 Aug 2005 195.00 8.125 0.0m CONDUCTOR CASING(CC) 9.5 14 Aug 2005 14 Aug 2005 204.50 8.521 209.0m CONDUCTOR HOLE(CH) 18.5 14 Aug 2005 15 Aug 2005 223.00 9.292 209.0m SURFACE HOLE(SH) 33 15 Aug 2005 16 Aug 2005 256.00 10.667 1,006.0m SURFACE CASING(SC) 24.5 16 Aug 2005 17 Aug 2005 280.50 11.688 1,006.0m RISER AND BOP STACK(BOP) 35 17 Aug 2005 19 Aug 2005 315.50 13.146 1,006.0m EVALUATION PHASE (1)(E1) 4 19 Aug 2005 19 Aug 2005 319.50 13.312 1,006.0m INTERMEDIATE HOLE(IH) 354 19 Aug 2005 03 Sep 2005 673.50 28.062 2,741.0m Bit # 4 Wear I O1 D L B G O2 R w 4 4 WT G E 2 BT BHA Bitwear Comments: Size ("): 12.250in IADC# 437X Nozzles Drilled over last 24 hrs Calculated over Bit Run Mfr: Not Found WOB(avg) No. Size 1 20/32nd" 1 20/32nd" 1 20/32nd" 1 20/32nd" Progress Cum. Progress 245.0m Type: Rock RPM(avg) On Bottom Hrs Cum. On Btm Hrs 36.0h Serial No.: MR6231 F.Rate IADC Drill Hrs Cum IADC Drill Hrs 42.5h Bit Model GFS10BV SPP Total Revs Cum Total Revs 411 Depth In 2,49... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:203 04-SEP-05 2872.0 2838.90 RIH to bottom and started drilling ahead in 12.25" hole from 2741 mMDRT. Average ROP = 5-10 m/hr. Background gas readings displayed in summary sheet. Operations For Period 0000 Hrs to 2400 Hrs on 04 Sep 2005 RIH to bottom and started drilling ahead in 12.25" hole from 2741 mMDRT. Average ROP = 5-10 m/hr. Background gas readings displayed in summary sheet. Operations For Period 0000 Hrs to 2400 Hrs on 04 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description E1 P TI 0000 0100 1.00 2,741.0m Run in hole with 12 1/4" directional BHA from 512m to 1000m E1 P TI 0100 0130 0.50 2,741.0m Service TDS and travelling blocks. E1 P TI 0130 0700 5.50 2,741.0m Continue to run in hole with 12 1/4" directional BHA from 1000m to 2628m, hole good. 30,000lbs of drag from 2350m to 2628m, wipe clear each stand. E1 P WIN 0700 0830 1.50 2,741.0m Excessive hole drag, unable to wipe clean, wash and ream from 2628m to 2741m IH P DM 0830 0900 0.50 2,745.0m Orientate tool face and slide drill 12 1/4" hole from 2741m to 2745m IH P OA 0900 0930 0.50 2,745.0m Cycle mud pumps to change the MWD mode, to enhance tool face acquisition. IH P DM 0930 1000 0.50 2,750.0m Slide drill 12 1/4" hole from 2745m to 2750m IH P DA 1000 1030 0.50 2,752.0m Rotary drill 12 1/4" hole from 2750m to 2752m IH P DM 1030 1300 2.50 2,770.0m Slide drill 12 1/4" hole from 2752m to 2770m IH P DA 1300 1430 1.50 2,794.0m Rotary drill 12 1/4" hole from 2770m to 2794m IH P DM 1430 1800 3.50 2,806.0m Slide drill 12 1/4" hole from 2794m to 2806m IH P DA 1800 1830 0.50 2,818.0m Rotary drill 12 1/4" hole from 2806m to 2818m IH P DM 1830 2130 3.00 2,835.0m Slide drill 12 1/4" hole from 2818m to 2835m IH P DA 2130 2200 0.50 2,837.0m Rotary drill 12 1/4" hole from 2835m to 2837m IH P DM 2200 2400 2.00 2,845.0m Slide drill 12 1/4" hole from2837m to 2845m Operations For Period 0000 Hrs to 06... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:203 05-SEP-05 2956.0 2938.80 Drilled ahead to 12.25" hole section TD at 2956 mMDRT. CBU. Started to POOH to run 9 5/8" casing. Operations For Period 0000 Hrs to 2400 Hrs on 05 Sep 2005 Drilled ahead to 12.25" hole section TD at 2956 mMDRT. CBU. Started to POOH to run 9 5/8" casing. Operations For Period 0000 Hrs to 2400 Hrs on 05 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description IH P DM 0000 0500 5.00 2,864.0m Slide drill 12 1/4" hole from 2845m to 2864m IH P DA 0500 0530 0.50 2,866.0m Rotary drill 12 1/4" hole from 2864m to 2866m IH P DM 0530 1000 4.50 2,892.0m Slide drill 12 1/4" hole from 2866m to 2892m IH P DA 1000 1030 0.50 2,894.0m Rotary drill 12 1/4" hole from 2892m to 2894m IH P DM 1030 1130 1.00 2,905.0m Slide drill 12 1/4" hole from 2894m to 2905m IH P DA 1130 1800 6.50 2,953.0m Rotary drill 12 1/4" hole from 2905m to 2953m IH P DM 1800 1900 1.00 2,956.0m Slide drill 12 1/4" hole from 2953m to 2956m L.A.T. E1 P CHC 1900 2100 2.00 2,956.0m Circulate shakers clean and flow check. E1 P TO 2100 2400 3.00 2,956.0m Pull out of hole from 2956m to 2349m. Hole condition good. Operations For Period 0000 Hrs to 0600 Hrs on 06 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description E1 P TO 0000 0600 6.00 2,956.0m Pull out 12 1/4" BHA from 2349m. Flow check at shoe and prior pulling HWDP through BOP. S.L.M. Phase Data to 2400hrs, 05 Sep 2005 Phase Phase Hrs Start On Finish On Cum Hrs Cum Days Max Depth RIG MOVE/RIG-UP/PRESPUD(RM) 154.5 06 Aug 2005 12 Aug 2005 154.50 6.438 0.0m ANCHORING(A) 32 12 Aug 2005 13 Aug 2005 186.50 7.771 0.0m PRESPUD(PS) 8.5 13 Aug 2005 14 Aug 2005 195.00 8.125 0.0m CONDUCTOR CASING(CC) 9.5 14 Aug 2005 14 Aug 2005 204.50 8.521 209.0m CONDUCTOR HOLE(CH) 18.5 14 Aug 2005 15 Aug 2005 223.00 9.292 209.0m SURFACE HOLE(SH) 33 15 Aug 2005 16 Aug 2005 256.00 10.667 1,006.0m SURFACE CASING(... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:203 06-SEP-05 2956.0 2938.80 POOH. Rigged up to run 9 5/8" casing. Run 9 5/8" casing. Operations For Period 0000 Hrs to 2400 Hrs on 06 Sep 2005 POOH. Rigged up to run 9 5/8" casing. Run 9 5/8" casing. Operations For Period 0000 Hrs to 2400 Hrs on 06 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description E1 P TO 0000 0600 6.00 2,956.0m Pull out 12 1/4" BHA from 2349m. Flow check at shoe and prior pulling HWDP through BOP. S.L.M.=.22m longer. E1 P TO 0600 0730 1.50 2,956.0m Pull out 12 1/4" BHA and rack back same. Drift HWDP for landing string. E1 P TO 0730 0800 0.50 2,956.0m Down load MWD and break off bit. IC P TI 0800 0900 1.00 2,956.0m Made up jetting sub and wear bushing running tool and run in hole to 172m IC P TOT 0900 0930 0.50 2,956.0m Jet wear bushing on trip in, latch into wearbushing and recover same. Wash wellhead and BOP. IC P TO 0930 1030 1.00 2,956.0m Pull out with wear bushing and lay down same. No excessive wear marks recorded on bushing. IC P RRC 1030 1200 1.50 2,956.0m Hold pre job safety meeting and rig up to pick up shoe track. Install flush mounted slips . IC P CRN 1200 1300 1.00 2,956.0m Pick up shoe track. Check float and shoe for correct operation. Thread lock all shoe track connections. IC P RRC 1300 1400 1.00 2,956.0m Rig up 500T bails and elevators. Install and function Tam packer. IC P CRN 1400 2400 10.00 2,956.0m Hold pre job safety meeting and run 9 5/8" casing to 1680m, 131 jnts. Operations For Period 0000 Hrs to 0600 Hrs on 07 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description IC P CRN 0000 0500 5.00 2,956.0m Run 9 5/8" casing from 1680m to 2764m IC P CRN 0500 0600 1.00 2,956.0m Rig down 500T elevators and Tam packer, rig up 5" elevators. Phase Data to 2400hrs, 06 Sep 2005 Phase Phase Hrs Start On Finish On Cum Hrs Cum Days Max Depth RIG MOVE/RIG-UP/PRESPUD(RM) 154.5 06 Aug 2005 12 Aug 200... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:203 07-SEP-05 2956.0 2938.80 Ran and landed 9 5/8" casing. Cemented 9 5/8" casing and pressure tested. Ran wear-bushing. Function tested BOP. Laid out 12 1/4" BHA. Began picking up new 8 1/2" BHA. Operations For Period 0000 Hrs to 2400 Hrs on 07 Sep 2005 Ran and landed 9 5/8" casing. Cemented 9 5/8" casing and pressure tested. Ran wear-bushing. Function tested BOP. Laid out 12 1/4" BHA. Began picking up new 8 1/2" BHA. Operations For Period 0000 Hrs to 2400 Hrs on 07 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description IC P CRN 0000 0500 5.00 2,956.0m Ran 9 5/8" casing from 1680m to 2764m IC P CRN 0500 0600 1.00 2,956.0m Rigged down 500T elevators and Tam packer, rigged up 5" elevators. Made up 9 5/8" hanger IC P CRN 0600 0730 1.50 2,956.0m Continued RIH with 9 5/8" casing on 5" HWDP landing string Washed down last stand of HWDP. IC P CRN 0730 0800 0.50 2,956.0m Landed hanger in 18 3/4" wellhead. Made up cementing hose to DeepSea Express cement head IC P CIC 0800 0930 1.50 2,956.0m Circulated 1 x casing volume at 100 SPM IC P CMC 0930 1300 3.50 2,956.0m Held PJSM. Cemented casing with 266 bbls of 15.8 ppg HT cement Displaced with cement unit to shear out top dart. Changed over to rig pumps and displaced cement. Bumped plug with 2400 psi and full returns IC P CMC 1300 1330 0.50 2,956.0m Switched over to Dowell. Pressure tested casing to 4500 psi for 15 mins - OK Released pressure, floats held Rigged down cement lines IC P PT 1330 1430 1.00 2,956.0m Set seal assy on 9 5/8" hanger. Took 20K overpull to check. Tested seal assy against middle4 pipe rams to 1000 / 5000 psi for 5 / 10 mins - OK IC P TO 1430 1700 2.50 2,956.0m Released CHSART, pulled out of hole andf laid down. Picked up DeepSea Express cement head and broke down. IC P TI 1700 1830 1.50 2,956.0m Made up and set wear bushing into wellhead IC P BOP 1830 1930 1.00 2,956.0m Function tested BOP rams and annulars against w... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:203 08-SEP-05 3175.0 3080.70 Completed making up 8 1/2" hole BHA. Shallow pulse tested FEWD tools. RIH and washed down to top of cement. Drilled out cement, wiper plugs, float collar, shoe track, float shoe and cleaned out rat hole and drilled 4m of new formation to 2960 mMDRT. Pulled bit into the shoe and performed FIT (13.0 ppg). Displaced to new 9.2 ppg mud on the fly while drilling ahead. Drilled ahead in 8 1/2" hole to 3119 mMDRT. Operations For Period 0000 Hrs to 2400 Hrs on 08 Sep 2005 Completed making up 8 1/2" hole BHA. Shallow pulse tested FEWD tools. RIH and washed down to top of cement. Drilled out cement, wiper plugs, float collar, shoe track, float shoe and cleaned out rat hole and drilled 4m of new formation to 2960 mMDRT. Pulled bit into the shoe and performed FIT (13.0 ppg). Displaced to new 9.2 ppg mud on the fly while drilling ahead. Drilled ahead in 8 1/2" hole to 3119 mMDRT. Operations For Period 0000 Hrs to 2400 Hrs on 08 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description PH P HBHA 0000 0200 2.00 2,956.0m Continued to make up 8 1/2" BHA Tested operation of AGS with 400 gpm for 500 psi Set bend in mud motor to 0.93 deg PH TP (VE) HBHA 0200 0230 0.50 2,956.0m Attempted to upload MWD Problem with connection between joints of MWD Replaced connection between joints and tested - OK PH P HBHA 0230 0300 0.50 2,956.0m Uploaded MWD Oriented mud motor to MWD PH P HBHA 0300 0500 2.00 2,956.0m Continued to make up 8 1/2" BHA Shallow tested MWD at 220m with 600 GPM for 1900 psi - OK PH P TI 0500 0600 1.00 2,956.0m Picked up extra 3 joints of 5" HWDP and 18 jts of 5" DP while running in hole with 8 1/2" BHA. PH P TI 0600 1030 4.50 2,956.0m Continued to run in hole with 5" DP from derrick to 2861m PH P CMD 1030 1100 0.50 2,956.0m Washed down from 2861 to top of cement plugs at 2918m PH P DFS 1100 1500 4.00 2,959.0m Drilled wiper plugs, float at 2920m, shoe track, casing shoe at 2945m. Cleane... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:303 11-SEP-05 3414.0 3344.60 Drilled ahead in 8 1/2" hole from 3350 mMDRT to final TD of 3414 mMDRT MSL. Mainly interbedded sandstones and highly weathered volcanics. ROP averaged 4 m/hr throughout the section. Operations For Period 0000 Hrs to 2400 Hrs on 11 Sep 2005 Drilled ahead in 8 1/2" hole from 3350 mMDRT to final TD of 3414 mMDRT MSL. Mainly interbedded sandstones and highly weathered volcanics. ROP averaged 4 m/hr throughout the section. Operations For Period 0000 Hrs to 2400 Hrs on 11 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description PH P DA 0000 1400 14.00 3,414.0m Continued to drill 8 1/2" hole from 3350 - 3414m MSL corrected depth PH P CHC 1400 1530 1.50 3,414.0m Circulated hole clean at well TD. Flushed choke and kill lines PH P TO 1530 2130 6.00 3,414.0m Flow checked well on bottom Pumped slug and pulled out of hole Flow checked well at casing shoe and at BOP - OK PH P HBHA 2130 2330 2.00 3,414.0m Pulled out of hole with 8 1/2" BHA Laid down stabs and MWD Broke off bit E2 P LOG 2330 2400 0.50 3,414.0m Held PJSM Rigged up Schlumberger wire sheaves and compensator line Operations For Period 0000 Hrs to 0600 Hrs on 12 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description E2 P LOG 0000 0030 0.50 3,414.0m Continued to rig up Schlumberger wireline sheaves in derrick E2 P LOG 0030 0200 1.50 3,414.0m Picked up tools for logging run # 1 E2 P LOG 0030 0600 5.50 3,414.0m Ran in hole with logging run # 1 PEX - HRLA - DSI - FMI - HNGS Logged repeat section from 3360m Ran in hole to TD. Loggers depth 3414.5m Started main log pass at 05:12am Phase Data to 2400hrs, 11 Sep 2005 Phase Phase Hrs Start On Finish On Cum Hrs Cum Days Max Depth RIG MOVE/RIG-UP/PRESPUD(RM) 154.5 06 Aug 2005 12 Aug 2005 154.50 6.438 0.0m ANCHORING(A) 32 12 Aug 2005 13 Aug 2005 186.50 7.771 0.0m PRESPUD(PS) 8.5 13 Aug 2005 14 Aug 2005 195.00 8.125 0.0m CONDUCTOR ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:303 12-SEP-05 3414.0 3344.60 Completed rigging up wireline and ran FMI-DSI-HRLA-PEX-HNGS log. Loggers TD found at 3414.5mMDRT MSL. Completed log run # 1 and ran VSI-4-GR seismic VSP up to 23943.7 mMDRT MSL. Completed run # 2 and started MDT program. Operations For Period 0000 Hrs to 2400 Hrs on 12 Sep 2005 Completed rigging up wireline and ran FMI-DSI-HRLA-PEX-HNGS log. Loggers TD found at 3414.5mMDRT MSL. Completed log run # 1 and ran VSI-4-GR seismic VSP up to 23943.7 mMDRT MSL. Completed run # 2 and started MDT program. Operations For Period 0000 Hrs to 2400 Hrs on 12 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description E2 P LOG 0000 0030 0.50 3,414.0m Continued to rig up Schlumberger wireline sheaves in derrick E2 P LOG 0030 0200 1.50 3,414.0m Picked up tools for logging run # 1 E2 P LOG 0200 1200 10.00 3,414.0m Ran in hole with logging run # 1 PEX - HRLA - DSI - FMI - HNGS. Logged repeat section from 3360m. Ran in hole to TD. Loggers depth 3414.5m. Started main log pass at 05:12am. Tools in Hi-Res mode from TD up to 9 5/8" casing. Sonic was run from in lower and upper Dipole mode (without X-Dipole mode) and P & S mode in open hole and P & S mode within the 9 5/8" casing to 1490m. Neutron corrections for hole size (HSCO), mud weight (MWCO), pressure - temperature (PTCO) and borehole salinity (BSCO) were applied in real time. HNGS barite and potassium corrections were applied in playback. Pulled out and laid down tools. E2 P LOG 1200 2130 9.50 3,414.0m Made up tools for wireline log # 2 Ran in hole with logging run # 2 VSI-4-GR seismic Logged from TD at 3414 - 2394.7m Pulled out of hole and laid down tools E2 P LOG 2130 2400 2.50 3,414.0m Made up tools for wireline log # 3 Ran in hole with logging run # 3 MDT - GR Operations For Period 0000 Hrs to 0600 Hrs on 13 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description E2 P LOG 0000 0600 6.00 3,414.0m Continued with wireline log # 3 MDT - ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:303 13-SEP-05 3414.0 3344.60 Wireline logging MDT-GR. Continued with pressure and sampling program. Obtained 33 valid pretests from 63 attempts. Commenced sampling program and collected 7 samples from 4 different depths Operations For Period 0000 Hrs to 2400 Hrs on 13 Sep 2005 Wireline logging MDT-GR. Continued with pressure and sampling program. Obtained 33 valid pretests from 63 attempts. Commenced sampling program and collected 7 samples from 4 different depths Operations For Period 0000 Hrs to 2400 Hrs on 13 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description E2 P LOG 0000 2400 24.00 3,414.0m Continued with wireline log # 3 MDT - GR Started taking pressure points at 01:30 Total of 63 pressure points were attempted 33 valid pressure points were obtained Started formation sampling program Collected 7 x 450cc samples from 4 different depths with 1 missed sample Operations For Period 0000 Hrs to 0600 Hrs on 14 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description E2 P LOG 0000 0600 6.00 3,414.0m Continued with Logging run # 3 MDT - GR formation sampling program Obtained 1 x 450 cc sample and 1 x 6 gall sample from 2 depths Still to obtain 2 x 450cc formation samples and 4 x pumpout tests from this logging run Phase Data to 2400hrs, 13 Sep 2005 Phase Phase Hrs Start On Finish On Cum Hrs Cum Days Max Depth RIG MOVE/RIG-UP/PRESPUD(RM) 154.5 06 Aug 2005 12 Aug 2005 154.50 6.438 0.0m ANCHORING(A) 32 12 Aug 2005 13 Aug 2005 186.50 7.771 0.0m PRESPUD(PS) 8.5 13 Aug 2005 14 Aug 2005 195.00 8.125 0.0m CONDUCTOR CASING(CC) 9.5 14 Aug 2005 14 Aug 2005 204.50 8.521 209.0m CONDUCTOR HOLE(CH) 18.5 14 Aug 2005 15 Aug 2005 223.00 9.292 209.0m SURFACE HOLE(SH) 33 15 Aug 2005 16 Aug 2005 256.00 10.667 1,006.0m SURFACE CASING(SC) 24.5 16 Aug 2005 17 Aug 2005 280.50 11.688 1,006.0m RISER AND BOP STACK(BOP) 35 17 Aug 2005 19 Aug 2005 315.50 13.146 1,006.0m EVALUATION PHASE (1... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:304 14-SEP-05 3414.0 3344.60 Continued running MDT to collect formation fluid samples. Completed first run of MDT pretests and sampling and pulled out of hole to recover sample chambers. Rigged up second MDT toolstring and started second sampling program. Operations For Period 0000 Hrs to 2400 Hrs on 14 Sep 2005 Continued running MDT to collect formation fluid samples. Completed first run of MDT pretests and sampling and pulled out of hole to recover sample chambers. Rigged up second MDT toolstring and started second sampling program. Operations For Period 0000 Hrs to 2400 Hrs on 14 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description E2 P LOG 0000 1830 18.50 3,414.0m Continued with Logging run # 3 MDT - GR formation sampling program Laid down formation sample bottles for testing when out of hole E2 P LOG 1830 2400 5.50 3,414.0m Made up tools for wireline log # 4 MDT-GR Ran in hole with wireline log # 4 to continue formation sampling program Operations For Period 0000 Hrs to 0600 Hrs on 15 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description E2 P LOG 0000 0600 6.00 3,414.0m Continued with wireline log # 4 MDT - GR Continuing with formation sampling program Phase Data to 2400hrs, 14 Sep 2005 Phase Phase Hrs Start On Finish On Cum Hrs Cum Days Max Depth RIG MOVE/RIG-UP/PRESPUD(RM) 154.498333333333 06 Aug 2005 12 Aug 2005 154.50 6.437 0.0m ANCHORING(A) 31.9997222222222 12 Aug 2005 13 Aug 2005 186.50 7.771 0.0m PRESPUD(PS) 8.49972222222222 13 Aug 2005 14 Aug 2005 195.00 8.125 0.0m CONDUCTOR CASING(CC) 9.49972222222222 14 Aug 2005 14 Aug 2005 204.50 8.521 209.0m CONDUCTOR HOLE(CH) 18.5 14 Aug 2005 15 Aug 2005 223.00 9.292 209.0m SURFACE HOLE(SH) 32.9997222222222 15 Aug 2005 16 Aug 2005 256.00 10.667 1,006.0m SURFACE CASING(SC) 24.4997222222222 16 Aug 2005 17 Aug 2005 280.50 11.687 1,006.0m RISER AND BOP STACK(BOP) 34.9994444444444 17 Aug 2005 19 Aug 2005 ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:304 15-SEP-05 3414.0 3344.60 Completed MDT sampling program (Run 4 MDT-GR). Rigged down wireline and RIH for a wiper trip. Operations For Period 0000 Hrs to 2400 Hrs on 15 Sep 2005 Completed MDT sampling program (Run 4 MDT-GR). Rigged down wireline and RIH for a wiper trip. Operations For Period 0000 Hrs to 2400 Hrs on 15 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description E2 P LOG 0000 2100 21.00 3,414.0m Continued with wireline log # 4 MDT - GR formation sampling program Pulled wireline tools out of hole after completing pressure and formation sampling program E2 P LOG 2100 2230 1.50 3,414.0m Removed sample bottles from MDT tool and laid down tool string E2 P RD 2230 2300 0.50 3,414.0m Rigged down wireline sheaves and compensator line PC P HBHA 2300 2400 1.00 3,414.0m Commenced making up 8 1/2" cleanout BHA and ran in hole Operations For Period 0000 Hrs to 0600 Hrs on 16 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description PC P TI 0000 0600 6.00 3,414.0m Continued to run in hole with 8 1/2" BHA for wiper trip prior to running 7" liner Phase Data to 2400hrs, 15 Sep 2005 Phase Phase Hrs Start On Finish On Cum Hrs Cum Days Max Depth RIG MOVE/RIG-UP/PRESPUD(RM) 154.5 06 Aug 2005 12 Aug 2005 154.50 6.437 0.0m ANCHORING(A) 32 12 Aug 2005 13 Aug 2005 186.50 7.771 0.0m PRESPUD(PS) 8.5 13 Aug 2005 14 Aug 2005 195.00 8.125 0.0m CONDUCTOR CASING(CC) 9.5 14 Aug 2005 14 Aug 2005 204.50 8.521 209.0m CONDUCTOR HOLE(CH) 18.5 14 Aug 2005 15 Aug 2005 223.00 9.292 209.0m SURFACE HOLE(SH) 33 15 Aug 2005 16 Aug 2005 256.00 10.667 1,006.0m SURFACE CASING(SC) 24.5 16 Aug 2005 17 Aug 2005 280.50 11.687 1,006.0m RISER AND BOP STACK(BOP) 35 17 Aug 2005 19 Aug 2005 315.50 13.146 1,006.0m EVALUATION PHASE (1)(E1) 16.5 19 Aug 2005 03 Sep 2005 332.00 13.833 2,741.0m INTERMEDIATE HOLE(IH) 404.5 19 Aug 2005 05 Sep 2005 736.49 30.687 2,956.0m INTERM... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:304 16-SEP-05 3414.0 3344.60 Ran in hole with 8 1/2" cleanout BHA. Circulated B/U. Pulled out of hole. Made up Baker cement stand and pressure tested to 5000 psi. Ran 18 joints of 7" liner Operations For Period 0000 Hrs to 2400 Hrs on 16 Sep 2005 Ran in hole with 8 1/2" cleanout BHA. Circulated B/U. Pulled out of hole. Made up Baker cement stand and pressure tested to 5000 psi. Ran 18 joints of 7" liner Operations For Period 0000 Hrs to 2400 Hrs on 16 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description PC P TI 0000 0030 0.50 3,414.0m Continued to run in hole with 8 1/2" BHA for wiper trip before 7" liner PC P TI 0030 0700 6.50 3,414.0m Ran 8 1/2" BHA on 5" DP to 3414m Filled pipe every 25 stands of DP No resistance or drag on way in hole PC P CMD 0700 0900 2.00 3,414.0m Circulated and conditioned mud prior to POOH for running 7" liner Total trip gas of 39% recorded at bottoms up PC P TO 0900 1630 7.50 3,414.0m Flow checked well at TD before POOH Pulled out of hole 5 stands wet - hole condition good Pumped slug and pulled out of hole to shoe Flow checked well at shoe - OK Took rotational checks at shoe while flow checking Continued out of hole with cleanout BHA Flow checked well before pulling BHA through BOP PC P HBHA 1630 1730 1.00 3,414.0m Held JSA Laid down 8 1/2" BHA PC P PT 1730 1900 1.50 3,414.0m Picked up and made up Baker cementing head to double of DP Rigged up and pressure tested cement head to 5000 psi with Dowell - OK Rigged down testing gear and racked stand with cement head back in derrick PC P RRC 1900 1930 0.50 3,414.0m Held JSA for running liner and rigged up floor for running 7" liner PC P CRN 1930 2400 4.50 3,414.0m Picked up 7" shoe and tested with water - OK Picked up 7" float and tested with water - OK Made up shoe to float then tested back pressure capability of shoe track - OK Continued to RIH with 7" liner as per running list Ran 18 joints of 7" liner at report time Operati... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:304 17-SEP-05 3414.0 3344.60 Continued running 7" liner. Picked up 7" liner hanger. Ran liner and hanger in hole on 5" HWDP and 5" DP. Set hanger, cemented liner, bumped plug and tested liner to 4500 psi. Energised liner packer, reverse circulated out excess cement and tested liner lap to 4500 psi. Rigged down cementing lines and racked back cement stand Operations For Period 0000 Hrs to 2400 Hrs on 17 Sep 2005 Continued running 7" liner. Picked up 7" liner hanger. Ran liner and hanger in hole on 5" HWDP and 5" DP. Set hanger, cemented liner, bumped plug and tested liner to 4500 psi. Energised liner packer, reverse circulated out excess cement and tested liner lap to 4500 psi. Rigged down cementing lines and racked back cement stand Operations For Period 0000 Hrs to 2400 Hrs on 17 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description PC P CRN 0000 0300 3.00 3,414.0m Continued to run 7" liner as per running list. Filled liner up every 5 joints. PC P CRN 0300 0400 1.00 3,414.0m Picked up and made up 7" liner hanger, ZXP packer and running tool to 7" liner string. PC P CIC 0400 0430 0.50 3,414.0m Rigged down 7" liner running gear, Made up 5" DP running gear Picked up first stand of 5" DP running string and circulated 110% liner contents PC P CRN 0430 1130 7.00 3,414.0m Continued running 7" liner on 5" HWDP and 5" DP Rabbited each stand of 5" DP with a 2 5/8" OD rabbit Filled string every 5 stands PC P CIC 1130 1230 1.00 3,414.0m Circulated 110% of DP and liner contents at 9 5/8" casing shoe. Max pressure of 700 psi Checked rotational torque values and P/U and S/O weights of string at shoe PC P CRN 1230 1500 2.50 3,414.0m Continued ran in hole with 7" liner on 5" DP Rabbitted each stand of DP with 2 5/8" OD drift Filled string every 5 stands PC P CIC 1500 1630 1.50 3,414.0m Washed down last 2 metres to TD at 3414m Picked up 1 metre and circulated bottoms up PC P CRN 1630 1830 2.00 3,414.0m Dropped hanger... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:304 18-SEP-05 3414.0 3344.60 Completed coming out of hole with liner running tools. Laid down cement stand from derrick. Made up jetting sub and jetted wellhead. Ran in hole and set BOP test plug with 30K down. Tested BOP's. Pulled out of hole with test assembly. Made up SPS well cleanout assy and ran in hole with same Operations For Period 0000 Hrs to 2400 Hrs on 18 Sep 2005 Completed coming out of hole with liner running tools. Laid down cement stand from derrick. Made up jetting sub and jetted wellhead. Ran in hole and set BOP test plug with 30K down. Tested BOP's. Pulled out of hole with test assembly. Made up SPS well cleanout assy and ran in hole with same Operations For Period 0000 Hrs to 2400 Hrs on 18 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description PC P TO 0000 0500 5.00 3,414.0m Continued to pull out of hole with 7" liner running string. Broke down and laid out liner hanger running tool PC P HBHA 0500 0630 1.50 3,414.0m Laid down cement stand from derrick PC TP (RE) TI 0630 0730 1.00 3,414.0m Repaired air operated elevators C P TI 0730 0830 1.00 3,414.0m Made up jetting tool and ran in hole with 6 x stands of HWDP and 1 x stands of 5" DP PC P CHC 0830 0930 1.00 3,414.0m Washed and jetted wellhead and BOP's PC P TI 0930 1030 1.00 3,414.0m Picked up BOP test tool then picked up 6m pup joint and ran in hole with another 6 stands of DP. First single above test tool painted white PC P PT 1030 1700 6.50 3,414.0m Tested BOP and C & K manifold to 500 / 5000 psi for 5 / 10 mins. Tested annulars to 500 / 4500 psi for 5 / 10 mins Tested BOP on yellow pod. Function tested BOP on Blue pod PC P TO 1700 1800 1.00 3,414.0m Pulled out of hole with test tool and jet sub. Laid down test tool and jet sub PC P CRF 1800 1830 0.50 3,414.0m Rigged down all test lines and cleared rig floor ready for picking up tubulars C P PUP 1830 2230 4.00 3,414.0m Rigged up for and picked up SPS cleanout BH... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:304 19-SEP-05 3414.0 3344.60 Ran in hole with SPS cleanout BHA. Took circulating and rotational data at 1000 and 2000m. Scraped and circulated upper and lower packer setting depths. Ran in hole and tagged cement. Dressed cement off to 3382m MD MSL. Displaced hole to sea water. Tripped pipe out of hole to clean riser brush junk basket. Ran in hole to TD and circulated sea water. Displaced hole to filtered brine. Spotted HEC pill in 7" liner. Pulled out of hole to top of liner laying down drill pipe to deck. Displaced well to inhibited filtered brine Operations For Period 0000 Hrs to 2400 Hrs on 19 Sep 2005 Ran in hole with SPS cleanout BHA. Took circulating and rotational data at 1000 and 2000m. Scraped and circulated upper and lower packer setting depths. Ran in hole and tagged cement. Dressed cement off to 3382m MD MSL. Displaced hole to sea water. Tripped pipe out of hole to clean riser brush junk basket. Ran in hole to TD and circulated sea water. Displaced hole to filtered brine. Spotted HEC pill in 7" liner. Pulled out of hole to top of liner laying down drill pipe to deck. Displaced well to inhibited filtered brine Operations For Period 0000 Hrs to 2400 Hrs on 19 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description C P TI 0000 0530 5.50 3,414.0m Continued to RIH with cleanout assy on 5" DP At 1000m, circulated at 853gpm, 3500 psi - 60 rpm, 2K torque At 2000m, circulated at 853gpm, 4200 psi - 60 rpm, 2K torque Picked up and made up SABS tools on btm of std 69 Continued to RIH drifting DP with 2 5/8" drift C P CIC 0530 0630 1.00 3,414.0m Reciprocated the 7" casing scraper at 2968m Worked scraper from 1 stand above to 1 stand below depth Circulated at 2 x 84 spm for 3800 psi with 60 rpm C P TI 0630 0700 0.50 3,414.0m Ran in hole with SPS cleanout assy on 5" DP Continued drifting 5" DP with 2 5/8" OD drift C P CIC 0700 0800 1.00 3,414.0m Reciprocated the 7" scraper at 3156m Worked scraper 1 stand above and i stand below depth Ci... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:304 20-SEP-05 3414.0 3344.60 Continued to circulate 8.9ppg inhibited filtered brine. Displaced booster C & K lines. Opened SABS tool and jetted BOP. Pulled out of hole laying down all tubulars. Rigged up wireline and ran log # 1 - CBL - VDL - CCL - GR Operations For Period 0000 Hrs to 2400 Hrs on 20 Sep 2005 Continued to circulate 8.9ppg inhibited filtered brine. Displaced booster C & K lines. Opened SABS tool and jetted BOP. Pulled out of hole laying down all tubulars. Rigged up wireline and ran log # 1 - CBL - VDL - CCL - GR Operations For Period 0000 Hrs to 2400 Hrs on 20 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description C P CIC 0000 0200 2.00 3,414.0m Continued circulating inhibited filtered brine to well above 7" liner top C P CIC 0200 0230 0.50 3,414.0m Displaced booster and C & K lines to inhibited brine and functioned BOP's C P CIC 0230 0330 1.00 3,414.0m Dropped 2 3/8" ball and opened SABS 102 with 3300 psi Washed BOP and wellhead with 636 gpm and 30 rpm C P PLD 0330 1630 13.00 3,414.0m Added 25 ltrs Barafilm to DP Pulled out of hole wet with 5" DP laying down tubulars to deck. Laid down SABS 101 and 102 tools Pumped Barafilm slug and continued to POOH laying down all tubulars to deck C P PLD 1630 1700 0.50 3,414.0m Rigged down 3 1/2" handling gear, rigged up 5" handling gear C P TI 1700 1730 0.50 3,414.0m Ran in hole with 13 stands of 5" DP from derrick C P PLD 1730 1900 1.50 3,414.0m Pulled out of hole laying down all tubulars to deck C P LOG 1900 2000 1.00 3,414.0m Held JSA Rigged up Schlumberger sheaves and compensator line to travelling block C P LOG 2000 2030 0.50 3,414.0m Picked up wireline tools for run # 1 C P LOG 2030 2400 3.50 3,414.0m Ran in hole with logging run # 1 CBL - VDL - CCL - GR Found PBTD at 3383m MD MSL Logged up from TD Operations For Period 0000 Hrs to 0600 Hrs on 21 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:304 21-SEP-05 3414.0 3344.60 Schlumberger continued to pull out of hole with CBL - VDL - CCL - GR log and laid down tools. Schlumberger ran 5 x perforating gun runs and perforated well as per program. Schlumberger ran GR - CCL - 6.00" gauge ring and junk basket to 10m above PBTD. Operations For Period 0000 Hrs to 2400 Hrs on 21 Sep 2005 Schlumberger continued to pull out of hole with CBL - VDL - CCL - GR log and laid down tools. Schlumberger ran 5 x perforating gun runs and perforated well as per program. Schlumberger ran GR - CCL - 6.00" gauge ring and junk basket to 10m above PBTD. Operations For Period 0000 Hrs to 2400 Hrs on 21 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description C P LOG 0000 0100 1.00 3,414.0m Completed pulling out of hole with wireline run # 1 CBL - VDL - CCL - GR Laid down tools from wireline run # 1 C P PER 0030 0130 1.00 3,414.0m Prepared perforating guns on catwalk Laid down tools from wireline run # 1 Picked up guns for perforating run # 1 C P PER 0100 0600 5.00 3,414.0m Picked up guns for perforating run # 1 Ran in hole with 4 1/2" HSD guns for perforating run # 1 Perforated well as per program, 2 intervals perforated successfully using SELECT system. Good indications of guns fired Monitored well fluid level - well stable Pulled out of hole with perforating guns. Checked all shots fired - OK Laid down spent guns C P PER 0600 1100 5.00 3,414.0m Picked up guns and ran in hole with Perforating run # 2 Perforated well as per program Pulled out of hole and laid down spent guns No losses to well seen - fluid level stable C P PER 1100 1430 3.50 3,414.0m Picked up guns and ran in hole with Perforating run # 3 Perforated well as per program Pulled out of hole and laid down spent guns No losses to well seen - fluid level stable C P PER 1430 1830 4.00 3,414.0m Picked up guns and ran in hole with Perforating run # 4 Perforated well as per program Pulled out of hole and laid down spent guns No losse... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:304 22-SEP-05 3414.0 3344.60 Completed 6.00" gauge ring and junk basket run. Jetted wellhead after pulling wear bushing. Ran lead impression tool to wellhead using 5 1/2" production riser. Racked production riser in derrick as LIT was pulled to surface. Serviced travelling block TDS and dollies. Rigged up control line sheaves and started running completion Operations For Period 0000 Hrs to 2400 Hrs on 22 Sep 2005 Completed 6.00" gauge ring and junk basket run. Jetted wellhead after pulling wear bushing. Ran lead impression tool to wellhead using 5 1/2" production riser. Racked production riser in derrick as LIT was pulled to surface. Serviced travelling block TDS and dollies. Rigged up control line sheaves and started running completion Operations For Period 0000 Hrs to 2400 Hrs on 22 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description C P LOG 0000 0100 1.00 3,414.0m Continued to POOH with wireline run # 2 GR - CCL - 6.00" gauge ring and junk basket. C P LOG 0100 0130 0.50 3,414.0m Laid down wireline tools. Small amounts of scale only found in junk basket. Rigged down Schlumberger sheaves and compensator line C P TI 0130 0400 2.50 3,414.0m Made up BOP jetting and wear bushing retrieval assy with bullnose, well patroller, SABS and WBRRT. Sheared out SABS tool with 2 3/8" OD ball with 800 psi at surface and confirmed visually that SABS tool sheared out correctly. Ran in hole to wellhead, SLM drill pipe above WBRRT to confirm distance to wellhead. Latched into wear bushing and confirmed with 10K overpull. Took index line mark at 173.14m above 18 3/4" wellhead datum C P BOP 0400 0430 0.50 3,414.0m Functioned BOP rams and annular with yellow pod against 5" DP. Pulled wear bushing with 30K overpull C P CIC 0430 0530 1.00 3,414.0m Washed BOP and wellhead with SABS tool with 750 gpm while rotating at 10 RPM and boosting riser. Displaced riser back to clean brine C P TO 0530 0630 1.00 3,414.0m Pulled out of hole with wear ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:304 23-SEP-05 3414.0 3344.60 Continued to pick up 3 1/2" completion assy and made up HF - 1 packer. Pressure tested control lines and ball valve and lubricator. Tested tubing with Dowell to 5000 psi against lubricator valve. Checked lubricator valve open after test with slickline. Continued to RIH with 4 1/2" tubing as per program Operations For Period 0000 Hrs to 2400 Hrs on 23 Sep 2005 Continued to pick up 3 1/2" completion assy and made up HF - 1 packer. Pressure tested control lines and ball valve and lubricator. Tested tubing with Dowell to 5000 psi against lubricator valve. Checked lubricator valve open after test with slickline. Continued to RIH with 4 1/2" tubing as per program Operations For Period 0000 Hrs to 2400 Hrs on 23 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description C P RIC 0000 0200 2.00 3,414.0m Continued to pick up 3 1/2" completion tailpipe assy. Picked up lubricator and AHC packer assy. Ran 3 1/2" blast joints as per program. Picked up HF - 1 packer assembly. C P PT 0200 0800 6.00 3,414.0m Attached control lines to HF - 1 packer. Pressure tested control line terminations and ball valve / lubricator as per Supplemental Completions Program procedures C P PT 0800 1200 4.00 3,414.0m Rigged up TIW valve and pump in sub to tubing and pressure tested 3 1/2" tubing against closed Lubricator and Interval Control valves to 5000 psi for 5 mins - OK. Rigged down lines from Dowell C P SLK 1200 1300 1.00 3,414.0m Rigged up slickline Ran 2.75" drift past lubricator valve to confirm open after being closed for pressure test. Rigged down slickline C P RIC 1300 2400 11.00 3,414.0m Continued to RIH with completion assy on 4 1/2" 13Cr tubing as per completion running list Operations For Period 0000 Hrs to 0600 Hrs on 24 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description C P RIC 0000 0600 6.00 3,414.0m Continued ran in hole with completion assy on 4 1/2" 13Cr tubing. Picked up and ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:305 24-SEP-05 3414.0 3344.60 Ran completion assy on 4 1/2" 13Cr tubing. Picked up hanger assy and handling tool. Installed hanger and connected and tested all control lines through tubing hanger. Laid down hanger handling tool. Conduct fire and Abandon drills. Wait for crane to start to continue operations. Picked up tubing hanger running tool and tested latch on hanger Operations For Period 0000 Hrs to 2400 Hrs on 24 Sep 2005 Ran completion assy on 4 1/2" 13Cr tubing. Picked up hanger assy and handling tool. Installed hanger and connected and tested all control lines through tubing hanger. Laid down hanger handling tool. Conduct fire and Abandon drills. Wait for crane to start to continue operations. Picked up tubing hanger running tool and tested latch on hanger Operations For Period 0000 Hrs to 2400 Hrs on 24 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description C P RIC 0000 1600 16.00 3,414.0m Continued ran in hole with completion assy on 4 1/2" 13Cr tubing. Picked up and made up 2nd Gas Lift Mandrel Continued in hole with 4 1/2" tubing as per completion running list C P RIC 1600 1730 1.50 3,414.0m Installed sheaves and umbilical cables in derrick for running of the tubing hanger running tool ( THRT ) C P RIC 1730 1830 1.00 3,414.0m Continued ran in hole with completion assy on 4 1/2" 13Cr tubing as per completion running list. C P RIC 1830 2100 2.50 3,414.0m Picked up tubing hanger and tubing hanger handling and test tool ( THHTT ) and made up hanger to string. Terminated all control lines from under hanger into hanger and pressure tested all control line connections as per procedures in SCP C P RIC 2100 2200 1.00 3,414.0m Laid down THHTT and picked up THRT, with umbilicals connected, into V-Door C TP (WOE) PA 2200 2230 0.50 3,414.0m THRT Laid back down on deck at request of DOGC in order to have weekly safety fire drill and abandon ship drill. Prepared to remove Well Dynamics umbilical from derrick to make bri... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:305 25-SEP-05 3414.0 3344.60 Completed pre-submergence tests on THRT. Ran completion assy and hanger on 5 1/2" production riser. Landed and tested hanger from above to 3000 psi - OK.Rigged up slickline BOP and lubricator. Set HF-1 packer and tested down annulus - OK. Checked CIV opening pressure. Set XSTT plug in X nipple below AHC packer. Attempt to pressure up tubing to set AHC packer Operations For Period 0000 Hrs to 2400 Hrs on 25 Sep 2005 Completed pre-submergence tests on THRT. Ran completion assy and hanger on 5 1/2" production riser. Landed and tested hanger from above to 3000 psi - OK.Rigged up slickline BOP and lubricator. Set HF-1 packer and tested down annulus - OK. Checked CIV opening pressure. Set XSTT plug in X nipple below AHC packer. Attempt to pressure up tubing to set AHC packer Operations For Period 0000 Hrs to 2400 Hrs on 25 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description C P PT 0000 0100 1.00 3,414.0m Continue conducting tubing hanger pre-submergence tests as per completion program. C TP (VE) PT 0100 0300 2.00 3,414.0m Had leak while testing annulus access hose to 5000 psi. Repaired leak on hose connection at annulus access hose reel. Re-tested annulus access line - leak on annulus hose connection above THRT. Repaired same. Brought shuttle table and BJ retractable slips to rig floor and function tested - OK C P PT 0300 0400 1.00 3,414.0m Continued with tubing hanger pre-submergence pressure tests as per completion program. C P RIC 0400 0500 1.00 3,414.0m Removed temporary annulus plugs from hanger. Completed final positioning of shuttle table. Set THRT and completion string in BJ retractable slips. Changed out 5 1/2" tubing side door elevators for 5 1/2" air powered elevators. C P RIC 0500 1030 5.50 3,414.0m Ran in hole with completion assy, tubing hanger and THRT on 5 1/2" production riser from derrick installing control line umbilical and annulus access hose clamps. Picked up single of 5 1/2" t... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:305 26-SEP-05 3414.0 3344.60 Set AHC packer. Performed inflow test on SSSV. Set plug and prong in tubing hanger and tested to 5000 psi. Rigged down slickline. Unlatched and pulled production riser. Rigged up for pulling BOP. Unlatched BOP, took off riser tensioners for use with production riser. Started to pull BOP and riser Operations For Period 0000 Hrs to 2400 Hrs on 26 Sep 2005 Set AHC packer. Performed inflow test on SSSV. Set plug and prong in tubing hanger and tested to 5000 psi. Rigged down slickline. Unlatched and pulled production riser. Rigged up for pulling BOP. Unlatched BOP, took off riser tensioners for use with production riser. Started to pull BOP and riser Operations For Period 0000 Hrs to 2400 Hrs on 26 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description C P PT 0000 0100 1.00 3,414.0m Flushed another 2 bbls through CIV down annulus access line to flush any debris from CIV. Pressured up down tubing to 500 psi to confirm tubing pressure integrity - pressure holding OK. Continued to pressure up tubing in stages to 5000psi and held for 15 mins to set lower (AHC) production packer - OK C P SLK 0100 0200 1.00 3,414.0m Pulled out of hole with slickline and XSTT plug. Changed slickline tools in lubricator. C P PT 0200 0300 1.00 3,414.0m Closed downhole lubricator valve and pressure tested tubing to 500 / 5000 psi for 5 / 10 mins - OK. Closed SSSV and bled off tubing above SSSV to 500 psi to inflow test SSSV with 5000 psi below SSSV and held for 15 mins - test good. Equalised pressure across SSSV then opened SSSV. Bled down all pressure from tubing. C P RPP 0300 0400 1.00 3,414.0m Ran in hole with slickline and set 4" ARH plug and prong in tubing hanger C P PT 0400 0430 0.50 3,414.0m Pressured up production riser to test 4" ARH plug from above to 500 / 5000 psi for 5 / 10 mins - OK Bled down all pressure from production riser. Closed downhole lubricator valve. C P SLK 0430 0500 0.50 3,414.0m Rigged down ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:305 27-SEP-05 3414.0 3344.60 Completed pull and racked back BOP. Rigged up "banana" sheaves in moonpool. Positoned SST on cart and moved under rotary in moonpool made up and tested umbilical and annular access lines. Installed guidelines in SST. Ran in hole with SST on 5 1/2" riser Operations For Period 0000 Hrs to 2400 Hrs on 27 Sep 2005 Completed pull and racked back BOP. Rigged up "banana" sheaves in moonpool. Positoned SST on cart and moved under rotary in moonpool made up and tested umbilical and annular access lines. Installed guidelines in SST. Ran in hole with SST on 5 1/2" riser Operations For Period 0000 Hrs to 2400 Hrs on 27 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description C P RR2 0000 0500 5.00 3,414.0m Continued to pull BOP and riser. Installed BOP on Nomar carrier, removed guidelines, pod lines and beacon Skidded BOP to stbd side of rig C P RR2 0500 0630 1.50 3,414.0m Broke out double of flotation riser and laid down to deck. Rigged down riser handling equipment C P RU 0630 0900 2.50 3,414.0m Held JSA Rotated moonpool cart 180 degrees Installed H-beam and welded down in place on moonpool cart Moved trolley to Stbd side to accept SST C P PT 0900 1130 2.50 3,414.0m Rigged up padeye sub to TDS and rigged up 5 1/2" completion riser running equipment on rig floor. Picked up TRT / Stress joint assy to rig floor. Pressure tested annulus access hose to 5000 psi C P WH 1130 1500 3.50 3,414.0m Picked up SST and rotated 180 degrees for correct orientation on cart. Secured SST to cart and skidded SST under rig floor. Removed tree lift tool and inspected mandrel hub and gasket profile - OK. Rigged up umbilical and annular access hose saddles. Landed TRT onto SST re-enrty mandrel and locked with 3000 psi. Lock travel verified on override rods - OK. C P WH 1500 1600 1.00 3,414.0m Filled up riser from Dowell unit. Tested TRT connector to 500 / 5000 psi for 15 mins from IWOCS - OK C P PT 1600 1700 1.00 3,41... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:305 28-SEP-05 3414.0 3344.60 Completed running SST on completion riser with umbilical and annular access lines. Changed out stiff joint after 1st one bent picking up flowhead. Rigged up lines to flowhead and pressure tested lines to flowhead and down tubing to PSV to 5000 psi. Repositioned rig over well. ROV removed debris cap while rig flushed control lines on SST. Land and latched SST on wellhead. Function tested SST valve functions with ROV visually checking subsea. Displaced riser with inhibited brine. Slickline retrieved 4" plug and prong from wellhead. Function tested ESD noting closing time. Slickline ran in and opened SSD. Held JSA prior to pumping diesel Operations For Period 0000 Hrs to 2400 Hrs on 28 Sep 2005 Completed running SST on completion riser with umbilical and annular access lines. Changed out stiff joint after 1st one bent picking up flowhead. Rigged up lines to flowhead and pressure tested lines to flowhead and down tubing to PSV to 5000 psi. Repositioned rig over well. ROV removed debris cap while rig flushed control lines on SST. Land and latched SST on wellhead. Function tested SST valve functions with ROV visually checking subsea. Displaced riser with inhibited brine. Slickline retrieved 4" plug and prong from wellhead. Function tested ESD noting closing time. Slickline ran in and opened SSD. Held JSA prior to pumping diesel Operations For Period 0000 Hrs to 2400 Hrs on 28 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description C P RR1 0000 0030 0.50 3,414.0m Continued to run 5 1/2" production riser installing cross coupling clamps for umbilical and annular access hose. C P RR1 0030 0100 0.50 3,414.0m Picked up and installed long bails and wireline chain block on TDS. Installed bullseye on riser in moonpool. C TP (VE) RR1 0100 0400 3.00 3,414.0m Picked up flowhead and stiffener joint to rig floor. As slacking off crane to release flowhead but still keep crane on stiff joint, stiff joint bent between stiffeners and f... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:305 29-SEP-05 3414.0 3344.60 Pumped diesel down tubing. Closed SSD and checked by pressure testing. Held pre-flaring safety meeting. Flowed well from upper and lower zones as per program. Closed well in. Inflow tested SSSV - OK. Inflow tested PMV for 15 mins - OK. Flushed SST with water then inhibited seawater Operations For Period 0000 Hrs to 2400 Hrs on 29 Sep 2005 Pumped diesel down tubing. Closed SSD and checked by pressure testing. Held pre-flaring safety meeting. Flowed well from upper and lower zones as per program. Closed well in. Inflow tested SSSV - OK. Inflow tested PMV for 15 mins - OK. Flushed SST with water then inhibited seawater Operations For Period 0000 Hrs to 2400 Hrs on 29 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description C P STI 0000 0200 2.00 3,414.0m Displaced production tubing to diesel from Dowell unit. Diesel was weighed at 7.00ppg Pumped 150 bbls of diesel with final backpressure of 869 psi Closed KWV. C P SLK 0200 0330 1.50 3,414.0m Slickline closed SSD and pulled out of hole to slickline lubricator. Bled pressure off slickline lubricator and checked tool. Pins not sheared. C P PT 0330 0400 0.50 3,414.0m Opened KWV on flowhead and Dowell pressure tested completion string to 3000 psi with diesel to verify SSD was closed. Monitored returns at annulus access line. No returns up annulus access line and good pressure test. C P SM 0400 0430 0.50 3,414.0m Held pre-flow safety meeting with all personnel. OIM, Production Supv and Drilling Supv signed off pre-flow check list C P FLO 0430 0500 0.50 3,414.0m Final checks and positioning of people prior to opening up well C P FLO 0500 0530 0.50 3,414.0m Opened LV and held pressure for 5 mins. Opened well and flowed well from lower zone. Closed well back in. C P FLO 0530 1200 6.50 3,414.0m Closed LV and opened ICV Flowed well as per completion program from upper zone Took samples and measurements as per completion program C P FLO 1200 ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:305 30-SEP-05 3414.0 3344.60 Tested SST integrity with Dowell unit Rigged down flowhead, slickline lubricator and BOP's. Unlatched from SST with production riser. Laid down flowhead. Pulled out of hole with production riser. Ran in hole with SST cap and TCRT. Could not pressure test tree cap. POOh with tree cap. Re-ran tree cap with hot line from surface. ROV attempting to latch tree cap. Operations For Period 0000 Hrs to 2400 Hrs on 30 Sep 2005 Tested SST integrity with Dowell unit Rigged down flowhead, slickline lubricator and BOP's. Unlatched from SST with production riser. Laid down flowhead. Pulled out of hole with production riser. Ran in hole with SST cap and TCRT. Could not pressure test tree cap. POOh with tree cap. Re-ran tree cap with hot line from surface. ROV attempting to latch tree cap. Operations For Period 0000 Hrs to 2400 Hrs on 30 Sep 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description C P PT 0000 0230 2.50 3,414.0m Suspended SST as per completion program Inflow tested annulus through annulus access line - OK Pressure tested AAV and AMV to 500 / 5000 psi for 5 / 10 mins - OK Pressure tested AMV to 500 / 5000 psi for 5 / 10 mins - OK Pressure tested XOV to 500 / 5000 psi for 5 /10 mins - OK Pressure tested PWV to 500 / 5000 psi for 5 / 10 mins - OK Pressure tested PSV to 500 / 5000 psi for 5/ 10 mins - OK All tests done with seawater down tubing with Dowell Tested completed on SST. Vented all functions and recorded final status record sheet ROV disconnected 2" UH-550 unitech connector and placed annulus access line on stress joint hook C P RD 0230 0500 2.50 3,414.0m Rigged down slickline lubricator and BOP's Disconnected flowline and kill line coflexips from flowhead Rigged down all control lines from flowhead ROV fitted 2" Unitech plug on annulus access line on SST ROV removed umbilical "flying lead" from SST junction plate C P RD 0500 0600 1.00 3,414.0m Unlatched production riser from SST Rigged down MRT's and bullseye fr... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:405 01-OCT-05 3414.0 3344.60 Pressure tested tree cap to 5000 psi. Released TCRT and pulled out of hole laying down all 5" DP. ROV attempted to close SCSSV with increased torque of 248 ft/lbs - no go. ROV did final inspection of SST and all valves and indicators. ROV performed seabed survey. Rig removed guide arms from TCRT. Deballasted rig to survival draft of 20m. Pacific Wrangler changed out swivel and pear link at #8 anchor while rig backloaded Pacific Sentinel of all remaining backload. Continued to de-ballast rig to transit draft after P. Sentinel backloaded. Rig continued to retreive anchors Operations For Period 0000 Hrs to 2400 Hrs on 01 Oct 2005 Pressure tested tree cap to 5000 psi. Released TCRT and pulled out of hole laying down all 5" DP. ROV attempted to close SCSSV with increased torque of 248 ft/lbs - no go. ROV did final inspection of SST and all valves and indicators. ROV performed seabed survey. Rig removed guide arms from TCRT. Deballasted rig to survival draft of 20m. Pacific Wrangler changed out swivel and pear link at #8 anchor while rig backloaded Pacific Sentinel of all remaining backload. Continued to de-ballast rig to transit draft after P. Sentinel backloaded. Rig continued to retreive anchors Operations For Period 0000 Hrs to 2400 Hrs on 01 Oct 2005 Phse Cls (RC) Op From To Hrs Depth Activity Description C TP (VE) WH 0000 0130 1.50 3,414.0m Latched tree cap and pressure tested as per Anzon completion program C P WH 0130 0230 1.00 3,414.0m Released from tree cap with running tools and hotline. Recovered guidelines with ROV observation C P PLD 0230 0400 1.50 3,414.0m Pulled out of hole with TCRT. Laid down all 5" DP as pulled out of hole C P WH 0400 0500 1.00 3,414.0m Rigged down TCRT guide arms and laid down tree cap RT C P WH 0500 0700 2.00 3,414.0m Rig started to deballast to survival draft at 0445 hrs. Rig at survival draft of 20m draft at 0645hrs. ROV attempted to close SSSV isolation valve with highest... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:505 13-JUN-06 3414.0 3344.60 Make up tree cap R/Tool while skidding rig from Basjker #4 to Basker #2. Ran in hole and recovered tree cap.Pulled out of hole laying out R/T and tree cap. Make up tree cap R/Tool while skidding rig from Basjker #4 to Basker #2. Ran in hole and recovered tree cap.Pulled out of hole laying out R/T and tree cap. FORMATION Name Top Top Reservoir ZC1 marker 3055.50m Top Zone 2 Sand 3104.00m Top Zone 5 3219.00m Top Volcanics Unit 1 3325.00m TD 3414.00m Operations for Period 0000 Hrs to 2400 Hrs on 13 Jun 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description C P XT 1000 1200 2.00 3414.0m Position rig over basker #2, made up tree cap running tool. Establish guide lines. C P XT 1200 1400 2.00 3414.0m Install 2 x arm guide in moon pool and install guide wires. C P XT 1400 1530 1.50 3414.0m Ran in hole tree cap running tool with 6 x 203mm (8")dcs and 127mm (5") drill pipe to surface. Land and latch. C P XT 1530 1700 1.50 3414.0m Unlock tree cap with ROV and hot stab. Pulled out of hole with tree cap, skid rig off location while pulling out of hole. C P XT 1700 1800 1.00 3414.0m Removed 2 x arm guide and removed tree cap. End of Basker #2. Last BOP Test: 'Copyright IDS 2006', AT 20060601, ANZON_AU_drllg Page 1 Printed on 13 Jun 2006 Phase Data to 2400hrs, 13 Jun 2006 Phase Phase Hrs Start On Finish On Cum Hrs Cum Days Max Depth RIG MOVE/RIG-UP/PRESPUD(RM) 154.5 06 Aug 2005 12 Aug 2005 154.50 6.437 0.0m ANCHORING(A) 32 12 Aug 2005 13 Aug 2005 186.50 7.771 0.0m PRESPUD(PS) 13 13 Aug 2005 14 Aug 2005 199.50 8.312 177.0m CONDUCTOR HOLE(CH) 2.5 14 Aug 2005 14 Aug 2005 202.00 8.417 209.0m CONDUCTOR CASING(CC) 21 14 Aug 2005 15 Aug 2005 223.00 9.292 209.0m SURFACE HOLE(SH) 33 15 Aug 2005 16 Aug 2005 256.00 10.667 1006.0m SURFACE CASING(SC) 24.5 16 Aug 2005 17 Aug 2005 280.50 11.687 1006.0m RISER AND BOP STACK(BOP) 35 17 Aug 2005 19 Aug 2... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:600 19-JUN-06 9999.9 9999.99 Operations For Period 0000 Hrs to 2400 Hrs on 19 Jun 2006 Operations For Period 0000 Hrs to 2400 Hrs on 19 Jun 2006 Phse Cls (RC) Op From To Hrs Activity Description PXT P WX 1000 1200 2.00 Make up control lines to SST running tool and pressure test same. Position rig over Basker 2 SOF's Ocean Patriot: Barite=1017 sx, Gel=940sx, G cement=133sx, HTB cement=392sx, Fuel=2662.2 bbl, D/water=4900 bbl, P/water=2730 bbl, P Wrangler; Gel=419sx, G cement=1736sx, HTB cement=69.2mt, Fuel=2192.3 bbl, D/water=0 bbl, P/water=1433.9 bbl Far Grip; Melbourne at Port PXT P WX 1200 1500 3.00 Rig up umbilical and annulus access hoses. Install guide ropes, bullseye and two arm guide PXT P TI 1500 1730 2.50 Run in with TRT on 5 1/2" riser. Install hose clamps mid and even stand PXT P RU 1730 1900 1.50 Rig up 45 ft bails, air hoist and top drive sub. Pick up stiff joint PXT P WX 1900 1930 0.50 Land and latch running tool to Basker 2 SST. Take 50 klbs overpull. PXT P WX 1930 2100 1.50 Hold JSA. Rig up slickline BOP and lubricator and test hose PXT P ROV 2100 2400 3.00 Fill completion riser with seawater and pressure test PSV and lubricator to 500 psi/5 min and 5000 psi/10 min. ROV to surface to install FLOT tool Operations For Period 0000 Hrs to 0600 Hrs on 20 Jun 2006 Phse Cls (RC) Op From To Hrs Activity Description PXT P ROV 0000 0300 3.00 Install FLOT tool and deploy ROV. Install Alpha plate, Annulus access line and Chemical injection line on Basker 2 SST Pressure test Annulus access line to 500 psi/5 min and 4500 psi/10 min PXT P PT 0300 0430 1.50 Close ICV and LV. Open AWV and XOV to displace Annulus Access line with Brine. 1300 psi pressure noted on Annulus Access line. Attempt to bleed off pressure. Pressure dropped to 1200 psi and increased to 1400 psi rapidly. 4 bbls bled back PXT P FTW 0430 0600 1.50 Open PMV, PSV and SSSV to monitor tubing pressure at choke manifold. Tubing ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:600 20-JUN-06 3382.0 3382.00 Operations for Period 0000 Hrs to 2400 Hrs on 20 Jun 2006 Operations for Period 0000 Hrs to 2400 Hrs on 20 Jun 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description PXT P ROV 0000 0300 3.00 3414.0m Install FLOT tool and deploy ROV. Install Alpha plate, Annulus access line and Chemical injection line on Basker 2 SST Pressure test Annulus access line to 500 psi/5 min and 4500 psi/10 min PXT TP (OTH) PT 0300 0500 2.00 3414.0m Close ICV and LV. Open AWV and XOV to displace Annulus Access line with Brine. 1300 psi pressure noted on Annulus Access line. Attempt to bleed off pressure. Pressure dropped to 1200 psi and increased to 1400 psi rapidly. 4 bbls bled back PXT TP (OTH) FTW 0500 0730 2.50 3414.0m Open PMV, PSV and SSSV to monitor tubing pressure at choke manifold. Tubing pressure = 1820 psi. Line up Annulus Access line to Expro separator via test line to bleed down annulus pressure. Pressure test surface lines to 500 psi and 3000 psi/5 min. Bleed tubing pressure to 1400 psi. Open AMV. Vented annulus fluid (gas) from Annulus Access line to flare boom for 10 min. Close choke and monitor pressure. Tubing and annulus pressures = 1200 psi PXT TP (OTH) FTW 0730 1000 2.50 3414.0m Open choke and bleed off annulus pressure to flare boom to 0 psi, tubing pressure = 860 psi. Close choke and monitor pressure for 60 minutes; Annulus = 93 psi, tubing = 790 psi PXT TP (OTH) SLK 1000 1430 4.50 3414.0m Close FOBV and bleed off lubricator pressure and break out lubricator. Make up slickline tandem shifting tool. Make up lubricator and pressure test to 1500 psi/ 5 min. Attempt to open FOBV with no success. PXT TP (OTH) SLK 1430 1600 1.50 3414.0m Install flow line connector plug with ROV and pressure test to 3000 psi through XOV. Bleed off pressure via AAL to 800 psi. Close PMV and open PWV and observe 2400 psi shut in tubing pressure via AMON line. Bleed off pressure between PMV and FOBV to 0 psi and open FOBV... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:600 21-JUN-06 9999.9 9999.99 Operations For Period 0000 Hrs to 2400 Hrs on 21 Jun 2006 Operations For Period 0000 Hrs to 2400 Hrs on 21 Jun 2006 Phse Cls (RC) Op From To Hrs Activity Description PXT P SLK 0000 0130 1.50 RIH with GS pulling tool and recover downhole memory gauges from XN nipple at 3200.8m. POOH with gauges. PXT P SLK 0130 0300 1.50 Close PMV and bleed down riser. Close FOBV and bleed down slickline lubricator. Break out lubricator and recover gauges PXT P SLK 0300 0400 1.00 Prepare XN gauge catcher. Reconfigure slickline tools. PXT P SLK 0400 0430 0.50 Pressure test lubricator to 5000 psi. Equalize riser pressure to 1400 psi and open PMV. PXT P SLK 0430 0600 1.50 RIH with XN gauge catcher to set gauge catcher in XN nipple at 3200.8m. POOH PXT P SLK 0600 0630 0.50 Close PSV, bleed off pressure, break out lubricator and lay out gauge catcher tool PXT P SLK 0630 0930 3.00 Make up kick over tool and gauge pulling tool. Make up lubricator, pressure test to 5000 psi and equalise pressure. Open PSV, RIH and retrieve memory gauge in SPM at 2819m. POOH PXT P SLK 0930 1100 1.50 Slickline wire jumped sheave. hang off line and replace slickline sheave. Continue to POOH and recover memory gauge from lubricator PXT TP (VE) SLK 1100 1400 3.00 Lay out slickline lubricator and sheaves. Strip 6000 ft of wire from wireline spool. Re-head slickline wire. Bullhead 250 bbls seawater down tubing with Dowell while working on slickline equipment PXT P SLK 1400 1500 1.00 Make up kick over tool and gauge pulling tool. Make up lubricator and pressure test to 5000 psi and equalise pressure open and PSV PXT P SLK 1500 1630 1.50 RIH and recover memory gauge from SPM at 2801m. POOH PXT P SLK 1630 1730 1.00 Close PSV and bleed down lubricator. Break out lubricator. Install catcher pulling tool and make up lubricator. Equalise pressure and open PSV. PXT P SLK 1730 1830 1.00 RIH and recover gauge catcher... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:600 22-JUN-06 9999.9 9999.99 Operations For Period 0000 Hrs to 2400 Hrs on 22 Jun 2006 Operations For Period 0000 Hrs to 2400 Hrs on 22 Jun 2006 Phse Cls (RC) Op From To Hrs Activity Description PXT P SLK 0000 0030 0.50 RIH with 2.813 XX plug and set in SSD at 2955m. POOH PXT P PT 0030 0130 1.00 Attempt to pressure test 2.813 plug with no success. Lubricator leaking. Remove lubricator and install test cap and reconfigure surface lines. PXT P PT 0130 0400 2.50 Bleed off control line pressures. Pressure test tubing string to 500 psi/5 min and 4000 psi/10 min against 2.813 plug. Common closed line pressure increased from 0 to 2590 psi. Pressure up on annulus to 1500 psi and monitor ICV and LV control lines pressures. Control line pressures remained constant (DH1-0, DH2=0, DH3=2590psi) Bleed off annulus pressure. Close AMV and AAV. Close SSSV and bleed back tubing head pressure to 500 psi. Perform inflow test on SSSV for 15 minutes. Pressure up tubing to 4000 psi, open SSSV and bleed off tubing pressure. Control line pressures constant. Bleed off control line pressure. PXT P PT 0400 0530 1.50 Remove test cap. Make up lubricator with 4" ARH plug installed. RIH and set ARH in tubing hanger. POOH and make up ARH prong, RIH and set on ARH plug in tubing hanger. POOH with slickline. Pressure test plug and prong to 500 psi/5 min and 5000 psi/10 min. Common close line pressure increased from 0 to 2000 psi during pressure test of ARH plug, but remained at 2000 psi after bleeding off tubing pressure. PXT P PT 0530 0600 0.50 Rig down slickline lubricator and BOP. Rig down surface lines. Bleed off control line pressures PXT P WX 0600 0630 0.50 Bleed down common closed control line pressure from 2500 psi to 0 psi. Shut in and monitor pressure build up of 500 psi in 15 minutes. Bleed off pressure and monitor for 15 minutes. 0 psi PXT P WX 0630 0700 0.50 Unlatch SST from Basker 2 and pick up above guide posts. Observe gas migration from tubing... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:700 28-JUN-06 9999.9 9999.99 Operations For Period 0000 Hrs to 2400 Hrs on 28 Jun 2006 Operations For Period 0000 Hrs to 2400 Hrs on 28 Jun 2006 Phse Cls (RC) Op From To Hrs Activity Description PXT P RM 1400 1600 2.00 Move rig from Basker 3 and position over Basker 2 SOF's Ocean Patriot: Barite=1017 sx, Gel=940sx, G cement=133sx, HTB cement=392sx, Fuel=2427.7 bbl, D/water=3327.7 bbl, P/water=2748 bbl, P Wrangler; At port in Melbourne Far Grip; Barite=1874sx, Gel=1131sx, G cement=1923sx, HTB cement=2179mt, Fuel=1716.9 bbl, D/water=4528.1 bbl, P/water=1289.2 bbl PXT P ROV 1600 1700 1.00 Deploy ROV and install new SAX gasket on Basker 2 and install guidelines. Land and latch TRT PXT P PT 1700 1800 1.00 Pressure test Production riser against FSV and PSV 500 psi/5 min and 5000 psi/10 min Install Alpha plate with ROV PXT P ROV 1800 1830 0.50 Pressure test AMON line to 5000 psi/5 min. Open AAV and AMV. Monitor annulus pressure via AMON line=0 psi ROV at surface to change out FLOT to torque tool PXT P ROV 1830 2330 5.00 Open PMV and PSV. Monitor tubing pressure via Expro choke=0 psi. Open SSSV, DH1, DH2 & DH3 with ROV. Monitor control line pressures; SSSV=450 psi, DH1, DH2, DH3 = 0 psi. Bleed down SSSV to 0 psi ROV at surface, change out torque tool to jetting tool. Re-deploy ROV with modified debris cap. Deploy temporary mandrel seal on pod line PXT TP (VE) WX 2330 2400 0.50 Attempt to unlatch SST from Basker 2 with no success. Troubleshoot IWOCs system. Functioned all SST valves; AMV, AAV, AWV & XOV functioning properly PSV & PWV opened but would not close PMV not functioning Operations For Period 0000 Hrs to 0600 Hrs on 29 Jun 2006 Phse Cls (RC) Op From To Hrs Activity Description PXT TP (VE) WX 0000 0400 4.00 Recover ROV and change out jetting tool for FLOT. Deploy ROV and inspect Alpha plate termination. back off Alpha plate 1/2 turn and re establish connection with 2 additional turns. PXT TP (VE) WX 0400 060... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:700 29-JUN-06 3382.0 3382.00 Operations for Period 0000 Hrs to 2400 Hrs on 29 Jun 2006 Operations for Period 0000 Hrs to 2400 Hrs on 29 Jun 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description PXT TP (VE) WX 0000 0400 4.00 3414.0m Recover ROV and change out jetting tool for FLOT. Deploy ROV and inspect Alpha plate termination. back off Alpha plate 1/2 turn and re establish connection with 2 additional turns. PXT TP (VE) WX 0400 0800 4.00 3414.0m Function test all valves successfully. Pressure test AMON line to 5000 psi/5 min. Open SSSV, DH1, DH2 & DH3 at IWOCS panel. Monitor control line pressures; SSSV=0 psi, DH1 & DH2=350 psi, DH3 = 0 psi. Bleed down DH2 & DH3 to 0 psi Open AAL and AMV. Monitor annulus pressure via AMON line=450 psi Open PMV and PSV. Monitor tubing pressure via Expro choke=0 psi. Recover ROV and change out FLOT to jetting tool and re deploy PXT P WX 0800 1000 2.00 3414.0m Unlatch SST and pick up above guide posts. No indications of gas venting from wellhead area noted. Move rig off location 15m aft. Install temporary mandrel seal into tubing hanger and wellhead/tubing hanger dust cap with ROV. Unlatch guidelines, rig down flowhead and surface lines from rig floor. Rig down tensioners. Lay down 45 ft bails, air hoist and TD sub PXT P WX 1000 1400 4.00 3414.0m Pull out SST on 5 1/2" production riser. Rig down umbilical lines, bullseye and ROV hose hanger. Install beams on trolley C P XT 1400 1500 1.00 3640.0m Set SST on trolley. Unlatch SST and skid tree back and set on test stump. Release rig to Install tree cap on Basker 5 at 15:00 hrs 29 June 2006 SOF's Ocean Patriot: Barite=1017 sx, Gel=940sx, G cement=133sx, HTB cement=392sx, Fuel=2389.6 bbl, D/water=3251.9 bbl, P/water=2765.5 bbl, P Wrangler; Melbourne at Port Gel=419sx, G cement=1736sx, HTB cement=1784mt, Fuel=1908.7 bbl, D/water=0 bbl, P/water=1289.2 bbl Far Grip; Gel=1131sx, Barite=1874sx, G cement=1923sx, HTB cement=0sx, Fuel=1660.3 bbl, D/water=4528... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:700 30-JUN-06 10.0 44.00 Continue to make up 42" drilling BHA. Wait on currents to deploy sonar equipment to seabed to perforrm wellhead survey for manifold placement. Move rig to Basker 2 to run SST Rig released at 08:30 30 June 2006 Operations for Period 0000 Hrs to 2400 Hrs on 30 Jun 2006 Continue to make up 42" drilling BHA. Wait on currents to deploy sonar equipment to seabed to perforrm wellhead survey for manifold placement. Move rig to Basker 2 to run SST Rig released at 08:30 30 June 2006 Operations for Period 0000 Hrs to 2400 Hrs on 30 Jun 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description CH P HBHA 0000 0300 3.00 0.0m Continue to pick up and make up 42" BHA. Surface test Anderdrift tool. 11 pulses=0 degrees. Make up 42" hole opener and 26" bit and lay out on pipe deck. CH P HBHA 0300 0430 1.50 0.0m Pick up and run in with 15 X 5" HWDP, pull out and rack back in derrick CH TP (WOW) ROV 0430 0830 4.00 0.0m Wait on currents to subside to deploy subsea sonar equipment. Currents drifting sonar equipment on entering water. ROV unable to maitain station to assist in deploying equipment. Perform general rig maintenance and rig PM's. Make up SST running tool. Move SST to test stump and then to moonpool trolley. Rig released to Basker 2 for SST running and flow testing. 08:30 30 Jun 2006 SOF's Ocean Patriot: Barite=1017 sx, Gel=940sx, G cement=133sx, HTB cement=2393sx, Fuel=2223 bbl, D/water=3219 bbl, P/water=2708 bbl, P Wrangler; Melbourne at Port Gel=419sx, G cement=1736sx, HTB cement=1784mt, Fuel=1908.7 bbl, D/water=0 bbl, P/water=1289.2 bbl Far Grip; Gel=1131sx, Barite= 1874sx, G cement=1923sx, HTB cement=0sx, Fuel=1616.3 bbl, D/water=4528.1 bbl, P/water=3131.9 bbl Phase Data to 2400hrs, 30 Jun 2006 Phase Phase Hrs Start On Finish On Cum Hrs Cum Days Max Depth CONDUCTOR HOLE(CH) 10.5 29 Jun 2006 30 Jun 2006 10.50 0.438 0.0m WBM Data Cost Today Mud Type: Brine Sample-From: Active pit Time: 1300 Weigh... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:800 03-JUL-06 9999.9 9999.99 Operations For Period 0000 Hrs to 2400 Hrs on 03 Jul 2006 Operations For Period 0000 Hrs to 2400 Hrs on 03 Jul 2006 Phse Cls (RC) Op From To Hrs Activity Description SW P WX 0000 0230 2.50 Perform final SST suspension pressure testing with Dowell 500 psi/5 min and 5000psi/ 10 min Test #2; PWV upstreram Test #3; AMV downstream/AWV upstream/ACI upstream Test #4; AAV downstream Test #5; PSV upstream Test #6; PSV downstream SW P ROV 0230 0500 2.50 Disconnect UH 550 Annulus Access connector and hot stab from LD-1 receptacle with ROV and hang on stress joint hanger. Install UH 550 plug in annulus access line receptacle. Perform Final suspension test via IWOC Annulus Monitor Line to 500 psi/5 min and 5000 psi/10 min Test #7; AA plug upstream Break out slickline lubricator and install 3.4" blind box. Make up lubricator and pressure test quick test sub to 5000 psi SW P ROV 0500 0630 1.50 Bleed down SST tree lock pressure and disconnect Alpha plate with ROV and hang on stress joint hanger. Bleed down riser tensioners SW P WX 0630 0700 0.50 Unlatch TRT from Basker 2 SST. Install dust cap with ROV SW P ROV 0700 0800 1.00 Close rotary valves on SST with ROV. Install bridging plate on SST. Unlatch guidelines. Rig released from Basker 2 at 08:00 03 July 2006 for wireline operations on Basker 3 SOF's Ocean Patriot: Barite=1017 sx, Gel=940sx, G cement=133sx, HTB cement=2393sx, Fuel=1205 bbl, D/water=2538 bbl, P/water=2763 bbl, P Wrangler; Gel=1058sx, G cement=1736sx, HTB cement=1784mt, Fuel=3176.6 bbl, D/water=4779.6 bbl, P/water=1622.6 bbl Far Grip; At port Eden Gel=1131sx, Barite= 1874sx, G cement=1923sx, HTB cement=0sx, Fuel=1478 bbl, D/water=4528.3 bbl, P/water=3050.3 bbl Phase Data to 2400hrs, 03 Jul 2006 Phase Phase Hrs Start On Finish On Cum Hrs Cum Days Max Depth PULL XMAS TREE(PXT) 142 13 Jun 2006 29 Jun 2006 142.00 5.917 3414.0m COMPLETION(C) 1 29 Jun 2006 29 Jun 2006 143.00 5.958 3640.0m W... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:801 01-JUL-06 3382.0 3382.00 Operations for Period 0000 Hrs to 2400 Hrs on 01 Jul 2006 Operations for Period 0000 Hrs to 2400 Hrs on 01 Jul 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description PWX TP (OTH) FSH 0000 0030 0.50 3640.0m Run in with 4 1/4" spear assembly on 5" DP. Latch spear into hanger isolation sleeve. No overpull noted. A large plume of gas released and quickly dissipated as sleeve was released. Pull up and recover fish N.B. Very minor percolation of gas coming from tubing hanger PWX TP (OTH) FSH 0030 0130 1.00 3640.0m Pull out with spear assembly and fish on 5" DP. Lay out fishing assembly Jet tubing hanger and inspect mandrel setting profile with ROV. Install debris cap with ROV PWX TP (OTH) WX 0130 0500 3.50 3640.0m Rig up 5 1/2" tubing handling equipment. Pick up and make up SST running tool. Position SST under rotary table. Rig up control lines to SST. Install bullseye and ROV hook PWX TP (OTH) PT 0500 0600 1.00 3640.0m Lower SST into water on 5 1/2" production riser. Pressure test AAL to 500 psi/5 min and 4500 psi/10 min. PWX TP (OTH) TI 0600 0730 1.50 3640.0m Run SST on 5 1/2" production riser PWX P RU 0730 0930 2.00 3640.0m Rig up 45 ft bails, TD sub and air hoist. Pick up stiff joint and flowhead. Hook up tensioners to tension jt. Make up coflex and cement hoses to flowhead. Move rig over Basker 2 PWX P PT 0930 1030 1.00 3640.0m Close PSV on SST and pressure test riser against PSV and FSV to 500 psi/5 min and 5000 psi/10 min. PWX P WX 1030 1100 0.50 3640.0m Position rig over Basker 2. Land and latch SST. Take 50 klbs overpull. apply 4 X 10 klbs on tensioners Increased tubing hanger gas percolation noted by ROV prior to landing SST Control line pressures; DH1= 0 psi, DH2= 0 psi, DH3= 2300 psi, SSSV =0 psi. Attempt to bleed down DH3 with no success (gas at surface) PWX P PT 1100 1300 2.00 3640.0m Rig up slickline sheaves, BOP and lubricator. Pressure test to 500 psi/5 min ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:801 02-JUL-06 3382.0 3382.00 Operations for Period 0000 Hrs to 2400 Hrs on 02 Jul 2006 Operations for Period 0000 Hrs to 2400 Hrs on 02 Jul 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description FW P FTW 0000 1800 18.00 3640.0m Flow well on clean up as per program. Throughout well test, SSSV control line pressure was held at 4000 psi with no leak-off, DH1 = zero, DH2 = 4000 psi (held on intentionally to ensure that well did not shut in downhole), DH3 = 2200 psi (gas at surface, unable to bleed off). At end of well test, check if ICV will close in well by reducing DH2 (ICV Open) control line pressure to 1000 psi and hold this for 15 mins, well continued to flow. then bleed off DH2 to zero - well continued to flow. FW P FTW 1800 1830 0.50 3640.0m Shut in well at choke manifold and monitor shut in tubing pressure, built up to 1845 psi (still building very slowly). Prepare to bullhead tubing SW P FTW 1830 2030 2.00 3480.0m Open Expro choke, line up with Dowell and pump 8 bbl diesel across surface flowhead, through to Expro choke manifold to clean surface lines. Close in choke and and pressure up on surface flowhead with Dowell and open flowhead master valve. Bullhead tubing with 105 bbls diesel at 3 BPM. Final SITHP= 910 psi. SW P PT 2030 2200 1.50 3640.0m Close SSSV and bleed off tubing pressure to 200 psi. Perform inflow test on SSSV for 1 hour. SW P PT 2200 2300 1.00 3480.0m Pressure up on tubing above SSSV to 700 psi and close PMV. Perform inflow test on PMV. Pressure up on PMV to 700 psi, open PMV and bleed tubing pressure above SSSV to 0 psi. Close PMV and perform Final SST suspension test #1 With Dowell to 500psi/5 min and 5000psi/ 10 min. Test #1; PMV downstream/XOV upstream/CIV1 upstream/CIV2 upstream. SW P CIR 2300 2400 1.00 3640.0m Line up and flush annulus access line, riser, flowhead and well test equipment with 20 bbl SAPP, 20 bbl seawater and 20 bbl inhibited seawater Operations for Period 0000 Hrs to 0600 Hrs... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:900 06-JUL-06 9999.9 9999.99 Operations For Period 0000 Hrs to 2400 Hrs on 06 Jul 2006 Operations For Period 0000 Hrs to 2400 Hrs on 06 Jul 2006 Phse Cls (RC) Op From To Hrs Activity Description C P RM 0000 0100 1.00 Move rig from Basker 3 to Basker 2 safe area. Pull out with tree cap running tool to run Basker 2 tree cap SOF's Ocean Patriot: Barite=1017 sx, Gel=940sx, G cement=133sx, HTB cement=2393sx, Fuel=2032.5 bbl, D/water=800 bbl, P/water=2754 bbl, P Wrangler; At port in Melbourne Gel=1058sx, G cement=1736sx, HTB cement=1784mt, Fuel=1855.3 bbl, D/water=4779.6 bbl, P/water=1591.2 bbl Far Grip; Gel=1131sx, Barite= 1874sx, G cement=1923sx, HTB cement=0sx, Fuel=1823.8 bbl, D/water=4528.3 bbl, P/water=2955.8 bbl C P XT 0100 0200 1.00 Make up Tree cap to running tool. Establish guideline to Basker 2 SST. Install guidelines to 2 arm guide. C P XT 0200 0300 1.00 Run tree cap running tool on 5" DP banding 4 core umbilical to DP C P XT 0300 0530 2.50 Position rig over Basker 3. Land and latch tree cap. Pressure test to 500 psi/5 min and 5000 psi/10 min. Disconnect stabs from tree cap. Unlatch running tool from tree cap. Unlatch guidelines from SST C P XT 0530 0700 1.50 Pull tree cap running tool on 5" DP and lay out running tool. Lay down assembly Phase Data to 2400hrs, 06 Jul 2006 Phase Phase Hrs Start On Finish On Cum Hrs Cum Days Max Depth PULL XMAS TREE(PXT) 142 13 Jun 2006 29 Jun 2006 142.00 5.917 3414.0m WELLHEAD/ XMAS(PWX) 33 30 Jun 2006 01 Jul 2006 175.00 7.292 3640.0m SLICKLINE OPS(SLO) 3 01 Jul 2006 01 Jul 2006 178.00 7.417 3640.0m FLOW WELL(FW) 22 01 Jul 2006 02 Jul 2006 200.00 8.333 3640.0m SUSPEND WELL(SW) 13.5 02 Jul 2006 03 Jul 2006 213.50 8.896 3640.0m COMPLETION(C) 8 29 Jun 2006 06 Jul 2006 221.50 9.229 3640.0m Bulk Stocks Name Unit In Used Adjust Balance Barite Bulk MT 0 0 0 46.1 Bentonite Bulk MT 0 0 0 42.6 Cement G MT 0 0 0 5.7 Cement HT (S... [From:WELL_DAILY]
A WELL_LOG_CURVE_INT: B.SOURCE B.CURVE_ID C.DESCRIPTION B.JOB_ID B.LOG_RUN B.PASS_NO B.TOP_DEPTH B.BASE_DEPTH B.DEPTH_UNIT B.QUALITY B.REMARK
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:ANOR DESC:ANOR JOB:01--BASKER-2 RUN:999 PASS:99 TOP:2923.94 BASE:3415.13 Metres Units=M/S2; 25 ?; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=8.5235; maxv=9.8159; average=9.7633; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:C1 DESC:C1 JOB:02--BASKER-2 RUN:999 PASS:99 TOP:2940.10 BASE:3412.99 Metres Units=MM; 28 Caliper 1; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=201.7928; maxv=341.3938; average=220.7591; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:C2 DESC:C2 JOB:03--BASKER-2 RUN:999 PASS:99 TOP:2940.10 BASE:3412.99 Metres Units=MM; 29 Caliper 2; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=209.5017; maxv=341.4573; average=221.0021; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:CBL DESC:CBL JOB:01--BASKER-2 RUN:999 PASS:99 TOP:2399.23 BASE:3387.85 Metres Units=MV; 2 ?; ; SRVC=Anzon; COMP=ANZON; START=2399.2332; STOP=3387.852; minv=0; maxv=49.1212; average=7.7884; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:CBSL DESC:CBSL JOB:02--BASKER-2 RUN:999 PASS:99 TOP:2399.23 BASE:3387.85 Metres Units=MV; 3 ?; ; SRVC=Anzon; COMP=ANZON; START=2399.2332; STOP=3387.852; minv=0.0572; maxv=49.1212; average=7.9702; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:CCL DESC:CCL JOB:03--BASKER-2 RUN:999 PASS:99 TOP:2399.23 BASE:3387.85 Metres Units=; 4 Casing Collar Locator Amplitude; ; SRVC=Anzon; COMP=ANZON; START=2399.2332; STOP=3387.852; minv=-5.5114; maxv=7.5845; average=0.0216; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:CDF DESC:CDF JOB:04--BASKER-2 RUN:999 PASS:99 TOP:2923.94 BASE:3415.13 Metres Units=N; 30 ?; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=10213.9346; maxv=12092.8438; average=11139.0341; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:DEPTH DESC:DEPTH JOB:00--BASKER-2 RUN:999 PASS:99 TOP:2399.23 BASE:3387.85 Metres Units=M; 1 Along hole depth; ; SRVC=Anzon; COMP=ANZON; START=2399.2332; STOP=3387.852; minv=2399.2332; maxv=3387.852; average=2893.5426; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:DEVI DESC:DEVI JOB:05--BASKER-2 RUN:999 PASS:99 TOP:2923.94 BASE:3415.13 Metres Units=DEG; 24 Hole Deviation; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=4.9214; maxv=31.4554; average=27.4355; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:DSO8 DESC:DSO8 JOB:06--BASKER-2 RUN:999 PASS:99 TOP:2945.13 BASE:3413.60 Metres Units=IN; 16 ?; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=-0.1; maxv=1.1602; average=0.0781; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:DT1 DESC:DT1 JOB:07--BASKER-2 RUN:999 PASS:99 TOP:2923.94 BASE:3415.13 Metres Units=US/F; 35 ?; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=80.8587; maxv=473.5911; average=142.4075; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:DT2 DESC:DT2 JOB:08--BASKER-2 RUN:999 PASS:99 TOP:2923.94 BASE:3415.13 Metres Units=US/F; 36 ?; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=77.1673; maxv=379.5916; average=158.811; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:DT4P DESC:DT4P JOB:09--BASKER-2 RUN:999 PASS:99 TOP:1591.36 BASE:3415.13 Metres Units=US/F; 37 ?; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=-156.9473; maxv=133.6675; average=83.3851; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:DT4S DESC:DT4S JOB:10--BASKER-2 RUN:999 PASS:99 TOP:1591.36 BASE:3415.13 Metres Units=US/M; 38 ?; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=-1344.7871; maxv=590.5463; average=470.984; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:DTCO DESC:DTCO JOB:11--BASKER-2 RUN:999 PASS:99 TOP:1591.36 BASE:3401.87 Metres Units=US/M; 31 Compressional Wave DT; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=-514.9189; maxv=438.5417; average=273.9824; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:DTSM DESC:DTSM JOB:12--BASKER-2 RUN:999 PASS:99 TOP:2923.94 BASE:3400.95 Metres Units=US/M; 32 Shear Wave DT; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=253.1736; maxv=1245.3793; average=522.5755; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:EHGR DESC:EHGR JOB:13--BASKER-2 RUN:999 PASS:99 TOP:2923.94 BASE:3415.13 Metres Units=GAPI; 22 ?; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=24.6465; maxv=187.1443; average=101.4731; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:FNOR DESC:FNOR JOB:14--BASKER-2 RUN:999 PASS:99 TOP:2923.94 BASE:3415.13 Metres Units=OER; 26 ?; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=0.3344; maxv=0.8386; average=0.6009; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:GR DESC:Gamma ray JOB:15--BASKER-2 RUN:999 PASS:99 TOP:1591.36 BASE:3379.92 Metres Units=GAPI; 14 Gamma Ray; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=15.6011; maxv=179.451; average=62.4103; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:GR1 DESC:GR1 JOB:04--BASKER-2 RUN:999 PASS:99 TOP:2399.23 BASE:3378.86 Metres Units=GAPI; 5 Gamma Ray; ; SRVC=Anzon; COMP=ANZON; START=2399.2332; STOP=3387.852; minv=18.6397; maxv=122.954; average=66.3724; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:HCAL DESC:HCAL JOB:16--BASKER-2 RUN:999 PASS:99 TOP:2945.13 BASE:3383.88 Metres Units=MM; 15 Caliper - High resolution; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=205.7628; maxv=341.3227; average=222.095; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:HCGR DESC:HCGR JOB:17--BASKER-2 RUN:999 PASS:99 TOP:2923.94 BASE:3373.98 Metres Units=GAPI; 13 High Res Computed GR; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=16.3319; maxv=139.4034; average=73.2234; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:HDAR DESC:HDAR JOB:18--BASKER-2 RUN:999 PASS:99 TOP:2940.10 BASE:3383.88 Metres Units=IN; 40 Hole DIameter from Area; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=8.1009; maxv=13.4379; average=8.7403; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:HDRA DESC:HDRA JOB:19--BASKER-2 RUN:999 PASS:99 TOP:2945.13 BASE:3383.88 Metres Units=K/M3; 17 High Resolution Density Correction Factor; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=-778.1; maxv=1490.6; average=19.0549; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:HFK DESC:HFK JOB:20--BASKER-2 RUN:999 PASS:99 TOP:2923.94 BASE:3373.98 Metres Units=%; 11 High Res Formation Potassium; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=0.0041; maxv=0.0393; average=0.019; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:HSGR DESC:HSGR JOB:21--BASKER-2 RUN:999 PASS:99 TOP:2923.94 BASE:3373.98 Metres Units=GAPI; 12 High Res Standard GR; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=18.6638; maxv=164.6978; average=91.0343; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:HTHO DESC:HTHO JOB:22--BASKER-2 RUN:999 PASS:99 TOP:2923.94 BASE:3373.98 Metres Units=PPM; 9 High Res Thorium; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=1.2451; maxv=27.6893; average=12.3095; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:HTNP DESC:HTNP JOB:23--BASKER-2 RUN:999 PASS:99 TOP:2923.94 BASE:3380.99 Metres Units=V/V; 23 High Resolution Thermal Neutron Porosity; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=0.0298; maxv=1.0427; average=0.2573; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:HURA DESC:HURA JOB:24--BASKER-2 RUN:999 PASS:99 TOP:2923.94 BASE:3373.98 Metres Units=PPM; 10 High Res Uranium; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=-0.6282; maxv=7.5527; average=2.2965; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:PEF8 DESC:PEF8 JOB:25--BASKER-2 RUN:999 PASS:99 TOP:2945.13 BASE:3383.88 Metres Units=B/EL; 18 High Res PEF; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=0.9; maxv=10; average=2.7857; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:PR DESC:PR JOB:26--BASKER-2 RUN:999 PASS:99 TOP:2923.94 BASE:3415.13 Metres Units=; 33 Poisson's Ratio; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=-499.5916; maxv=0.4731; average=-1.4094; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:RB DESC:RB JOB:27--BASKER-2 RUN:999 PASS:99 TOP:2923.94 BASE:3415.13 Metres Units=DEG; 27 Relative Bearing; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=38.4345; maxv=354.936; average=189.3295; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:RHO8 DESC:RHO8 JOB:28--BASKER-2 RUN:999 PASS:99 TOP:2945.13 BASE:3383.88 Metres Units=K/M3; 19 High Resolution Bulk Density; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=935.9; maxv=4628.7998; average=2492.4293; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:RLA1 DESC:RLA1 JOB:29--BASKER-2 RUN:999 PASS:99 TOP:2945.13 BASE:3388.91 Metres Units=OHMM; 4 ?; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=0.0055; maxv=9.1703; average=3.296; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:RLA2 DESC:RLA2 JOB:30--BASKER-2 RUN:999 PASS:99 TOP:2945.13 BASE:3388.91 Metres Units=OHMM; 5 ?; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=0.0058; maxv=117.9914; average=9.6898; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:RLA3 DESC:RLA3 JOB:31--BASKER-2 RUN:999 PASS:99 TOP:2945.13 BASE:3388.91 Metres Units=OHMM; 6 ?; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=0.0058; maxv=260.8344; average=14.032; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:RLA4 DESC:RLA4 JOB:32--BASKER-2 RUN:999 PASS:99 TOP:2945.13 BASE:3388.91 Metres Units=OHMM; 7 ?; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=0.0053; maxv=467.6621; average=15.4939; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:RLA5 DESC:RLA5 JOB:33--BASKER-2 RUN:999 PASS:99 TOP:2945.13 BASE:3388.91 Metres Units=OHMM; 8 ?; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=0.005; maxv=488.2639; average=16.37; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:RMHRLT DESC:RMHRLT JOB:34--BASKER-2 RUN:999 PASS:99 TOP:2923.94 BASE:3415.13 Metres Units=OHMM; 3 ?; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=0.0049; maxv=0.0857; average=0.0479; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:RSO8 DESC:RSO8 JOB:35--BASKER-2 RUN:999 PASS:99 TOP:2945.13 BASE:3413.60 Metres Units=IN; 21 ?; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=0; maxv=0.6117; average=0.0463; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:RXO8 DESC:RXO8 JOB:36--BASKER-2 RUN:999 PASS:99 TOP:2945.13 BASE:3413.60 Metres Units=OHMM; 20 ?; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=0.03; maxv=4221.02; average=16.3766; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:SDDE DESC:SDDE JOB:01--BASKER-2 RUN:999 PASS:99 TOP:989.5 BASE:3410.1 Metres Units=PTS/M; 15 ?; ; SRVC=Anzon; COMP=ANZON; START=208.1; STOP=3415.2; minv=0.3; maxv=2566.2578; average=54.1047; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:SEDA DESC:SEDA JOB:02--BASKER-2 RUN:999 PASS:99 TOP:989.2 BASE:3410.1 Metres Units=OHMM; 12 ?; ; SRVC=Anzon; COMP=ANZON; START=208.1; STOP=3415.2; minv=0.1427; maxv=200; average=6.0895; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:SEDP DESC:SEDP JOB:03--BASKER-2 RUN:999 PASS:99 TOP:997 BASE:3410.1 Metres Units=OHMM; 8 Deep EWR; ; SRVC=Anzon; COMP=ANZON; START=208.1; STOP=3415.2; minv=0.4257; maxv=1117.1172; average=4.279; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:SEMA DESC:SEMA JOB:04--BASKER-2 RUN:999 PASS:99 TOP:989.2 BASE:3410.1 Metres Units=OHMM; 11 ?; ; SRVC=Anzon; COMP=ANZON; START=208.1; STOP=3415.2; minv=0.1; maxv=200; average=6.1913; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:SEMP DESC:SEMP JOB:05--BASKER-2 RUN:999 PASS:99 TOP:997 BASE:3410.1 Metres Units=OHMM; 7 Medium EWR; ; SRVC=Anzon; COMP=ANZON; START=208.1; STOP=3415.2; minv=0.42; maxv=2000; average=4.5408; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:SESA DESC:SESA JOB:06--BASKER-2 RUN:999 PASS:99 TOP:989.2 BASE:3410.1 Metres Units=OHMM; 10 ?; ; SRVC=Anzon; COMP=ANZON; START=208.1; STOP=3415.2; minv=0.08; maxv=200; average=6.9248; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:SESP DESC:SESP JOB:07--BASKER-2 RUN:999 PASS:99 TOP:997 BASE:3410.1 Metres Units=OHMM; 6 Shallow EWR; ; SRVC=Anzon; COMP=ANZON; START=208.1; STOP=3415.2; minv=0.41; maxv=2000; average=4.6048; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:SEXA DESC:SEXA JOB:08--BASKER-2 RUN:999 PASS:99 TOP:989.2 BASE:3410.1 Metres Units=OHMM; 9 ?; ; SRVC=Anzon; COMP=ANZON; START=208.1; STOP=3415.2; minv=0.07; maxv=200; average=4.5191; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:SEXP DESC:SEXP JOB:09--BASKER-2 RUN:999 PASS:99 TOP:997 BASE:3410.1 Metres Units=OHMM; 5 Extremely Shallow Electromagnetic Wave Resistivity; ; SRVC=Anzon; COMP=ANZON; START=208.1; STOP=3415.2; minv=0.19; maxv=2000; average=3.3336; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:SFXE DESC:SFXE JOB:10--BASKER-2 RUN:999 PASS:99 TOP:990.2 BASE:3410.1 Metres Units=HR; 14 ?; ; SRVC=Anzon; COMP=ANZON; START=208.1; STOP=3415.2; minv=0.11; maxv=201.94; average=4.4774; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:SGRA DESC:SGRA JOB:11--BASKER-2 RUN:999 PASS:99 TOP:991.2 BASE:3412.5 Metres Units=API; 2 ?; ; SRVC=Anzon; COMP=ANZON; START=208.1; STOP=3415.2; minv=25.6193; maxv=201.2486; average=96.2478; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:SGRB DESC:SGRB JOB:12--BASKER-2 RUN:999 PASS:99 TOP:991.2 BASE:3412.5 Metres Units=API; 3 ?; ; SRVC=Anzon; COMP=ANZON; START=208.1; STOP=3415.2; minv=25.5054; maxv=200.0003; average=95.2351; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:SGRC DESC:SGRC JOB:13--BASKER-2 RUN:999 PASS:99 TOP:208.1 BASE:3412.5 Metres Units=API; 4 Smoothed GR from MWD; ; SRVC=Anzon; COMP=ANZON; START=208.1; STOP=3415.2; minv=12.3614; maxv=196.5573; average=80.9676; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:SP DESC:Spontaneous potential JOB:37--BASKER-2 RUN:999 PASS:99 TOP:2945.13 BASE:3371.85 Metres Units=MV; 2 Spontanteous Potential; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=-16.4375; maxv=178.5625; average=97.9959; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:SROP DESC:SROP JOB:14--BASKER-2 RUN:999 PASS:99 TOP:208.1 BASE:3415.2 Metres Units=M/HR; 13 ?; ; SRVC=Anzon; COMP=ANZON; START=208.1; STOP=3415.2; minv=0; maxv=190.8502; average=42.1158; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:STEM DESC:STEM JOB:15--BASKER-2 RUN:999 PASS:99 TOP:990.2 BASE:3411.1 Metres Units=DEGC; 16 Smoothed downhole circulating temperature; ; SRVC=Anzon; COMP=ANZON; START=208.1; STOP=3415.2; minv=29.3; maxv=84.8; average=54.6088; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:TENS DESC:TENS JOB:38--BASKER-2 RUN:999 PASS:99 TOP:1591.36 BASE:3415.13 Metres Units=KGF; 39 Cable Tension at surface; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=1787.6075; maxv=3222.3203; average=2329.2868; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:TT DESC:TT JOB:05--BASKER-2 RUN:999 PASS:99 TOP:2399.23 BASE:3387.85 Metres Units=US; 6 ?; ; SRVC=Anzon; COMP=ANZON; START=2399.2332; STOP=3387.852; minv=265.3852; maxv=312.3471; average=281.3489; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:TTSL DESC:TTSL JOB:06--BASKER-2 RUN:999 PASS:99 TOP:2399.23 BASE:3387.85 Metres Units=US; 7 ?; ; SRVC=Anzon; COMP=ANZON; START=2399.2332; STOP=3387.852; minv=246.9729; maxv=316.5521; average=281.39; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:S_WILTSHIRE CURVE:VPVS DESC:VPVS JOB:39--BASKER-2 RUN:999 PASS:99 TOP:2923.94 BASE:3415.13 Metres Units=; 34 Ratio of VP to VS; ; SRVC=Anzon; COMP=ANZON; START=1591.3608; STOP=3415.1316; minv=-498.8911; maxv=4.4295; average=0.2943; metadata from DPI Geolog (mostly Occam);
HDR A GEOGRAPHICALLY _VERY_ CLOSE WELL TO THIS WELL: WELL_NAME= BASKER-3
HDR A GEOGRAPHICALLY _VERY_ CLOSE WELL TO THIS WELL: WELL_NAME= BASKER-4
HDR A GEOGRAPHICALLY _VERY_ CLOSE WELL TO THIS WELL: WELL_NAME= BASKER-5
HDR A GEOGRAPHICALLY _VERY_ CLOSE WELL TO THIS WELL: WELL_NAME= BASKER-7
--- LISTING OF GEOGRAPHICALLY CLOSE WELLS TO THIS WELL ---
DISTANCE= 00.0 km (very approx) Onshore?=N WELL_NAME= BASKER-3
DISTANCE= 00.0 km (very approx) Onshore?=N WELL_NAME= BASKER-4
DISTANCE= 00.0 km (very approx) Onshore?=N WELL_NAME= BASKER-5
DISTANCE= 00.1 km (very approx) Onshore?=N WELL_NAME= BASKER-7
DISTANCE= 01.0 km (very approx) Onshore?=N WELL_NAME= BASKER-1
DISTANCE= 02.0 km (very approx) Onshore?=N WELL_NAME= MANTA-2
DISTANCE= 02.0 km (very approx) Onshore?=N WELL_NAME= MANTA-2A
DISTANCE= 02.2 km (very approx) Onshore?=N WELL_NAME= BASKER SOUTH-1
DISTANCE= 02.4 km (very approx) Onshore?=N WELL_NAME= MANTA-1
DISTANCE= 02.7 km (very approx) Onshore?=N WELL_NAME= BASKER-6
DISTANCE= 02.7 km (very approx) Onshore?=N WELL_NAME= BASKER-6 ST1
DISTANCE= 02.7 km (very approx) Onshore?=N WELL_NAME= GUMMY-1
DISTANCE= 03.1 km (very approx) Onshore?=N WELL_NAME= CHIMAERA-1
DISTANCE= 03.3 km (very approx) Onshore?=N WELL_NAME= MANTA-3
DISTANCE= 09.5 km (very approx) Onshore?=N WELL_NAME= CULVERIN-1
DISTANCE= 09.9 km (very approx) Onshore?=N WELL_NAME= BIGNOSE-1
DISTANCE= 11.8 km (very approx) Onshore?=N WELL_NAME= KIPPER-2
DISTANCE= 11.9 km (very approx) Onshore?=N WELL_NAME= SCALLOP-1
DISTANCE= 12.8 km (very approx) Onshore?=N WELL_NAME= STONEFISH-1
DISTANCE= 13.0 km (very approx) Onshore?=N WELL_NAME= ADMIRAL-1
DISTANCE= 13.5 km (very approx) Onshore?=N WELL_NAME= KIPPER-A4
DISTANCE= 13.6 km (very approx) Onshore?=N WELL_NAME= KIPPER-A1
DISTANCE= 13.6 km (very approx) Onshore?=N WELL_NAME= KIPPER-A2
DISTANCE= 13.6 km (very approx) Onshore?=N WELL_NAME= KIPPER-A3
DISTANCE= 13.7 km (very approx) Onshore?=N WELL_NAME= KIPPER-1
DISTANCE= 14.2 km (very approx) Onshore?=N WELL_NAME= GREAT WHITE-1
DISTANCE= 14.6 km (very approx) Onshore?=N WELL_NAME= EAST PILCHARD-1
DISTANCE= 14.6 km (very approx) Onshore?=N WELL_NAME= HAMMERHEAD-1
DISTANCE= 16.0 km (very approx) Onshore?=N WELL_NAME= GRUNTER-1
SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = 082/03
SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = 68_12P1
SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = 68_12P2
SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = G88A-9170
SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = G92A-3044
SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = G94A-4083
SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = G94A-4097
SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = GNS07-10
SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = GS81A-36A
SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = GS81A-69A
SDO: HISTORICAL TITLES: 1. ENCLOSING BASKER-2 : TITLE_NAME=PEP38
SDO: HISTORICAL TITLES: 1. ENCLOSING BASKER-2 : TITLE_NAME=VIC/L26
SDO: HISTORICAL TITLES: 1. ENCLOSING BASKER-2 : TITLE_NAME=VIC/P1
SDO: HISTORICAL TITLES: 1. ENCLOSING BASKER-2 : TITLE_NAME=VIC/RL6
SDO: HISTORICAL TITLES: 2. NEAR BASKER-2 : TITLE_NAME=PEP38 : Distance=0
SDO: HISTORICAL TITLES: 2. NEAR BASKER-2 : TITLE_NAME=PEP57 : Distance=11.7
SDO: HISTORICAL TITLES: 2. NEAR BASKER-2 : TITLE_NAME=V11-5 : Distance=5.68
SDO: HISTORICAL TITLES: 2. NEAR BASKER-2 : TITLE_NAME=VIC/L11 : Distance=10.67
SDO: HISTORICAL TITLES: 2. NEAR BASKER-2 : TITLE_NAME=VIC/L25 : Distance=6.63
SDO: HISTORICAL TITLES: 2. NEAR BASKER-2 : TITLE_NAME=VIC/L26 : Distance=0
SDO: HISTORICAL TITLES: 2. NEAR BASKER-2 : TITLE_NAME=VIC/L27 : Distance=3.4
SDO: HISTORICAL TITLES: 2. NEAR BASKER-2 : TITLE_NAME=VIC/L28 : Distance=3.87
SDO: HISTORICAL TITLES: 2. NEAR BASKER-2 : TITLE_NAME=VIC/L9 : Distance=12.09
SDO: HISTORICAL TITLES: 2. NEAR BASKER-2 : TITLE_NAME=VIC/P1 : Distance=0
SDO: HISTORICAL TITLES: 2. NEAR BASKER-2 : TITLE_NAME=VIC/P1 : Distance=3.4
SDO: HISTORICAL TITLES: 2. NEAR BASKER-2 : TITLE_NAME=VIC/P19 : Distance=3.4
SDO: HISTORICAL TITLES: 2. NEAR BASKER-2 : TITLE_NAME=VIC/P22 : Distance=11.15
SDO: HISTORICAL TITLES: 2. NEAR BASKER-2 : TITLE_NAME=VIC/P24 : Distance=3.59
SDO: HISTORICAL TITLES: 2. NEAR BASKER-2 : TITLE_NAME=VIC/P3 : Distance=11.73
SDO: HISTORICAL TITLES: 2. NEAR BASKER-2 : TITLE_NAME=VIC/P41 : Distance=11.15
SDO: HISTORICAL TITLES: 2. NEAR BASKER-2 : TITLE_NAME=VIC/P49 : Distance=3.57
SDO: HISTORICAL TITLES: 2. NEAR BASKER-2 : TITLE_NAME=VIC/P55 : Distance=5.69
SDO: HISTORICAL TITLES: 2. NEAR BASKER-2 : TITLE_NAME=VIC/P56 : Distance=4.93
SDO: HISTORICAL TITLES: 2. NEAR BASKER-2 : TITLE_NAME=VIC/P9 : Distance=11.7
SDO: HISTORICAL TITLES: 2. NEAR BASKER-2 : TITLE_NAME=VIC/RL10 : Distance=3.87
SDO: HISTORICAL TITLES: 2. NEAR BASKER-2 : TITLE_NAME=VIC/RL2 : Distance=6.63
SDO: HISTORICAL TITLES: 2. NEAR BASKER-2 : TITLE_NAME=VIC/RL6 : Distance=0
SDO: HISTORICAL TITLES: 2. NEAR BASKER-2 : TITLE_NAME=VIC/RL9 : Distance=3.4
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE012855 a BASKER-2 Log Data CD [CD] PE012855__((_BASKER-2_LOG_DATA_CD_))_.TAR.GZ(795.2m).........SAM0_685_PE012855__((_BASKER-2_LOG_DATA_CD_))_I_MEDIA_LABELLING.JPG(2.9m).........PE012855__((_BASKER-2_LOG_DATA_CD_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE012855 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE012855 c DESC=BASKER-2 Open Hole and Cased Hole and Processed Log Data CD. (PDF, PDS, LAS and DLIS Format) By Anzon Australia March 2006.
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE012855 d WELL_NAME=BASKER-2
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE012855 d WELL_NAME=BASKER-2 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE915238 a BASKER-2 Final Well Rpt and Data [CD] PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))_.TAR.GZ(177.2m).........PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))_.TAR.GZ(177.2m).........F7746698_068_PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))__MEDIA_LABELLING.PDF(0.7m).........SAM2_196_PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))__MEDIA_LABELLING.JPG(2.8m).........PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE915238 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE915238 c DESC=BASKER-2 Final Well Report and Data. Geoservices for Anzon Australia Ltd. FWR, PDF logs, database, ASCII, Surveys, Time Backup, Mudlogging Data, Sample Manifest. March 2006 VIC/L26
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE915238 d WELL_NAME=BASKER-2
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE915239 a BASKER-2 End of Well Report and Data [CD] PE915239__((_BASKER-2_END_OF_WELL_REPORT_AND_DATA_))_.TAR.GZ(12.7m).........SAM2_197_PE915239__((_BASKER-2_END_OF_WELL_REPORT_AND_DATA_))_I_MEDIA_LABELLING.JPG(2.7m).........PE915239__((_BASKER-2_END_OF_WELL_REPORT_AND_DATA_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE915239 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE915239 c DESC=BASKER-2 End of Well Report and Data. Halliburton for Anzon Australia Ltd. Final LWD Data. March 2006 VIC/L26
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE915239 d WELL_NAME=BASKER-2
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE915240 a BASKER-2 Velocity Survey Reports & Data [CD] PE915240__((_BASKER-2_VELOCITY_SURVEY_REPORTS___DATA_))_.TAR.GZ(156.3m).........SAM2_198_PE915240__((_BASKER-2_VELOCITY_SURVEY_REPORTS___DATA_))_I_MEDIA_LABELLING.JPG(2.7m).........PE915240__((_BASKER-2_VELOCITY_SURVEY_REPORTS___DATA_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE915240 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE915240 c DESC=BASKER-2 Velocity Survey Reports & Data. Schlumberger for Anzon Australia Ltd. PDF, PDS, CGM, TIF, LAS, XLS, LDF, SEGY formats. March 2006 VIC/L26
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE915240 d WELL_NAME=BASKER-2
ASSETS (DETAIL) GENERAL ESUBS_CD_DVD PE907809 a Well Data - Electronic Submissions 2009 [DVD] (2978 DIGITAL FILES)
ASSETS (DETAIL) GENERAL ESUBS_CD_DVD PE907809 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) GENERAL ESUBS_CD_DVD PE907809 c DESC=Well Data - Electronic Submissions 2009. Contains all well data types catalogued in 2009. Disk to be created at end of year frm email attachments stored in Active folder on Unix p1. For well/co./rpt details see Remarks/Ancillary Data.
ASSETS (DETAIL) GENERAL ESUBS_CD_DVD PE907809 d (more than 25 wells for this asset item)
ASSETS (DETAIL) GENERAL ESUBS_CD_DVD PE911536 a DDRs, Well & Permit Data 2005 to 2007 [DVD] (3259 DIGITAL FILES)
ASSETS (DETAIL) GENERAL ESUBS_CD_DVD PE911536 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) GENERAL ESUBS_CD_DVD PE911536 c DESC=Daily Drilling reports, Well Data & Permit Data for the years 2005 to 2007. Reports submitted via email to DPI. Saved by Kourosh Mehin, Mary Jane, Hannah Wallace. NOTE! Some files corrupted. See Remarks.
ASSETS (DETAIL) GENERAL FIELD_DEV PE805508 a Basker Manta Gummy Development Update [PAPER]
ASSETS (DETAIL) GENERAL FIELD_DEV PE805508 b (located in::PE181944= Recent Fields Box 3 of 3 All Basins)
ASSETS (DETAIL) GENERAL FIELD_DEV PE805508 c DESC=Basker Manta Gummy (BMG) Development Update Report. VIC/L26. 38p document from Powerpoint presentation at DPI Offices, Nov 2008. Roc Oil/AGR/Anzon.
ASSETS (DETAIL) GENERAL FIELD_DEV PE805508 d WELL_NAME=BASKER-2
ASSETS (DETAIL) GENERAL FIELD_DEV PE805508 d WELL_NAME=BASKER-3
ASSETS (DETAIL) GENERAL FIELD_DEV PE805508 d WELL_NAME=BASKER-4
ASSETS (DETAIL) GENERAL FIELD_DEV PE805508 d WELL_NAME=BASKER-5
ASSETS (DETAIL) GENERAL FIELD_DEV PE805508 d WELL_NAME=BASKER-6
ASSETS (DETAIL) GENERAL FIELD_DEV PE805508 d WELL_NAME=BASKER-6 ST1
ASSETS (DETAIL) GENERAL FIELD_DEV PE805508 d WELL_NAME=MANTA-2A
ASSETS (DETAIL) GENERAL REGISTRY_FILE F7703302 a PE/16/0535(Part-1) Registry File [PAPER]
ASSETS (DETAIL) GENERAL REGISTRY_FILE F7703302 b (located in::COMPACTUS_1=COMPACTUS_1 55 Collins St)
ASSETS (DETAIL) GENERAL REGISTRY_FILE F7703302 c DESC=PE/16/0535(Part-1) PETROLEUM EXPLORATION WELL W1444 - BASKER - 2 CORRESPONDENCE
ASSETS (DETAIL) GENERAL REGISTRY_FILE F7703302 d WELL_NAME=BASKER-2
ASSETS (DETAIL) TITLE DMP_ACCEPTED PE801522 a Anzon BASKER-2 VIC/RL6 DMP (2004) [PAPER] PE801522__((_ANZON_BASKER-2_VIC_RL6_DMP__2004__))_.PDF(0.3m).........
ASSETS (DETAIL) TITLE DMP_ACCEPTED PE801522 b (located in::F3112020= PE/35/0145 /2 Registry File (DMPs) 2004)
ASSETS (DETAIL) TITLE DMP_ACCEPTED PE801522 c DESC=Anzon BASKER-2 VIC/RL6 DMP (2004) -- NOTE: This DMP Is For A Well ACTIVITY Only
ASSETS (DETAIL) TITLE DMP_ACCEPTED PE801522 d WELL_NAME=BASKER-2
ASSETS (DETAIL) TITLE FIELD_RPT PE802633 a Presentation to DPI by Anzon [PAPER]
ASSETS (DETAIL) TITLE FIELD_RPT PE802633 b (located in::PE184842= Well Box - Recent Wells 1)
ASSETS (DETAIL) TITLE FIELD_RPT PE802633 c DESC=Presentation to: Victorian Department of Primary Industries. MANTA-2 update; production statistics; EPT progress; BASKER-2 workover; future development. Andrew A. Young, Anzon Australia Limited, 15 Feb 2006. Prints of 41 slides.
ASSETS (DETAIL) TITLE FIELD_RPT PE802633 d WELL_NAME=BASKER-2
ASSETS (DETAIL) TITLE FIELD_RPT PE802633 d WELL_NAME=MANTA-2
ASSETS (DETAIL) TITLE FIELD_RPT PE802634 a Basker Manta Update [PAPER]
ASSETS (DETAIL) TITLE FIELD_RPT PE802634 b (located in::PE184842= Well Box - Recent Wells 1)
ASSETS (DETAIL) TITLE FIELD_RPT PE802634 c DESC=Basker Manta Update: Vic. DPI. Production statistics report; Operations report; Technical studies; Forward plans; Environmental plan update. Andrew A. Young, Anzon Australia Limited, 7 March 2006. Prints of 32 slides.
ASSETS (DETAIL) TITLE FIELD_RPT PE802634 d WELL_NAME=BASKER-2
ASSETS (DETAIL) TITLE FIELD_RPT PE802635 a Basker Manta Gummy Project [PAPER]
ASSETS (DETAIL) TITLE FIELD_RPT PE802635 b (located in::PE184842= Well Box - Recent Wells 1)
ASSETS (DETAIL) TITLE FIELD_RPT PE802635 c DESC=Basker Manta Gummy Project. DPI Presentation. Operations update; Technical studies; Environmental plan update. Andrew A. Young, Anzon Australia Limited, 23 March 2006. Prints of 35 slides.
ASSETS (DETAIL) TITLE FIELD_RPT PE802635 d WELL_NAME=BASKER-2
ASSETS (DETAIL) TITLE FIELD_RPT PE802637 a Basker Manta Project [PAPER]
ASSETS (DETAIL) TITLE FIELD_RPT PE802637 b (located in::PE184842= Well Box - Recent Wells 1)
ASSETS (DETAIL) TITLE FIELD_RPT PE802637 c DESC=Basker Manta Project. DITR/GA/Vic DPI Presentation. Background; BASKER-2/ MANTA-2A/ BASKER-5 results; Flare to date; Critical value of EPT; Way forward. Steve Koroknay, Anzon Australia Limited, 6 April 2006. Prints of 29 slides.
ASSETS (DETAIL) TITLE FIELD_RPT PE802637 d WELL_NAME=BASKER-2
ASSETS (DETAIL) TITLE FIELD_RPT PE802637 d WELL_NAME=BASKER-5
ASSETS (DETAIL) TITLE FIELD_RPT PE802637 d WELL_NAME=MANTA-2A
ASSETS (DETAIL) TITLE FIELD_RPT PE802638 a Basker Manta Update [PAPER]
ASSETS (DETAIL) TITLE FIELD_RPT PE802638 b (located in::PE184842= Well Box - Recent Wells 1)
ASSETS (DETAIL) TITLE FIELD_RPT PE802638 c DESC=Basker Manta Update: VicDPI/DITR/GA/NOPSA. Introduction; Safety & environment; Drilling, MDT & EPT results; Geological correlation; Field Development plan; FFD project update; Gas project. Anzon Australia Limited, 28 June 2006. Prints of 80 slides.
ASSETS (DETAIL) TITLE FIELD_RPT PE802638 d WELL_NAME=BASKER-2
ASSETS (DETAIL) TITLE FIELD_RPT PE802638 d WELL_NAME=BASKER-3
ASSETS (DETAIL) TITLE FIELD_RPT PE802638 d WELL_NAME=BASKER-4
ASSETS (DETAIL) TITLE FIELD_RPT PE802638 d WELL_NAME=BASKER-5
ASSETS (DETAIL) TITLE FIELD_RPT PE802638 d WELL_NAME=MANTA-2A
ASSETS (DETAIL) WELL DAILY_RPT PE907806 a Daily Drilling Reports. Various Wells. [CD] PE907806__((_DAILY_DRILLING_REPORTS._VARIOUS_WELLS._))_.TAR.GZ(383.8m).........SAM1_579_PE907806__((_DAILY_DRILLING_REPORTS._VARIOUS_WELLS._))_I_MEDIA_LABELLING.JPG(2.8m).........PE907806__((_DAILY_DRILLING_REPORTS._VARIOUS_WELLS._))__FILES_LISTING.TXT(0.4m).........
ASSETS (DETAIL) WELL DAILY_RPT PE907806 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) WELL DAILY_RPT PE907806 c DESC=Daily Drilling and Geological Reports, drilling updates, approvals, mud logs, for Development and Exploration Wells, 24 January 2005 to 24 May 2006. Format: pdf, zip, doc; occasional las, xls, txt, ASCII, pds, jpg, wmf, ai. Taken from Kourosh Mehin.
ASSETS (DETAIL) WELL DAILY_RPT PE909652 a BASKER-2 Daily Drilling & Workover Rpts [CD] (235 DIGITAL FILES)
ASSETS (DETAIL) WELL DAILY_RPT PE909652 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) WELL DAILY_RPT PE909652 c DESC=BASKER-2 Daily Drilling & Workover Reports. June 2006. Anzon Australia.
ASSETS (DETAIL) WELL DAILY_RPT PE909652 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL DAILY_RPT PE911536_5 a Daily Drilling, Geol, Workover, Mud Rpts [DVD] (3259 DIGITAL FILES)
ASSETS (DETAIL) WELL DAILY_RPT PE911536_5 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007)
ASSETS (DETAIL) WELL DAILY_RPT PE911536_5 c DESC=Daily Drilling, Geol, Workover, Mud Reports, 2005-2007.
ASSETS (DETAIL) WELL DAILY_RPT PE915095 a Multiple Wells Drill Reports/Mud Logs CD [CD] PE915095__((_MULTIPLE_WELLS_DRILL_REPORTS_MUD_LOGS_CD_))_.TAR.GZ(383.6m).........SAM3_345_PE915095__((_MULTIPLE_WELLS_DRILL_REPORTS_MUD_LOGS_CD_))__MEDIA_LABELLING.JPG(2.6m).........PE915095__((_MULTIPLE_WELLS_DRILL_REPORTS_MUD_LOGS_CD_))__BASKER-5_BASKER-5_12__MWD_SURVEYS.TXT(0.0m).........
ASSETS (DETAIL) WELL DAILY_RPT PE915095 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) WELL DAILY_RPT PE915095 c DESC=Multiple Wells Drill Reports & Mud Logs. Contains daily reports, daily geological reports, mudlogs, abandonment programs, well approvals, drilling logs, daily ops reports, progress reports, MWD reports, sampling data, well logs for 30 wells.
ASSETS (DETAIL) WELL DAILY_RPT PE915095 d (more than 25 wells for this asset item)
ASSETS (DETAIL) WELL DATA_CD_DVD PE012753 a BASKER-2 Wireline log data CD [CD] PE012753__((_BASKER-2_WIRELINE_LOG_DATA_CD_))_.TAR.GZ(8.4m).........F7746696_033_PE012753__((_BASKER-2_WIRELINE_LOG_DATA_CD_))_I_MEDIA_LABELLING.PDF(0.7m).........SAM0_942_PE012753__((_BASKER-2_WIRELINE_LOG_DATA_CD_))_I_MEDIA_LABELLING.JPG(3.0m).........PE012753__((_BASKER-2_WIRELINE_LOG_DATA_CD_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) WELL DATA_CD_DVD PE012753 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) WELL DATA_CD_DVD PE012753 c DESC=BASKER-2 Wireline log Run 1 data CD. (DLIS and PDS Format) By Schlumberger for Anzon Australia Ltd.
ASSETS (DETAIL) WELL DATA_CD_DVD PE012753 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL DIRECTIONAL PE911503_112 a BASKER-2 deviation survey data [CD] PE911503__((_BASKER-2_WCR_ON_CD_))_.TAR.GZ(25.5m).........BASKER-2 WCR VOLUME 1 BASIC DATA MARCH 2006.PDF(28.7m).........SAM2_080_PE911503__((_BASKER-2_WCR_ON_CD_))_I_MEDIA_LABELLING.JPG(2.8m).........PE911503__((_BASKER-2_WCR_ON_CD_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) WELL DIRECTIONAL PE911503_112 b (located in::PE911503= BASKER-2 Well Completion Report on CD)
ASSETS (DETAIL) WELL DIRECTIONAL PE911503_112 c DESC=BASKER-2 deviation survey data. 3 pages, 106 rows.
ASSETS (DETAIL) WELL DIRECTIONAL PE911503_112 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 a Geodetic Survey Data [DVD] (3259 DIGITAL FILES)
ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007)
ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 c DESC=Geodetic Survey Data.
ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=BASKER-4
ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=BASKER-5
ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=BREAM-A19A
ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=BREAM-A6A
ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=BREAM-A9B
ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=GALLOWAY-1
ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=GLENAIRE-1
ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=GLENAIRE-1 ST1
ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=HAZELWOOD-1
ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=LONGTOM-3
ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=LONGTOM-3 ST1
ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=LONGTOM-3H
ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=LONGTOM-3P
ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=MANTA-2A
ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=WEST KINGFISH-W18A
ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=WEST KINGFISH-W19A
ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=WEST KINGFISH-W20A
ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=WEST KINGFISH-W21A
ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=WEST KINGFISH-W23A
ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=WEST KINGFISH-W31A
ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=WEST KINGFISH-W6A
ASSETS (DETAIL) WELL DRILL_RPT PE911536_9 a Drilling Data, Logs, TD Curves & Reports [DVD] (3259 DIGITAL FILES)
ASSETS (DETAIL) WELL DRILL_RPT PE911536_9 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007)
ASSETS (DETAIL) WELL DRILL_RPT PE911536_9 c DESC=Drilling Data, Logs, TD Curves & Reports.
ASSETS (DETAIL) WELL ENVIRO_RPT PE907809_16 a Well Environment Reports 2009 [DVD] (2978 DIGITAL FILES)
ASSETS (DETAIL) WELL ENVIRO_RPT PE907809_16 b (located in::PE907809= Well Data - Electronic Submissions 2009)
ASSETS (DETAIL) WELL ENVIRO_RPT PE907809_16 c DESC=Well Environment Reports - Electronic Submissions 2009. Includes weekly reports.
ASSETS (DETAIL) WELL ENVIRO_RPT PE907809_16 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL ENVIRO_RPT PE907809_16 d WELL_NAME=BASKER-7
ASSETS (DETAIL) WELL EOW_RPT PE915239_1 a BASKER-2 End of Well Report [CD] PE915239__((_BASKER-2_END_OF_WELL_REPORT_AND_DATA_))_.TAR.GZ(12.7m).........SAM2_197_PE915239__((_BASKER-2_END_OF_WELL_REPORT_AND_DATA_))_I_MEDIA_LABELLING.JPG(2.7m).........PE915239__((_BASKER-2_END_OF_WELL_REPORT_AND_DATA_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) WELL EOW_RPT PE915239_1 b (located in::PE915239= BASKER-2 End of Well Report and Data)
ASSETS (DETAIL) WELL EOW_RPT PE915239_1 c DESC=BASKER-2 End of Well Report. Halliburton for Anzon Australia Ltd. Final LWD Data. March 2006 VIC/L26
ASSETS (DETAIL) WELL EOW_RPT PE915239_1 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL FWR_RPT PE915238_3 a BASKER-2 Final Well Report [CD] PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))_.TAR.GZ(177.2m).........PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))_.TAR.GZ(177.2m).........F7746698_068_PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))__MEDIA_LABELLING.PDF(0.7m).........SAM2_196_PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))__MEDIA_LABELLING.JPG(2.8m).........PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) WELL FWR_RPT PE915238_3 b (located in::PE915238= BASKER-2 Final Well Rpt and Data)
ASSETS (DETAIL) WELL FWR_RPT PE915238_3 c DESC=BASKER-2 Final Well Report. Anzon Australia Ltd. BMP, DOC and XLS format.
ASSETS (DETAIL) WELL FWR_RPT PE915238_3 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 a Various Data and Reports [DVD] (3259 DIGITAL FILES)
ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007)
ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 c DESC=Various Data and Reports, including mud/drilling fluids reports, rig logistics and lookahead reports, personnel data, drill completion, time estimates & cleanup.
ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=BASKER-3
ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=BASKER-4
ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=BASKER-5
ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=CULVERIN-1
ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=GLENAIRE-1
ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=GLENAIRE-1 ST1
ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=LONGTOM-3
ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=LONGTOM-3H
ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=LONGTOM-3P
ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=LOY YANG-2
ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=MANTA-2
ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=MANTA-2A
ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=MEGASCOLIDES-1 RE ST1
ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=PETERBOROUGH-1 ST1
ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=PRITCHARD-1
ASSETS (DETAIL) WELL GEOCHEM PE911503_851 a BASKER-2 Hydrocarbon Properties Summary [CD] PE911503__((_BASKER-2_WCR_ON_CD_))_.TAR.GZ(25.5m).........BASKER-2 WCR VOLUME 1 BASIC DATA MARCH 2006.PDF(28.7m).........SAM2_080_PE911503__((_BASKER-2_WCR_ON_CD_))_I_MEDIA_LABELLING.JPG(2.8m).........PE911503__((_BASKER-2_WCR_ON_CD_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) WELL GEOCHEM PE911503_851 b (located in::PE911503= BASKER-2 Well Completion Report on CD)
ASSETS (DETAIL) WELL GEOCHEM PE911503_851 c DESC=BASKER-2 Hydrocarbon Properties Summary (MDT PVT Samples) in WCR. Appendix 9. (2 Pages). By Anzon Australia Limited.
ASSETS (DETAIL) WELL GEOCHEM PE911503_851 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL GEOCHEM PE911536_11 a Basker-Manta-Gummy Gas Compositions [DVD] (3259 DIGITAL FILES)
ASSETS (DETAIL) WELL GEOCHEM PE911536_11 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007)
ASSETS (DETAIL) WELL GEOCHEM PE911536_11 c DESC=Basker-Manta-Gummy Gas Compositions. Petrolab/Anzon
ASSETS (DETAIL) WELL GEOCHEM PE911536_11 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL GEOCHEM PE911536_11 d WELL_NAME=GUMMY-1
ASSETS (DETAIL) WELL GEOCHEM PE911536_11 d WELL_NAME=MANTA-1
ASSETS (DETAIL) WELL GEOCHEM PE911536_11 d WELL_NAME=MANTA-2A
ASSETS (DETAIL) WELL HYDROCARBON_SAMPLENOTE3694 a BASKER-2 liquid hydrocarbon sample [SAMPLE]
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 a Lithology Logs and Cuttings Descriptions [DVD] (3259 DIGITAL FILES)
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007)
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 c DESC=Lithology Logs and Cuttings Descriptions.
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 d WELL_NAME=BASKER-1
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 d WELL_NAME=BOUNDARY CREEK-2
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 d WELL_NAME=CRC-1
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 d WELL_NAME=GLENAIRE-1
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 d WELL_NAME=GLENAIRE-1 ST1
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 d WELL_NAME=HAZELWOOD-1
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 d WELL_NAME=LOY YANG-2
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 d WELL_NAME=MACLEAN-1
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 d WELL_NAME=MANTA-2A
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 d WELL_NAME=MEGASCOLIDES-1 RE ST1
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 d WELL_NAME=MEGASCOLIDES-2
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE012053 a Selected Wells, Gippsland & Otway Basin [CD]
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE012053 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE012053 c DESC=Selected Wells, Gippsland & Otway Basin, Well Log Tape CD, Occam Technology (formerly Wiltshire), May 2007. Files are in .LAS format, for 28 wells. NOTE: This Data SHOULD NOT BE COPIED Or DISTRIBUTED
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE012053 d (more than 25 wells for this asset item)
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE012305 a BASKER-2 TD Wireline Log Data CD [DVD] PE012305__((_BASKER-2__TD_WIRELINE_LOG_DATA_CD_))_.ISO.GZ(519.0m).........PE012305__((_BASKER-2__TD_WIRELINE_LOG_DATA_CD_))__MEDIA_LABELLING.PDF(0.1m).........
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE012305 b (located in::COMPACTUS_1=COMPACTUS_1 55 Collins St)
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE012305 c DESC=BASKER-2 TD Section, Wireline Log Data CD. DLIS, LAS, PDS formats. Schlumberger for Anzon Australia Ltd. 20-SEP-2005. Run 1: FMI-DSI-HRLA-PEX. Run2: VSI-ZVSP(PDF). Runs 3-4: MDT-PS-SAMPLING. Run 5: CH-CBL-PERFO-JB.
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE012305 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE012753_1 a BASKER-2 Wireline Log Data CD [CD] PE012753__((_BASKER-2_WIRELINE_LOG_DATA_CD_))_.TAR.GZ(8.4m).........F7746696_033_PE012753__((_BASKER-2_WIRELINE_LOG_DATA_CD_))_I_MEDIA_LABELLING.PDF(0.7m).........SAM0_942_PE012753__((_BASKER-2_WIRELINE_LOG_DATA_CD_))_I_MEDIA_LABELLING.JPG(3.0m).........PE012753__((_BASKER-2_WIRELINE_LOG_DATA_CD_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE012753_1 b (located in::PE012753= BASKER-2 Wireline log data CD)
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE012753_1 c DESC=BASKER-2 Wireline Log Data CD. Run 1. (DLIS Format) By Schlumberger for Anzon Australia Ltd.
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE012753_1 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE915238_2 a BASKER-2 Wireline Log Data [CD] PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))_.TAR.GZ(177.2m).........PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))_.TAR.GZ(177.2m).........F7746698_068_PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))__MEDIA_LABELLING.PDF(0.7m).........SAM2_196_PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))__MEDIA_LABELLING.JPG(2.8m).........PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE915238_2 b (located in::PE915238= BASKER-2 Final Well Rpt and Data)
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE915238_2 c DESC=BASKER-2 Wireline Log Data. Anzon Australia Ltd. ASCII and XLS format.
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE915238_2 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE915239_2 a BASKER-2 End of Well Report ASCII data [CD] PE915239__((_BASKER-2_END_OF_WELL_REPORT_AND_DATA_))_.TAR.GZ(12.7m).........SAM2_197_PE915239__((_BASKER-2_END_OF_WELL_REPORT_AND_DATA_))_I_MEDIA_LABELLING.JPG(2.7m).........PE915239__((_BASKER-2_END_OF_WELL_REPORT_AND_DATA_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE915239_2 b (located in::PE915239= BASKER-2 End of Well Report and Data)
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE915239_2 c DESC=BASKER-2 End of Well Report Data. Halliburton for Anzon Australia Ltd. Final LWD Data in ASCII and LAS format. March 2006 VIC/L26
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE915239_2 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL MAP PE903467 a BASKER SOUTH-1,BASKER-2 Seabed features [PAPER] PE903467__((_BASKER_SOUTH-1,BASKER-2_SEABED_FEATURES_))_.TIF(0.4m).........
ASSETS (DETAIL) WELL MAP PE903467 b (located in::PE903466= BASKER SOUTH-1,BASKER-2 SSSonar Srvy Rpt)
ASSETS (DETAIL) WELL MAP PE903467 c DESC=BASKER SOUTH-1 Seabed features from Side Scan Site at Location BASKER-2, Shell Development (Australia) Pty. Ltd.
ASSETS (DETAIL) WELL MAP PE903467 d WELL_NAME=BASKER SOUTH-1
ASSETS (DETAIL) WELL MAP PE903467 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL MUD_LOG PE911536_6 a Mudlogs [DVD] (3259 DIGITAL FILES)
ASSETS (DETAIL) WELL MUD_LOG PE911536_6 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007)
ASSETS (DETAIL) WELL MUD_LOG PE911536_6 c DESC=Mudlogs.
ASSETS (DETAIL) WELL PROD_RPT PE911536_10 a Basker-Manta-Gummy Reserves Review [DVD] (3259 DIGITAL FILES)
ASSETS (DETAIL) WELL PROD_RPT PE911536_10 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007)
ASSETS (DETAIL) WELL PROD_RPT PE911536_10 c DESC=Basker-Manta-Gummy Reserves Review. There is also a 'Hydrocarbon Reserves and Resources Certificate'.
ASSETS (DETAIL) WELL PROD_RPT PE911536_10 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL PROD_RPT PE911536_10 d WELL_NAME=BASKER-3
ASSETS (DETAIL) WELL PROD_RPT PE911536_10 d WELL_NAME=BASKER-4
ASSETS (DETAIL) WELL PROD_RPT PE911536_10 d WELL_NAME=GUMMY-1
ASSETS (DETAIL) WELL PROD_RPT PE911536_10 d WELL_NAME=MANTA-1
ASSETS (DETAIL) WELL PROD_RPT PE911536_10 d WELL_NAME=MANTA-2A
ASSETS (DETAIL) WELL RPT PE909713 a BASKER-2 Workover 1 Clean-up Test [CD] PE909713__((_BASKER-2_WORKOVER_1_CLEAN-UP_TEST_))_.TAR.GZ(2.1m).........SAM1_692_PE909713__((_BASKER-2_WORKOVER_1_CLEAN-UP_TEST_))_I_MEDIA_LABELLING.JPG(3.0m).........PE909713__((_BASKER-2_WORKOVER_1_CLEAN-UP_TEST_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) WELL RPT PE909713 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) WELL RPT PE909713 c DESC=BASKER-2 Workover 1 Clean-up Test. VIC/L26. Anzon Australia Ltd. The Expro Group. 1st July 2006. Report in PDF, data in ASC.
ASSETS (DETAIL) WELL RPT PE909713 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL RPT PE911536_12 a Basker-Manta-Gummy Intgtd Field Dev Plan [DVD] (3259 DIGITAL FILES)
ASSETS (DETAIL) WELL RPT PE911536_12 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007)
ASSETS (DETAIL) WELL RPT PE911536_12 c DESC=Basker-Manta-Gummy Integrated Field Development Plan. Anzon/Beach.
ASSETS (DETAIL) WELL RPT PE911536_12 d WELL_NAME=BASKER-1
ASSETS (DETAIL) WELL RPT PE911536_12 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL RPT PE911536_12 d WELL_NAME=BASKER-3
ASSETS (DETAIL) WELL RPT PE911536_12 d WELL_NAME=BASKER-4
ASSETS (DETAIL) WELL RPT PE911536_12 d WELL_NAME=BASKER-5
ASSETS (DETAIL) WELL RPT PE911536_12 d WELL_NAME=GUMMY-1
ASSETS (DETAIL) WELL RPT PE911536_12 d WELL_NAME=MANTA-1
ASSETS (DETAIL) WELL RPT PE911536_12 d WELL_NAME=MANTA-2A
ASSETS (DETAIL) WELL SRVY_RPT PE903466 a BASKER SOUTH-1,BASKER-2 SSSonar Srvy Rpt [PAPER] PE903466__((_BASKER_SOUTH-1,BASKER-2_SSSONAR_SRVY_RPT_))_.TIF(0.6m).........
ASSETS (DETAIL) WELL SRVY_RPT PE903466 b (located in::PE180242= BASKER SOUTH-1 W839 box 1/2)
ASSETS (DETAIL) WELL SRVY_RPT PE903466 c DESC=BASKER SOUTH-1 Report on Side Scan Sonar Survey around BASKER-2 Location, Shell Development (Australia) Pty. Ltd.
ASSETS (DETAIL) WELL SRVY_RPT PE903466 d WELL_NAME=BASKER SOUTH-1
ASSETS (DETAIL) WELL SRVY_RPT PE903466 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL SRVY_RPT PE915240_1 a BASKER-2 Velocity Survey Reports [CD] PE915240__((_BASKER-2_VELOCITY_SURVEY_REPORTS___DATA_))_.TAR.GZ(156.3m).........SAM2_198_PE915240__((_BASKER-2_VELOCITY_SURVEY_REPORTS___DATA_))_I_MEDIA_LABELLING.JPG(2.7m).........PE915240__((_BASKER-2_VELOCITY_SURVEY_REPORTS___DATA_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) WELL SRVY_RPT PE915240_1 b (located in::PE915240= BASKER-2 Velocity Survey Reports & Data)
ASSETS (DETAIL) WELL SRVY_RPT PE915240_1 c DESC=BASKER-2 Velocity Survey Reports. Schlumberger for Anzon Australia Ltd. PDF Format. March 2006 VIC/L26. VSP/Geogram Processing Report, Intermediate VSP Q-Borehole Survey Report, TD VSP Q-Borehole Survey Report.
ASSETS (DETAIL) WELL SRVY_RPT PE915240_1 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL VELOCITY PE915240_3 a BASKER-2 Velocity Survey Report Data [CD] PE915240__((_BASKER-2_VELOCITY_SURVEY_REPORTS___DATA_))_.TAR.GZ(156.3m).........SAM2_198_PE915240__((_BASKER-2_VELOCITY_SURVEY_REPORTS___DATA_))_I_MEDIA_LABELLING.JPG(2.7m).........PE915240__((_BASKER-2_VELOCITY_SURVEY_REPORTS___DATA_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) WELL VELOCITY PE915240_3 b (located in::PE915240= BASKER-2 Velocity Survey Reports & Data)
ASSETS (DETAIL) WELL VELOCITY PE915240_3 c DESC=BASKER-2 Velocity Survey Report Data. Schlumberger for Anzon Australia Ltd. LAS, XLS, LDF, SEGY formats. March 2006 VIC/L26
ASSETS (DETAIL) WELL VELOCITY PE915240_3 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL WCR_RPT PE911503 a BASKER-2 WCR on CD [CD] PE911503__((_BASKER-2_WCR_ON_CD_))_.TAR.GZ(25.5m).........BASKER-2 WCR VOLUME 1 BASIC DATA MARCH 2006.PDF(28.7m).........SAM2_080_PE911503__((_BASKER-2_WCR_ON_CD_))_I_MEDIA_LABELLING.JPG(2.8m).........PE911503__((_BASKER-2_WCR_ON_CD_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) WELL WCR_RPT PE911503 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) WELL WCR_RPT PE911503 c DESC=BASKER-2 Well Completion Report (Volume 1), Basic Data, Anzon Australia Ltd.
ASSETS (DETAIL) WELL WCR_RPT PE911503 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL WCR_RPT PE911503 d WELL_NAME=BASKER-2 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0
ASSETS (DETAIL) WELL WCR_RPT PE915237 a BASKER-2 WCR Vol.2 (interpretive) [CD] PE915237__((_BASKER-2_WCR_VOL.2__INTERPRETIVE__))_.TAR.GZ(72.4m).........PE915237__((_BASKER-2_WCR_VOL.2__INTERPRETIVE__))_.TAR.GZ(72.4m).........SAM2_195_PE915237__((_BASKER-2_WCR_VOL.2__INTERPRETIVE__))_I_MEDIA_LABELLING.JPG(2.6m).........PE915237__((_BASKER-2_WCR_VOL.2__INTERPRETIVE__))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) WELL WCR_RPT PE915237 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) WELL WCR_RPT PE915237 c DESC=BASKER-2 Well Completion Report. Volume 2 Interpretive Data. VIC/L26 Anzon Australia Limited. May 2006
ASSETS (DETAIL) WELL WCR_RPT PE915237 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL WELL_LOG PE012753_2 a BASKER-2 Wireline log data CD [CD] PE012753__((_BASKER-2_WIRELINE_LOG_DATA_CD_))_.TAR.GZ(8.4m).........F7746696_033_PE012753__((_BASKER-2_WIRELINE_LOG_DATA_CD_))_I_MEDIA_LABELLING.PDF(0.7m).........SAM0_942_PE012753__((_BASKER-2_WIRELINE_LOG_DATA_CD_))_I_MEDIA_LABELLING.JPG(3.0m).........PE012753__((_BASKER-2_WIRELINE_LOG_DATA_CD_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) WELL WELL_LOG PE012753_2 b (located in::PE012753= BASKER-2 Wireline log data CD)
ASSETS (DETAIL) WELL WELL_LOG PE012753_2 c DESC=BASKER-2 Wireline log Run 1 data CD. (PDS Format) By Schlumberger for Anzon Australia Ltd.
ASSETS (DETAIL) WELL WELL_LOG PE012753_2 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL WELL_LOG PE012855_1 a BASKER-2 Logs [CD] PE012855__((_BASKER-2_LOG_DATA_CD_))_.TAR.GZ(795.2m).........SAM0_685_PE012855__((_BASKER-2_LOG_DATA_CD_))_I_MEDIA_LABELLING.JPG(2.9m).........PE012855__((_BASKER-2_LOG_DATA_CD_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) WELL WELL_LOG PE012855_1 b (located in::PE012855= BASKER-2 Log Data CD)
ASSETS (DETAIL) WELL WELL_LOG PE012855_1 c DESC=BASKER-2 Logs. Open Hole and Cased Hole and Processed Log Data CD. PDF, PDS Format. Anzon Australia March 2006.
ASSETS (DETAIL) WELL WELL_LOG PE012855_1 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL WELL_LOG PE012855_2 a BASKER-2 Log Data [CD] PE012855__((_BASKER-2_LOG_DATA_CD_))_.TAR.GZ(795.2m).........SAM0_685_PE012855__((_BASKER-2_LOG_DATA_CD_))_I_MEDIA_LABELLING.JPG(2.9m).........PE012855__((_BASKER-2_LOG_DATA_CD_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) WELL WELL_LOG PE012855_2 b (located in::PE012855= BASKER-2 Log Data CD)
ASSETS (DETAIL) WELL WELL_LOG PE012855_2 c DESC=BASKER-2 Log Data. Open Hole and Cased Hole and Processed Log Data CD. DLIS, LAS Format. Anzon Australia March 2006.
ASSETS (DETAIL) WELL WELL_LOG PE012855_2 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL WELL_LOG PE911536_14 a Well Log Images [DVD] (3259 DIGITAL FILES)
ASSETS (DETAIL) WELL WELL_LOG PE911536_14 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007)
ASSETS (DETAIL) WELL WELL_LOG PE911536_14 c DESC=Well Log Images.
ASSETS (DETAIL) WELL WELL_LOG PE915238_1 a BASKER-2 Wireline Log Images [CD] PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))_.TAR.GZ(177.2m).........PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))_.TAR.GZ(177.2m).........F7746698_068_PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))__MEDIA_LABELLING.PDF(0.7m).........SAM2_196_PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))__MEDIA_LABELLING.JPG(2.8m).........PE915238__((_BASKER-2_FINAL_WELL_RPT_AND_DATA_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) WELL WELL_LOG PE915238_1 b (located in::PE915238= BASKER-2 Final Well Rpt and Data)
ASSETS (DETAIL) WELL WELL_LOG PE915238_1 c DESC=BASKER-2 Wireline Log Images. Anzon Australia Ltd. PDF Format. (Mud, Gas, Drill, Pressure)
ASSETS (DETAIL) WELL WELL_LOG PE915238_1 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL WELL_LOG PE915240_2 a BASKER-2 Velocity Survey Logs [CD] PE915240__((_BASKER-2_VELOCITY_SURVEY_REPORTS___DATA_))_.TAR.GZ(156.3m).........SAM2_198_PE915240__((_BASKER-2_VELOCITY_SURVEY_REPORTS___DATA_))_I_MEDIA_LABELLING.JPG(2.7m).........PE915240__((_BASKER-2_VELOCITY_SURVEY_REPORTS___DATA_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) WELL WELL_LOG PE915240_2 b (located in::PE915240= BASKER-2 Velocity Survey Reports & Data)
ASSETS (DETAIL) WELL WELL_LOG PE915240_2 c DESC=BASKER-2 Velocity Survey Logs. Schlumberger for Anzon Australia Ltd. PDF, PDS, CGM, TIF formats. March 2006 VIC/L26 Composite Logs (x4) and a Velocity Plot.
ASSETS (DETAIL) WELL WELL_LOG PE915240_2 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL WELL_WOMP PE913297 a BASKER-2 Drilling & Completion Programme [CD] PE913297__((_BASKER-2_DRILLING___COMPLETION_PROGRAMME_))_.ISO.GZ(33.4m).........PE913297__((_BASKER-2_DRILLING___COMPLETION_PROGRAMME_))__MEDIA_LABELLING.PDF(0.1m).........
ASSETS (DETAIL) WELL WELL_WOMP PE913297 b (located in::COMPACTUS_1=COMPACTUS_1 55 Collins St)
ASSETS (DETAIL) WELL WELL_WOMP PE913297 c DESC=BASKER-2 Drilling & Completion Programme. Revised Well Location. Revised on 12-JULY-2005.
ASSETS (DETAIL) WELL WELL_WOMP PE913297 d WELL_NAME=BASKER-2
05 1 CHECKSHOT: 200016526405 Schlumberger AH10_TW Conventional
05 2 CHECKSHOT: 200016526405 01 SOURCE =AH10_TW
05 2 CHECKSHOT: 200016526405 02 SURVEY_COMPANY =Schlumberger
05 2 CHECKSHOT: 200016526405 03 SURVEY_DATE =11-SEP-05
05 2 CHECKSHOT: 200016526405 03 SURVEY_ID =200016526405
05 2 CHECKSHOT: 200016526405 03 SURVEY_TYPE =CONV
05 2 CHECKSHOT: 200016526405 05 TOP_DEPTH =213.2
05 2 CHECKSHOT: 200016526405 06 BASE_DEPTH =3400
05 2 CHECKSHOT: 200016526405 07 ENERGY_SOURCE =GASGUN
05 2 CHECKSHOT: 200016526405 08 SOURCE_DEPTH =4.4
05 2 CHECKSHOT: 200016526405 08 SOURCE_OFFSET =64
05 2 CHECKSHOT: 200016526405 09 SOURCE_AZIMUTH =190
05 2 CHECKSHOT: 200016526405 12 DATUM_ELEV =21.5
05 2 CHECKSHOT: 200016526405 13 CHECKSHOT_VELOCITY =1524
05 2 CHECKSHOT: 200016526405 14 CHECKSHOT_TRAVEL_PATH =OWT
05 2 CHECKSHOT: 200016526405 18 PETROSYS_SRD_TIME =0
05 2 CHECKSHOT: 200016526405 19 PETROSYS_SRD_ELEV =0
05 2 CHECKSHOT: 200016526405 25 REMARK =Time-Depth points sourced from PE915240 (VSP Data). For Anzon Australia Ltd. (checked AH10, Dec 2007)
05 2 CHECKSHOT: 200016526405 29 POINT COUNT =212
05 3 CHECKSHOT: 200016526405
05 4 CHECKSHOT: 200016526405 :0235 SHOT:2 MD:234.7 VERT DEPTH:213.2 OBS_TIME:142.3 Type:CONV Rmk:(VERT_DEPTH: 213.2m, CORR_TIME: 138.8ms)
05 4 CHECKSHOT: 200016526405 :0250 SHOT:3 MD:249.8 VERT DEPTH:228.3 OBS_TIME:150.3 Type:CONV Rmk:(VERT_DEPTH: 228.3m, CORR_TIME: 147.2ms)
05 4 CHECKSHOT: 200016526405 :0265 SHOT:4 MD:264.9 VERT DEPTH:243.4 OBS_TIME:157.8 Type:CONV Rmk:(VERT_DEPTH: 243.4m, CORR_TIME: 155.1ms)
05 4 CHECKSHOT: 200016526405 :0280 SHOT:5 MD:280 VERT DEPTH:258.5 OBS_TIME:165.5 Type:CONV Rmk:(VERT_DEPTH: 258.5m, CORR_TIME: 163.2ms)
05 4 CHECKSHOT: 200016526405 :0295 SHOT:6 MD:294.7 VERT DEPTH:273.2 OBS_TIME:173.1 Type:CONV Rmk:(VERT_DEPTH: 273.2m, CORR_TIME: 171.1ms)
05 4 CHECKSHOT: 200016526405 :0310 SHOT:7 MD:309.8 VERT DEPTH:288.3 OBS_TIME:179.7 Type:CONV Rmk:(VERT_DEPTH: 288.3m, CORR_TIME: 178ms)
05 4 CHECKSHOT: 200016526405 :0325 SHOT:8 MD:324.9 VERT DEPTH:303.4 OBS_TIME:187.2 Type:CONV Rmk:(VERT_DEPTH: 303.4m, CORR_TIME: 185.8ms)
05 4 CHECKSHOT: 200016526405 :0340 SHOT:9 MD:340 VERT DEPTH:318.5 OBS_TIME:193.9 Type:CONV Rmk:(VERT_DEPTH: 318.5m, CORR_TIME: 192.7ms)
05 4 CHECKSHOT: 200016526405 :0355 SHOT:10 MD:354.6 VERT DEPTH:333.1 OBS_TIME:200.5 Type:CONV Rmk:(VERT_DEPTH: 333.1m, CORR_TIME: 199.5ms)
05 4 CHECKSHOT: 200016526405 :0370 SHOT:11 MD:369.8 VERT DEPTH:348.3 OBS_TIME:207.4 Type:CONV Rmk:(VERT_DEPTH: 348.3m, CORR_TIME: 206.7ms)
05 4 CHECKSHOT: 200016526405 :0385 SHOT:12 MD:384.9 VERT DEPTH:363.4 OBS_TIME:214.2 Type:CONV Rmk:(VERT_DEPTH: 363.4m, CORR_TIME: 213.6ms)
05 4 CHECKSHOT: 200016526405 :0400 SHOT:13 MD:400 VERT DEPTH:378.5 OBS_TIME:220.6 Type:CONV Rmk:(VERT_DEPTH: 378.5m, CORR_TIME: 220.1ms)
05 4 CHECKSHOT: 200016526405 :0415 SHOT:14 MD:414.7 VERT DEPTH:393.2 OBS_TIME:227 Type:CONV Rmk:(VERT_DEPTH: 393.2m, CORR_TIME: 226.7ms)
05 4 CHECKSHOT: 200016526405 :0430 SHOT:15 MD:429.8 VERT DEPTH:408.3 OBS_TIME:233.6 Type:CONV Rmk:(VERT_DEPTH: 408.3m, CORR_TIME: 233.4ms)
05 4 CHECKSHOT: 200016526405 :0445 SHOT:16 MD:444.9 VERT DEPTH:423.4 OBS_TIME:240 Type:CONV Rmk:(VERT_DEPTH: 423.4m, CORR_TIME: 239.9ms)
05 4 CHECKSHOT: 200016526405 :0460 SHOT:17 MD:460 VERT DEPTH:438.5 OBS_TIME:246.3 Type:CONV Rmk:(VERT_DEPTH: 438.5m, CORR_TIME: 246.4ms)
05 4 CHECKSHOT: 200016526405 :0475 SHOT:18 MD:474.7 VERT DEPTH:453.2 OBS_TIME:252.4 Type:CONV Rmk:(VERT_DEPTH: 453.2m, CORR_TIME: 252.6ms)
05 4 CHECKSHOT: 200016526405 :0490 SHOT:19 MD:489.8 VERT DEPTH:468.3 OBS_TIME:258.6 Type:CONV Rmk:(VERT_DEPTH: 468.3m, CORR_TIME: 258.9ms)
05 4 CHECKSHOT: 200016526405 :0505 SHOT:20 MD:504.9 VERT DEPTH:483.4 OBS_TIME:264.6 Type:CONV Rmk:(VERT_DEPTH: 483.4m, CORR_TIME: 264.9ms)
05 4 CHECKSHOT: 200016526405 :0520 SHOT:21 MD:520 VERT DEPTH:498.5 OBS_TIME:270.6 Type:CONV Rmk:(VERT_DEPTH: 498.5m, CORR_TIME: 271ms)
05 4 CHECKSHOT: 200016526405 :0535 SHOT:22 MD:534.6 VERT DEPTH:513.1 OBS_TIME:276.6 Type:CONV Rmk:(VERT_DEPTH: 513.1m, CORR_TIME: 277.1ms)
05 4 CHECKSHOT: 200016526405 :0550 SHOT:23 MD:549.8 VERT DEPTH:528.299 OBS_TIME:282.7 Type:CONV Rmk:(VERT_DEPTH: 528.3m, CORR_TIME: 283.4ms)
05 4 CHECKSHOT: 200016526405 :0565 SHOT:24 MD:564.9 VERT DEPTH:543.399 OBS_TIME:289 Type:CONV Rmk:(VERT_DEPTH: 543.4m, CORR_TIME: 289.7ms)
05 4 CHECKSHOT: 200016526405 :0580 SHOT:25 MD:580 VERT DEPTH:558.499 OBS_TIME:295.2 Type:CONV Rmk:(VERT_DEPTH: 558.5m, CORR_TIME: 295.9ms)
05 4 CHECKSHOT: 200016526405 :0595 SHOT:26 MD:594.7 VERT DEPTH:573.199 OBS_TIME:301 Type:CONV Rmk:(VERT_DEPTH: 573.2m, CORR_TIME: 301.9ms)
05 4 CHECKSHOT: 200016526405 :0610 SHOT:27 MD:609.8 VERT DEPTH:588.299 OBS_TIME:307 Type:CONV Rmk:(VERT_DEPTH: 588.3m, CORR_TIME: 307.9ms)
05 4 CHECKSHOT: 200016526405 :0625 SHOT:28 MD:624.9 VERT DEPTH:603.399 OBS_TIME:312.6 Type:CONV Rmk:(VERT_DEPTH: 603.4m, CORR_TIME: 313.6ms)
05 4 CHECKSHOT: 200016526405 :0640 SHOT:29 MD:640 VERT DEPTH:618.499 OBS_TIME:318.5 Type:CONV Rmk:(VERT_DEPTH: 618.5m, CORR_TIME: 319.5ms)
05 4 CHECKSHOT: 200016526405 :0655 SHOT:30 MD:654.7 VERT DEPTH:633.199 OBS_TIME:324.2 Type:CONV Rmk:(VERT_DEPTH: 633.2m, CORR_TIME: 325.2ms)
05 4 CHECKSHOT: 200016526405 :0670 SHOT:31 MD:669.8 VERT DEPTH:648.299 OBS_TIME:330.3 Type:CONV Rmk:(VERT_DEPTH: 648.3m, CORR_TIME: 331.4ms)
05 4 CHECKSHOT: 200016526405 :0685 SHOT:32 MD:684.9 VERT DEPTH:663.399 OBS_TIME:336.3 Type:CONV Rmk:(VERT_DEPTH: 663.4m, CORR_TIME: 337.4ms)
05 4 CHECKSHOT: 200016526405 :0700 SHOT:33 MD:700 VERT DEPTH:678.499 OBS_TIME:342 Type:CONV Rmk:(VERT_DEPTH: 678.5m, CORR_TIME: 343.2ms)
05 4 CHECKSHOT: 200016526405 :0715 SHOT:34 MD:714.6 VERT DEPTH:693.099 OBS_TIME:347.5 Type:CONV Rmk:(VERT_DEPTH: 693.1m, CORR_TIME: 348.7ms)
05 4 CHECKSHOT: 200016526405 :0730 SHOT:35 MD:729.8 VERT DEPTH:708.299 OBS_TIME:353.5 Type:CONV Rmk:(VERT_DEPTH: 708.3m, CORR_TIME: 354.7ms)
05 4 CHECKSHOT: 200016526405 :0745 SHOT:36 MD:744.9 VERT DEPTH:723.399 OBS_TIME:359.2 Type:CONV Rmk:(VERT_DEPTH: 723.4m, CORR_TIME: 360.5ms)
05 4 CHECKSHOT: 200016526405 :0760 SHOT:37 MD:760 VERT DEPTH:738.499 OBS_TIME:365.2 Type:CONV Rmk:(VERT_DEPTH: 738.5m, CORR_TIME: 366.5ms)
05 4 CHECKSHOT: 200016526405 :0775 SHOT:38 MD:774.6 VERT DEPTH:753.099 OBS_TIME:370.7 Type:CONV Rmk:(VERT_DEPTH: 753.1m, CORR_TIME: 372.1ms)
05 4 CHECKSHOT: 200016526405 :0790 SHOT:39 MD:789.7 VERT DEPTH:768.199 OBS_TIME:376.5 Type:CONV Rmk:(VERT_DEPTH: 768.2m, CORR_TIME: 377.9ms)
05 4 CHECKSHOT: 200016526405 :0805 SHOT:40 MD:804.9 VERT DEPTH:783.399 OBS_TIME:382.4 Type:CONV Rmk:(VERT_DEPTH: 783.4m, CORR_TIME: 383.8ms)
05 4 CHECKSHOT: 200016526405 :0820 SHOT:41 MD:820 VERT DEPTH:798.499 OBS_TIME:388.2 Type:CONV Rmk:(VERT_DEPTH: 798.5m, CORR_TIME: 389.6ms)
05 4 CHECKSHOT: 200016526405 :0835 SHOT:42 MD:834.6 VERT DEPTH:813.099 OBS_TIME:393.8 Type:CONV Rmk:(VERT_DEPTH: 813.1m, CORR_TIME: 395.2ms)
05 4 CHECKSHOT: 200016526405 :0850 SHOT:43 MD:849.8 VERT DEPTH:828.299 OBS_TIME:399.5 Type:CONV Rmk:(VERT_DEPTH: 828.3m, CORR_TIME: 401ms)
05 4 CHECKSHOT: 200016526405 :0865 SHOT:44 MD:864.9 VERT DEPTH:843.399 OBS_TIME:405.1 Type:CONV Rmk:(VERT_DEPTH: 843.4m, CORR_TIME: 406.6ms)
05 4 CHECKSHOT: 200016526405 :0880 SHOT:45 MD:880 VERT DEPTH:858.499 OBS_TIME:410.3 Type:CONV Rmk:(VERT_DEPTH: 858.5m, CORR_TIME: 411.9ms)
05 4 CHECKSHOT: 200016526405 :0895 SHOT:46 MD:894.6 VERT DEPTH:873.099 OBS_TIME:415.2 Type:CONV Rmk:(VERT_DEPTH: 873.1m, CORR_TIME: 416.8ms)
05 4 CHECKSHOT: 200016526405 :0910 SHOT:47 MD:909.7 VERT DEPTH:888.199 OBS_TIME:420.3 Type:CONV Rmk:(VERT_DEPTH: 888.2m, CORR_TIME: 421.9ms)
05 4 CHECKSHOT: 200016526405 :0925 SHOT:48 MD:924.8 VERT DEPTH:903.299 OBS_TIME:425.4 Type:CONV Rmk:(VERT_DEPTH: 903.3m, CORR_TIME: 427.1ms)
05 4 CHECKSHOT: 200016526405 :0940 SHOT:49 MD:940 VERT DEPTH:918.499 OBS_TIME:430.8 Type:CONV Rmk:(VERT_DEPTH: 918.5m, CORR_TIME: 432.4ms)
05 4 CHECKSHOT: 200016526405 :0955 SHOT:50 MD:954.6 VERT DEPTH:933.099 OBS_TIME:435.8 Type:CONV Rmk:(VERT_DEPTH: 933.1m, CORR_TIME: 437.4ms)
05 4 CHECKSHOT: 200016526405 :0970 SHOT:51 MD:969.7 VERT DEPTH:948.199 OBS_TIME:440.9 Type:CONV Rmk:(VERT_DEPTH: 948.2m, CORR_TIME: 442.6ms)
05 4 CHECKSHOT: 200016526405 :0985 SHOT:52 MD:984.9 VERT DEPTH:963.399 OBS_TIME:446.1 Type:CONV Rmk:(VERT_DEPTH: 963.4m, CORR_TIME: 447.8ms)
05 4 CHECKSHOT: 200016526405 :1000 SHOT:53 MD:1000 VERT DEPTH:978.499 OBS_TIME:451.3 Type:CONV Rmk:(VERT_DEPTH: 978.5m, CORR_TIME: 453ms)
05 4 CHECKSHOT: 200016526405 :1015 SHOT:54 MD:1014.6 VERT DEPTH:993.099 OBS_TIME:456.1 Type:CONV Rmk:(VERT_DEPTH: 993.1m, CORR_TIME: 457.8ms)
05 4 CHECKSHOT: 200016526405 :1030 SHOT:55 MD:1029.7 VERT DEPTH:1008.199 OBS_TIME:461 Type:CONV Rmk:(VERT_DEPTH: 1008.2m, CORR_TIME: 462.7ms)
05 4 CHECKSHOT: 200016526405 :1045 SHOT:56 MD:1044.9 VERT DEPTH:1023.399 OBS_TIME:465.9 Type:CONV Rmk:(VERT_DEPTH: 1023.4m, CORR_TIME: 467.6ms)
05 4 CHECKSHOT: 200016526405 :1060 SHOT:57 MD:1060 VERT DEPTH:1038.499 OBS_TIME:470.9 Type:CONV Rmk:(VERT_DEPTH: 1038.5m, CORR_TIME: 472.7ms)
05 4 CHECKSHOT: 200016526405 :1075 SHOT:58 MD:1074.6 VERT DEPTH:1053.099 OBS_TIME:475.3 Type:CONV Rmk:(VERT_DEPTH: 1053.1m, CORR_TIME: 477.1ms)
05 4 CHECKSHOT: 200016526405 :1090 SHOT:59 MD:1089.7 VERT DEPTH:1068.199 OBS_TIME:480 Type:CONV Rmk:(VERT_DEPTH: 1068.2m, CORR_TIME: 481.8ms)
05 4 CHECKSHOT: 200016526405 :1105 SHOT:60 MD:1104.9 VERT DEPTH:1083.399 OBS_TIME:485 Type:CONV Rmk:(VERT_DEPTH: 1083.4m, CORR_TIME: 486.9ms)
05 4 CHECKSHOT: 200016526405 :1120 SHOT:61 MD:1120 VERT DEPTH:1098.499 OBS_TIME:489.7 Type:CONV Rmk:(VERT_DEPTH: 1098.5m, CORR_TIME: 491.6ms)
05 4 CHECKSHOT: 200016526405 :1135 SHOT:62 MD:1134.6 VERT DEPTH:1113.099 OBS_TIME:494.4 Type:CONV Rmk:(VERT_DEPTH: 1113.1m, CORR_TIME: 496.2ms)
05 4 CHECKSHOT: 200016526405 :1150 SHOT:63 MD:1149.7 VERT DEPTH:1128.198 OBS_TIME:499.2 Type:CONV Rmk:(VERT_DEPTH: 1128.2m, CORR_TIME: 501.1ms)
05 4 CHECKSHOT: 200016526405 :1165 SHOT:64 MD:1164.8 VERT DEPTH:1143.298 OBS_TIME:503.9 Type:CONV Rmk:(VERT_DEPTH: 1143.3m, CORR_TIME: 505.8ms)
05 4 CHECKSHOT: 200016526405 :1180 SHOT:65 MD:1180 VERT DEPTH:1158.498 OBS_TIME:508.3 Type:CONV Rmk:(VERT_DEPTH: 1158.5m, CORR_TIME: 510.2ms)
05 4 CHECKSHOT: 200016526405 :1195 SHOT:66 MD:1194.6 VERT DEPTH:1173.098 OBS_TIME:512.6 Type:CONV Rmk:(VERT_DEPTH: 1173.1m, CORR_TIME: 514.5ms)
05 4 CHECKSHOT: 200016526405 :1210 SHOT:67 MD:1209.7 VERT DEPTH:1188.198 OBS_TIME:517.4 Type:CONV Rmk:(VERT_DEPTH: 1188.2m, CORR_TIME: 519.4ms)
05 4 CHECKSHOT: 200016526405 :1225 SHOT:68 MD:1224.8 VERT DEPTH:1203.297 OBS_TIME:521.9 Type:CONV Rmk:(VERT_DEPTH: 1203.3m, CORR_TIME: 523.9ms)
05 4 CHECKSHOT: 200016526405 :1240 SHOT:69 MD:1240 VERT DEPTH:1218.497 OBS_TIME:526.2 Type:CONV Rmk:(VERT_DEPTH: 1218.5m, CORR_TIME: 528.2ms)
05 4 CHECKSHOT: 200016526405 :1255 SHOT:70 MD:1254.6 VERT DEPTH:1233.097 OBS_TIME:530.7 Type:CONV Rmk:(VERT_DEPTH: 1233.1m, CORR_TIME: 532.7ms)
05 4 CHECKSHOT: 200016526405 :1270 SHOT:71 MD:1269.7 VERT DEPTH:1248.197 OBS_TIME:535.3 Type:CONV Rmk:(VERT_DEPTH: 1248.2m, CORR_TIME: 537.3ms)
05 4 CHECKSHOT: 200016526405 :1285 SHOT:72 MD:1284.9 VERT DEPTH:1263.396 OBS_TIME:539.8 Type:CONV Rmk:(VERT_DEPTH: 1263.4m, CORR_TIME: 541.8ms)
05 4 CHECKSHOT: 200016526405 :1300 SHOT:73 MD:1300 VERT DEPTH:1278.496 OBS_TIME:544 Type:CONV Rmk:(VERT_DEPTH: 1278.5m, CORR_TIME: 546ms)
05 4 CHECKSHOT: 200016526405 :1315 SHOT:74 MD:1314.6 VERT DEPTH:1293.096 OBS_TIME:548.6 Type:CONV Rmk:(VERT_DEPTH: 1293.1m, CORR_TIME: 550.5ms)
05 4 CHECKSHOT: 200016526405 :1330 SHOT:75 MD:1329.7 VERT DEPTH:1308.195 OBS_TIME:553.1 Type:CONV Rmk:(VERT_DEPTH: 1308.2m, CORR_TIME: 555.1ms)
05 4 CHECKSHOT: 200016526405 :1345 SHOT:76 MD:1344.9 VERT DEPTH:1323.395 OBS_TIME:557.5 Type:CONV Rmk:(VERT_DEPTH: 1323.3m, CORR_TIME: 559.5ms)
05 4 CHECKSHOT: 200016526405 :1360 SHOT:77 MD:1360 VERT DEPTH:1338.494 OBS_TIME:561.9 Type:CONV Rmk:(VERT_DEPTH: 1338.5m, CORR_TIME: 564ms)
05 4 CHECKSHOT: 200016526405 :1375 SHOT:78 MD:1374.6 VERT DEPTH:1353.094 OBS_TIME:566 Type:CONV Rmk:(VERT_DEPTH: 1353.1m, CORR_TIME: 568ms)
05 4 CHECKSHOT: 200016526405 :1390 SHOT:79 MD:1389.7 VERT DEPTH:1368.193 OBS_TIME:570.5 Type:CONV Rmk:(VERT_DEPTH: 1368.2m, CORR_TIME: 572.5ms)
05 4 CHECKSHOT: 200016526405 :1405 SHOT:80 MD:1404.9 VERT DEPTH:1383.393 OBS_TIME:575.1 Type:CONV Rmk:(VERT_DEPTH: 1383.4m, CORR_TIME: 577.1ms)
05 4 CHECKSHOT: 200016526405 :1420 SHOT:81 MD:1420 VERT DEPTH:1398.492 OBS_TIME:579.4 Type:CONV Rmk:(VERT_DEPTH: 1398.5m, CORR_TIME: 581.5ms)
05 4 CHECKSHOT: 200016526405 :1435 SHOT:82 MD:1434.6 VERT DEPTH:1413.091 OBS_TIME:584 Type:CONV Rmk:(VERT_DEPTH: 1413.1m, CORR_TIME: 586.1ms)
05 4 CHECKSHOT: 200016526405 :1450 SHOT:83 MD:1449.8 VERT DEPTH:1428.29 OBS_TIME:588.5 Type:CONV Rmk:(VERT_DEPTH: 1428.2m, CORR_TIME: 590.6ms)
05 4 CHECKSHOT: 200016526405 :1465 SHOT:84 MD:1464.9 VERT DEPTH:1443.39 OBS_TIME:593.1 Type:CONV Rmk:(VERT_DEPTH: 1443.4m, CORR_TIME: 595.2ms)
05 4 CHECKSHOT: 200016526405 :1480 SHOT:85 MD:1480 VERT DEPTH:1458.489 OBS_TIME:598 Type:CONV Rmk:(VERT_DEPTH: 1458.5m, CORR_TIME: 600ms)
05 4 CHECKSHOT: 200016526405 :1495 SHOT:86 MD:1494.6 VERT DEPTH:1473.088 OBS_TIME:602.6 Type:CONV Rmk:(VERT_DEPTH: 1473.1m, CORR_TIME: 604.7ms)
05 4 CHECKSHOT: 200016526405 :1510 SHOT:87 MD:1509.8 VERT DEPTH:1488.288 OBS_TIME:607.4 Type:CONV Rmk:(VERT_DEPTH: 1488.2m, CORR_TIME: 609.5ms)
05 4 CHECKSHOT: 200016526405 :1525 SHOT:88 MD:1524.9 VERT DEPTH:1503.387 OBS_TIME:611.8 Type:CONV Rmk:(VERT_DEPTH: 1503.4m, CORR_TIME: 613.9ms)
05 4 CHECKSHOT: 200016526405 :1540 SHOT:89 MD:1540 VERT DEPTH:1518.486 OBS_TIME:616.3 Type:CONV Rmk:(VERT_DEPTH: 1518.5m, CORR_TIME: 618.4ms)
05 4 CHECKSHOT: 200016526405 :1555 SHOT:90 MD:1554.5 VERT DEPTH:1532.985 OBS_TIME:620.5 Type:CONV Rmk:(VERT_DEPTH: 1533m, CORR_TIME: 622.6ms)
05 4 CHECKSHOT: 200016526405 :1570 SHOT:91 MD:1569.7 VERT DEPTH:1548.184 OBS_TIME:624.8 Type:CONV Rmk:(VERT_DEPTH: 1548.1m, CORR_TIME: 626.9ms)
05 4 CHECKSHOT: 200016526405 :1585 SHOT:92 MD:1584.8 VERT DEPTH:1563.283 OBS_TIME:629.4 Type:CONV Rmk:(VERT_DEPTH: 1563.3m, CORR_TIME: 631.5ms)
05 4 CHECKSHOT: 200016526405 :1600 SHOT:93 MD:1599.9 VERT DEPTH:1578.382 OBS_TIME:633.9 Type:CONV Rmk:(VERT_DEPTH: 1578.4m, CORR_TIME: 636ms)
05 4 CHECKSHOT: 200016526405 :1615 SHOT:94 MD:1614.6 VERT DEPTH:1593.081 OBS_TIME:638.2 Type:CONV Rmk:(VERT_DEPTH: 1593.1m, CORR_TIME: 640.3ms)
05 4 CHECKSHOT: 200016526405 :1630 SHOT:95 MD:1629.8 VERT DEPTH:1608.279 OBS_TIME:642.8 Type:CONV Rmk:(VERT_DEPTH: 1608.2m, CORR_TIME: 644.9ms)
05 4 CHECKSHOT: 200016526405 :1645 SHOT:96 MD:1644.9 VERT DEPTH:1623.378 OBS_TIME:647 Type:CONV Rmk:(VERT_DEPTH: 1623.4m, CORR_TIME: 649.1ms)
05 4 CHECKSHOT: 200016526405 :1660 SHOT:97 MD:1660 VERT DEPTH:1638.476 OBS_TIME:651.4 Type:CONV Rmk:(VERT_DEPTH: 1638.5m, CORR_TIME: 653.5ms)
05 4 CHECKSHOT: 200016526405 :1675 SHOT:98 MD:1674.6 VERT DEPTH:1653.074 OBS_TIME:655.8 Type:CONV Rmk:(VERT_DEPTH: 1653.1m, CORR_TIME: 657.9ms)
05 4 CHECKSHOT: 200016526405 :1690 SHOT:99 MD:1689.8 VERT DEPTH:1668.272 OBS_TIME:660.4 Type:CONV Rmk:(VERT_DEPTH: 1668.2m, CORR_TIME: 662.6ms)
05 4 CHECKSHOT: 200016526405 :1705 SHOT:100 MD:1704.9 VERT DEPTH:1683.37 OBS_TIME:664.8 Type:CONV Rmk:(VERT_DEPTH: 1683.4m, CORR_TIME: 667ms)
05 4 CHECKSHOT: 200016526405 :1720 SHOT:101 MD:1720 VERT DEPTH:1698.467 OBS_TIME:669.4 Type:CONV Rmk:(VERT_DEPTH: 1698.5m, CORR_TIME: 671.5ms)
05 4 CHECKSHOT: 200016526405 :1735 SHOT:102 MD:1734.7 VERT DEPTH:1713.165 OBS_TIME:674 Type:CONV Rmk:(VERT_DEPTH: 1713.1m, CORR_TIME: 676.2ms)
05 4 CHECKSHOT: 200016526405 :1750 SHOT:103 MD:1749.8 VERT DEPTH:1728.262 OBS_TIME:679.1 Type:CONV Rmk:(VERT_DEPTH: 1728.3m, CORR_TIME: 679.1ms)
05 4 CHECKSHOT: 200016526405 :1765 SHOT:104 MD:1764.9 VERT DEPTH:1743.358 OBS_TIME:684.3 Type:CONV Rmk:(VERT_DEPTH: 1743.4m, CORR_TIME: 686.4ms)
05 4 CHECKSHOT: 200016526405 :1780 SHOT:105 MD:1780 VERT DEPTH:1758.454 OBS_TIME:689.4 Type:CONV Rmk:(VERT_DEPTH: 1758.5m, CORR_TIME: 691.5ms)
05 4 CHECKSHOT: 200016526405 :1795 SHOT:106 MD:1794.7 VERT DEPTH:1773.15 OBS_TIME:694.4 Type:CONV Rmk:(VERT_DEPTH: 1773.1m, CORR_TIME: 696.5ms)
05 4 CHECKSHOT: 200016526405 :1810 SHOT:107 MD:1809.8 VERT DEPTH:1788.246 OBS_TIME:699.5 Type:CONV Rmk:(VERT_DEPTH: 1788.2m, CORR_TIME: 701.7ms)
05 4 CHECKSHOT: 200016526405 :1825 SHOT:108 MD:1824.9 VERT DEPTH:1803.342 OBS_TIME:704.6 Type:CONV Rmk:(VERT_DEPTH: 1803.3m, CORR_TIME: 706.7ms)
05 4 CHECKSHOT: 200016526405 :1840 SHOT:109 MD:1840 VERT DEPTH:1818.439 OBS_TIME:709.6 Type:CONV Rmk:(VERT_DEPTH: 1818.5m, CORR_TIME: 711.8ms)
05 4 CHECKSHOT: 200016526405 :1855 SHOT:110 MD:1854.6 VERT DEPTH:1833.036 OBS_TIME:714.4 Type:CONV Rmk:(VERT_DEPTH: 1833.1m, CORR_TIME: 716.5ms)
05 4 CHECKSHOT: 200016526405 :1870 SHOT:111 MD:1869.8 VERT DEPTH:1848.232 OBS_TIME:719.6 Type:CONV Rmk:(VERT_DEPTH: 1848.2m, CORR_TIME: 721.7ms)
05 4 CHECKSHOT: 200016526405 :1885 SHOT:112 MD:1884.9 VERT DEPTH:1863.328 OBS_TIME:724.5 Type:CONV Rmk:(VERT_DEPTH: 1863.3m, CORR_TIME: 726.6ms)
05 4 CHECKSHOT: 200016526405 :1900 SHOT:113 MD:1900 VERT DEPTH:1878.422 OBS_TIME:729.5 Type:CONV Rmk:(VERT_DEPTH: 1878.4m, CORR_TIME: 731.7ms)
05 4 CHECKSHOT: 200016526405 :1915 SHOT:114 MD:1914.6 VERT DEPTH:1893.017 OBS_TIME:734.6 Type:CONV Rmk:(VERT_DEPTH: 1893.1m, CORR_TIME: 736.7ms)
05 4 CHECKSHOT: 200016526405 :1930 SHOT:115 MD:1929.8 VERT DEPTH:1908.211 OBS_TIME:739.9 Type:CONV Rmk:(VERT_DEPTH: 1908.2m, CORR_TIME: 742.1ms)
05 4 CHECKSHOT: 200016526405 :1945 SHOT:116 MD:1944.9 VERT DEPTH:1923.305 OBS_TIME:745.4 Type:CONV Rmk:(VERT_DEPTH: 1923.3m, CORR_TIME: 747.6ms)
05 4 CHECKSHOT: 200016526405 :1960 SHOT:117 MD:1960 VERT DEPTH:1938.4 OBS_TIME:750.9 Type:CONV Rmk:(VERT_DEPTH: 1938.4m, CORR_TIME: 753ms)
05 4 CHECKSHOT: 200016526405 :1975 SHOT:118 MD:1974.6 VERT DEPTH:1952.995 OBS_TIME:756.1 Type:CONV Rmk:(VERT_DEPTH: 1953m, CORR_TIME: 758.2ms)
05 4 CHECKSHOT: 200016526405 :1990 SHOT:119 MD:1989.7 VERT DEPTH:1968.091 OBS_TIME:761.7 Type:CONV Rmk:(VERT_DEPTH: 1968.1m, CORR_TIME: 763.9ms)
05 4 CHECKSHOT: 200016526405 :2005 SHOT:120 MD:2004.9 VERT DEPTH:1983.286 OBS_TIME:767.3 Type:CONV Rmk:(VERT_DEPTH: 1983.2m, CORR_TIME: 769.4ms)
05 4 CHECKSHOT: 200016526405 :2020 SHOT:121 MD:2020 VERT DEPTH:1998.381 OBS_TIME:772.7 Type:CONV Rmk:(VERT_DEPTH: 1998.4m, CORR_TIME: 774.8ms)
05 4 CHECKSHOT: 200016526405 :2035 SHOT:122 MD:2034.6 VERT DEPTH:2012.976 OBS_TIME:777.8 Type:CONV Rmk:(VERT_DEPTH: 2013m, CORR_TIME: 779.9ms)
05 4 CHECKSHOT: 200016526405 :2050 SHOT:123 MD:2049.7 VERT DEPTH:2028.071 OBS_TIME:782.9 Type:CONV Rmk:(VERT_DEPTH: 2028.1m, CORR_TIME: 785.1ms)
05 4 CHECKSHOT: 200016526405 :2065 SHOT:124 MD:2064.9 VERT DEPTH:2043.267 OBS_TIME:788 Type:CONV Rmk:(VERT_DEPTH: 2043.2m, CORR_TIME: 790.1ms)
05 4 CHECKSHOT: 200016526405 :2080 SHOT:125 MD:2080 VERT DEPTH:2058.362 OBS_TIME:793.4 Type:CONV Rmk:(VERT_DEPTH: 2058.3m, CORR_TIME:795.6ms)
05 4 CHECKSHOT: 200016526405 :2095 SHOT:126 MD:2094.6 VERT DEPTH:2072.958 OBS_TIME:798.3 Type:CONV Rmk:(VERT_DEPTH: 2073m, CORR_TIME:800.4ms)
05 4 CHECKSHOT: 200016526405 :2110 SHOT:127 MD:2109.8 VERT DEPTH:2088.153 OBS_TIME:802.8 Type:CONV Rmk:(VERT_DEPTH: 2088.1m, CORR_TIME: 804.9ms)
05 4 CHECKSHOT: 200016526405 :2125 SHOT:128 MD:2124.9 VERT DEPTH:2103.248 OBS_TIME:807.1 Type:CONV Rmk:(VERT_DEPTH: 2103.2m, CORR_TIME: 809.3ms)
05 4 CHECKSHOT: 200016526405 :2140 SHOT:129 MD:2140 VERT DEPTH:2118.343 OBS_TIME:811.5 Type:CONV Rmk:(VERT_DEPTH: 2118.3m, CORR_TIME: 813.6ms)
05 4 CHECKSHOT: 200016526405 :2155 SHOT:130 MD:2154.6 VERT DEPTH:2132.938 OBS_TIME:815.5 Type:CONV Rmk:(VERT_DEPTH: 2133m, CORR_TIME: 817.6ms)
05 4 CHECKSHOT: 200016526405 :2170 SHOT:131 MD:2169.8 VERT DEPTH:2148.132 OBS_TIME:820.3 Type:CONV Rmk:(VERT_DEPTH: 2148.1m, CORR_TIME: 822.4ms)
05 4 CHECKSHOT: 200016526405 :2185 SHOT:132 MD:2184.9 VERT DEPTH:2163.227 OBS_TIME:824.3 Type:CONV Rmk:(VERT_DEPTH: 2163.2m, CORR_TIME: 826.4ms)
05 4 CHECKSHOT: 200016526405 :2200 SHOT:133 MD:2200 VERT DEPTH:2178.321 OBS_TIME:828.4 Type:CONV Rmk:(VERT_DEPTH: 2178.3m, CORR_TIME: 830.5ms)
05 4 CHECKSHOT: 200016526405 :2215 SHOT:134 MD:2214.6 VERT DEPTH:2192.915 OBS_TIME:832.4 Type:CONV Rmk:(VERT_DEPTH: 2192.9m, CORR_TIME: 834.6ms)
05 4 CHECKSHOT: 200016526405 :2230 SHOT:135 MD:2229.7 VERT DEPTH:2208.008 OBS_TIME:836.6 Type:CONV Rmk:(VERT_DEPTH: 2208m, CORR_TIME: 838.7ms)
05 4 CHECKSHOT: 200016526405 :2245 SHOT:136 MD:2244.8 VERT DEPTH:2223.101 OBS_TIME:840.7 Type:CONV Rmk:(VERT_DEPTH: 2223.1m, CORR_TIME: 842.8ms)
05 4 CHECKSHOT: 200016526405 :2260 SHOT:137 MD:2260 VERT DEPTH:2238.293 OBS_TIME:844.8 Type:CONV Rmk:(VERT_DEPTH: 2238.3m, CORR_TIME: 846.9ms)
05 4 CHECKSHOT: 200016526405 :2275 SHOT:138 MD:2274.6 VERT DEPTH:2252.886 OBS_TIME:849.2 Type:CONV Rmk:(VERT_DEPTH: 2252.9m, CORR_TIME: 851.4ms)
05 4 CHECKSHOT: 200016526405 :2290 SHOT:139 MD:2289.7 VERT DEPTH:2267.978 OBS_TIME:853.3 Type:CONV Rmk:(VERT_DEPTH: 2268m, CORR_TIME: 855.5ms)
05 4 CHECKSHOT: 200016526405 :2305 SHOT:140 MD:2304.9 VERT DEPTH:2283.17 OBS_TIME:857.6 Type:CONV Rmk:(VERT_DEPTH: 2283.1m, CORR_TIME: 859.7ms)
05 4 CHECKSHOT: 200016526405 :2320 SHOT:141 MD:2320 VERT DEPTH:2298.261 OBS_TIME:861.7 Type:CONV Rmk:(VERT_DEPTH: 2298.2m, CORR_TIME: 863.8ms)
05 4 CHECKSHOT: 200016526405 :2335 SHOT:142 MD:2334.6 VERT DEPTH:2312.853 OBS_TIME:866 Type:CONV Rmk:(VERT_DEPTH: 2312.9m, CORR_TIME: 868.2ms)
05 4 CHECKSHOT: 200016526405 :2350 SHOT:143 MD:2349.8 VERT DEPTH:2328.043 OBS_TIME:870.3 Type:CONV Rmk:(VERT_DEPTH: 2328m, CORR_TIME: 872.4ms)
05 4 CHECKSHOT: 200016526405 :2365 SHOT:144 MD:2364.9 VERT DEPTH:2343.134 OBS_TIME:874 Type:CONV Rmk:(VERT_DEPTH: 2343.1m, CORR_TIME: 876.1ms)
05 4 CHECKSHOT: 200016526405 :2380 SHOT:145 MD:2380 VERT DEPTH:2358.225 OBS_TIME:878.1 Type:CONV Rmk:(VERT_DEPTH: 2358.2m, CORR_TIME: 880.2ms)
05 4 CHECKSHOT: 200016526405 :2395 SHOT:146 MD:2394.7 VERT DEPTH:2372.916 OBS_TIME:881.9 Type:CONV Rmk:(VERT_DEPTH: 2372.9m, CORR_TIME: 884ms)
05 4 CHECKSHOT: 200016526405 :2410 SHOT:147 MD:2409.8 VERT DEPTH:2388.006 OBS_TIME:885.8 Type:CONV Rmk:(VERT_DEPTH: 2388m, CORR_TIME: 888ms)
05 4 CHECKSHOT: 200016526405 :2425 SHOT:148 MD:2424.9 VERT DEPTH:2403.096 OBS_TIME:889.8 Type:CONV Rmk:(VERT_DEPTH: 2403.1m, CORR_TIME: 892ms)
05 4 CHECKSHOT: 200016526405 :2440 SHOT:149 MD:2440 VERT DEPTH:2418.186 OBS_TIME:894 Type:CONV Rmk:(VERT_DEPTH: 2418.2m, CORR_TIME: 896.1ms)
05 4 CHECKSHOT: 200016526405 :2455 SHOT:150 MD:2454.7 VERT DEPTH:2432.877 OBS_TIME:898 Type:CONV Rmk:(VERT_DEPTH: 2432.8m, CORR_TIME: 900.1ms)
05 4 CHECKSHOT: 200016526405 :2470 SHOT:151 MD:2469.8 VERT DEPTH:2447.967 OBS_TIME:902.3 Type:CONV Rmk:(VERT_DEPTH: 2447.9m, CORR_TIME: 904.5ms)
05 4 CHECKSHOT: 200016526405 :2485 SHOT:152 MD:2484.9 VERT DEPTH:2463.057 OBS_TIME:906.8 Type:CONV Rmk:(VERT_DEPTH: 2463.1m, CORR_TIME: 909ms)
05 4 CHECKSHOT: 200016526405 :2500 SHOT:153 MD:2500 VERT DEPTH:2478.147 OBS_TIME:910.9 Type:CONV Rmk:(VERT_DEPTH: 2478.2m, CORR_TIME: 913ms)
05 4 CHECKSHOT: 200016526405 :2515 SHOT:154 MD:2514.7 VERT DEPTH:2492.839 OBS_TIME:915 Type:CONV Rmk:(VERT_DEPTH: 2492.8m, CORR_TIME: 917.1ms)
05 4 CHECKSHOT: 200016526405 :2530 SHOT:155 MD:2529.8 VERT DEPTH:2507.935 OBS_TIME:919.4 Type:CONV Rmk:(VERT_DEPTH: 2507.9m, CORR_TIME: 921.5ms)
05 4 CHECKSHOT: 200016526405 :2545 SHOT:156 MD:2544.9 VERT DEPTH:2523.032 OBS_TIME:924 Type:CONV Rmk:(VERT_DEPTH: 2523m, CORR_TIME: 926.1ms)
05 4 CHECKSHOT: 200016526405 :2560 SHOT:157 MD:2560 VERT DEPTH:2538.131 OBS_TIME:928.3 Type:CONV Rmk:(VERT_DEPTH: 2538.1m, CORR_TIME: 930.4ms)
05 4 CHECKSHOT: 200016526405 :2575 SHOT:158 MD:2574.6 VERT DEPTH:2552.728 OBS_TIME:933 Type:CONV Rmk:(VERT_DEPTH: 2552.8m, CORR_TIME: 935.1ms)
05 4 CHECKSHOT: 200016526405 :2590 SHOT:159 MD:2589.7 VERT DEPTH:2567.824 OBS_TIME:937.4 Type:CONV Rmk:(VERT_DEPTH: 2567.9m, CORR_TIME: 939.6ms)
05 4 CHECKSHOT: 200016526405 :2605 SHOT:160 MD:2604.9 VERT DEPTH:2583.01 OBS_TIME:941.7 Type:CONV Rmk:(VERT_DEPTH: 2583m, CORR_TIME: 943.9ms)
05 4 CHECKSHOT: 200016526405 :2620 SHOT:161 MD:2620 VERT DEPTH:2598.08 OBS_TIME:945.4 Type:CONV Rmk:(VERT_DEPTH: 2598.1m, CORR_TIME: 947.6ms)
05 4 CHECKSHOT: 200016526405 :2635 SHOT:162 MD:2634.7 VERT DEPTH:2612.724 OBS_TIME:949.1 Type:CONV Rmk:(VERT_DEPTH: 2612.7m, CORR_TIME: 951.2ms)
05 4 CHECKSHOT: 200016526405 :2650 SHOT:163 MD:2649.8 VERT DEPTH:2627.733 OBS_TIME:952.9 Type:CONV Rmk:(VERT_DEPTH: 2627.7m, CORR_TIME: 955.1ms)
05 4 CHECKSHOT: 200016526405 :2665 SHOT:164 MD:2664.9 VERT DEPTH:2642.725 OBS_TIME:956.9 Type:CONV Rmk:(VERT_DEPTH: 2642.7m, CORR_TIME: 959.1ms)
05 4 CHECKSHOT: 200016526405 :2680 SHOT:165 MD:2680 VERT DEPTH:2657.7 OBS_TIME:961 Type:CONV Rmk:(VERT_DEPTH: 2657.7m, CORR_TIME: 963.2ms)
05 4 CHECKSHOT: 200016526405 :2695 SHOT:166 MD:2694.7 VERT DEPTH:2672.242 OBS_TIME:964 Type:CONV Rmk:(VERT_DEPTH: 2672.2m, CORR_TIME: 966.2ms)
05 4 CHECKSHOT: 200016526405 :2710 SHOT:167 MD:2709.8 VERT DEPTH:2687.14 OBS_TIME:968 Type:CONV Rmk:(VERT_DEPTH: 2687.1m, CORR_TIME: 970.3ms)
05 4 CHECKSHOT: 200016526405 :2725 SHOT:168 MD:2724.9 VERT DEPTH:2701.999 OBS_TIME:972 Type:CONV Rmk:(VERT_DEPTH: 2702m, CORR_TIME: 974.4ms)
05 4 CHECKSHOT: 200016526405 :2740 SHOT:169 MD:2740 VERT DEPTH:2716.807 OBS_TIME:976.4 Type:CONV Rmk:(VERT_DEPTH: 2716.8m, CORR_TIME: 978.7ms)
05 4 CHECKSHOT: 200016526405 :2755 SHOT:170 MD:2754.6 VERT DEPTH:2731.044 OBS_TIME:980.7 Type:CONV Rmk:(VERT_DEPTH: 2731m, CORR_TIME: 983.1ms)
05 4 CHECKSHOT: 200016526405 :2770 SHOT:171 MD:2769.7 VERT DEPTH:2745.689 OBS_TIME:984.9 Type:CONV Rmk:(VERT_DEPTH: 2745.7m, CORR_TIME: 987.3ms)
05 4 CHECKSHOT: 200016526405 :2785 SHOT:172 MD:2784.9 VERT DEPTH:2760.378 OBS_TIME:988.8 Type:CONV Rmk:(VERT_DEPTH: 2760.3m, CORR_TIME: 991.3ms)
05 4 CHECKSHOT: 200016526405 :2800 SHOT:173 MD:2800 VERT DEPTH:2774.913 OBS_TIME:993 Type:CONV Rmk:(VERT_DEPTH: 2774.9m, CORR_TIME: 995.5ms)
05 4 CHECKSHOT: 200016526405 :2815 SHOT:174 MD:2814.6 VERT DEPTH:2788.908 OBS_TIME:997.3 Type:CONV Rmk:(VERT_DEPTH: 2788.9m, CORR_TIME: 999.8ms)
05 4 CHECKSHOT: 200016526405 :2830 SHOT:175 MD:2829.8 VERT DEPTH:2803.393 OBS_TIME:1001.2 Type:CONV Rmk:(VERT_DEPTH: 2803.3m, CORR_TIME: 1003.8ms)
05 4 CHECKSHOT: 200016526405 :2845 SHOT:176 MD:2844.9 VERT DEPTH:2817.675 OBS_TIME:1005.1 Type:CONV Rmk:(VERT_DEPTH: 2817.6m, CORR_TIME: 1007.7ms)
05 4 CHECKSHOT: 200016526405 :2860 SHOT:177 MD:2860 VERT DEPTH:2831.774 OBS_TIME:1008.9 Type:CONV Rmk:(VERT_DEPTH: 2831.7m, CORR_TIME: 1011.5ms)
05 4 CHECKSHOT: 200016526405 :2874 SHOT:178 MD:2874.1 VERT DEPTH:2844.707 OBS_TIME:1012.1 Type:CONV Rmk:(VERT_DEPTH: 2844.7m, CORR_TIME: 1014.7ms)
05 4 CHECKSHOT: 200016526405 :2889 SHOT:179 MD:2889.2 VERT DEPTH:2858.317 OBS_TIME:1015.6 Type:CONV Rmk:(VERT_DEPTH: 2858.2m, CORR_TIME: 1018.3ms)
05 4 CHECKSHOT: 200016526405 :2904 SHOT:180 MD:2904.4 VERT DEPTH:2871.774 OBS_TIME:1019.4 Type:CONV Rmk:(VERT_DEPTH: 2871.7m, CORR_TIME: 1022.1ms)
05 4 CHECKSHOT: 200016526405 :2920 SHOT:181 MD:2919.5 VERT DEPTH:2885.037 OBS_TIME:1023.2 Type:CONV Rmk:(VERT_DEPTH: 2885m, CORR_TIME: 1025.8ms)
05 4 CHECKSHOT: 200016526405 :2933 SHOT:182 MD:2932.7 VERT DEPTH:2896.604 OBS_TIME:1026.7 Type:CONV Rmk:(VERT_DEPTH: 2896.6m, CORR_TIME: 1029.4ms)
05 4 CHECKSHOT: 200016526405 :2948 SHOT:183 MD:2947.8 VERT DEPTH:2909.797 OBS_TIME:1030.7 Type:CONV Rmk:(VERT_DEPTH: 2909.7m, CORR_TIME: 1033.4ms)
05 4 CHECKSHOT: 200016526405 :2963 SHOT:184 MD:2962.9 VERT DEPTH:2922.945 OBS_TIME:1034.5 Type:CONV Rmk:(VERT_DEPTH: 2922.9m, CORR_TIME: 1037.2ms)
05 4 CHECKSHOT: 200016526405 :2978 SHOT:185 MD:2978 VERT DEPTH:2936.045 OBS_TIME:1038.3 Type:CONV Rmk:(VERT_DEPTH: 2936m, CORR_TIME: 1041ms)
05 4 CHECKSHOT: 200016526405 :2995 SHOT:186 MD:2994.6 VERT DEPTH:2950.416 OBS_TIME:1042.2 Type:CONV Rmk:(VERT_DEPTH: 2950.4m, CORR_TIME: 1044.9ms)
05 4 CHECKSHOT: 200016526405 :3010 SHOT:187 MD:3009.7 VERT DEPTH:2963.501 OBS_TIME:1045.7 Type:CONV Rmk:(VERT_DEPTH: 2963.5m, CORR_TIME: 1048.3ms)
05 4 CHECKSHOT: 200016526405 :3025 SHOT:188 MD:3024.8 VERT DEPTH:2976.621 OBS_TIME:1049.5 Type:CONV Rmk:(VERT_DEPTH: 2976.7m, CORR_TIME: 1052.1ms)
05 4 CHECKSHOT: 200016526405 :3040 SHOT:189 MD:3040 VERT DEPTH:2989.883 OBS_TIME:1053.3 Type:CONV Rmk:(VERT_DEPTH: 2989.8m, CORR_TIME: 1055.9ms)
05 4 CHECKSHOT: 200016526405 :3055 SHOT:190 MD:3054.6 VERT DEPTH:3002.659 OBS_TIME:1058.3 Type:CONV Rmk:(VERT_DEPTH: 3002.7m, CORR_TIME: 1060.8ms)
05 4 CHECKSHOT: 200016526405 :3070 SHOT:191 MD:3069.8 VERT DEPTH:3015.988 OBS_TIME:1062.3 Type:CONV Rmk:(VERT_DEPTH: 3015.9m, CORR_TIME: 1064.8ms)
05 4 CHECKSHOT: 200016526405 :3085 SHOT:192 MD:3084.9 VERT DEPTH:3029.236 OBS_TIME:1065.3 Type:CONV Rmk:(VERT_DEPTH: 3029.2m, CORR_TIME: 1067.7ms)
05 4 CHECKSHOT: 200016526405 :3100 SHOT:193 MD:3100 VERT DEPTH:3042.485 OBS_TIME:1069.2 Type:CONV Rmk:(VERT_DEPTH: 3042.5m, CORR_TIME: 1071.5ms)
05 4 CHECKSHOT: 200016526405 :3115 SHOT:194 MD:3114.7 VERT DEPTH:3055.415 OBS_TIME:1072.2 Type:CONV Rmk:(VERT_DEPTH: 3055.4m, CORR_TIME: 1074.4ms)
05 4 CHECKSHOT: 200016526405 :3130 SHOT:195 MD:3129.8 VERT DEPTH:3068.739 OBS_TIME:1075.6 Type:CONV Rmk:(VERT_DEPTH: 3068.7m, CORR_TIME: 1077.8ms)
05 4 CHECKSHOT: 200016526405 :3145 SHOT:196 MD:3144.9 VERT DEPTH:3082.078 OBS_TIME:1079.4 Type:CONV Rmk:(VERT_DEPTH: 3082.1m, CORR_TIME: 1081.5ms)
05 4 CHECKSHOT: 200016526405 :3160 SHOT:197 MD:3160 VERT DEPTH:3095.428 OBS_TIME:1083.4 Type:CONV Rmk:(VERT_DEPTH: 3095.4m, CORR_TIME: 1085.5ms)
05 4 CHECKSHOT: 200016526405 :3175 SHOT:198 MD:3174.7 VERT DEPTH:3108.448 OBS_TIME:1086.9 Type:CONV Rmk:(VERT_DEPTH: 3108.4m, CORR_TIME: 1088.8ms)
05 4 CHECKSHOT: 200016526405 :3190 SHOT:199 MD:3189.8 VERT DEPTH:3121.853 OBS_TIME:1090.4 Type:CONV Rmk:(VERT_DEPTH: 3121.9m, CORR_TIME: 1092.2ms)
05 4 CHECKSHOT: 200016526405 :3205 SHOT:200 MD:3204.9 VERT DEPTH:3135.305 OBS_TIME:1093.7 Type:CONV Rmk:(VERT_DEPTH: 3135.3m, CORR_TIME: 1095.5ms)
05 4 CHECKSHOT: 200016526405 :3220 SHOT:201 MD:3220 VERT DEPTH:3148.803 OBS_TIME:1097.1 Type:CONV Rmk:(VERT_DEPTH: 3148.8m, CORR_TIME: 1098.8ms)
05 4 CHECKSHOT: 200016526405 :3235 SHOT:202 MD:3234.6 VERT DEPTH:3161.875 OBS_TIME:1100.3 Type:CONV Rmk:(VERT_DEPTH: 3161.9m, CORR_TIME: 1101.9ms)
05 4 CHECKSHOT: 200016526405 :3250 SHOT:203 MD:3249.8 VERT DEPTH:3175.506 OBS_TIME:1103.8 Type:CONV Rmk:(VERT_DEPTH: 3175.5m, CORR_TIME: 1105.3ms)
05 4 CHECKSHOT: 200016526405 :3265 SHOT:204 MD:3264.9 VERT DEPTH:3189.07 OBS_TIME:1108 Type:CONV Rmk:(VERT_DEPTH: 3189m, CORR_TIME: 1109.4ms)
05 4 CHECKSHOT: 200016526405 :3280 SHOT:205 MD:3280 VERT DEPTH:3202.646 OBS_TIME:1111.2 Type:CONV Rmk:(VERT_DEPTH: 3202.6m, CORR_TIME: 1112.5ms)
05 4 CHECKSHOT: 200016526405 :3295 SHOT:206 MD:3294.6 VERT DEPTH:3215.769 OBS_TIME:1114.7 Type:CONV Rmk:(VERT_DEPTH: 3215.8m, CORR_TIME: 1115.9ms)
05 4 CHECKSHOT: 200016526405 :3310 SHOT:207 MD:3309.8 VERT DEPTH:3229.426 OBS_TIME:1117.7 Type:CONV Rmk:(VERT_DEPTH: 3229.4m, CORR_TIME: 1118.8ms)
05 4 CHECKSHOT: 200016526405 :3325 SHOT:208 MD:3324.9 VERT DEPTH:3242.993 OBS_TIME:1120.5 Type:CONV Rmk:(VERT_DEPTH: 3243m, CORR_TIME: 1121.4ms)
05 4 CHECKSHOT: 200016526405 :3340 SHOT:209 MD:3340 VERT DEPTH:3256.564 OBS_TIME:1123.6 Type:CONV Rmk:(VERT_DEPTH: 3256.6m, CORR_TIME: 1124.5ms)
05 4 CHECKSHOT: 200016526405 :3355 SHOT:210 MD:3354.6 VERT DEPTH:3269.689 OBS_TIME:1126.2 Type:CONV Rmk:(VERT_DEPTH: 3269.7m, CORR_TIME: 1127ms)
05 4 CHECKSHOT: 200016526405 :3370 SHOT:211 MD:3369.8 VERT DEPTH:3283.357 OBS_TIME:1129.2 Type:CONV Rmk:(VERT_DEPTH: 3283.3m, CORR_TIME: 1129.8ms)
05 4 CHECKSHOT: 200016526405 :3385 SHOT:212 MD:3384.9 VERT DEPTH:3296.935 OBS_TIME:1131.7 Type:CONV Rmk:(VERT_DEPTH: 3296.9m, CORR_TIME: 1132.2ms)
05 4 CHECKSHOT: 200016526405 :3400 SHOT:213 MD:3400 VERT DEPTH:3310.512 OBS_TIME:1134.6 Type:CONV Rmk:(VERT_DEPTH: 3310.5m, CORR_TIME: 1135ms)
BASKER_2_DIR OIL_CO_DATA:1: DEVIATION SRVY 01 SURVEY_ID =BASKER_2_DIR
BASKER_2_DIR OIL_CO_DATA:1: DEVIATION SRVY 02 SURVEY_COMPANY =Halliburton
BASKER_2_DIR OIL_CO_DATA:1: DEVIATION SRVY 03 SURVEY_DATE =22-SEP-05
BASKER_2_DIR OIL_CO_DATA:1: DEVIATION SRVY 05 SURVEY_TYPE =DIR
BASKER_2_DIR OIL_CO_DATA:1: DEVIATION SRVY 06 STORAGE_UNIT =Metres
BASKER_2_DIR OIL_CO_DATA:1: DEVIATION SRVY 09 COMPUTE_METHOD =MC
BASKER_2_DIR OIL_CO_DATA:1: DEVIATION SRVY 10 EW_MAGNETIC_DECLINATION =U
BASKER_2_DIR OIL_CO_DATA:1: DEVIATION SRVY 11 MAGNETIC_DECLINATION =13.38
BASKER_2_DIR OIL_CO_DATA:1: DEVIATION SRVY 13 AZIMUTH_NORTH_TYPE =G
BASKER_2_DIR OIL_CO_DATA:1: DEVIATION SRVY 14 TOP_DEPTH =0
BASKER_2_DIR OIL_CO_DATA:1: DEVIATION SRVY 16 BASE_DEPTH =3414
BASKER_2_DIR OIL_CO_DATA:1: DEVIATION SRVY 18 SOURCE =OIL_CO_DATA
BASKER_2_DIR OIL_CO_DATA:1: DEVIATION SRVY 20 REMARK =Data Source PE911503 page 112, 113 and 114. 106 Points.
BASKER_2_DIR OIL_CO_DATA:1: DEVIATION SRVY 21 POINT COUNT = 106
BASKER_2_DIR OIL_CO_DATA:2: DEVIATION SRVY STATION_MD INCLINATION AZIMUTH STATION_ID STATION_TVD X_OFFSET Y_OFFSET VERTICAL_SECTION NS_DIRECTION EW_DIRECTION DOG_LEG_SEVERITY REMARK
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0000 .0 0 0 0 0 0 N E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0176 176.0 0 0 176 0 0 N E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0225 224.6 .19 161.03 224.63991 .03 .08 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0282 282.3 .07 139.65 282.38975 .08 .19 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0311 311.2 .09 116.77 311.28973 .11 .22 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0340 340.1 .1 73.76 340.12969 .16 .22 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0369 368.9 .06 116.98 368.97966 .19 .22 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0398 397.8 .09 163.12 397.81964 .21 .25 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0427 426.6 .04 150.94 426.63962 .23 .28 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0455 455.2 .09 138.56 455.2696 .25 .3 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0512 512.4 .09 115.62 512.44953 .32 .36 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0541 541.0 .09 127.28 541.0395 .35 .38 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0570 569.5 .09 149.55 569.56947 .38 .41 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0598 598.1 .1 130.15 598.14943 .41 .45 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0627 626.6 .07 122.82 626.6794 .45 .48 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0655 655.3 .07 93.47 655.38937 .48 .49 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0684 684.1 .09 75.67 684.10935 .52 .48 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0713 713.0 .07 46.86 713.00932 .55 .46 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0742 741.7 .09 14.62 741.77929 .57 .43 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0771 770.7 .11 35.1 770.72925 .59 .38 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0799 799.4 .1 46.21 799.4692 .63 .34 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0828 828.1 .07 89.32 828.15917 .66 .33 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0857 856.7 .07 42.39 856.71915 .69 .31 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0885 885.2 0 253.43 885.22915 .7 .3 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0914 913.6 .06 324.63 913.65914 .7 .29 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0971 970.7 .04 321.6 970.76912 .67 .25 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0990 990.3 .1 275.8 990.29911 .64 .24 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1000 1000.1 .1 305.57 1000.09909 .63 .24 S E Correct Inclination is 0.102 whereas it was entered 0.10.
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1008 1007.5 .12 323.98 1007.57908 .62 .23 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1036 1036.2 .17 300.46 1036.28899 .56 .18 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1065 1065.4 .17 5.05 1065.39888 .53 .12 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1094 1093.9 .22 331.06 1093.89873 .51 .03 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1123 1122.8 .14 342.26 1122.81858 .47 .06 N E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1152 1151.7 .31 334.26 1151.69835 .43 .16 N E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1180 1180.4 .25 318.65 1180.47801 .35 .28 N E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1209 1209.2 .31 340.89 1209.25767 .28 .4 N E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1238 1237.9 .31 337.82 1237.93725 .23 .54 N E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1295 1294.9 .41 316.37 1294.95615 .03 .83 N E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1323 1323.3 .41 317.99 1323.32542 .11 .98 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1352 1351.7 .5 308.15 1351.77452 .27 1.14 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1380 1380.2 .45 323.73 1380.28355 .44 1.3 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1409 1408.9 .56 313.66 1408.91244 .61 1.49 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1466 1466.4 .57 319.33 1466.42965 1 1.9 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1495 1495.4 .53 333.19 1495.43833 1.15 2.13 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1525 1524.5 .62 322.85 1524.50687 1.31 2.38 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1554 1553.7 .62 337.42 1553.73518 1.46 2.65 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1583 1582.7 .61 335.79 1582.68351 1.58 2.93 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1612 1611.6 .79 336.96 1611.62134 1.73 3.26 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1640 1640.3 .88 343.27 1640.2783 1.87 3.65 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1727 1727.4 1.05 341.55 1727.38591 2.31 5.05 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1754 1753.7 1.25 345.4 1753.7106 2.46 5.55 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1782 1782.0 1.31 348.87 1782.01354 2.6 6.17 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1811 1810.7 1.32 342.05 1810.676 2.77 6.81 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1840 1839.5 1.16 347.31 1839.44926 2.93 7.41 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1868 1868.4 1.33 345.6 1868.33243 3.08 8.02 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1898 1897.6 1.53 346.99 1897.52333 3.25 8.72 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1927 1926.7 1.66 346.26 1926.64203 3.44 9.51 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1956 1955.7 1.49 331.53 1955.6012 3.72 10.25 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1984 1984.1 1.39 329.83 1984.02222 4.07 10.87 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2013 2012.5 1.45 328.82 2012.44348 4.43 11.48 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2041 2040.9 1.49 334.37 2040.83415 4.77 12.12 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2069 2069.4 1.39 333.91 2069.33514 5.09 12.77 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2185 2184.5 1.56 330.85 2184.41698 6.46 15.39 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2214 2213.5 1.69 337.47 2213.36535 6.82 16.13 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2242 2242.3 1.79 336.87 2242.15207 7.16 16.93 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2271 2271.0 1.8 337.68 2270.86797 7.51 17.76 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2300 2299.8 1.92 339.68 2299.57283 7.84 18.63 N W Correct Azimuth is 339.68 whereas it was entered 339.76.
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2328 2328.3 1.98 339.76 2328.06632 8.18 19.54 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2356 2356.3 1.99 341.4 2356.12948 8.5 20.46 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2385 2384.8 2.01 340.79 2384.56214 8.83 21.4 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2414 2413.6 2.13 341.03 2413.34335 9.17 22.38 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2443 2442.7 2.02 337.08 2442.39429 9.54 23.36 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2472 2472.2 2.07 337.28 2471.8855 9.95 24.33 N W Correct Azimuth is 337.28 whreas it was entered 338.28.
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2499 2499.0 2.11 341.02 2498.69766 10.3 25.25 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2528 2527.6 1.24 320.72 2527.32539 10.66 25.99 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2557 2557.3 .87 264.89 2556.97102 11.09 26.21 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2585 2585.2 1.48 194.31 2584.83624 11.39 25.85 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2612 2612.4 3.62 191.42 2612.0477 11.65 24.66 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2643 2643.4 6.45 190.09 2642.88511 12.15 21.99 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2671 2671.3 7.27 185.29 2670.63501 12.59 18.69 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2700 2700.4 9.3 184.65 2699.41991 12.95 14.51 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2729 2728.7 10.88 181.9 2727.24212 13.22 9.57 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2758 2757.9 13.9 178.27 2755.74941 13.2 3.31 N W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2786 2786.3 15.37 180.97 2783.30494 13.17 3.88 S W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2815 2814.7 16.98 182.03 2810.55109 13.38 11.78 S W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2844 2844.3 19.56 181.05 2838.62815 13.62 21.05 S W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2872 2872.3 24.39 182.4 2864.64198 13.95 31.54 S W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2901 2901.4 28.38 180.27 2890.67903 14.23 44.45 S W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2931 2930.7 28.88 180.28 2916.36139 14.3 58.47 S W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2945 2944.9 29.21 180.44 2928.76682 14.34 65.36 S W Correct Azimuth is 180.442 whereas it was entered as 180.44.
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2981 2981.0 30.08 180.84 2960.18476 14.54 83.24 S W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 3010 3009.8 29.88 179.84 2985.14879 14.63 97.64 S W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 3038 3038.4 29.08 178.87 3010.03711 14.47 111.71 S W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 3067 3066.6 28.66 178.39 3034.71481 14.15 125.31 S W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 3095 3095.2 28.69 178.54 3059.84227 13.78 139.05 S W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 3124 3123.9 28.01 177.16 3085.10022 13.27 152.67 S W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 3153 3153.2 27.87 176.17 3110.92327 12.47 166.34 S W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 3182 3181.8 27.45 174.86 3136.26384 11.44 179.58 S W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 3210 3210.1 26.65 173.92 3161.48583 10.18 192.4 S W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 3217 3216.8 26.57 173.55 3167.50296 9.85 195.39 S W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 3239 3238.5 26.31 172.34 3186.90643 8.67 204.97 S W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 3268 3267.8 25.94 171.77 3213.18607 6.88 217.73 S W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 3308 3307.7 26.06 170.42 3249.05726 4.18 235.02 S W
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 3365 3364.8 25.94 170.2 3300.36941 .04 259.69 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 3401 3401.2 25.96 170.31 3333.10842 2.73 275.39 S E
BASKER_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 3414 3414.0 25.96 170.31 3344.59892 3.68 280.9 S E
BASKER_2_MASTER MASTER:1: DEVIATION SRVY 01 SURVEY_ID =BASKER_2_MASTER
BASKER_2_MASTER MASTER:1: DEVIATION SRVY 02 SURVEY_COMPANY =Halliburton
BASKER_2_MASTER MASTER:1: DEVIATION SRVY 03 SURVEY_DATE =22-SEP-05
BASKER_2_MASTER MASTER:1: DEVIATION SRVY 05 SURVEY_TYPE =DIR
BASKER_2_MASTER MASTER:1: DEVIATION SRVY 06 STORAGE_UNIT =Metres
BASKER_2_MASTER MASTER:1: DEVIATION SRVY 09 COMPUTE_METHOD =MC
BASKER_2_MASTER MASTER:1: DEVIATION SRVY 10 EW_MAGNETIC_DECLINATION =U
BASKER_2_MASTER MASTER:1: DEVIATION SRVY 11 MAGNETIC_DECLINATION =13.38
BASKER_2_MASTER MASTER:1: DEVIATION SRVY 13 AZIMUTH_NORTH_TYPE =G
BASKER_2_MASTER MASTER:1: DEVIATION SRVY 14 TOP_DEPTH =0
BASKER_2_MASTER MASTER:1: DEVIATION SRVY 16 BASE_DEPTH =3414
BASKER_2_MASTER MASTER:1: DEVIATION SRVY 18 SOURCE =MASTER
BASKER_2_MASTER MASTER:1: DEVIATION SRVY 18 SOURCE =MASTER [Note: surveys with a SOURCE of MASTER should usually be just a copy of one of the original surveys run in the well. The MASTER survey is used by the database to display/calculate well paths etc]
BASKER_2_MASTER MASTER:1: DEVIATION SRVY 20 REMARK =Data Source PE911503 page 112, 113 and 114. 106 Points.
BASKER_2_MASTER MASTER:1: DEVIATION SRVY 21 POINT COUNT = 106
BASKER_2_MASTER MASTER:2: DEVIATION SRVY STATION_MD INCLINATION AZIMUTH STATION_ID STATION_TVD X_OFFSET Y_OFFSET VERTICAL_SECTION NS_DIRECTION EW_DIRECTION DOG_LEG_SEVERITY REMARK
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 0000 .0 0 0 0 0 0 N E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 0176 176.0 0 0 176 0 0 N E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 0225 224.6 .19 161.03 224.63991 .03 .08 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 0282 282.3 .07 139.65 282.38975 .08 .19 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 0311 311.2 .09 116.77 311.28973 .11 .22 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 0340 340.1 .1 73.76 340.12969 .16 .22 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 0369 368.9 .06 116.98 368.97966 .19 .22 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 0398 397.8 .09 163.12 397.81964 .21 .25 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 0427 426.6 .04 150.94 426.63962 .23 .28 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 0455 455.2 .09 138.56 455.2696 .25 .3 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 0512 512.4 .09 115.62 512.44953 .32 .36 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 0541 541.0 .09 127.28 541.0395 .35 .38 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 0570 569.5 .09 149.55 569.56947 .38 .41 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 0598 598.1 .1 130.15 598.14943 .41 .45 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 0627 626.6 .07 122.82 626.6794 .45 .48 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 0655 655.3 .07 93.47 655.38937 .48 .49 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 0684 684.1 .09 75.67 684.10935 .52 .48 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 0713 713.0 .07 46.86 713.00932 .55 .46 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 0742 741.7 .09 14.62 741.77929 .57 .43 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 0771 770.7 .11 35.1 770.72925 .59 .38 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 0799 799.4 .1 46.21 799.4692 .63 .34 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 0828 828.1 .07 89.32 828.15917 .66 .33 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 0857 856.7 .07 42.39 856.71915 .69 .31 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 0885 885.2 0 253.43 885.22915 .7 .3 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 0914 913.6 .06 324.63 913.65914 .7 .29 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 0971 970.7 .04 321.6 970.76912 .67 .25 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 0990 990.3 .1 275.8 990.29911 .64 .24 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1000 1000.1 .1 305.57 1000.09909 .63 .24 S E Correct Inclination is 0.102 whereas it was entered 0.10.
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1008 1007.5 .12 323.98 1007.57908 .62 .23 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1036 1036.2 .17 300.46 1036.28899 .56 .18 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1065 1065.4 .17 5.05 1065.39888 .53 .12 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1094 1093.9 .22 331.06 1093.89873 .51 .03 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1123 1122.8 .14 342.26 1122.81858 .47 .06 N E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1152 1151.7 .31 334.26 1151.69835 .43 .16 N E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1180 1180.4 .25 318.65 1180.47801 .35 .28 N E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1209 1209.2 .31 340.89 1209.25767 .28 .4 N E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1238 1237.9 .31 337.82 1237.93725 .23 .54 N E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1295 1294.9 .41 316.37 1294.95615 .03 .83 N E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1323 1323.3 .41 317.99 1323.32542 .11 .98 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1352 1351.7 .5 308.15 1351.77452 .27 1.14 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1380 1380.2 .45 323.73 1380.28355 .44 1.3 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1409 1408.9 .56 313.66 1408.91244 .61 1.49 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1466 1466.4 .57 319.33 1466.42965 1 1.9 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1495 1495.4 .53 333.19 1495.43833 1.15 2.13 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1525 1524.5 .62 322.85 1524.50687 1.31 2.38 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1554 1553.7 .62 337.42 1553.73518 1.46 2.65 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1583 1582.7 .61 335.79 1582.68351 1.58 2.93 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1612 1611.6 .79 336.96 1611.62134 1.73 3.26 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1640 1640.3 .88 343.27 1640.2783 1.87 3.65 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1727 1727.4 1.05 341.55 1727.38591 2.31 5.05 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1754 1753.7 1.25 345.4 1753.7106 2.46 5.55 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1782 1782.0 1.31 348.87 1782.01354 2.6 6.17 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1811 1810.7 1.32 342.05 1810.676 2.77 6.81 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1840 1839.5 1.16 347.31 1839.44926 2.93 7.41 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1868 1868.4 1.33 345.6 1868.33243 3.08 8.02 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1898 1897.6 1.53 346.99 1897.52333 3.25 8.72 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1927 1926.7 1.66 346.26 1926.64203 3.44 9.51 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1956 1955.7 1.49 331.53 1955.6012 3.72 10.25 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 1984 1984.1 1.39 329.83 1984.02222 4.07 10.87 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2013 2012.5 1.45 328.82 2012.44348 4.43 11.48 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2041 2040.9 1.49 334.37 2040.83415 4.77 12.12 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2069 2069.4 1.39 333.91 2069.33514 5.09 12.77 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2185 2184.5 1.56 330.85 2184.41698 6.46 15.39 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2214 2213.5 1.69 337.47 2213.36535 6.82 16.13 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2242 2242.3 1.79 336.87 2242.15207 7.16 16.93 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2271 2271.0 1.8 337.68 2270.86797 7.51 17.76 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2300 2299.8 1.92 339.68 2299.57283 7.84 18.63 N W Correct Azimuth is 339.68 whereas it was entered 339.76.
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2328 2328.3 1.98 339.76 2328.06632 8.18 19.54 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2356 2356.3 1.99 341.4 2356.12948 8.5 20.46 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2385 2384.8 2.01 340.79 2384.56214 8.83 21.4 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2414 2413.6 2.13 341.03 2413.34335 9.17 22.38 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2443 2442.7 2.02 337.08 2442.39429 9.54 23.36 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2472 2472.2 2.07 337.28 2471.8855 9.95 24.33 N W Correct Azimuth is 337.28 whreas it was entered 338.28.
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2499 2499.0 2.11 341.02 2498.69766 10.3 25.25 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2528 2527.6 1.24 320.72 2527.32539 10.66 25.99 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2557 2557.3 .87 264.89 2556.97102 11.09 26.21 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2585 2585.2 1.48 194.31 2584.83624 11.39 25.85 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2612 2612.4 3.62 191.42 2612.0477 11.65 24.66 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2643 2643.4 6.45 190.09 2642.88511 12.15 21.99 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2671 2671.3 7.27 185.29 2670.63501 12.59 18.69 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2700 2700.4 9.3 184.65 2699.41991 12.95 14.51 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2729 2728.7 10.88 181.9 2727.24212 13.22 9.57 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2758 2757.9 13.9 178.27 2755.74941 13.2 3.31 N W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2786 2786.3 15.37 180.97 2783.30494 13.17 3.88 S W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2815 2814.7 16.98 182.03 2810.55109 13.38 11.78 S W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2844 2844.3 19.56 181.05 2838.62815 13.62 21.05 S W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2872 2872.3 24.39 182.4 2864.64198 13.95 31.54 S W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2901 2901.4 28.38 180.27 2890.67903 14.23 44.45 S W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2931 2930.7 28.88 180.28 2916.36139 14.3 58.47 S W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2945 2944.9 29.21 180.44 2928.76682 14.34 65.36 S W Correct Azimuth is 180.442 whereas it was entered as 180.44.
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 2981 2981.0 30.08 180.84 2960.18476 14.54 83.24 S W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 3010 3009.8 29.88 179.84 2985.14879 14.63 97.64 S W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 3038 3038.4 29.08 178.87 3010.03711 14.47 111.71 S W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 3067 3066.6 28.66 178.39 3034.71481 14.15 125.31 S W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 3095 3095.2 28.69 178.54 3059.84227 13.78 139.05 S W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 3124 3123.9 28.01 177.16 3085.10022 13.27 152.67 S W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 3153 3153.2 27.87 176.17 3110.92327 12.47 166.34 S W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 3182 3181.8 27.45 174.86 3136.26384 11.44 179.58 S W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 3210 3210.1 26.65 173.92 3161.48583 10.18 192.4 S W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 3217 3216.8 26.57 173.55 3167.50296 9.85 195.39 S W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 3239 3238.5 26.31 172.34 3186.90643 8.67 204.97 S W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 3268 3267.8 25.94 171.77 3213.18607 6.88 217.73 S W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 3308 3307.7 26.06 170.42 3249.05726 4.18 235.02 S W
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 3365 3364.8 25.94 170.2 3300.36941 .04 259.69 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 3401 3401.2 25.96 170.31 3333.10842 2.73 275.39 S E
BASKER_2_MASTER MASTER:3: DEVIATION SRVY 3414 3414.0 25.96 170.31 3344.59892 3.68 280.9 S E
PPDM_AUDIT_HISTORY: WELL_NAME=HISTWELL200004738944