Earth Resources Policy and Programs : dbMap DATABASE DUMP
MEGASCOLIDES2
*** MEGASCOLIDES2 ***
megascolides2 000 LINKS HYPERLINKAGESGIPPSLAND_OFFSHORE_EXPLO_WELLSGIPPSLAND_OFFSHORE_DEVEL_WELLS
LINKS HYPERLINKAGESGIPPSLAND_WELLSGIPPSLAND_ON_SHORE_WELLSGIPPSLAND_OFFSHORE_WELLS
Geoscience Australia may also have other information: (see the GA Well Summary page for the well with this ENO (436130):
Geoscience Australia may also have other information: (see the GA well search page: http://dbforms.ga.gov.au/www/npm.well.search ) *** ENO=436130 -- MEGASCOLIDES 2
HDR WELL_NAME = MEGASCOLIDES-2
HDR DATE 1: SPUD_DATE = 04-JAN-07
HDR DATE 3: RIG_RELEASE_DATE = 01-FEB-07
HDR DATE 4: DB_ENTRY_BY = EF03_SW (database header data entry)
HDR DATE 4: DB_ENTRY_DATE = 15-FEB-07 (database header data entry date)
HDR DATE 5: DB_ROW_UPDATER = RH16_TW (database header data entry last updated by)
HDR DATE 5: DB_ROW_UPDATE_DATE = 29-DEC-08 (database header data entry last update date)
HDR DATE 6: THEORETICAL OPENFILE BASIC DATE= 01-FEB-09
HDR DATE 6: THEORETICAL OPENFILE INTERPRETIVE DATE= 02-FEB-12 (ONLY IF GAZETTED)
HDR DEVIATION_IND = N (i.e. has this hole been deviated?)
HDR LOC: BASIN DESCRIPTION= Gippsland Basin
HDR LOC: BASIN_CODE = GIPPSLAND
HDR LOC: COUNTRY = AUSTRALIA
HDR LOC: FIELD_NAME = UNKNOWN FIELD
HDR LOC: ONSHORE_IND = Y
HDR LOC: PROVINCE_STATE = VIC
HDR LOC: TITLE_NAME = PEP 162
HDR LOC: TITLE_NAME: SDO: CURRENT TITLE (Current as at 23-FEB-12) BY LOCATION: ENCLOSING MEGASCOLIDES-2 : TITLE_NAME=GEP11
HDR OPERATOR = KAROON GAS PTY LTD
HDR PLATFORM_IND = N (i.e. is this hole off a platform?)
HDR SIDETRACK_IND = N (i.e. is this hole a sidetrack?)
HDR DPH GREATEST OF DEPTHS = 2132.9
HDR DPH: DRILL_TD = 2130
HDR DPH: DRILL_TD = DRILLERS TOTAL DEPTH: Total or maximum depth of the well as reported by the operator/driller (PPDM definition).
HDR DPH: FINAL_TD = 2130
HDR DPH: FINAL_TD = FINAL TOTAL DEPTH: The actual measurement along the well path from the reference datum to the bottom of the well (PPDM definition).
HDR DPH: LOG_TD = 2132.9
HDR DPH: LOG_TD = LOGGERS TOTAL DEPTH: Total or maximum depth of the well as measured by the logging tool and reported by the logger/logging service (PPDM definition).
HDR DPH: MAX_TVD = 2124.99
HDR DPH: MAX_TVD = MAXIMUM TRUE VERTICAL DEPTH: The maximum true vertical depth from the surface datum reference to the final total depth or deepest point, measured on a straight line (PPDM definition).
HDR ELEV: DEPTH_DATUM = RT
HDR ELEV: DEPTH_DATUM LONGNM= Rotary Table
HDR ELEV: DEPTH_DATUM_ELEV = 156.2
HDR ELEV: ELEVATION_REF = RT
HDR ELEV: ELEVATION_REF LN = Rotary Table
HDR ELEV: GROUND_ELEV = 151
HDR ELEV: REF_ELEV = 156.2
HDR ELEV: RT_ELEV = 156.2
HDR STORAGE_UNIT = Metres
HDR CURRENT_CLASS = E_APPRAISAL
HDR CURRENT_CLASS LONG_NAME = Exploration Appraisal well
HDR CURRENT_STATUS = SUS
HDR CURRENT_STATUS LONG_NAME= Suspended
HDR INITIAL_CLASS = E_APPRAISAL
HDR INITIAL_CLASS LONG_NAME = Exploration Appraisal well
HDR PLOT SYMBOL DESCRIPTION = --- OIL WELL STRONG GAS SHOW
HDR PLOT_SYMBOL = 137
WELL_ALIAS BOREHOLE_NAME = WARRAGUL-20002 : [WELL_BORE] WELL_BORE: the BOREHOLE and BORE NUMBER of the well
WELL_ALIAS BOREHOLE_SITE_ID=SIT959636 : equivalent BOREHOLE_NAME=WARRAGUL 20002
WELL_ALIAS PLOT_NAME= MEGASCOLIDES-2
WELL_ALIAS UWI= 200006781884
WELL_ALIAS WELL_NAME= 436130 : [WELL_PEDIN_E] WELL_PEDIN_ENO Geoscience Australia ENO
WELL_ALIAS WELL_NAME= 959636 : [WELL_SITE_ID] WELL_SITE_ID -- GEDIS Boreholes Database SITE ID
WELL_ALIAS WELL_NAME= MEGASCOLIDES-2 : [WELL_GENERIC] WELL_GENERIC -- a generic wellname
WELL_ALIAS WELL_NAME= W1416 : [WELL_BOX_NO] WELL_BOX_NO: the W Number (Well Box No) of the well
NODE_COORD BOTTOM HOLE LAT & LONG = -38.233952 145.894208
NODE_COORD SURFACE LAT & LONG = -38.2339522 145.8942083
NODE_COORD DATUM = COORD_SYSTEM_ID=218 GEODETIC_DATUM_ID=4283
ASSETS (BRIEF) DATA_TYPE DATA_SUB_TYPE BARCODE ITEM_NAME [MEDIA_TYPE] SCANNED_OR_DIGITAL_FILES
ASSETS (BRIEF) GENERAL DATA_CD_DVD PE911565 MEGASCOLIDES-1 RE ST1 & -2 WCR Volume 3 [CD] 2008 PE911565__((_MEGASCOLIDES-1_RE_ST1___-2_WCR_VOLUME_3_))_.TAR.GZ(34.6m).........PE911565__((_MEGASCOLIDES-1_RE_ST1___-2_WCR_VOLUME_3_))_.TAR.GZ(34.6m).........SAM2_305_PE911565__((_MEGASCOLIDES-1_RE_ST1___-2_WCR_VOLUME_3_))_I_MEDIA_LABELLING.JPG(3.0m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) GENERAL ESUBS_CD_DVD PE911536 DDRs, Well & Permit Data 2005 to 2007 [DVD] 2007 (3259 DIGITAL FILES) in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) SEISMIC VELOCITY PE501011 MEGASCOLIDES-2 Velocity Survey Report [CD] 2007 PE501011__((_MEGASCOLIDES-2_VELOCITY_SURVEY_REPORT_))_.TAR.GZ(0.9m).........KAROON_MEGASCOLIDES2.PDF(0.9m).........SAM0_794_PE501011__((_MEGASCOLIDES-2_VELOCITY_SURVEY_REPORT_))__MEDIA_LABELLING.JPG(3.0m).........DATA_KAROON_MEGASCOLIDES.XLS(0.1m).........PE501011__((_MEGASCOLIDES-2_VELOCITY_SURVEY_REPORT_))__FILES_LISTING.TXT(0.0m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) WELL APPLICATION_RPT PE907825 MEGASCOLIDES-2 Well Approval Docs [CD] 2006 PE907825__((_MEGASCOLIDES-2_WELL_APPROVAL_DOCS_))_.TAR.GZ(7.0m).........SAM1_590_PE907825__((_MEGASCOLIDES-2_WELL_APPROVAL_DOCS_))__MEDIA_LABELLING.JPG(2.9m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) WELL DAILY_RPT PE909735 MEGASCOLIDES-1 RE ST1 & -2 Daily Reports [CD] 2006 (165 DIGITAL FILES) in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) WELL DAILY_RPT PE909789 MEGASCOLIDES-2 Daily Reports [CD] 2006 (34 DIGITAL FILES) in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) WELL DATA_CD_DVD PE915098 Well Data - Electronic Submissions 2008 [DVD] 2008 (2291 DIGITAL FILES) in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) WELL LOG_TAPE_OR_DISK PE913233 MEGASCOLIDES-2 Wireline Logs [CD] 2007 PE913233__((_MEGASCOLIDES-2_WIRELINE_LOGS_))_.TAR.GZ(218.9m).........SAM3_281_PE913233__((_MEGASCOLIDES-2_WIRELINE_LOGS_))_I_MEDIA_LABELLING.JPG(2.6m).........PE913233__((_MEGASCOLIDES-2_WIRELINE_LOGS_))__FILES_LISTING.TXT(0.0m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) WELL WCR_RPT PE610413 MEGASCOLIDES-1 RE ST1 & -2 WCR Vol.3 [CD] 2008 (8 DIGITAL FILES) in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) WELL WCR_RPT PE913052 MEGASCOLIDES-1 RE ST1 & -2 Interp WCR [CD] 2008 (15 DIGITAL FILES) in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) WELL WCR_RPT PE913232 MEGASCOLIDES-2 WCR Basic Geology [CD] 2007 (18 DIGITAL FILES) in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) WELL APPLICATION_RPT PE907825_1 MEGASCOLIDES-2 Drilling Program [CD] 2006 PE907825__((_MEGASCOLIDES-2_WELL_APPROVAL_DOCS_))_.TAR.GZ(7.0m).........SAM1_590_PE907825__((_MEGASCOLIDES-2_WELL_APPROVAL_DOCS_))__MEDIA_LABELLING.JPG(2.9m)......... in: CD MEGASCOLIDES-2 Well Approval Docs
ASSETS (BRIEF) WELL BIOSTRAT_RPT PE913052_3 MEGASCOLIDES-1&2 Biostrat, 2007 [CD] 2007 (15 DIGITAL FILES) in: CD MEGASCOLIDES-1 RE ST1 + -2 Interp WCR
ASSETS (BRIEF) WELL DAILY_RPT PE911536_5 Daily Drilling, Geol, Workover, Mud Rpts [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007
ASSETS (BRIEF) WELL DIRECTIONAL PE913232_009MEGASCOLIDES-2 Deviation Survey Data [CD] 2007 (18 DIGITAL FILES) in: WCR_RPT MEGASCOLIDES-2 WCR Basic Geology
ASSETS (BRIEF) WELL DRILL_RPT PE911536_9 Drilling Data, Logs, TD Curves & Reports [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007
ASSETS (BRIEF) WELL DRILL_RPT PE911565_4 MEGASCOLIDES-2 Drilling Fluid SummaryRpt [CD] 2007 PE911565__((_MEGASCOLIDES-1_RE_ST1___-2_WCR_VOLUME_3_))_.TAR.GZ(34.6m).........PE911565__((_MEGASCOLIDES-1_RE_ST1___-2_WCR_VOLUME_3_))_.TAR.GZ(34.6m).........SAM2_305_PE911565__((_MEGASCOLIDES-1_RE_ST1___-2_WCR_VOLUME_3_))_I_MEDIA_LABELLING.JPG(3.0m)......... in: CD MEGASCOLIDES-1 RE ST1 & -2 WCR Vol.3
ASSETS (BRIEF) WELL DRILL_RPT PE915098_08 Well Drill Repts, Logs & T-D Curves 2008 [CD] 2008 (2291 DIGITAL FILES) in: DVD Well Data - Electronic Submissions 2008
ASSETS (BRIEF) WELL ELEMENTARY PE915098_13 Well Elementary WCR, FWR, EOW Data 2008 [CD] 2008 (2291 DIGITAL FILES) in: DVD Well Data - Electronic Submissions 2008
ASSETS (BRIEF) WELL GEOL_RPT PE907825_2 MEGASCOLIDES-2 Geological Well File [CD] 2006 PE907825__((_MEGASCOLIDES-2_WELL_APPROVAL_DOCS_))_.TAR.GZ(7.0m).........SAM1_590_PE907825__((_MEGASCOLIDES-2_WELL_APPROVAL_DOCS_))__MEDIA_LABELLING.JPG(2.9m)......... in: CD MEGASCOLIDES-2 Well Approval Docs
ASSETS (BRIEF) WELL LITHOLOGY_LOG PE911536_7 Lithology Logs and Cuttings Descriptions [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007
ASSETS (BRIEF) WELL MUD_LOG PE911536_6 Mudlogs [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007
ASSETS (BRIEF) WELL PETROPHYSICAL_RPT PE913052_4 MEGASCOLIDES-2 Composite log [CD] 2008 (15 DIGITAL FILES) in: CD MEGASCOLIDES-1 RE ST1 + -2 Interp WCR
ASSETS (BRIEF) WELL RPT PE911536_13 Abandonment Programs, P&A Approvals [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007
ASSETS (BRIEF) WELL WCR_RPT PE911565_3 MEGASCOLIDES-2 WCR Vol.3: Drill Data Rpt [CD] 2008 PE911565__((_MEGASCOLIDES-1_RE_ST1___-2_WCR_VOLUME_3_))_.TAR.GZ(34.6m).........PE911565__((_MEGASCOLIDES-1_RE_ST1___-2_WCR_VOLUME_3_))_.TAR.GZ(34.6m).........SAM2_305_PE911565__((_MEGASCOLIDES-1_RE_ST1___-2_WCR_VOLUME_3_))_I_MEDIA_LABELLING.JPG(3.0m)......... in: CD MEGASCOLIDES-1 RE ST1 & -2 WCR Vol.3
ASSETS (BRIEF) WELL WCR_RPT PE913052_2 MEGASCOLIDES-2 WCR interpretive [CD] 2007 (15 DIGITAL FILES) in: CD MEGASCOLIDES-1 RE ST1 + -2 Interp WCR
ASSETS (BRIEF) WELL WELL_LOG PE911536_14 Well Log Images [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007
ASSETS (BRIEF) GENERAL REGISTRY_FILE F7715555 PE/16/0542 (Part-1) Registry File [PAPER] 2006 in:[ADMIN] SEE RECFIND DATABASE
LINKS HYPERLINKAGESCOPYRIGHT_DISCLAIMERABOUT_DBMAPHOW_TO_GET_OR_SUBMIT_DATA This data has been dumped from Victorian Govt (http://www.dpi.vic.gov.au) dbMap database on 23-FEB-12
ASSETS *** ALSO: Search the Geoscience Australia database for other information: (see http://dbforms.ga.gov.au/www/npm.well.search ) *** ENO=436130 MEGASCOLIDES-2
CORE/CUTTINGS Megascolides 2 Cutts : SAMPLE_TYPE=CUTT 00020 DEPTH_RANGE= 20.000 TO 2130.000M STORAGE_BAY=241 ROW=S TO T #TRAYS=23 [ <--this shows the actual cores and cuttings that DPI has stored in the DPI Werribee core shed ]
CORE/CUTTINGS Megascolides 2 Cutts : SAMPLE_TYPE=CUTT 01925 DEPTH_RANGE= 1925.000 TO 2130.000M STORAGE_BAY=241 ROW=X TO X #TRAYS=1 [ <--this shows the actual cores and cuttings that DPI has stored in the DPI Werribee core shed ]
ASSET Counts Summary: GENERAL DATA_CD_DVD [CD] 1
ASSET Counts Summary: GENERAL ESUBS_CD_DVD [DVD] 1
ASSET Counts Summary: GENERAL REGISTRY_FILE [PAPER] 1
ASSET Counts Summary: SEISMIC VELOCITY [CD] 1
ASSET Counts Summary: WELL APPLICATION_RPT [CD] 2
ASSET Counts Summary: WELL BIOSTRAT_RPT [CD] 1
ASSET Counts Summary: WELL DAILY_RPT [CD] 2
ASSET Counts Summary: WELL DAILY_RPT [DVD] 1
ASSET Counts Summary: WELL DATA_CD_DVD [DVD] 1
ASSET Counts Summary: WELL DIRECTIONAL [CD] 1
ASSET Counts Summary: WELL DRILL_RPT [CD] 2
ASSET Counts Summary: WELL DRILL_RPT [DVD] 1
ASSET Counts Summary: WELL ELEMENTARY [CD] 1
ASSET Counts Summary: WELL GEOL_RPT [CD] 1
ASSET Counts Summary: WELL LITHOLOGY_LOG [DVD] 1
ASSET Counts Summary: WELL LOG_TAPE_OR_DISK [CD] 1
ASSET Counts Summary: WELL MUD_LOG [DVD] 1
ASSET Counts Summary: WELL PETROPHYSICAL_RPT [CD] 1
ASSET Counts Summary: WELL RPT [DVD] 1
ASSET Counts Summary: WELL WCR_RPT [CD] 5
ASSET Counts Summary: WELL WELL_LOG [DVD] 1
A WELL_SHOWS:TOP_DEPTH BASE_DEPTH TOP_FORM BASE_FORM SHOW_TYPE SHOW_SYMBOL SHOW_OBS_NO SAMPLE_TYPE LITHOLOGY_DESC REMARK SOURCE
B WELL_SHOWS: 670 685 STRZELECKI GROUP STRZELECKI GROUP CORE_L0_MF 0 1 W_CUTTINGS the calcite fracture infill material has 10% mod bright patchy light yellow fluorescence giving weak dull yellow white crush cut, trace residue. From WCR PE913232 pg.14 [From:WCR]
B WELL_SHOWS: 820 1884 STRZELECKI GROUP STRZELECKI GROUP INTP_G2_UGZ 0 14 The total gas ranged from 0.020% to 0.630% with and averaged of 0.02%. From WCR PE913232 pg.14 [From:WCR]
B WELL_SHOWS: 930 935 STRZELECKI GROUP STRZELECKI GROUP CORE_L0_MF 0 2 W_CUTTINGS the calcite fracture infill material has trace moderately bright patchy light yellow fluorescence, weak dull white crush cut, trace residue From WCR PE913232 pg.14 [From:WCR]
B WELL_SHOWS: 1160 1180 STRZELECKI GROUP STRZELECKI GROUP CORE_L0_MF 0 3 W_CUTTINGS the calcite fracture infill material has 5% moderately bright-bright patchy light yellow-white fluorescence, weak dull milky white crush cut, trace residue. From WCR PE913232 pg.14 [From:WCR]
B WELL_SHOWS: 1240 1270 STRZELECKI GROUP STRZELECKI GROUP CORE_L0_MF 0 4 W_CUTTINGS the calcite fracture infill has 5-10% moderately bright-bright patchy pale yellow fluorescence giving a weak dull yellow white crush cut, trace residue. From WCR PE913232 pg.14 [From:WCR]
B WELL_SHOWS: 1280 1290 STRZELECKI GROUP STRZELECKI GROUP CORE_L0_MF 0 5 W_CUTTINGS the calcite fracture infill has trace moderately bright - bright patchy pale yellow fluorescence giving a weak dull yellow white crush cut, thin ring residue, trace medium dark brown oil staining. From WCR PE913232 pg.14 [From:WCR]
B WELL_SHOWS: 1300 1305 STRZELECKI GROUP STRZELECKI GROUP CORE_L0_MF 0 6 W_CUTTINGS the calcite fracture infill has trace moderately bright - bright patchy pale yellow fluorescence giving a weak dull yellow white crush cut, thin ring residue, trace medium dark brown oil staining. From WCR PE913232 pg.14 [From:WCR]
B WELL_SHOWS: 1310 1330 STRZELECKI GROUP STRZELECKI GROUP CORE_L0_MF 0 7 W_CUTTINGS the calcite fracture infill has 10-20% moderately bright - bright patchy pale yellow fluorescence giving a weak dull yellow white crush cut, thin ring residue, trace medium dark brown oil staining. From WCR PE913232 pg.14 [From:WCR]
B WELL_SHOWS: 1335 1340 STRZELECKI GROUP STRZELECKI GROUP CORE_L0_MF 0 8 W_CUTTINGS the calcite fracture infill has 10-20% moderately bright - bright patchy pale yellow fluorescence giving a weak dull yellow white crush cut, thin ring residue, trace medium dark brown oil staining. From WCR PE913232 pg.14 [From:WCR]
B WELL_SHOWS: 1370 1375 STRZELECKI GROUP STRZELECKI GROUP CORE_L0_MF 0 9 W_CUTTINGS The calcite fracture infill has 5% moderately bright �bright patchy pale yellow fluorescence giving a weak dull yellow white crush cut, trace residue. From WCR PE913232 pg.14 [From:WCR]
B WELL_SHOWS: 1470 1485 STRZELECKI GROUP STRZELECKI GROUP CORE_L0_MF 0 10 W_CUTTINGS The calcite fracture infill has trace to 5% moderately bright �bright patchy pale yellow fluorescence giving a weak dull yellow white crush cut, trace residue. From WCR PE913232 pg.14 [From:WCR]
B WELL_SHOWS: 1490 1505 STRZELECKI GROUP STRZELECKI GROUP CORE_L0_MF 0 11 W_CUTTINGS The calcite fracture infill has trace to 5% moderately bright �bright patchy pale yellow fluorescence giving a weak dull yellow white crush cut, trace residue. From WCR PE913232 pg.14 [From:WCR]
B WELL_SHOWS: 1620 1630 STRZELECKI GROUP STRZELECKI GROUP CORE_L0_MF 0 12 W_CUTTINGS the white crystallyn calcite fracture infill (tr-5% of total sample) has 50%-80% bright patchy very pale yellow white fluorescence giving strong bright milky crush cut, thick rare yellow white fluorescence. From WCR PE913232 pg.14 [From:WCR]
B WELL_SHOWS: 1830 1855 STRZELECKI GROUP STRZELECKI GROUP CORE_L0_MF 0 13 W_CUTTINGS The calcite fracture infill has trace to 20% moderately bright �bright patchy pale yellow fluorescence giving a weak dull yellow white crush cut, trace residue. From WCR PE913232 pg.14 [From:WCR]
B WELL_SHOWS: 1884 2060 STRZELECKI GROUP VOLCANICS INTP_G2_UGZ 0 15 Duck Bay Volcanics - BASE The total gas ranged from 0.01% to 0.365% with and averaged of 0.004%. From WCR PE913232 pg.15 [From:WCR]
B WELL_SHOWS: 2060 2065 VOLCANICS VOLCANICS CORE_L0_MF 0 14 W_CUTTINGS Duck Bay Volcanics The Marble(?) has trace dull - rare moderately bright patchy pale yellow white fluorescence giving a very weak milky white crush cut, trace residue. From WCR PE913232 pg.14 [From:WCR]
B WELL_SHOWS: 2060 2130 VOLCANICS VOLCANICS INTP_G2_UGZ 0 16 Duck Bay Volcanics The total gas recorded 0.01% to 0.98% with and averaged of 0.03%. From WCR PE913232 pg.15 [From:WCR]
A WELL_DRILL_HISTORY: DRILL_OBS_NO DRILL_DATE DEPTH DEPTH_TVD HOLE_IND MUD_WT REMARK source
B WELL_DRILL_HISTORY:001 29-DEC-06 1850.0 9999.99 Rig down & prepare for rig move to Megascolides 2 Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 255,585 Cum. Cost: $ 255,585 Operations For Period 0000 Hrs to 2400 Hrs on 29 Dec 2006 Phse Cls Op From To Hrs Depth Activity Description RM P RRD 1600 2400 8.00 0m Rig down & prepare for rig mover Operations For Period 0000 Hrs to 0600 Hrs on 30 Dec 2006 Phse Cls Op From To Hrs Depth Activity Description RM P RRD 0000 0600 6.00 0m Rig Down & prepare for rig mover Summary Company Pax On Karoon Gas Ltd 2 Century Drilling Ltd 19 RMN Drilling Fluids 1 BHI 2 Eurest 2 Total on Rig 26 karoongas... karoongas... DAILY DRILLING REPORT # 1 'Copyright IDS 2006', AT 20060818, KAROONGAS_AU_drllg Page 1 Printed on 29 Dec 2006 [FILE:/061229 Megascolides 2 Drilling R01 [From:WELL_DAILY]
B WELL_DRILL_HISTORY:002 30-DEC-06 1850.0 9999.99 Rig down & rig move Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 21,065 Cum. Cost: $ 276,650 Operations For Period 0000 Hrs to 2400 Hrs on 30 Dec 2006 Phse Cls Op From To Hrs Depth Activity Description RM P RRD 0000 0600 6.00 0m Rig Down & prepare for rig mover RM P RM 0600 2000 14.00 0m Load out & rig move from Megascolides # 1 to Megascolides # 2 50 % moved 0 % rigged up RM P RRD 2000 2400 4.00 0m Wait on Daylight Operations For Period 0000 Hrs to 0600 Hrs on 31 Dec 2006 Phse Cls Op From To Hrs Depth Activity Description RM P RRD 0000 0600 6.00 0m Wait on Day light Summary Company Pax On Karoon Gas Ltd 2 Century Drilling Ltd 19 RMN Drilling Fluids 1 BHI 2 Eurest 2 Total on Rig 26 karoongas... karoongas... DAILY DRILLING REPORT # 2 'Copyright IDS 2006', AT 20060818, KAROONGAS_AU_drllg Page 1 Printed on 31 Dec 2006 [FILE:/061229 Megascolides 2 Drilling R02 [From:WELL_DAILY]
B WELL_DRILL_HISTORY:003 31-DEC-06 1850.0 9999.99 wait on day light,rig move,rig up on Mega # 2 Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 21,065 Cum. Cost: $ 297,715 Operations For Period 0000 Hrs to 2400 Hrs on 31 Dec 2006 Phse Cls Op From To Hrs Depth Activity Description RM P RRD 0000 0600 6.00 0m Wait on Day light RM P RU 0600 1800 12.00 0m Rig move from Megascolides # 1 to Megascolides # 2 (90% moved; 40% rigged up). RM P RU 1800 2400 6.00 0m Wait on Day light Operations For Period 0000 Hrs to 0600 Hrs on 01 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description RM P RU 0000 0600 6.00 0m Wait on Day light Summary Company Pax On Karoon Gas Ltd 2 Century Drilling Ltd 19 RMN Drilling Fluids 1 BHI 2 Eurest 2 Total on Rig 26 karoongas... karoongas... DAILY DRILLING REPORT # 3 'Copyright IDS 2006', AT 20060818, KAROONGAS_AU_drllg Page 1 Printed on 01 Jan 2007 [FILE:/061229 Megascolides 2 Drilling R03 [From:WELL_DAILY]
B WELL_DRILL_HISTORY:100 01-JAN-07 1850.0 9999.99 Complete rig move,Rig up on Megascolides #2 Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 20,265 Cum. Cost: $ 317,980 Operations For Period 0000 Hrs to 2400 Hrs on 01 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description RM P RU 0000 0600 6.00 0m Wait on Day light RM P RU 0600 1800 12.00 0m Continue to rig up on Megascolides # 2 rig move 100% Rig up 70 % RM P RU 1800 2400 6.00 0m Wait on Crews to break tour Operations For Period 0000 Hrs to 0600 Hrs on 02 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description RM P RU 0000 0600 6.00 0m Continue to rig up on Megascolides # 2 Summary Company Pax On Karoon Gas Ltd 2 Century Drilling Ltd 19 RMN Drilling Fluids 1 BHI 2 Eurest 2 Total on Rig 26 karoongas... karoongas... DAILY DRILLING REPORT # 4 'Copyright IDS 2006', AT 20060818, KAROONGAS_AU_drllg Page 1 Printed on 02 Jan 2007 [FILE:/070101 Megascolides 2 Drilling R04 [From:WELL_DAILY]
B WELL_DRILL_HISTORY:100 02-JAN-07 1850.0 9999.99 Rig up on Megascolides # 2 Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 193,465 Cum. Cost: $ 511,445 Projected Cost: HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 02 Jan 2007 0 Days All personel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 02 Jan 2007 0 Days rigging up,forklift ops Operations For Period 0000 Hrs to 2400 Hrs on 02 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description RM P RU 0000 2400 24.00 0m Continue to rig up on Megascolides # 2 Operations For Period 0000 Hrs to 0600 Hrs on 03 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description RM P RU 0000 0100 1.00 0m Conduct Rig inspection,Derrick inspection,Upstream check list RM P RU 0100 0300 2.00 0m Rig up flow line & run survey line,adjust kelly hose & hydraulic lines RM P RU 0300 0330 0.50 0m Trouble shoot problem with Draw works sand line clutch ( unable to disengage ) RM P RU 0330 0600 2.50 0m unable to spud due to sand line drum bearing failure Summary Company Pax On Karoon Gas Ltd 2 Century Drilling Ltd 19 RMN Drilling Fluids 1 BHI 2 Eurest 2 Total on Rig 26 karoongas... karoongas... DAILY DRILLING REPORT # 5 'Copyright IDS 2006', AT 20070102, KAROONGAS_AU_drllg Page 1 Printed on 02 Jan 2007 [FILE:/070102 Megascolides 2 Drilling R05 [From:WELL_DAILY]
B WELL_DRILL_HISTORY:100 03-JAN-07 1850.0 9999.99 Repair Draw works Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 23,165 Cum. Cost: $ 534,610 Projected Cost: $ 2,839,256 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 02 Jan 2007 1 Day All personel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 02 Jan 2007 1 Day rigging up,forklift ops Operations For Period 0000 Hrs to 2400 Hrs on 03 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description RM P RU 0000 0100 1.00 0m Conduct Rig inspection,Derrick inspection,Upstream check list RM P RU 0100 0300 2.00 0m Rig up flow line & run survey line,adjust kelly hose & hydraulic lines RM P RU 0300 0330 0.50 0m Trouble shoot problem with Draw works sand line clutch ( unable to disengage ) RM P RU 0330 2400 20.50 0m Unable to spud due to sand line drum bearing failure,remove & replace Operations For Period 0000 Hrs to 0600 Hrs on 04 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description RM P RU 0000 0600 6.00 0m Continue to Repair Draw works Summary Company Pax On Karoon Gas Ltd 2 Century Drilling Ltd 19 RMN Drilling Fluids 1 BHI 2 Eurest 2 Total on Rig 26 karoongas... karoongas... DAILY DRILLING REPORT # 6 'Copyright IDS 2006', AT 20070102, KAROONGAS_AU_drllg Page 1 Printed on 04 Jan 2007 [FILE:/070103 Megascolides 2 Drilling R06 [From:WELL_DAILY]
B WELL_DRILL_HISTORY:100 04-JAN-07 1850.0 9999.99 Complete repairs to Draw works,Spud in Megacolides # 2, drill ahead with 12.25 " bit Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 56,985 Cum. Cost: $ 591,595 Projected Cost: $ 2,839,256 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 04 Jan 2007 0 Days All personel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 04 Jan 2007 0 Days rigging up,forklift ops,working on draw works,handling drill collars Operations For Period 0000 Hrs to 2400 Hrs on 04 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description RM P RU 0000 1400 14.00 16m Continue to Repair Draw works SH P DA 1400 1800 4.00 79m Spud in Megascolides # 2, Drill 12.25" hole from 16m to 79m SH P SVY 1800 1830 0.50 79m Circulate & run W.L.S @ 67 m ( 0 dg ) SH P DA 1830 2400 5.50 153m Drill ahead with 12.25" bit from 79 m to 153 m Operations For Period 0000 Hrs to 0600 Hrs on 05 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description SH P DA 0000 0200 2.00 178m Drill ahead with 12.25" bit from 153 m to 178 m SH P SVY 0200 0230 0.50 178m Circulate & run W.L.S @ 166 m = 1.25 dg SH P DA 0230 0530 3.00 216m Drill ahead with 12.25" bit from 178 m to 216 m SH P SVY 0530 0600 0.50 216m Circulate & run W.L.S @ 204 m = 1 dg WBM Data Daily Chemical Costs: $ 1679 Cost To Date: $ 1679 Engineer : Peter N Aronetz Mud Type: ! FluidReclaimed fm ME Sample From: Suction Tk Time: 23:10 Weight: 8.90ppg ECD TD: 9.56ppg ECD Shoe: Viscosity 46sec/qt KCl Equiv: 0% Flowline Temp: 35C� Nitrates: 0mg/l Sulphites: 0mg/l API FL: 17cm�/30m API Cake: 1/32nd" PV 8cp YP 13lb/100ft� Cl: 3.40x1000 mg/l Hard/Ca: 420mg/l MBT: 16 PM: 0.32 PF: 0.05 MF: 0.42 pH: 8.3 PHPA Excess: 0ppb Low Gravity Solids: ! 4% High Gravity Solids: ! 0% Solids (c... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:100 05-JAN-07 1850.0 9999.99 Drill 12 1/4" hole from 153m to 363m with WLS at 166m, 204m & 316m Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 72,364 Cum. Cost: $ 663,959 Projected Cost: $ 2,839,256 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 05 Jan 2007 0 Days All personel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 05 Jan 2007 0 Days Operating rig tongs & Drillin Operations For Period 0000 Hrs to 2400 Hrs on 05 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description SH P DA 0000 0200 2.00 178m Drill ahead with 12.25" bit from 153 m to 178 m SH P SVY 0200 0230 0.50 178m Circulate & run W.L.S @ 166 m = 1.25 dg SH P DA 0230 0530 3.00 216m Drill ahead with 12.25" bit from 178 m to 216 m SH P SVY 0530 0600 0.50 216m Circulate & run W.L.S @ 204 m = 1 dg SH P DA 0600 1830 12.50 328m Drill 12 1/4" hole from 216m to 328m SH P SVY 1830 1900 0.50 328m Circulate & run WLS @ 316 m = 1.5 deg SH P DA 1900 2400 5.00 363m Drill 12 1/4" hole from 328m to 363m Operations For Period 0000 Hrs to 0600 Hrs on 06 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description SH P DA 0000 0600 6.00 393m Drill 12 1/4" hole from 363m to 393m WBM Data Daily Chemical Costs: $ 239 Cost To Date: $ 1918 Engineer : Peter N Aronetz Mud Type: ! FluidReclaimed fm ME Sample From: Suction Tk Time: 22:55 Weight: 8.95ppg ECD TD: 9.01ppg ECD Shoe: Viscosity 40sec/qt KCl Equiv: 0% Flowline Temp: 51C� Nitrates: 0mg/l Sulphites: 0mg/l API FL: 22cm�/30m API Cake: 2/32nd" PV 7cp YP 12lb/100ft� Cl: 4.20x1000 mg/l Hard/Ca: 400mg/l MBT: 16 PM: 0.28 PF: 0 MF: 0.42 pH: 8 PHPA Excess: 0ppb Low Gravity Solids: ! 4.1% High Gravity Solids: ! 0.0% Solids (corrected): ! 4.1% H2O: 95.9% Oil: 0.0% Sand: 0.1 % Barite: 0 Gels 10s ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:100 06-JAN-07 1850.0 9999.99 Drill 12 1/4" hole from 363m to 487m with WLS at 419m Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 64,425 Cum. Cost: $ 728,384 Projected Cost: $ 2,839,256 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 06 Jan 2007 0 Days Personnel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 06 Jan 2007 0 Days General Housekeeping & Laying out Drill Collars Operations For Period 0000 Hrs to 2400 Hrs on 06 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description SH P DA 0000 0730 7.50 403m Drill 12 1/4" hole from 363m to 403m SH P RS 0730 0830 1.00 403m Rig Service & adjust mast over well centre SH P DA 0830 1330 5.00 431m Drill 12 1/4" hole from 403m to 431m SH P SVY 1330 1400 0.50 431m Circulate and Totco single shot WLS SH P DA 1400 2400 10.00 487m Drill 12 1/4" hole from 431m to 487m Operations For Period 0000 Hrs to 0600 Hrs on 07 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description SH P DA 0000 0600 6.00 510m Drill 12 1/4" hole from 487m to 510m WBM Data Daily Chemical Costs: $ 301 Cost To Date: $ 2219 Engineer : Peter N Aronetz Mud Type: ! FluidReclaimed fm ME Sample From: Suction Tk Time: 21:45 Weight: 9.10ppg ECD TD: 9.17ppg ECD Shoe: Viscosity 37sec/qt KCl Equiv: 0% Flowline Temp: 54C� Nitrates: 0mg/l Sulphites: 0mg/l API FL: 28cm�/30m API Cake: 3/32nd" PV 5cp YP 13lb/100ft� Cl: 4.40x1000 mg/l Hard/Ca: 680mg/l MBT: 18 PM: 0.15 PF: 0 MF: 0.52 pH: 8 PHPA Excess: 0ppb Low Gravity Solids: ! 5.1% High Gravity Solids: ! 0.0% Solids (corrected): ! 5.1% H2O: 94.9% Oil: 0.0% Sand: 0.1 % Barite: 0 Gels 10s 20 Gels 10m 22 Fann 003 12 Fann 006 13 Fann 100 15 Fann 200 16 Fann 300 18 Fann 600 23 Comment: Reclaim a further 150bbls of fluid from the sump... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:101 07-JAN-07 1850.0 9999.99 Drill 12 1/4" hole from 487m to 510m - Circulate clean & survey - Trip out to run casing - Rig up to run 9 5/8" casing - Make up shoe track & 2nd casing joint - Layout casing double & run 12 1/4" bit in hole to condition hole while waiting on equipment to run 9 5/8" casing Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 59,584 Cum. Cost: $ 787,968 Projected Cost: $ 2,839,256 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 07 Jan 2007 0 Days Personnel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 07 Jan 2007 0 Days Racking back drill collars on rig floor & Running casing Operations For Period 0000 Hrs to 2400 Hrs on 07 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description SH P DA 0000 0600 6.00 510m Drill 12 1/4" hole from 487m to 510m SH P CMD 0600 0700 1.00 510m Pump Hi-vis sweep, circulate clean, flow check & check for fill, spot heavy slug & drop survey SH P TO 0700 1200 5.00 510m Pull out of hole with 12 1/4" drilling assembly to run 9 5/8" casing - lay out 12 1/4" stabilizer (unable to service break) SH P HBHA 1200 1230 0.50 510m Lay out 2ea 8" drill collars SH P HT 1230 1300 0.50 510m Clean rig floor and remove excess equipment SH P RRC 1300 1600 3.00 510m Rig up to run 9 5/8" casing SH P CRN 1600 1730 1.50 510m Pick up shoe joint & test float - Install centralizer - Pick up float collar joint & make up to shoe joint with Halliburton Weld A ( Power tong malfunctioning & correct rotary tong jaw not on location) Casing stabbing board not functional SH TP (RE) RR 1730 1930 2.00 510m Work on casing power tong & source rotary tong jaws in Wacol Qld. SH TP (RE) RR 1930 2130 2.00 510m Lay out double joint of 9 5/8" casing & measure casing stabbing board for modification SH P HBHA 2130 2400 2.50 510m P... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:101 08-JAN-07 1850.0 9999.99 Wash to TD at 510m, Circulate to maintain hole condition while waiting on rig equipment to run 9 5/8" casing, Pull out of hole, Rig up & run 9 5/8" casing to 502m Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 135,785 Cum. Cost: $ 923,753 Projected Cost: $ 2,839,256 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 08 Jan 2007 0 Days Personnel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 08 Jan 2007 0 Days Running in drill pipe on the rig floor & Running casing Operations For Period 0000 Hrs to 2400 Hrs on 08 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description SH TP (RE) RW 0000 0030 0.50 510m Pick up 4 1/2" drill pipe & wash from 483m to 510m - no fill SH TP (RE) RR 0030 0900 8.50 510m Rotate & reciprocate drill string while circulating to maintain hole condition while waiting on rig equipment to run 9 5/8" casing - Work on modifiying casing stabbing board and installing flare & vent lines to flare pit SH TP (RE) RR 0900 1000 1.00 510m Flow check, pull one stand of drill pipe. Pick up, install & lay out casing stabbing board. Run in hole to 510m SH TP (RE) RR 1000 1230 2.50 510m Rotate & reciprocate drill string while circulating to maintain hole condition while waitnig on rig equipment to run 9 5/8" casing - inspect modified casing stabbing board SH TP (RE) RR 1230 1300 0.50 510m flow check, pump slug & rack kelly SH TP (RE) RR 1300 1500 2.00 510m Pull out of hole to run 9 5/8" casing SH TP (RE) RR 1500 1530 0.50 510m Break and lay out 12 1/4" bit, bit sub & crossover sub - clean floor of excess equipment SH TP (RE) RR 1530 1600 0.50 510m Rig up 9 5/8" casing running equipment SH TP (RE) RR 1600 1630 0.50 510m Pick up and run 9 5/8" casing double with float shoe and float collar SH TP (RE) RR 1630 1... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:101 09-JAN-07 1850.0 9999.99 Run & cement 9 5/8" casing, Conduct top up cement job, wait on cement, slack off casing, nipple up BOPs Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 74,385 Cum. Cost: $ 998,138 Projected Cost: $ 2,839,256 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 09 Jan 2007 0 Days Personnel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 09 Jan 2007 0 Days Cement 9 5/8" casing and Nipple up BOPs Operations For Period 0000 Hrs to 2400 Hrs on 09 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description SH P CRN 0000 0030 0.50 510m Pick up landing joint, attempt to install circulating swedge, change out circulating swedge, install circulating swedge and landing joint on casing SH P CRN 0030 0130 1.00 510m Run casing in hole to 507m, make up circulating hose, reciprocate and circulate casing twice hole volume. Cementing pre-job safety meeting SH P CRN 0130 0400 2.50 510m Break out circulating swedge and make up Halliburton cement head. Pump 15bbls fresh water spacer, pressure test surface lines to 300/2500psi. Mix pump & displace lead and tail cement slurries - no cement to surface and lost returns prior to bump plug with 2,500psi for 10 minutes - floats held SH P TUC 0400 0530 1.50 510m Rig up to, and cut window in conductor pipe SH P TUC 0530 0900 3.50 510m Make up cement stinger in conductor and conduct top up cement job - dump and clean shaker tank compartments SH P WOW 0900 1330 4.50 510m Wait on Cement - hook up BOP lines, prepare equipment to nipple up BOPs, Dump and clean mud tanks SH P RRD 1330 1400 0.50 510m Slack off on casing, lay out cement head and casing stabbing board SH P RRD 1400 1500 1.00 510m Break out and lay out casing landiing joint SH P RRD 1500 1530 0.50 510m Cut and layout conductor riser pipe SH ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:101 10-JAN-07 1850.0 9999.99 Pressure test BOP components - work on AOI & BHI PVT systems - dump & clean mud tanks, prepare mud to drill out Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 61,115 Cum. Cost: $ 1,059,253 Projected Cost: $ 2,839,256 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 10 Jan 2007 0 Days Personnel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 10 Jan 2007 0 Days Nipple up BOPs and Pressure Testing Operations For Period 0000 Hrs to 2400 Hrs on 10 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description SC P BOP 0000 1000 10.00 510m Pick up & make up test plug on 4 1/2" drill pipe - pressure test BOPs - Annular 300/2000psi 10/10min - Pipe Rams, Blind rams, 2ea Choke line valves, 2ea Kill Line valves & choke line to 300/2500psi 10/10min. - lay out drill pipe SC P BOP 1000 1200 2.00 510m Pick up pup joint and make up with 2ea FOSV, Kelly & test plug - Pressure test 2ea FOSV & Lower Kelly Cock 300/2500psi 10/10min. (Work on AOI PVT system) SC P BOP 1200 1530 3.50 510m Pressure test Upper Kelly Cock, 4" Standpipe valve, 2" Kill Line valve, 4" Mud Pump Valves, Kelly Hose & Mud Lines to 300/2500psi 10/10min (Work on AOI PVT system) SC P BOP 1530 1630 1.00 510m Rack Kelly & Lay out pup joint, FOSVs and test plug - pick up cup tester on drill pipe (Work on AOI PVT system) SC P (RE) RR 1630 1730 1.00 510m Replace outside kill line valve on mud cross (Work on AOI PVT system) SC P BOP 1730 1830 1.00 510m Pressure test A Section to casing BTC connection and outside kill line valve 300/2500psi 10/10min (Work on AOI PVT system) SC P BOP 1830 1930 1.00 510m Lay out cup tester and attempt to install wear bushing - unble to install - damaged (Work on AOI PVT system) SC P BOP 1930 2200 2.50 510m Nipple up bell nipple and flow line from BOPs to... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:101 11-JAN-07 1850.0 9999.99 Run in hole to tag cement at 490m - Slip & cut drilling line - Calibrate PVT system Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 37,885 Cum. Cost: $ 1,097,138 Projected Cost: $ 2,839,256 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 11 Jan 2007 0 Days Personnel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 11 Jan 2007 0 Days Tripping drill pipe on rig floor & Setting and testing crown-o-matic Operations For Period 0000 Hrs to 2400 Hrs on 11 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P TI 0000 0330 3.50 510m Run in hole with bit #RR2 on BHA #3 and tag cement at 490m. Lay out 3 joints of drill pipe (Work on AOI & BHI PVT systems) PH1 P SC 0330 0630 3.00 510m Slip and cut 140' drilling line - PVT systems not functioning correctly PH1 U (RE) RR 0630 0730 1.00 510m Work on PVT calibration & repair crown saver valve PH1 U (RE) RR 0730 0900 1.50 510m Work on PVT calibration - adjust mast over well centre PH1 U (RE) RR 0900 2400 15.00 510m Work on PVT calibration - unspool drilling line from draw works and check drilling line clamp installation - repair crown saver valve Operations For Period 0000 Hrs to 0600 Hrs on 12 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 U (RE) RR 0000 0600 6.00 510m Calibrate PVT system WBM Data Daily Chemical Costs: $ 0 Cost To Date: $ 5748 Engineer : Peter N Aronetz Mud Type: ! FluidReclaimed fm ME Sample From: Suction Time: 22:00 Weight: 8.50ppg ECD TD: ECD Shoe: Viscosity 51sec/qt KCl Equiv: 1% Flowline Temp: Nitrates: 0mg/l Sulphites: 0mg/l API FL: 11cm�/30m API Cake: 1/32nd" PV 10cp YP 10lb/100ft� Cl: 8.10x1000 mg/l Hard/Ca: 300mg/l MBT: 1.5 PM: 0.35 PF: 0.12 MF: 0.75 pH: 10 PHPA Excess: 0ppb Low Gravity Solids: ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:101 12-JAN-07 1850.0 9999.99 Calibrate PVT system, Pressure test casing, Drill shoe track and 3m of new hole, Conduct FIT to 20.0ppg EMW, Drill 8 1/2" hole to 651m Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 81,385 Cum. Cost: $ 1,178,523 Projected Cost: $ 2,839,256 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 12 Jan 2007 0 Days Personnel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 12 Jan 2007 0 Days General housekeeping and Operating rig tongs Operations For Period 0000 Hrs to 2400 Hrs on 12 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 U (RE) RR 0000 0800 8.00 510m Calibrate PVT system PH1 P CMD 0800 0830 0.50 510m Prepare mud tanks and circulate well with water using pill tank PH1 U (RE) RR 0830 0900 0.50 510m Repair pressure testing unit prior to pressure testing casing PH1 P PT 0900 1000 1.00 510m Presure test casing down drill string and annulus to 2,500psi for 15 minutes PH1 P DFS 1000 1130 1.50 510m Drill out shoe track from 490m to 507m - Drill out cement to 510m PH1 P DA 1130 1200 0.50 513m Drill 8 1/2" hole from 510m to 513m PH1 P CMD 1200 1230 0.50 513m Circulate and displace well to drilling mud PH1 P LOT 1230 1300 0.50 513m Conduct FIT to 20.0ppg EMW without leak off PH1 P OTH 1300 1330 0.50 513m Rig down pressure test equipment and conduct slow pump rates PH1 P DA 1330 1900 5.50 604m Drill 8 1/2" hole from 513m to 604m PH1 P SVY 1900 1930 0.50 604m Circulate hole clean, flow check and run directional survey (no reading) PH1 P DA 1930 2230 3.00 642m Drill 8 1/2" hole from 604m to 642m PH1 U SVY 2230 2300 0.50 642m Circulate hole clean, flow check and run directional survey (no reading) PH1 P DA 2300 2330 0.50 651m Drill 8 1/2" hole from 642m to 651m PH1 U SVY ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:101 13-JAN-07 1850.0 9999.99 Drill 8 1/2" hole from 651m to 821m with WLS at 705m & 771m Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 60,254 Cum. Cost: $ 1,238,777 Projected Cost: $ 2,839,256 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 13 Jan 2007 0 Days Personnel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 13 Jan 2007 0 Days Drilling and general rig floor operation - Running wire line surveys Operations For Period 0000 Hrs to 2400 Hrs on 13 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P DA 0000 0600 6.00 717m Drill 8 1/2" hole from 651m to 717m PH1 P SVY 0600 0700 1.00 717m Circulate, flow check and run Totco deviation survey PH1 P DA 0700 1530 8.50 773m Drill 8 1/2" hhole from 717m to 773m PH1 P SVY 1530 1600 0.50 773m Circulate, flow check and run directional survey (no reading obtained) PH1 P DA 1600 1730 1.50 783m Drill 8 1/2" hole from 773m to 783m PH1 P SVY 1730 1800 0.50 783m Circulate, flow check and run directional survey PH1 P DA 1800 2400 6.00 821m Drill 8 1/2" hole from 783m to 821m Operations For Period 0000 Hrs to 0600 Hrs on 14 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P DA 0000 0600 6.00 870m Drill 8 1/2" hole from 821m to 870m WBM Data Daily Chemical Costs: $ 2574 Cost To Date: $ 10116 Engineer : Peter N Aronetz Mud Type: ! KCl-PHPA-POLYMER Sample From: Below Shaker Time: 22:30 Weight: 8.60ppg ECD TD: 8.88ppg ECD Shoe: Viscosity 49sec/qt KCl Equiv: 1.4% Flowline Temp: 41C� Nitrates: 0mg/l Sulphites: 250mg/l API FL: 8.4cm�/30m API Cake: 1/32nd" PV 13cp YP 14lb/100ft� Cl: 8.40x1000 mg/l Hard/Ca: 240mg/l MBT: 3 PM: 0.28 PF: 0.12 MF: 1.55 pH: 10 PHPA Excess: 1.80ppb Low Gravity Solids: ! 1.5% High Gravity Solids: ! 0.0% Solids (c... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:101 14-JAN-07 1850.0 9999.99 Drill 8 1/2" hole from 821m to 1003m with WLS at 875m & 987m Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 59,885 Cum. Cost: $ 1,298,662 Projected Cost: $ 2,839,256 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 14 Jan 2007 0 Days Personnel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 14 Jan 2007 0 Days Weekly safety meeting - Need for better comms on rig Operations For Period 0000 Hrs to 2400 Hrs on 14 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P DA 0000 0800 8.00 887m Drill 8 1/2" hole from 821m to 887m PH1 P SVY 0800 0830 0.50 887m Circulate, flow check and WLS (no reading) PH1 P DA 0830 0930 1.00 896m Drill 8 1/2" hole from 887m to 896m PH1 U (OTH) SVY 0930 1000 0.50 896m Circulate, flow check and WLS PH1 P DA 1000 2300 13.00 999m Drill 8 1/2" hole from 896m to 999m PH1 P SVY 2300 2330 0.50 999m Circulate, SPR, flow check and WLS PH1 P DA 2330 2400 0.50 1003m Drill 8 1/2" hole from 999m to 1003m Operations For Period 0000 Hrs to 0600 Hrs on 15 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P DA 0000 0600 6.00 1045m drill 8 1/2" hole from 1003m to 1045m WBM Data Daily Chemical Costs: $ 5249 Cost To Date: $ 15365 Engineer : Peter N Aronetz Mud Type: ! KCl-PHPA-POLYMER Sample From: Below Shaker Time: 22:50 Weight: 8.60ppg ECD TD: 8.94ppg ECD Shoe: Viscosity 51sec/qt KCl Equiv: 1.0% Flowline Temp: 45C� Nitrates: 0mg/l Sulphites: 200mg/l API FL: 8.0cm�/30m API Cake: 1/32nd" PV 15cp YP 19lb/100ft� Cl: 8.43x1000 mg/l Hard/Ca: 200mg/l MBT: 3 PM: 0.24 PF: 0.08 MF: 1.48 pH: 9.5 PHPA Excess: 2.06ppb Low Gravity Solids: ! 1.6% High Gravity Solids: ! 0.0% Solids (corrected): ! 1.6% H2O: 98.4% Oil: 0.0% Sand: 0.10 % Barite: 0 ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:101 15-JAN-07 1850.0 9999.99 Drill 8 1/2" hole from 1003m to 1221m with wire line surveys at 1090m & 1193m Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 61,612 Cum. Cost: $ 1,364,022 Projected Cost: $ 2,839,256 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 15 Jan 2007 0 Days Personnel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 15 Jan 2007 0 Days Drilling and general rig floor operations & Body placement and fatigue reduction Operations For Period 0000 Hrs to 2400 Hrs on 15 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P DA 0000 0700 7.00 1055m Drill 8 1/2" hole from 1003m to 1055m PH1 P RS 0700 0730 0.50 1055m Rig Service PH1 P DA 0730 1230 5.00 1102m Drill 8 1/2" hole from 1055m to 1102m PH1 P SVY 1230 1300 0.50 1102m Circulate, flow check and Wire Line Survey PH1 P DA 1300 2200 9.00 1205m Drill 8 1/2" hole from 1102m to 1205m PH1 P SVY 2200 2230 0.50 1205m Circulate, flow check and Wire Line Survey PH1 P DA 2230 2400 1.50 1221m Drill 8 1/2" hole from 1205m to 1221m Operations For Period 0000 Hrs to 0600 Hrs on 16 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P DA 0000 0600 6.00 1261m Drill 8 1/2" hole from 1221m to 1261m karoongas... karoongas... DAILY DRILLING REPORT # 18 'Copyright IDS 2007', AT 20070114, KAROONGAS_AU_drllg Page 1 Printed on 15 Jan 2007 WBM Data Daily Chemical Costs: $ 2727 Cost To Date: $ 18092 Engineer : Peter N Aronetz Mud Type: ! KCl-PHPA-POLYMER Sample From: Below Shaker Time: 22:45 Weight: 8.65ppg ECD TD: 8.99ppg ECD Shoe: Viscosity 50sec/qt KCl Equiv: 0.8% Flowline Temp: 48C� Nitrates: 0mg/l Sulphites: 150mg/l API FL: 7.8cm�/30m API Cake: 1/32nd" PV 16cp YP 18lb/100ft� Cl: 8.50x1000 mg/l Hard/Ca: 280mg/l MBT: 3.... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:101 16-JAN-07 1850.0 9999.99 Drill 8 1/2" hole from 1221m to 1357m with WLS at 1296m Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 62,060 Cum. Cost: $ 1,426,082 Projected Cost: $ 2,839,256 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 16 Jan 2007 0 Days Personnel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 16 Jan 2007 0 Days General Housekeeping & Correct use of non powered tools Operations For Period 0000 Hrs to 2400 Hrs on 16 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P DA 0000 1300 13.00 1308m Drill 8 1/2" hole from 1221m to 1308m PH1 P SVY 1300 1330 0.50 1308m Circulate, flow check and Wire Line Survey PH1 P DA 1330 2300 9.50 1355m Drill 8 1/2" hole from 1308m to 1355m PH1 P RS 2300 2330 0.50 1355m Rig Service PH1 P DA 2330 2400 0.50 1357m Drill 8 1/2" hole from 1355m to 1357m Operations For Period 0000 Hrs to 0600 Hrs on 17 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P DA 0000 0600 6.00 1377m Drill 8 1/2" hole from 1357m to 1377m karoongas... karoongas... DAILY DRILLING REPORT # 19 'Copyright IDS 2007', AT 20070114, KAROONGAS_AU_drllg Page 1 Printed on 17 Jan 2007 WBM Data Daily Chemical Costs: $ 3075 Cost To Date: $ 21267 Engineer : Peter N Aronetz Mud Type: ! KCl-PHPA-POLYMER Sample From: Below Shaker Time: 22:50 Weight: 8.80ppg ECD TD: 9.26ppg ECD Shoe: Viscosity 55sec/qt KCl Equiv: 1.7% Flowline Temp: 50C� Nitrates: 0mg/l Sulphites: 200mg/l API FL: 7.4cm�/30m API Cake: 1/32nd" PV 18cp YP 24lb/100ft� Cl: 10.50x1000 mg/l Hard/Ca: 100mg/l MBT: 5.5 PM: 0.46 PF: 0.1 MF: 1 pH: 10 PHPA Excess: 1.83ppb Low Gravity Solids: ! 2.8% High Gravity Solids: ! 0.0% Solids (corrected): ! 2.8% H2O: 97.2% Oil: 0.0% Sand: .15 % Barite: 0 Gels 10s ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:102 17-JAN-07 1850.0 9999.99 Drill 8 1/2" hole from 1357m to 1421m with WLS at 1399m - Circulate and slug drill string - Pull out of hole - Change bits & install wear bushing - Run BHA in hole Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 68,148 Cum. Cost: $ 1,494,230 Projected Cost: $ 2,839,256 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 17 Jan 2007 0 Days Personnel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 17 Jan 2007 0 Days General housekeeping and Racking back drill pipe on rig floor Operations For Period 0000 Hrs to 2400 Hrs on 17 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P DA 0000 0800 8.00 1383m Drill 8 1/2" hole from 1357m to 1383m PH1 P RS 0800 0830 0.50 1383m Rig Service PH1 P DA 0830 1230 4.00 1411m Drill 8 1/2" hole from 1383m to 1411m PH1 P SVY 1230 1330 1.00 1411m Circulate, flow check, BOP drill and WLS PH1 P DA 1330 1600 2.50 1421m Drill 8 1/2" hhole from 1411m to 1421m PH1 P CMD 1600 1700 1.00 1421m Circulate hole clean and mix weighted pill PH1 P TO 1700 2130 4.50 1421m Flow check, spot weighted pill, pull out of hole to surface PH1 P HBHA 2130 2300 1.50 1421m Break out bit, clean rig floor and install wear bushing in well head PH1 P TI 2300 2400 1.00 1421m Make up bit # 3 and run in hole - check gauge on stabilizers Operations For Period 0000 Hrs to 0600 Hrs on 18 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P TI 0000 0200 2.00 1421m Run in hole with bit # 3 to 498m PH1 P SC 0200 0230 0.50 1421m Slip 33' drilling line & break ciricultaion PH1 P TI 0230 0600 3.50 1421m Continue to run in hole to 1330m - break circulation at 1009m karoongas... karoongas... DAILY DRILLING REPORT # 20 'Copyright IDS 2007', AT 200701... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:102 18-JAN-07 2170.0 9999.99 Finish RIH with Bit #3. Wash to bottom. Drill 8 1/2" hole from 1421m to 1505m. WLS at 1493m. Drill 8 1/2" hole from 1505m to 1524 m. Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 119,482 Cum. Cost: $ 1,613,712 Projected Cost: $ 2,839,256 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 18 Jan 2007 0 Days Personnel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 18 Jan 2007 0 Days Running in hole & General housekeeping Operations For Period 0000 Hrs to 2400 Hrs on 18 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P TI 0000 0200 2.00 1421m Run in hole with bit # 3 to 498m PH1 P SC 0200 0230 0.50 1421m Slip 33' drilling line & break ciriculation PH1 P TI 0230 0630 4.00 1421m Continue to run in hole to 1339m - break circulation at 1009m PH1 P TI 0630 0700 0.50 1421m Pick up kelly. Wash/ream from 1399 m to 1421 m. PH1 P DA 0700 1900 12.00 1505m Drill from 1421m to 1505 m. PH1 P SVY 1900 2000 1.00 1505m Circulate, flow check, conduct wire line survey. PH1 P DA 2000 2400 4.00 1524m Drill 8-1/2" hole from 1505 m to 1524 m. Operations For Period 0000 Hrs to 0600 Hrs on 19 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P DA 0000 0600 6.00 1546m Drill 8 1/2" hole from 1524m to 1546m WBM Data Daily Chemical Costs: $ 1597 Cost To Date: $ 25127 Engineer : Peter N Aronetz Mud Type: ! KCl-PHPA-POLYMER Sample From: Below Shaker Time: 22:20 Weight: 8.95ppg ECD TD: 9.41ppg ECD Shoe: Viscosity 57sec/qt KCl Equiv: 1.7% Flowline Temp: 49C� Nitrates: 0mg/l Sulphites: 250mg/l API FL: 7.2cm�/30m API Cake: 1/32nd" PV 21cp YP 24lb/100ft� CaCO3 Added: 2.8ppb Cl: 11.00x1000 mg/l Hard/Ca: 180mg/l MBT: 5.5 PM: 0.35 PF: 0.06 MF: 0.9 pH: 9.8 PHPA Added: 1.70ppb Low ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:102 19-JAN-07 2170.0 9999.99 Drill ahead from 1524 m to 1578 m. POH for bit change. Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 68,285 Cum. Cost: $ 1,681,997 Projected Cost: $ 2,839,256 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 19 Jan 2007 0 Days Personnel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 19 Jan 2007 0 Days Use of Non-powered tools & Racking back DC's Operations For Period 0000 Hrs to 2400 Hrs on 19 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P DA 0000 1130 11.50 1561m Drill 8 1/2" hole from 1524m to 1561m PH1 P RS 1130 1200 0.50 1561m Rig Service PH1 P DA 1200 2100 9.00 1578m Drill 8-1/2" hole from 1561 to 1578 m PH1 P TO 2100 2400 3.00 1578m Flow check, pump weighted pill, pull out of hole. Operations For Period 0000 Hrs to 0600 Hrs on 20 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P TO 0000 0015 0.25 1578m Pull out of hole with Bit # 3 PH1 P HBHA 0015 0200 1.75 1578m Break out bit # 3 & make up bit # 4 - gauge stabilizers & clean rig floor PH1 P TI 0200 0600 4.00 1578m Run in hole with bit # 4 to 1380m - fill drill string at 500m & 1,000m WBM Data Daily Chemical Costs: $ 1877 Cost To Date: $ 27004 Engineer : Peter N Aronetz Mud Type: ! KCl-PHPA-POLYMER Sample From: Below Shaker Time: 20:45 Weight: 8.95ppg ECD TD: 9.30ppg ECD Shoe: Viscosity 54sec/qt KCl Equiv: 1.4% Flowline Temp: 54C� Nitrates: 0mg/l Sulphites: 250mg/l API FL: 7.0cm�/30m API Cake: 1/32nd" PV 20cp YP 21lb/100ft� CaCO3 Added: 4.4ppb Cl: 9.80x1000 mg/l Hard/Ca: 80mg/l MBT: 4.5 PM: 0.53 PF: 0.15 MF: 1.25 pH: 10.5 PHPA Added: 1.89ppb Low Gravity Solids: ! 3.6% High Gravity Solids: ! 0.0% Solids (corrected): ! 3.6% H2O: 96.4% Oil: 0.0% Sand: .20 % Barite: 0 Gels 1... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:102 20-JAN-07 2170.0 9999.99 Run in hole with bit # 4 - wash to bottom - no fill - drill 8 1/2" hole to 1636m with WLS at 1596m Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 81,639 Cum. Cost: $ 1,765,513 Projected Cost: $ 3,039,256 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 20 Jan 2007 0 Days Personnel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 20 Jan 2007 0 Days Racking back DC's & Guidlines for operating winch Operations For Period 0000 Hrs to 2400 Hrs on 20 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P TO 0000 0015 0.25 1578m Pull out of hole with Bit # 3 PH1 P HBHA 0015 0200 1.75 1578m Break out bit # 3 & make up bit # 4 - gauge stabilizers & clean rig floor PH1 P TI 0200 0630 4.50 1578m Run in hole with bit # 4 to 1380m - fill drill string at 500m & 1,000m PH1 P TI 0630 0700 0.50 1578m PU kelly, wash to 1578m (no fill). PH1 P DA 0700 1600 9.00 1608m Drill 8-1/2" hole from 1578 m to 1608 m. PH1 P SVY 1600 1630 0.50 1608m Circulate, flow check, conduct wireline survey. PH1 P DA 1630 2300 6.50 1636m Drill 8-1/2" hole from 1608 m to 1636 m PH1 P WTH 2300 2400 1.00 1636m Work tight hole f/ 1617 - 1627 m. LO single and continue to work tight hole. Operations For Period 0000 Hrs to 0600 Hrs on 21 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P WTH 0000 0030 0.50 1636m Circulate, wash & ream tight hole 1627m to 1636m on drill pipe connection PH1 P DA 0030 0600 5.50 1656m Drill 8 1/2" hole from 1636m to 1656m karoongas... karoongas... DAILY DRILLING REPORT # 23 'Copyright IDS 2007', AT 20070114, KAROONGAS_AU_drllg Page 1 Printed on 20 Jan 2007 WBM Data Daily Chemical Costs: $ 2054 Cost To Date: $ 29058 Engineer : Peter N Aronet... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:102 21-JAN-07 2170.0 9999.99 Work tight hole - Drill 8 1/2" hole from 1636m to 1722m - Circulate for WLS Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 66,585 Cum. Cost: $ 1,832,098 Projected Cost: $ 3,039,256 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 21 Jan 2007 0 Days Personnel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 21 Jan 2007 0 Days Guidlines for operating winch & Correct selection and mtce of elevators Weekly Safety Meeting ( 2 ) 21 Jan 2007 0 Days Discuss and review weekly safety items. Operations For Period 0000 Hrs to 2400 Hrs on 21 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P WTH 0000 0030 0.50 1636m Circulate, wash & ream tight hole 1627m to 1636m on drill pipe connection PH1 P DA 0030 0800 7.50 1665m Drill 8 1/2" hole from 1636m to 1665m PH1 P RS 0800 0830 0.50 1665m Circulate and rig service. PH1 P DA 0830 2330 15.00 1722m Drill 8-1/2" hole from 1665m to 1722m. PH1 P CS 2330 2400 0.50 1722m Circulate botttom hole sample prior to WLS. Operations For Period 0000 Hrs to 0600 Hrs on 22 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P SVY 0000 0030 0.50 1722m Flow check well and run WLS at 1710m PH1 P PS 0030 0100 0.50 1722m Circulate well, spot weighted pill and rack kelly PH1 P WT 0100 0230 1.50 1722m Pull out of hole to 1530m for wiper trip - run in hole to 1710m PH1 P RW 0230 0300 0.50 1722m Pick up kelly and wash to 1722m - 1mt of fill on bottom PH1 P DA 0300 0600 3.00 1736m Drill 8 1/2" hole from 1722m to 1736m karoongas... karoongas... DAILY DRILLING REPORT # 24 'Copyright IDS 2007', AT 20070114, KAROONGAS_AU_drllg Page 1 Printed on 22 Jan 2007 WBM Data Daily Chemical Costs: $ 4714 Cost To Date: $ 33772... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:102 22-JAN-07 2170.0 9999.99 Conduct WLS and wiper trip to 1530m. RIH and drill 8-1/2" hole to 1750m. Rig repair (1 hr). Con't drill 8-1/2" hole to 1769m. Rig service (1/2 hr). Rig repair (1/2 hr). Drill 8 1/2" hole to 1778m. Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 73,924 Cum. Cost: $ 1,906,022 Projected Cost: $ 3,039,256 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 22 Jan 2007 0 Days Personnel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 22 Jan 2007 0 Days Correct selection and maintenance of elevators & Correct use of non-powered tools Operations For Period 0000 Hrs to 2400 Hrs on 22 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P SVY 0000 0030 0.50 1722m Flow check well and run WLS at 1710m PH1 P PS 0030 0100 0.50 1722m Circulate well, spot weighted pill and rack kelly PH1 P WT 0100 0230 1.50 1722m Pull out of hole to 1530m for wiper trip - run in hole to 1710m PH1 P RW 0230 0300 0.50 1722m Pick up kelly and wash to 1722m - 1mt of fill on bottom PH1 P DA 0300 1000 7.00 1750m Drill 8 1/2" hole from 1722m to 1750m PH1 P (RE) RR 1000 1100 1.00 1750m Repair hydromatic drive - key dislodged from driven sprocket on hydromatic input shaft PH1 P DA 1100 1715 6.25 1769m Drill 8 1/2" hole from 1750m to 1769m. PH1 P RS 1715 1745 0.50 1769m Rig Service PH1 P (RE) RR 1745 1815 0.50 1769m Work on weight indicator - bleed and lubricate to eliminate false readings PH1 P DA 1815 2400 5.75 1778m Drill 8 1/2" hole from 1769m to 1778m Operations For Period 0000 Hrs to 0600 Hrs on 23 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P DA 0000 0600 6.00 1792m Drill 8 1/2" hole from 1778m to 1792m karoongas... karoongas... DAILY DRILLING REPORT # 25 'Copyright IDS ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:102 23-JAN-07 2170.0 9999.99 Drill 8-1/2" hole from 1778m to 1810m. Circ, drop survey and POH for bit change. Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 68,585 Cum. Cost: $ 1,974,607 Projected Cost: $ 3,039,256 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 23 Jan 2007 0 Days Personnel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 23 Jan 2007 0 Days General housekeeping & Drifting drill pipe Operations For Period 0000 Hrs to 2400 Hrs on 23 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P DA 0000 1600 16.00 1810m Drill 8 1/2" hole from 1778m to 1810m PH1 P DA 1600 1630 0.50 1810m Circulate hole clean. Drop survey, pump slug and rack back kelly. PH1 P TO 1630 2300 6.50 1810m POH from 1810 to surface. PH1 P HBHA 2300 2330 0.50 1810m Retreive Hofco survey (misrun), break out bit, and gauge stabilizers. Clean up work floor. PH1 P TI 2330 2400 0.50 1810m MU new bit. RIH on BHA to 45m. Operations For Period 0000 Hrs to 0600 Hrs on 24 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P HBHA 0000 0230 2.50 1810m Pick up and make up 3ea 6 1/4" drill collars below drilling jars - RIH with BHA and bit # 5 to casing shoe at 507m PH1 P SC 0230 0400 1.50 1810m Hang traveling blocks, slip 48' and cut 138' of drilling line, fill drill string and reset AOI block height sensor PH1 P TI 0400 0600 2.00 1810m Run in hole with bit # 5 - fill pipe at ~1200m karoongas... karoongas... DAILY DRILLING REPORT # 26 'Copyright IDS 2007', AT 20070114, KAROONGAS_AU_drllg Page 1 Printed on 23 Jan 2007 WBM Data Daily Chemical Costs: $ 1544 Cost To Date: $ 41941 Engineer : Peter N Aronetz Mud Type: ! KCl-PHPA-POLYMER Sample From: Past Shaker Time: 16:45 Weight: 9.20ppg ECD TD: 9.66p... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:202 25-JAN-07 2170.0 9999.99 Drill 8 1/2" hole from 1845m to 1902m with 1/2 hour rig service Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 67,585 Cum. Cost: $ 2,122,251 Projected Cost: $ 3,139,256 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 25 Jan 2007 0 Days Personnel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 25 Jan 2007 0 Days General housekeeping & Hand and foot placement, general body placement Operations For Period 0000 Hrs to 2400 Hrs on 25 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P DA 0000 0700 7.00 1862m Drill 8 1/2" hole from 1845m to 1862m PH1 P RS 0700 0730 0.50 1862m Rig service. PH1 P DA 0730 2400 16.50 1902m Drill 8-1/2" hole from 1862m to 1902m. Operations For Period 0000 Hrs to 0600 Hrs on 26 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P DA 0000 0600 6.00 1923m Drill 8 1/2" hole from 1902m to 1923m WBM Data Daily Chemical Costs: $ 2600 Cost To Date: $ 47171 Engineer : Peter N Aronetz Mud Type: ! KCl-PHPA-POLYMER Sample From: Past Shaker Time: 22:15 Weight: 9.20ppg ECD TD: 9.60ppg ECD Shoe: Viscosity 55sec/qt KCl Equiv: 1.7% Flowline Temp: 59C� Nitrates: 0mg/l Sulphites: 150mg/l API FL: 5.7cm�/30m API Cake: 1/32nd" PV 19cp YP 21lb/100ft� CaCO3 Added: 27.3ppb Cl: 11.40x1000 mg/l Hard/Ca: 150mg/l MBT: 5.5 PM: 0.43 PF: 0.1 MF: 0.9 pH: 10 PHPA Added: 2.18ppb Low Gravity Solids: ! 5.7% High Gravity Solids: ! 0.0% Solids (corrected): ! 5.7% H2O: 94.3% Oil: 0.0% Sand: 0.25% % Barite: 0 Gels 10s 3 Gels 10m 3 Fann 003 2 Fann 006 4 Fann 100 22 Fann 200 34 Fann 300 42 Fann 600 61 Comment: Recycle 80bbls fluid from local sump and treat to current specifications. Run de-sander to keep density at 9.2ppg. Pre-mix weighted to 9.1ppg. kar... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:202 26-JAN-07 2170.0 9999.99 Drill 8-1/2" hole f/ 1902m to 1927m. Circulate, conduct rig service and WLS. Con't drill ahead to 1977m. Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 72,458 Cum. Cost: $ 2,194,409 Projected Cost: $ 3,139,256 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 26 Jan 2007 0 Days Personnel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 26 Jan 2007 0 Days General housekeeping & Correct use of powered tools Operations For Period 0000 Hrs to 2400 Hrs on 26 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P DA 0000 0730 7.50 1927m Drill 8 1/2" hole from 1902m to 1927m PH1 P RS 0730 0800 0.50 1927m Conduct rig service. PH1 P SVY 0800 0900 1.00 1927m Conduct WLS. PH1 P DA 0900 2400 15.00 1977m Con't drill 8-1/2" hole f/ 1927m to 1977m. Operations For Period 0000 Hrs to 0600 Hrs on 27 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P DA 0000 0600 6.00 1997m Drill 8-1/2" hole f/ 1977m to 1997m. WBM Data Daily Chemical Costs: $ 3373 Cost To Date: $ 50544 Engineer : Peter N Aronetz Mud Type: ! KCl-PHPA-POLYMER Sample From: Past Shaker Time: 22:15 Weight: 9.30ppg ECD TD: 9.72ppg ECD Shoe: Viscosity 56sec/qt KCl Equiv: 1.7% Flowline Temp: 59C� Nitrates: 0mg/l Sulphites: 100mg/l API FL: 5.6cm�/30m API Cake: 1/32nd" PV 20cp YP 22lb/100ft� CaCO3 Added: 31.8ppb Cl: 11.00x1000 mg/l Hard/Ca: 100mg/l MBT: 5 PM: 0.39 PF: 0.08 MF: 0.85 pH: 9.8 PHPA Added: 2.10ppb Low Gravity Solids: ! 6.4% High Gravity Solids: ! 0.0% Solids (corrected): ! 6.4% H2O: 93.6% Oil: 0.0% Sand: 0.25% % Barite: 0 Gels 10s 4 Gels 10m 5 Fann 003 4 Fann 006 5 Fann 100 24 Fann 200 35 Fann 300 42 Fann 600 62 Comment: Recycle 100bbls fluid from local sump and treat to current sp... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:203 01-FEB-07 2170.0 9999.99 RIH and log well (3 runs). Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 186,485 Cum. Cost: $ 2,724,766 Projected Cost: $ 3,239,256 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 01 Feb 2007 0 Days Personnel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 01 Feb 2007 0 Days Running wireline logs & Wireline logging and mtce. Operations For Period 0000 Hrs to 2400 Hrs on 01 Feb 2007 Phse Cls Op From To Hrs Depth Activity Description E1 P LOG 0000 0930 9.50 2130m Log hole with super combo (DLL-MLL-SLL-GR-Sonic-Density Neutron-SP-CAL) log. Tag TD at 2132m. E1 P LOG 0930 1700 7.50 2130m Log well with HMI log. E1 P LOG 1700 2330 6.50 2130m Log well with velocity check shot tools. E1 P LOG 2330 2400 0.50 2130m Lay out logging tools. Operations For Period 0000 Hrs to 0600 Hrs on 02 Feb 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P PLD 0000 0400 4.00 2130m RIH BHA and LO HWDP. PH1 P PLD 0400 0530 1.50 2130m PU kelly, Break same. PH1 P PLD 0530 0600 0.50 2130m Con't LO remaining DC's. WBM Data Daily Chemical Costs: $ 0 Cost To Date: $ 60191 Engineer : Peter N Aronetz Mud Type: ! KCl-PHPA-POLYMER Sample From: P/Suction Time: 22:00 Weight: 9.45ppg ECD TD: 0.00ppg ECD Shoe: Viscosity 63sec/qt KCl Equiv: 1.8% Flowline Temp: Nitrates: 0mg/l Sulphites: 250mg/l API FL: 5.6cm�/30m API Cake: 1/32nd" PV 19cp YP 31lb/100ft� CaCO3 Added: 39.8ppb Cl: 11.50x1000 mg/l Hard/Ca: 120mg/l MBT: 5 PM: 0.55 PF: 0.16 MF: 1.5 pH: 9.8 PHPA Added: 2.15ppb Low Gravity Solids: ! 7.4% High Gravity Solids: ! 0.0% Solids (corrected): ! 7.4% H2O: 92.6% Oil: 0.0% Sand: 0.20% % Barite: 0 Gels 10s 6 Gels 10m 10 Fann 003 5 Fann 006 7 Fann 100 30 Fann 200 41 Fann 300 50... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:203 02-FEB-07 2170.0 9999.99 LO BHA. RIH with cement stinger and set cement plug #1 & #2. Lay down DP. RIH and tag Plug #2. POH laying down DP. Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 93,650 Cum. Cost: $ 2,817,416 Projected Cost: $ 3,200,000 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 02 Feb 2007 0 Days Personnel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 02 Feb 2007 0 Days Tripping and cement jobs & Body placement while LDDP Safety Meeting ( 2 ) 02 Feb 2007 0 Days Hold pre-job safety meeting prior to cement jobs Operations For Period 0000 Hrs to 2400 Hrs on 02 Feb 2007 Phse Cls Op From To Hrs Depth Activity Description E1 P LOG 0000 0100 1.00 2130m Complete electric line logs. RD wireline. PH1 P PLD 0100 0630 5.50 2130m RIH BHA and LO HWDP. PU kelly, Break same. PH1 P HBHA 0630 0700 0.50 2130m Clean up rig floor. Rig to RIH cement stinger. PH1 P CMP 0700 1030 3.50 2130m PU, MU and RIH w/ 10 jts cement stinger, X/O & DP to 986m. PH1 P CMP 1030 1100 0.50 2130m MU circ swage, break circ, spot 15 bbl HV pill. PH1 P PLD 1100 1130 0.50 2130m POH laying out 6 DP. PH1 P CMP 1130 1230 1.00 2130m MU Halliburton cement swage, Hold PJSM, pressure test lines. PH1 P CMP 1230 1300 0.50 2130m Pump Cement Plug #1, 950m - 850 m. Pump 2 bbl water ahead, mix & pump 33.6 bbl of class G cement @ 15.8ppg, 2 bbl water, displace with 31 bbl mud PH1 P PLD 1300 1500 2.00 2130m POH 6 stds, LO 24 singles. PH1 P CMP 1500 1530 0.50 2130m Head up & circ 2 x tubing volumes. Spot 15 bbl HV pill, LD 6 jts DP. PH1 P CMP 1530 1600 0.50 2130m Head up, pressure test lines & pump Cement Plug #2, 550m - 450 m. Pump 10 bbl water ahead, mix & pump 37 bbl Class G cement @ 15.8 ppg, 2 bbl water, displace with 15 bbls mud PH1 P PLD 1600 1700 1.00... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:203 27-JAN-07 2170.0 9999.99 Drill 8-1/2" hole f/ 1977m to 2018m. Circ sample, drop survey, pump slug and POH. LO bit #5 and recover survey. MU Bit #6 and RIH. Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 66,285 Cum. Cost: $ 2,260,694 Projected Cost: $ 3,139,256 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 27 Jan 2007 0 Days Personnel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 27 Jan 2007 0 Days Greasing crown sheaves & Tripping: hand and foot placement Operations For Period 0000 Hrs to 2400 Hrs on 27 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P DA 0000 0800 8.00 2002m Drill 8-1/2" hole f/ 1977m to 2002 m PH1 P RS 0800 0830 0.50 2002m Rig service PH1 P DA 0830 1400 5.50 2018m Drill 8-1/2" hole f/- 2002m to 2018 m PH1 P TO 1400 1430 0.50 2018m Slug pipe,drop survey,rack kelly PH1 P TO 1430 2100 6.50 2018m P.O.H for bit change ( flow check @ regular intervals ). Observe steady, slight flow during trip out - thermal effect. PH1 P HBHA 2100 2230 1.50 2018m Recover Hofco survey, break out bit #5 and gauge stabilizers. Clean work floor. MU RR PDC Bit #6. PH1 P HBHA 2230 2400 1.50 2018m RIH RR Bit #6 on BHA. Operations For Period 0000 Hrs to 0600 Hrs on 28 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P TI 0000 0030 0.50 2018m RIH with RR Bit #6 to casing shoe. PH1 P SC 0030 0130 1.00 2018m Pick up kelly, fill pipe. Slip drilling line. PH1 P TI 0130 0430 3.00 2018m Con't RIH, filling pipe at 1000 m and 1500 m. PH1 P TIT 0430 0500 0.50 2018m Work tight hole at 1650m. Fire jars once and came free. PU kelly and ream tight spot. PH1 P TI 0500 0600 1.00 2018m Con't RIH. karoongas... karoongas... DAILY DRILLING REPORT # 30 'Copyright IDS 2007', A... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:203 28-JAN-07 2170.0 9999.99 RIH with Bit #RR6. Slip drilling line, con't RIH. Top up hole at 1000m & 1500m. Work tight hole at 1650m. Con't trip in hole. PU kelly and wash to bottom. Drill 8-1/2" hole. Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 66,000 Cum. Cost: $ 2,326,694 Projected Cost: $ 3,139,256 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 28 Jan 2007 0 Days Personnel Blow into Alcoholiser Weekly Safety Meeting ( 2 ) 28 Jan 2007 0 Days Discuss safety alerts and HAZOBs Operations For Period 0000 Hrs to 2400 Hrs on 28 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P TI 0000 0030 0.50 2018m RIH with RR Bit #6 to casing shoe. PH1 P SC 0030 0130 1.00 2018m Pick up kelly, fill pipe. Slip drilling line. PH1 P TI 0130 0500 3.50 2018m Con't RIH, filling pipe at 1000 m and 1500 m. PH1 P TIT 0530 0630 1.00 2018m Work tight hole at 1650m. Fire jars once and came free. PU kelly and ream tight spot. PH1 P TI 0630 0730 1.00 2018m Con't RIH to 2000m. PH1 P TI 0730 0800 0.50 2018m PU kelly & wash down from 2000m to 2018m. PH1 P DA 0800 1730 9.50 2046m Drill 8-1/2" hole f/ 2018m to 2046m. PH1 P CS 1730 1830 1.00 2046m Circ BH sample. PH1 P DA 1830 2400 5.50 2062m Continue Drill 8-1/2" hole f/ 2046m to 2062m. Operations For Period 0000 Hrs to 0600 Hrs on 29 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P DA 0000 0600 6.00 2064m Drill 8-1/2" hole f/ 2062m to 2064m. karoongas... karoongas... DAILY DRILLING REPORT # 31 'Copyright IDS 2007', AT 20070114, KAROONGAS_AU_drllg Page 1 Printed on 28 Jan 2007 WBM Data Daily Chemical Costs: $ 2303 Cost To Date: $ 54073 Engineer : Peter N Aronetz Mud Type: ! KCl-PHPA-POLYMER Sample From: Past Shaker ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:203 29-JAN-07 2170.0 9999.99 Drill 8-1/2" hole to 2065m. Drop survey and POH. Test BOP's. RIH Bit #7. Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 67,485 Cum. Cost: $ 2,405,193 Projected Cost: $ 3,139,256 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 29 Jan 2007 0 Days Personnel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 29 Jan 2007 0 Days Blow out prevention drills & Review old safety alerts Operations For Period 0000 Hrs to 2400 Hrs on 29 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P DA 0000 0600 6.00 2065m Drill 8-1/2" hole f/ 2062m to 2065m. PH1 P TO 0600 1300 7.00 2065m Drop survey,slug pipe and P.O.H for bit change. PH1 P HBHA 1300 1400 1.00 2065m Handle BHA. Recover survey. LO bit #6. Pull wear bushing. PH1 P PT 1400 1600 2.00 2065m Install test plug. Press test BOP's as per Karoon Gas specs. BO and LO test plug. PH1 P HBHA 1600 1700 1.00 2065m Install wear bushing. MU Bit #7. PH1 P TI 1700 2000 3.00 2065m RIH with Bit #7 to shoe. Fill pipe. PH1 P SC 2000 2030 0.50 2065m Slip drilling line. PH1 P TI 2030 2400 3.50 2065m Con't RIH. Fill pipe at 1000m, & 1500m. Operations For Period 0000 Hrs to 0600 Hrs on 30 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P TI 0000 0100 1.00 2065m Con't RIH f/ 1651m to 2049m. PH1 P WCU 0100 0300 2.00 2065m PU kelly, wash and ream 2040m - 2065m. (1m hard fill on bottom) PH1 P DA 0300 0600 3.00 2068m Drill 8-1/2" hole f/ 2065 m to 2068m. karoongas... karoongas... DAILY DRILLING REPORT # 32 'Copyright IDS 2007', AT 20070114, KAROONGAS_AU_drllg Page 1 Printed on 29 Jan 2007 WBM Data Daily Chemical Costs: $ 1187 Cost To Date: $ 55260 Engineer : Peter N Aronetz Mud Type: ! KCl-PHPA-P... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:203 30-JAN-07 2170.0 9999.99 RIH with bit #7. Wash and ream f/ 2049m to 2065m. Drill 8-1/2" hole to 2110m. Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 66,485 Cum. Cost: $ 2,471,678 Projected Cost: $ 3,139,256 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 30 Jan 2007 0 Days Personnel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 30 Jan 2007 0 Days RIH DP on rig floor & Racking DC's and monkeyboard ops Operations For Period 0000 Hrs to 2400 Hrs on 30 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P TI 0000 0100 1.00 2065m Con't RIH f/ 1651m to 2049m. PH1 P WCU 0100 0300 2.00 2065m PU kelly, wash and ream 2040m - 2065m. (1m hard fill on bottom) PH1 P DA 0300 0900 6.00 2077m Drill 8-1/2" hole f/ 2065 m to 2077m. PH1 P WTH 0900 0930 0.50 2077m Work tight hole f/ 2055m to 2077m. PH1 P RS 0930 1000 0.50 2077m Rig service. PH1 P DA 1000 2400 14.00 2110m Con't drill 8-1/2" hole f/ 2077m to 2110m. Operations For Period 0000 Hrs to 0600 Hrs on 31 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P DA 0000 0600 6.00 2125m Drill 8-1/2" hole f/ 2110m to 2125m. WBM Data Daily Chemical Costs: $ 4047 Cost To Date: $ 59307 Engineer : Peter N Aronetz Mud Type: ! KCl-PHPA-POLYMER Sample From: Past Shaker Time: 22:15 Weight: 9.45ppg ECD TD: 9.97ppg ECD Shoe: Viscosity 58sec/qt KCl Equiv: 1.5% Flowline Temp: 60C� Nitrates: 0mg/l Sulphites: 80mg/l API FL: 5.6cm�/30m API Cake: 2/32nd" PV 18cp YP 28lb/100ft� CaCO3 Added: 38.2ppb Cl: 10.70x1000 mg/l Hard/Ca: 100mg/l MBT: 5 PM: 0.44 PF: 0.14 MF: 1.5 pH: 10 PHPA Added: 2.00ppb Low Gravity Solids: ! 7.5% High Gravity Solids: ! 0.0% Solids (corrected): ! 7.5% H2O: 92.5% Oil: 0.0% Sand: 0.20% % Barite: 0 Gels 10s 4 Gels 10m 7 ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:203 31-JAN-07 2170.0 9999.99 Drill 8-1/2" hole f/ 2110m to 2130m. Circ b/up. Conduct wiper trip to 1250m. RIH, circ and POH to log. RU electric line services. Well Costs - AFE Number: Original AFE: $ 2,839,256 Orig & Supp AFE: $ 2,839,256 Daily Cost: $ 66,603 Cum. Cost: $ 2,538,281 Projected Cost: $ 3,239,256 HSE Summary Event (# Of) Date of last Days Since Short Description Alcohol & drug screening ( 2 ) 31 Jan 2007 0 Days Personnel Blow into Alcoholiser Pre-Tour Meetings ( 2 ) 31 Jan 2007 0 Days Setting and functioning crownomatic & Racking DC's and tripping pipe Safety Meeting ( 1 ) 31 Jan 2007 0 Days Hold pre-job SM with all crew and electric line services. Trip / Kick Drill ( 1 ) 31 Jan 2007 0 Days Hold BOP drill- good crew response Operations For Period 0000 Hrs to 2400 Hrs on 31 Jan 2007 Phse Cls Op From To Hrs Depth Activity Description PH1 P DA 0000 0900 9.00 2130m Drill 8-1/2" hole f/ 2110m to 2130m TD PH1 P CMD 0900 1000 1.00 2130m Circulate bottoms up PH1 P WT 1000 1400 4.00 2130m P.O.H wiper trip from 2130m to 1250 m ( no over pull,1 mtr fill on btm ) PH1 P CMD 1400 1530 1.50 2130m Pump 30 bbl Hi-Vis and circulate hole clean PH1 P TO 1530 2200 6.50 2130m P.O.H for log (slm: diff = +0.28m). PH1 P HBHA 2200 2300 1.00 2130m BO and LO stab, 1 x 6-1/4" DC, NMDC, P/DC and bit. E1 P LOG 2300 2400 1.00 2130m Hold safety meeting. Rig to run electric line logs. Operations For Period 0000 Hrs to 0600 Hrs on 01 Feb 2007 Phse Cls Op From To Hrs Depth Activity Description E1 P LOG 0000 0600 6.00 2130m Log hole with super combo (DLL-MLL-SLL-GR-Sonic-Density Neutron-SP-CAL) log. Tag TD at 2132m. karoongas... karoongas... DAILY DRILLING REPORT # 34 'Copyright IDS 2007', AT 20070114, KAROONGAS_AU_drllg Page 1 Printed on 31 Jan 2007 WBM Data Daily Chemical Costs: $ 884 Cost To Da... [From:WELL_DAILY]
A WELL_LOG_CURVE_INT: B.SOURCE B.CURVE_ID C.DESCRIPTION B.JOB_ID B.LOG_RUN B.PASS_NO B.TOP_DEPTH B.BASE_DEPTH B.DEPTH_UNIT B.QUALITY B.REMARK
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:AVOL DESC:AVOL JOB:01--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2122.2 Metres Units=F3; Annular Volume; ; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=0; maxv=0.007; average=0.0011; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:AVOL DESC:AVOL JOB:42--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2119.8 Metres Units=F3; Annular Volume; _70 0 0 00; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=0.1222; maxv=0.7814; average=0.2543; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:BIT DESC:BIT JOB:02--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:10 BASE:2135.4 Metres Units=MM; Bit size; ; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=215.9; maxv=215.9; average=215.9; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:BIT DESC:BIT JOB:49--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:495.8 BASE:2125.4 Metres Units=IN; Bit size; _70 282 00 00; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=302.934; maxv=653.707; average=466.4265; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:CGXT DESC:CGXT JOB:03--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2115.6 Metres Units=DEGC; MCG External Temperature; ; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=52.376; maxv=87.987; average=68.8452; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:CGXT DESC:CGXT JOB:28--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2115.4 Metres Units=DEGC; MCG External Temperature; _30 660 1 00; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=52.357; maxv=88.005; average=68.8448; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:CLDC DESC:CLDC JOB:04--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2122.2 Metres Units=IN; Density Caliper; ; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=1.231; maxv=12.625; average=8.6177; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:CLDC DESC:CLDC JOB:31--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2122.6 Metres Units=IN; Density Caliper; _45 280 1 00; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=-291; maxv=393; average=55.9776; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:CLYC DESC:CLYC JOB:05--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2117.4 Metres Units=IN; Y Two Arm Caliper; ; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=7.58; maxv=16.663; average=8.6341; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:CLYC DESC:CLYC JOB:35--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2132 Metres Units=IN; Y Two Arm Caliper; _70 280 2 00; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=0.001; maxv=582.917; average=39.131; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:DCOR DESC:DCOR JOB:06--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2122.6 Metres Units=K/M3; Density Correction; ; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=-286; maxv=394; average=55.942; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:DCOR DESC:DCOR JOB:32--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2132 Metres Units=G/C3; Density Correction; _42 356 1 00; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=0.038; maxv=641.926; average=44.5597; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:DDLL DESC:DDLL JOB:07--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2132 Metres Units=OHMM; Deep Laterolog; ; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=0.045; maxv=646.034; average=44.5575; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:DDLL DESC:DDLL JOB:37--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:10 BASE:2114.8 Metres Units=OHMM; Deep Laterolog; _11 220 10 00; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=11.993; maxv=205.499; average=86.1058; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:DEN DESC:DEN JOB:08--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2122.6 Metres Units=K/M3; Compensated Density; ; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=1319; maxv=2914; average=2526.1438; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:DEN DESC:DEN JOB:33--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2122.6 Metres Units=G/C3; Compensated Density; _42 350 1 00; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=1306; maxv=2924; average=2526.1735; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:DEPT DESC:DEPT JOB:25--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:10 BASE:2135.4 Metres Units=M; Logged depth; _00 001 00 00; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=10.1; maxv=2135.5; average=1072.8; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:DEPTH DESC:DEPTH JOB:00--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:10 BASE:2135.4 Metres Units=M; Logged depth; ; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=10; maxv=2135.4; average=1072.7; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:DPOR DESC:DPOR JOB:09--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2122.6 Metres Units=PERC; Base Density Porosity; ; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=-11.924; maxv=81.364; average=10.7518; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:DPOR DESC:DPOR JOB:48--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:495.4 BASE:2125 Metres Units=PERC; Base Density Porosity; _45 890 13 00; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=248.161; maxv=463.315; average=312.6649; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:DSLL DESC:DSLL JOB:10--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2132 Metres Units=OHMM; Shallow Laterolog; ; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=0.001; maxv=574.364; average=39.129; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:DSLL DESC:DSLL JOB:36--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:20 BASE:2124.6 Metres Units=OHMM; Shallow Laterolog; _11 220 9 00; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=52.507; maxv=181.442; average=77.345; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:DT35 DESC:DT35 JOB:11--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:20 BASE:2124.8 Metres Units=US/F; -5' Compensated Sonic; ; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=52.798; maxv=180.853; average=77.3437; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:DT35 DESC:DT35 JOB:27--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:10 BASE:2135.4 Metres Units=US/F; -5' Compensated Sonic; _60 520 32 00; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=215.9; maxv=215.9; average=215.9; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:GGCE DESC:GGCE JOB:12--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:10 BASE:2115 Metres Units=GAPI; Borehole Corrected Gamma; ; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=12.063; maxv=208.562; average=86.102; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:GGCE DESC:GGCE JOB:26--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2122.2 Metres Units=GAPI; Borehole Corrected Gamma; _30 310 0 00; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=0; maxv=0.007; average=0.0011; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:HVOL DESC:HVOL JOB:13--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2122.2 Metres Units=F3; Hole Volume; ; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=0; maxv=0.009; average=0.004; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:HVOL DESC:HVOL JOB:41--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2119.8 Metres Units=F3; Hole Volume; _70 0 0 00; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=0.1095; maxv=0.7311; average=0.2368; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:MATC DESC:MATC JOB:14--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2135.4 Metres Units=IN; MMR Caliper; ; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=4.86; maxv=14.685; average=8.5849; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:MATC DESC:MATC JOB:40--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2135.4 Metres Units=IN; MMR Caliper; _15 280 1 00; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=0.025; maxv=201.858; average=17.055; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:MRRS DESC:MRRS JOB:15--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2135.4 Metres Units=OHMM; MicroRes Resistance (S); ; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=0.026; maxv=202.124; average=17.0478; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:MRRS DESC:MRRS JOB:39--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2135.4 Metres Units=OHMM; MicroRes Resistance (S); _15 252 0 00; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=4.86; maxv=14.687; average=8.5846; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:NPOR DESC:NPOR JOB:16--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2120 Metres Units=V/V; Base Neutron Porosity; ; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=0.1107; maxv=0.7187; average=0.2369; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:NPOR DESC:NPOR JOB:47--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:495.8 BASE:2124.4 Metres Units=PERC; Base Neutron Porosity; _42 890 4 00; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=303.226; maxv=789.04; average=542.291; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:NPRL DESC:NPRL JOB:17--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2120 Metres Units=V/V; Limestone Neutron Por.; ; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=0.1236; maxv=0.7666; average=0.2543; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:NPRL DESC:NPRL JOB:30--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2117.2 Metres Units=PERC; Limestone Neutron Por.; _42 890 1 00; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=7.578; maxv=16.918; average=8.6346; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:PDPE DESC:PDPE JOB:18--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2122.6 Metres Units=B/E; PE; ; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=1.879; maxv=13.975; average=3.2449; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:PDPE DESC:PDPE JOB:34--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2122.6 Metres Units=B/E; PE; _45 358 1 00; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=-12.526; maxv=82.124; average=10.7504; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:SMTU DESC:SMTU JOB:19--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2135.4 Metres Units=LB; DST Uphole Tension; ; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=1152.344; maxv=3017.5779; average=2039.9169; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:SMTU DESC:SMTU JOB:29--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2122.2 Metres Units=LB; DST Uphole Tension; _30 635 0 00; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=1.231; maxv=12.625; average=8.6173; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:SPDL DESC:SPDL JOB:20--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2110.6 Metres Units=MV; Spontaneous Potential; ; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=-133.968; maxv=57.987; average=-101.6928; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:SPDL DESC:SPDL JOB:38--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2122.2 Metres Units=MV; Spontaneous Potential; _30 10 0 00; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=0; maxv=0.009; average=0.004; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:TR11 DESC:TR11 JOB:21--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:495.4 BASE:2125 Metres Units=US; 4' Transit Time; ; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=242.123; maxv=557.558; average=389.0219; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:TR11 DESC:TR11 JOB:43--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2122.6 Metres Units=US; 4' Transit Time; _60 520 4 00; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=1.919; maxv=13.829; average=3.2442; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:TR12 DESC:TR12 JOB:22--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496 BASE:2124.6 Metres Units=US; 6' Transit Time; ; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=374.282; maxv=762.407; average=542.2696; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:TR12 DESC:TR12 JOB:44--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2135.4 Metres Units=US; 6' Transit Time; _60 520 60 00; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=1142.578; maxv=2934.5701; average=2040.0331; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:TR21 DESC:TR21 JOB:23--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:495.6 BASE:2125.2 Metres Units=US; 3' Transit Time; ; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=249.854; maxv=451.97; average=312.6501; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:TR21 DESC:TR21 JOB:45--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:496.6 BASE:2110.4 Metres Units=US; 3' Transit Time; _60 520 30 00; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=-133.849; maxv=57.774; average=-101.7012; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:TR22 DESC:TR22 JOB:24--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:495.8 BASE:2125.4 Metres Units=US; 5' Transit Time; ; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=297.56; maxv=633.833; average=466.4576; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:TR22 DESC:TR22 JOB:46--MEGASCOLIDES-2 RUN:1 PASS:99 TOP:495.4 BASE:2125 Metres Units=US; 5' Transit Time; _60 520 50 00; SRVC=Precision Energy Services; COMP=KAROON GAS PTY. LTD.; START=10; STOP=2135.5; minv=249.35; maxv=557.173; average=388.9991; metadata from DPI Geolog (mostly Occam);
B WELL_LOG_CURVE_INT:WELL_WCR_RPT CURVE:DLL DESC:DLL JOB:Precision Logging RUN:1 PASS:1 TOP:497 BASE:2132 Metres DLL-MLL-SLL-GR-SONIC-NEUTRON-DENSITY-SP-CAL (SUPER COMBO) (01-FEB-2007). NOTE: GR TO SURFACE Source: pg 8 of file: "3446-DR-01-0008 Rev 0.pdf", WCR within "ATTACH-TRMNO-000001-_2EA0HBI2J.ZIP" (PE610413).
B WELL_LOG_CURVE_INT:WELL_WCR_RPT CURVE:HMI DESC:High Resolution Micro Imager - Imaged Di JOB:Precision Logging RUN:1 PASS:1 TOP:960 BASE:2132 Metres High Resolution Micro Imager � Imaged Dip Log (01-FEB-2007). Source: pg 8 of file: "3446-DR-01-0008 Rev 0.pdf", WCR within "ATTACH-TRMNO-000001-_2EA0HBI2J.ZIP" (PE610413).
B WELL_LOG_CURVE_INT:WELL_WCR_RPT CURVE:Velocity_Survey DESC:Velocity Survey JOB:Precision Logging RUN:1 PASS:1 TOP:15 BASE:2130 Metres Velocity Check Shot Survey (01-FEB-2007). Source: pg 8 of file: "3446-DR-01-0008 Rev 0.pdf", WCR within "ATTACH-TRMNO-000001-_2EA0HBI2J.ZIP" (PE610413).
--- LISTING OF GEOGRAPHICALLY CLOSE WELLS TO THIS WELL ---
DISTANCE= 01.0 km (very approx) Onshore?=Y WELL_NAME= MEGASCOLIDES-1 RE ST1
DISTANCE= 01.1 km (very approx) Onshore?=Y WELL_NAME= MEGASCOLIDES-1
DISTANCE= 08.5 km (very approx) Onshore?=Y WELL_NAME= INVERMAY-1
DISTANCE to non-petroleum deep borehole= 02.1 km (very approx) BOREHOLE_SITE_ID=SIT330737 : BOREHOLE_NAME=WARRAGUL 10 (Depth=100.584)
DISTANCE to non-petroleum deep borehole= 03.1 km (very approx) BOREHOLE_SITE_ID=SIT330736 : BOREHOLE_NAME=WARRAGUL 9 (Depth=309.982)
DISTANCE to non-petroleum deep borehole= 04.0 km (very approx) BOREHOLE_SITE_ID=SIT61125 : BOREHOLE_NAME=DROUIN EAST 1 (Depth=113.995)
DISTANCE to non-petroleum deep borehole= 04.6 km (very approx) BOREHOLE_SITE_ID=SIT312571 : BOREHOLE_NAME=LONGWARRY 1 (Depth=219.456)
DISTANCE to non-petroleum deep borehole= 04.9 km (very approx) BOREHOLE_SITE_ID=SIT61134 : BOREHOLE_NAME=DROUIN EAST 10005 (Depth=110.7)
DISTANCE to non-petroleum deep borehole= 06.9 km (very approx) BOREHOLE_SITE_ID=SIT300222 : BOREHOLE_NAME=ALLAMBEE 1 (Depth=355.83)
DISTANCE to non-petroleum deep borehole= 06.9 km (very approx) BOREHOLE_SITE_ID=SIT300223 : BOREHOLE_NAME=ALLAMBEE 2 (Depth=362.889)
DISTANCE to non-petroleum deep borehole= 08.5 km (very approx) BOREHOLE_SITE_ID=SIT312572 : BOREHOLE_NAME=LONGWARRY 2 (Depth=194.1576)
DISTANCE to non-petroleum deep borehole= 11.0 km (very approx) BOREHOLE_SITE_ID=SIT330741 : BOREHOLE_NAME=WARRAGUL 8032 (Depth=191.8)
DISTANCE to non-petroleum deep borehole= 11.3 km (very approx) BOREHOLE_SITE_ID=SIT101186 : BOREHOLE_NAME=WARRAGUL 10007 (Depth=221)
DISTANCE to non-petroleum deep borehole= 11.3 km (very approx) BOREHOLE_SITE_ID=SIT300226 : BOREHOLE_NAME=ALLAMBEE 5 (Depth=256.03)
DISTANCE to non-petroleum deep borehole= 11.5 km (very approx) BOREHOLE_SITE_ID=SIT312573 : BOREHOLE_NAME=LONGWARRY 3 (Depth=189.8904)
DISTANCE to non-petroleum deep borehole= 12.0 km (very approx) BOREHOLE_SITE_ID=SIT300225 : BOREHOLE_NAME=ALLAMBEE 4 (Depth=300.83)
DISTANCE to non-petroleum deep borehole= 12.6 km (very approx) BOREHOLE_SITE_ID=SIT330742 : BOREHOLE_NAME=WARRAGUL 8033 (Depth=240.8)
DISTANCE to non-petroleum deep borehole= 12.9 km (very approx) BOREHOLE_SITE_ID=SIT61175 : BOREHOLE_NAME=DROUIN WEST 16 (Depth=160.935)
DISTANCE to non-petroleum deep borehole= 13.3 km (very approx) BOREHOLE_SITE_ID=SIT61172 : BOREHOLE_NAME=DROUIN WEST 10 (Depth=132.588)
DISTANCE to non-petroleum deep borehole= 13.4 km (very approx) BOREHOLE_SITE_ID=SIT311373 : BOREHOLE_NAME=KORUMBURRA 27 (Depth=426.848)
DISTANCE to non-petroleum deep borehole= 13.5 km (very approx) BOREHOLE_SITE_ID=SIT330765 : BOREHOLE_NAME=WARRAGUL 8056 (Depth=119)
DISTANCE to non-petroleum deep borehole= 13.6 km (very approx) BOREHOLE_SITE_ID=SIT330728 : BOREHOLE_NAME=WARRAGUL 1 (Depth=391.363)
DISTANCE to non-petroleum deep borehole= 13.6 km (very approx) BOREHOLE_SITE_ID=SIT330763 : BOREHOLE_NAME=WARRAGUL 8054 (Depth=108)
DISTANCE to non-petroleum deep borehole= 13.7 km (very approx) BOREHOLE_SITE_ID=SIT61182 : BOREHOLE_NAME=DROUIN WEST 23 (Depth=133.503)
DISTANCE to non-petroleum deep borehole= 14.0 km (very approx) BOREHOLE_SITE_ID=SIT311374 : BOREHOLE_NAME=KORUMBURRA 28 (Depth=246.457)
DISTANCE to non-petroleum deep borehole= 14.2 km (very approx) BOREHOLE_SITE_ID=SIT333618 : BOREHOLE_NAME=YANNATHAN 8014 (Depth=105)
DISTANCE to non-petroleum deep borehole= 14.2 km (very approx) BOREHOLE_SITE_ID=SIT61142 : BOREHOLE_NAME=DROUIN EAST 10013 (Depth=147)
DISTANCE to non-petroleum deep borehole= 14.3 km (very approx) BOREHOLE_SITE_ID=SIT79782 : BOREHOLE_NAME=MOE 45 (Depth=289.865)
DISTANCE to non-petroleum deep borehole= 14.4 km (very approx) BOREHOLE_SITE_ID=SIT305905 : BOREHOLE_NAME=DARNUM 8025 (Depth=174.5)
DISTANCE to non-petroleum deep borehole= 14.5 km (very approx) BOREHOLE_SITE_ID=SIT319962 : BOREHOLE_NAME=MOE 8017 (Depth=321.2)
DISTANCE to non-petroleum deep borehole= 14.8 km (very approx) BOREHOLE_SITE_ID=SIT300224 : BOREHOLE_NAME=ALLAMBEE 3 (Depth=286.51)
DISTANCE to non-petroleum deep borehole= 14.8 km (very approx) BOREHOLE_SITE_ID=SIT305904 : BOREHOLE_NAME=DARNUM 8024 (Depth=165.5)
DISTANCE to non-petroleum deep borehole= 15.4 km (very approx) BOREHOLE_SITE_ID=SIT311229 : BOREHOLE_NAME=KOOROOMAN 2 (Depth=395.022)
DISTANCE to non-petroleum deep borehole= 15.5 km (very approx) BOREHOLE_SITE_ID=SIT71856 : BOREHOLE_NAME=KOO-WEE-RUP EAST 14 (Depth=146)
DISTANCE to non-petroleum deep borehole= 15.7 km (very approx) BOREHOLE_SITE_ID=SIT311363 : BOREHOLE_NAME=KORUMBURRA 17 (Depth=363.068)
DISTANCE to non-petroleum deep borehole= 15.7 km (very approx) BOREHOLE_SITE_ID=SIT311393 : BOREHOLE_NAME=KORUMBURRA 47 (Depth=350.97)
DISTANCE to non-petroleum deep borehole= 15.7 km (very approx) BOREHOLE_SITE_ID=SIT319973 : BOREHOLE_NAME=MOE 8028 (Depth=135)
DISTANCE to non-petroleum deep borehole= 15.7 km (very approx) BOREHOLE_SITE_ID=SIT319974 : BOREHOLE_NAME=MOE 8029 (Depth=128)
DISTANCE to non-petroleum deep borehole= 15.7 km (very approx) BOREHOLE_SITE_ID=SIT72423 : BOREHOLE_NAME=KOO-WEE-RUP EAST 10043 (Depth=455)
DISTANCE to non-petroleum deep borehole= 15.8 km (very approx) BOREHOLE_SITE_ID=SIT319963 : BOREHOLE_NAME=MOE 8018 (Depth=110)
DISTANCE to non-petroleum deep borehole= 16.2 km (very approx) BOREHOLE_SITE_ID=SIT305909 : BOREHOLE_NAME=DARNUM 8029 (Depth=102)
DISTANCE to non-petroleum deep borehole= 16.2 km (very approx) BOREHOLE_SITE_ID=SIT319972 : BOREHOLE_NAME=MOE 8027 (Depth=119)
DISTANCE to non-petroleum deep borehole= 16.4 km (very approx) BOREHOLE_SITE_ID=SIT311362 : BOREHOLE_NAME=KORUMBURRA 16 (Depth=181.966)
DISTANCE to non-petroleum deep borehole= 16.5 km (very approx) BOREHOLE_SITE_ID=SIT71846 : BOREHOLE_NAME=KOO-WEE-RUP EAST 4 (Depth=181.356)
SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = GKG05-01
SDO: HISTORICAL TITLES: 1. ENCLOSING MEGASCOLIDES-2 : TITLE_NAME=GEP06-29
SDO: HISTORICAL TITLES: 1. ENCLOSING MEGASCOLIDES-2 : TITLE_NAME=GEP11
SDO: HISTORICAL TITLES: 1. ENCLOSING MEGASCOLIDES-2 : TITLE_NAME=PEP131
SDO: HISTORICAL TITLES: 1. ENCLOSING MEGASCOLIDES-2 : TITLE_NAME=PEP162
SDO: HISTORICAL TITLES: 1. ENCLOSING MEGASCOLIDES-2 : TITLE_NAME=PEP27
SDO: HISTORICAL TITLES: 1. ENCLOSING MEGASCOLIDES-2 : TITLE_NAME=PEP99
SDO: HISTORICAL TITLES: 2. NEAR MEGASCOLIDES-2 : TITLE_NAME=GEP06-29 : Distance=0
SDO: HISTORICAL TITLES: 2. NEAR MEGASCOLIDES-2 : TITLE_NAME=GEP11 : Distance=0
SDO: HISTORICAL TITLES: 2. NEAR MEGASCOLIDES-2 : TITLE_NAME=PEP131 : Distance=0
SDO: HISTORICAL TITLES: 2. NEAR MEGASCOLIDES-2 : TITLE_NAME=PEP162 : Distance=0
SDO: HISTORICAL TITLES: 2. NEAR MEGASCOLIDES-2 : TITLE_NAME=PEP27 : Distance=0
SDO: HISTORICAL TITLES: 2. NEAR MEGASCOLIDES-2 : TITLE_NAME=PEP99 : Distance=0
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE911565 a MEGASCOLIDES-1 RE ST1 & -2 WCR Volume 3 [CD] PE911565__((_MEGASCOLIDES-1_RE_ST1___-2_WCR_VOLUME_3_))_.TAR.GZ(34.6m).........PE911565__((_MEGASCOLIDES-1_RE_ST1___-2_WCR_VOLUME_3_))_.TAR.GZ(34.6m).........SAM2_305_PE911565__((_MEGASCOLIDES-1_RE_ST1___-2_WCR_VOLUME_3_))_I_MEDIA_LABELLING.JPG(3.0m).........
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE911565 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE911565 c DESC=MEGASCOLIDES-1 RE ST1 & MEGASCOLIDES-2 WCR Volume 3 and Data, containing Drilling Data (two copies) and Mud Recap in PDF format for MEGASCOLIDES-1 RE ST1, and Drilling Data and Mud Recap in PDF format for MEGASCOLIDES-2. See Remarks. Karoon Gas Jun 2008
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE911565 d WELL_NAME=MEGASCOLIDES-1 RE ST1
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE911565 d WELL_NAME=MEGASCOLIDES-2
ASSETS (DETAIL) GENERAL ESUBS_CD_DVD PE911536 a DDRs, Well & Permit Data 2005 to 2007 [DVD] (3259 DIGITAL FILES)
ASSETS (DETAIL) GENERAL ESUBS_CD_DVD PE911536 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) GENERAL ESUBS_CD_DVD PE911536 c DESC=Daily Drilling reports, Well Data & Permit Data for the years 2005 to 2007. Reports submitted via email to DPI. Saved by Kourosh Mehin, Mary Jane, Hannah Wallace. NOTE! Some files corrupted. See Remarks.
ASSETS (DETAIL) GENERAL REGISTRY_FILE F7715555 a PE/16/0542 (Part-1) Registry File [PAPER]
ASSETS (DETAIL) GENERAL REGISTRY_FILE F7715555 b (located in::RECFINDD= SEE RECFIND DATABASE)
ASSETS (DETAIL) GENERAL REGISTRY_FILE F7715555 c DESC=PE/16/0542 (Part-1) PETROLEUM EXPLORATION WELL W1416 MEGASCOLIDES-2 CORRESPONDENCE
ASSETS (DETAIL) GENERAL REGISTRY_FILE F7715555 d WELL_NAME=MEGASCOLIDES-2
ASSETS (DETAIL) SEISMIC VELOCITY PE501011 a MEGASCOLIDES-2 Velocity Survey Report [CD] PE501011__((_MEGASCOLIDES-2_VELOCITY_SURVEY_REPORT_))_.TAR.GZ(0.9m).........KAROON_MEGASCOLIDES2.PDF(0.9m).........SAM0_794_PE501011__((_MEGASCOLIDES-2_VELOCITY_SURVEY_REPORT_))__MEDIA_LABELLING.JPG(3.0m).........DATA_KAROON_MEGASCOLIDES.XLS(0.1m).........PE501011__((_MEGASCOLIDES-2_VELOCITY_SURVEY_REPORT_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) SEISMIC VELOCITY PE501011 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) SEISMIC VELOCITY PE501011 c DESC=MEGASCOLIDES-2 Velocity Survey Report by Velseis for Karoon Gas. CPCD-827. 4-Sep-2007.q
ASSETS (DETAIL) SEISMIC VELOCITY PE501011 d WELL_NAME=MEGASCOLIDES-2
ASSETS (DETAIL) WELL APPLICATION_RPT PE907825 a MEGASCOLIDES-2 Well Approval Docs [CD] PE907825__((_MEGASCOLIDES-2_WELL_APPROVAL_DOCS_))_.TAR.GZ(7.0m).........SAM1_590_PE907825__((_MEGASCOLIDES-2_WELL_APPROVAL_DOCS_))__MEDIA_LABELLING.JPG(2.9m).........
ASSETS (DETAIL) WELL APPLICATION_RPT PE907825 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) WELL APPLICATION_RPT PE907825 c DESC=MEGASCOLIDES-2, PEP162, Well Approval Documents: Covering letter, Drilling Program, Geological Well file. Upstream Petroleum for Karoon Gas Pty Ltd, 20 October, 2006.
ASSETS (DETAIL) WELL APPLICATION_RPT PE907825 d WELL_NAME=MEGASCOLIDES-2
ASSETS (DETAIL) WELL APPLICATION_RPT PE907825_1 a MEGASCOLIDES-2 Drilling Program [CD] PE907825__((_MEGASCOLIDES-2_WELL_APPROVAL_DOCS_))_.TAR.GZ(7.0m).........SAM1_590_PE907825__((_MEGASCOLIDES-2_WELL_APPROVAL_DOCS_))__MEDIA_LABELLING.JPG(2.9m).........
ASSETS (DETAIL) WELL APPLICATION_RPT PE907825_1 b (located in::PE907825= MEGASCOLIDES-2 Well Approval Docs)
ASSETS (DETAIL) WELL APPLICATION_RPT PE907825_1 c DESC=MEGASCOLIDES-2, PEP162, Drilling Program. Upstream Petroleum Doc No. 34461-DR-01-0002 (57 pp plus Appendices 6 & 7 (pdf)). Appendices 9 - 14 listed but not included. Karoon Gas Pty Ltd, 20 October, 2006.
ASSETS (DETAIL) WELL APPLICATION_RPT PE907825_1 d WELL_NAME=MEGASCOLIDES-2
ASSETS (DETAIL) WELL BIOSTRAT_RPT PE913052_3 a MEGASCOLIDES-1&2 Biostrat, 2007 [CD] (15 DIGITAL FILES)
ASSETS (DETAIL) WELL BIOSTRAT_RPT PE913052_3 b (located in::PE913052= MEGASCOLIDES-1 RE ST1 + -2 Interp WCR)
ASSETS (DETAIL) WELL BIOSTRAT_RPT PE913052_3 c DESC=MEGASCOLIDES-1&2 Biostrat Biostrata Report 2007/07 with Cross section June 2007
ASSETS (DETAIL) WELL BIOSTRAT_RPT PE913052_3 d WELL_NAME=MEGASCOLIDES-1
ASSETS (DETAIL) WELL BIOSTRAT_RPT PE913052_3 d WELL_NAME=MEGASCOLIDES-2
ASSETS (DETAIL) WELL DAILY_RPT PE909735 a MEGASCOLIDES-1 RE ST1 & -2 Daily Reports [CD] (165 DIGITAL FILES)
ASSETS (DETAIL) WELL DAILY_RPT PE909735 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) WELL DAILY_RPT PE909735 c DESC=MEGASCOLIDES-1 Re-Entry Sidetrack (REST) and MEGASCOLIDES-2 Daily Reports & well logs. November 2006. January 2007. Karoon Gas
ASSETS (DETAIL) WELL DAILY_RPT PE909735 d WELL_NAME=MEGASCOLIDES-1 RE ST1
ASSETS (DETAIL) WELL DAILY_RPT PE909735 d WELL_NAME=MEGASCOLIDES-2
ASSETS (DETAIL) WELL DAILY_RPT PE909735 d WELL_NAME=MEGASCOLIDES-2 WELL_ANC = POINT DEPTH=3281
ASSETS (DETAIL) WELL DAILY_RPT PE909789 a MEGASCOLIDES-2 Daily Reports [CD] (34 DIGITAL FILES)
ASSETS (DETAIL) WELL DAILY_RPT PE909789 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) WELL DAILY_RPT PE909789 c DESC=MEGASCOLIDES-2 Daily Reports. November 2006. January 2007. Karoon Gas CD 2/2
ASSETS (DETAIL) WELL DAILY_RPT PE909789 d WELL_NAME=MEGASCOLIDES-2
ASSETS (DETAIL) WELL DAILY_RPT PE911536_5 a Daily Drilling, Geol, Workover, Mud Rpts [DVD] (3259 DIGITAL FILES)
ASSETS (DETAIL) WELL DAILY_RPT PE911536_5 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007)
ASSETS (DETAIL) WELL DAILY_RPT PE911536_5 c DESC=Daily Drilling, Geol, Workover, Mud Reports, 2005-2007.
ASSETS (DETAIL) WELL DATA_CD_DVD PE915098 a Well Data - Electronic Submissions 2008 [DVD] (2291 DIGITAL FILES)
ASSETS (DETAIL) WELL DATA_CD_DVD PE915098 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) WELL DATA_CD_DVD PE915098 c DESC=Well Data - Electronic Submissions 2008. Contains all well data types catalogued in 2008. Disk to be created at end of year frm email attachments stored in Active folder on Unix p1. For well/co./rpt details see Remarks/Ancillary Data.
ASSETS (DETAIL) WELL DATA_CD_DVD PE915098 d (more than 25 wells for this asset item)
ASSETS (DETAIL) WELL DIRECTIONAL PE913232_009 a MEGASCOLIDES-2 Deviation Survey Data [CD] (18 DIGITAL FILES)
ASSETS (DETAIL) WELL DIRECTIONAL PE913232_009 b (located in::PE913232= MEGASCOLIDES-2 WCR Basic Geology)
ASSETS (DETAIL) WELL DIRECTIONAL PE913232_009 c DESC=MEGASCOLIDES-2 Deviation Survey Data. Page 9 and 10. 22 Points. Contained in Volume 1 : Basic Geology Well Completion Report Karoon Gas September 2007
ASSETS (DETAIL) WELL DIRECTIONAL PE913232_009 d WELL_NAME=MEGASCOLIDES-2
ASSETS (DETAIL) WELL DRILL_RPT PE911536_9 a Drilling Data, Logs, TD Curves & Reports [DVD] (3259 DIGITAL FILES)
ASSETS (DETAIL) WELL DRILL_RPT PE911536_9 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007)
ASSETS (DETAIL) WELL DRILL_RPT PE911536_9 c DESC=Drilling Data, Logs, TD Curves & Reports.
ASSETS (DETAIL) WELL DRILL_RPT PE911565_4 a MEGASCOLIDES-2 Drilling Fluid SummaryRpt [CD] PE911565__((_MEGASCOLIDES-1_RE_ST1___-2_WCR_VOLUME_3_))_.TAR.GZ(34.6m).........PE911565__((_MEGASCOLIDES-1_RE_ST1___-2_WCR_VOLUME_3_))_.TAR.GZ(34.6m).........SAM2_305_PE911565__((_MEGASCOLIDES-1_RE_ST1___-2_WCR_VOLUME_3_))_I_MEDIA_LABELLING.JPG(3.0m).........
ASSETS (DETAIL) WELL DRILL_RPT PE911565_4 b (located in::PE911565= MEGASCOLIDES-1 RE ST1 & -2 WCR Vol.3)
ASSETS (DETAIL) WELL DRILL_RPT PE911565_4 c DESC=MEGASCOLIDES-2 Drilling Fluid Summary Report in PDF Format.
ASSETS (DETAIL) WELL DRILL_RPT PE911565_4 d WELL_NAME=MEGASCOLIDES-1 RE ST1
ASSETS (DETAIL) WELL DRILL_RPT PE911565_4 d WELL_NAME=MEGASCOLIDES-2
ASSETS (DETAIL) WELL DRILL_RPT PE915098_08 a Well Drill Repts, Logs & T-D Curves 2008 [CD] (2291 DIGITAL FILES)
ASSETS (DETAIL) WELL DRILL_RPT PE915098_08 b (located in::PE915098= Well Data - Electronic Submissions 2008)
ASSETS (DETAIL) WELL DRILL_RPT PE915098_08 c DESC=Well Drilling Reports, Logs & Time-Depth Curves - Electronic Submissions 2008. Contains drilling reports, and digital & image files of drill logs and time depth curves.
ASSETS (DETAIL) WELL DRILL_RPT PE915098_08 d (more than 25 wells for this asset item)
ASSETS (DETAIL) WELL ELEMENTARY PE915098_13 a Well Elementary WCR, FWR, EOW Data 2008 [CD] (2291 DIGITAL FILES)
ASSETS (DETAIL) WELL ELEMENTARY PE915098_13 b (located in::PE915098= Well Data - Electronic Submissions 2008)
ASSETS (DETAIL) WELL ELEMENTARY PE915098_13 c DESC=Well Elementary WCR, FWR, EOW Data - Electronic Submissions 2008. Contains other elementary WCR data such as wireline logging & SWC summary reports/listings, drilling fluids/data logging, 'morning' reports. Also see Remarks.
ASSETS (DETAIL) WELL ELEMENTARY PE915098_13 d WELL_NAME=AYRFORD-1
ASSETS (DETAIL) WELL ELEMENTARY PE915098_13 d WELL_NAME=BOOLA BOOLA-2
ASSETS (DETAIL) WELL ELEMENTARY PE915098_13 d WELL_NAME=COELACANTH-1
ASSETS (DETAIL) WELL ELEMENTARY PE915098_13 d WELL_NAME=EAST WING-1
ASSETS (DETAIL) WELL ELEMENTARY PE915098_13 d WELL_NAME=EAST WING-1 ST1
ASSETS (DETAIL) WELL ELEMENTARY PE915098_13 d WELL_NAME=HAZELWOOD-1
ASSETS (DETAIL) WELL ELEMENTARY PE915098_13 d WELL_NAME=SNAPPER-A21A
ASSETS (DETAIL) WELL ELEMENTARY PE915098_13 d WELL_NAME=SNAPPER-M33A
ASSETS (DETAIL) WELL ELEMENTARY PE915098_13 d WELL_NAME=SNAPPER-M33A WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0
ASSETS (DETAIL) WELL GEOL_RPT PE907825_2 a MEGASCOLIDES-2 Geological Well File [CD] PE907825__((_MEGASCOLIDES-2_WELL_APPROVAL_DOCS_))_.TAR.GZ(7.0m).........SAM1_590_PE907825__((_MEGASCOLIDES-2_WELL_APPROVAL_DOCS_))__MEDIA_LABELLING.JPG(2.9m).........
ASSETS (DETAIL) WELL GEOL_RPT PE907825_2 b (located in::PE907825= MEGASCOLIDES-2 Well Approval Docs)
ASSETS (DETAIL) WELL GEOL_RPT PE907825_2 c DESC=MEGASCOLIDES-2, PEP162 / EL 4537, Geological Well File and Evaluation Programme. Upstream Petroleum Doc No. 34461-DR-01-0003 Rev 0 (31 pp). Karoon Gas Pty Ltd, October, 2006. EL4537 Surrendered 12/3/09.
ASSETS (DETAIL) WELL GEOL_RPT PE907825_2 d WELL_NAME=MEGASCOLIDES-2
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 a Lithology Logs and Cuttings Descriptions [DVD] (3259 DIGITAL FILES)
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007)
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 c DESC=Lithology Logs and Cuttings Descriptions.
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 d WELL_NAME=BASKER-1
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 d WELL_NAME=BASKER-2
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 d WELL_NAME=BOUNDARY CREEK-2
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 d WELL_NAME=CRC-1
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 d WELL_NAME=GLENAIRE-1
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 d WELL_NAME=GLENAIRE-1 ST1
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 d WELL_NAME=HAZELWOOD-1
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 d WELL_NAME=LOY YANG-2
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 d WELL_NAME=MACLEAN-1
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 d WELL_NAME=MANTA-2A
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 d WELL_NAME=MEGASCOLIDES-1 RE ST1
ASSETS (DETAIL) WELL LITHOLOGY_LOG PE911536_7 d WELL_NAME=MEGASCOLIDES-2
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE913233 a MEGASCOLIDES-2 Wireline Logs [CD] PE913233__((_MEGASCOLIDES-2_WIRELINE_LOGS_))_.TAR.GZ(218.9m).........SAM3_281_PE913233__((_MEGASCOLIDES-2_WIRELINE_LOGS_))_I_MEDIA_LABELLING.JPG(2.6m).........PE913233__((_MEGASCOLIDES-2_WIRELINE_LOGS_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE913233 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE913233 c DESC=MEGASCOLIDES-2 Wireline Logs (Copy 1) Precision Engineering Services for Karoon Gas September 2007
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE913233 d WELL_NAME=MEGASCOLIDES-2
ASSETS (DETAIL) WELL MUD_LOG PE911536_6 a Mudlogs [DVD] (3259 DIGITAL FILES)
ASSETS (DETAIL) WELL MUD_LOG PE911536_6 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007)
ASSETS (DETAIL) WELL MUD_LOG PE911536_6 c DESC=Mudlogs.
ASSETS (DETAIL) WELL PETROPHYSICAL_RPT PE913052_4 a MEGASCOLIDES-2 Composite log [CD] (15 DIGITAL FILES)
ASSETS (DETAIL) WELL PETROPHYSICAL_RPT PE913052_4 b (located in::PE913052= MEGASCOLIDES-1 RE ST1 + -2 Interp WCR)
ASSETS (DETAIL) WELL PETROPHYSICAL_RPT PE913052_4 c DESC=MEGASCOLIDES-2 Composite Log (Petrophysics) Mar 08
ASSETS (DETAIL) WELL PETROPHYSICAL_RPT PE913052_4 d WELL_NAME=MEGASCOLIDES-2
ASSETS (DETAIL) WELL RPT PE911536_13 a Abandonment Programs, P&A Approvals [DVD] (3259 DIGITAL FILES)
ASSETS (DETAIL) WELL RPT PE911536_13 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007)
ASSETS (DETAIL) WELL RPT PE911536_13 c DESC=Abandonment Programs, Suspensions and P&A Approval Letters. In DOC & PDF formats.
ASSETS (DETAIL) WELL RPT PE911536_13 d WELL_NAME=BANJO-1
ASSETS (DETAIL) WELL RPT PE911536_13 d WELL_NAME=CHILDERS COVE-1
ASSETS (DETAIL) WELL RPT PE911536_13 d WELL_NAME=FUR SEAL-1
ASSETS (DETAIL) WELL RPT PE911536_13 d WELL_NAME=GALLOWAY-1
ASSETS (DETAIL) WELL RPT PE911536_13 d WELL_NAME=LOY YANG-2
ASSETS (DETAIL) WELL RPT PE911536_13 d WELL_NAME=MANTA-2
ASSETS (DETAIL) WELL RPT PE911536_13 d WELL_NAME=MEGASCOLIDES-1 RE ST1
ASSETS (DETAIL) WELL RPT PE911536_13 d WELL_NAME=MEGASCOLIDES-2
ASSETS (DETAIL) WELL WCR_RPT PE610413 a MEGASCOLIDES-1 RE ST1 & -2 WCR Vol.3 [CD] (8 DIGITAL FILES)
ASSETS (DETAIL) WELL WCR_RPT PE610413 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) WELL WCR_RPT PE610413 c DESC=MEGASCOLIDES-1 RE ST1 and MEGASCOLIDES-2. Well Completion Report Volume 3 Drilling Data By AGR for Karoon Gas. June 08.
ASSETS (DETAIL) WELL WCR_RPT PE610413 d WELL_NAME=MEGASCOLIDES-1 RE ST1
ASSETS (DETAIL) WELL WCR_RPT PE610413 d WELL_NAME=MEGASCOLIDES-2
ASSETS (DETAIL) WELL WCR_RPT PE911565_3 a MEGASCOLIDES-2 WCR Vol.3: Drill Data Rpt [CD] PE911565__((_MEGASCOLIDES-1_RE_ST1___-2_WCR_VOLUME_3_))_.TAR.GZ(34.6m).........PE911565__((_MEGASCOLIDES-1_RE_ST1___-2_WCR_VOLUME_3_))_.TAR.GZ(34.6m).........SAM2_305_PE911565__((_MEGASCOLIDES-1_RE_ST1___-2_WCR_VOLUME_3_))_I_MEDIA_LABELLING.JPG(3.0m).........
ASSETS (DETAIL) WELL WCR_RPT PE911565_3 b (located in::PE911565= MEGASCOLIDES-1 RE ST1 & -2 WCR Vol.3)
ASSETS (DETAIL) WELL WCR_RPT PE911565_3 c DESC=MEGASCOLIDES-2 WCR Volume 3: Drilling Data Report Rev 0 in PDF Format. PEP162/EL4537, Karoon Gas, Jul 2008. Also has 2 transmittals in .XML format.
ASSETS (DETAIL) WELL WCR_RPT PE911565_3 d WELL_NAME=MEGASCOLIDES-2
ASSETS (DETAIL) WELL WCR_RPT PE913052 a MEGASCOLIDES-1 RE ST1 & -2 Interp WCR [CD] (15 DIGITAL FILES)
ASSETS (DETAIL) WELL WCR_RPT PE913052 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) WELL WCR_RPT PE913052 c DESC=MEGASCOLIDES-1 RE ST1 & MEGASCOLIDES-2 Interp WCR. Mar 2008
ASSETS (DETAIL) WELL WCR_RPT PE913052 d WELL_NAME=MEGASCOLIDES-1
ASSETS (DETAIL) WELL WCR_RPT PE913052 d WELL_NAME=MEGASCOLIDES-1 RE ST1
ASSETS (DETAIL) WELL WCR_RPT PE913052 d WELL_NAME=MEGASCOLIDES-2
ASSETS (DETAIL) WELL WCR_RPT PE913052_2 a MEGASCOLIDES-2 WCR interpretive [CD] (15 DIGITAL FILES)
ASSETS (DETAIL) WELL WCR_RPT PE913052_2 b (located in::PE913052= MEGASCOLIDES-1 RE ST1 + -2 Interp WCR)
ASSETS (DETAIL) WELL WCR_RPT PE913052_2 c DESC=MEGASCOLIDES-2 Interpretative WCR Nov-2007
ASSETS (DETAIL) WELL WCR_RPT PE913052_2 d WELL_NAME=MEGASCOLIDES-2
ASSETS (DETAIL) WELL WCR_RPT PE913232 a MEGASCOLIDES-2 WCR Basic Geology [CD] (18 DIGITAL FILES)
ASSETS (DETAIL) WELL WCR_RPT PE913232 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) WELL WCR_RPT PE913232 c DESC=MEGASCOLIDES-2 Volume 1 : Basic Geology Well Completion Report Karoon Gas September 2007
ASSETS (DETAIL) WELL WCR_RPT PE913232 d WELL_NAME=MEGASCOLIDES-2
ASSETS (DETAIL) WELL WELL_LOG PE911536_14 a Well Log Images [DVD] (3259 DIGITAL FILES)
ASSETS (DETAIL) WELL WELL_LOG PE911536_14 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007)
ASSETS (DETAIL) WELL WELL_LOG PE911536_14 c DESC=Well Log Images.
MEGASCOLIDES_2_DIR OIL_CO_DATA:1: DEVIATION SRVY 01 SURVEY_ID =MEGASCOLIDES_2_DIR
MEGASCOLIDES_2_DIR OIL_CO_DATA:1: DEVIATION SRVY 02 SURVEY_COMPANY =TOTCO
MEGASCOLIDES_2_DIR OIL_CO_DATA:1: DEVIATION SRVY 05 SURVEY_TYPE =DIR
MEGASCOLIDES_2_DIR OIL_CO_DATA:1: DEVIATION SRVY 06 STORAGE_UNIT =Metres
MEGASCOLIDES_2_DIR OIL_CO_DATA:1: DEVIATION SRVY 09 COMPUTE_METHOD =MC
MEGASCOLIDES_2_DIR OIL_CO_DATA:1: DEVIATION SRVY 10 EW_MAGNETIC_DECLINATION =U
MEGASCOLIDES_2_DIR OIL_CO_DATA:1: DEVIATION SRVY 11 MAGNETIC_DECLINATION =12
MEGASCOLIDES_2_DIR OIL_CO_DATA:1: DEVIATION SRVY 13 AZIMUTH_NORTH_TYPE =T
MEGASCOLIDES_2_DIR OIL_CO_DATA:1: DEVIATION SRVY 14 TOP_DEPTH =67
MEGASCOLIDES_2_DIR OIL_CO_DATA:1: DEVIATION SRVY 16 BASE_DEPTH =2130
MEGASCOLIDES_2_DIR OIL_CO_DATA:1: DEVIATION SRVY 18 SOURCE =OIL_CO_DATA
MEGASCOLIDES_2_DIR OIL_CO_DATA:1: DEVIATION SRVY 20 REMARK = Data source, Page 9 and 10. 22 Points (PE913232). Contained in Volume 1 : Basic Geology Well Completion Report Karoon Gas September 2007. North reference assumed.
MEGASCOLIDES_2_DIR OIL_CO_DATA:1: DEVIATION SRVY 21 POINT COUNT = 22
MEGASCOLIDES_2_DIR OIL_CO_DATA:2: DEVIATION SRVY STATION_MD INCLINATION AZIMUTH STATION_ID STATION_TVD X_OFFSET Y_OFFSET VERTICAL_SECTION NS_DIRECTION EW_DIRECTION DOG_LEG_SEVERITY REMARK
MEGASCOLIDES_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0067 67.0 0 360 67 0 0 N E
MEGASCOLIDES_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0166 166.0 1.25 360 165.99215 0 1.08 N W
MEGASCOLIDES_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0204 204.0 1 360 203.98479 0 1.83 N W
MEGASCOLIDES_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0316 316.0 1.5 360 315.95778 0 4.27 N W
MEGASCOLIDES_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0419 419.0 .75 360 418.93719 0 6.29 N W
MEGASCOLIDES_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0503 503.0 1 360 502.92733 0 7.57 N W
MEGASCOLIDES_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0705 705.0 3 360 704.79403 0 14.62 N W
MEGASCOLIDES_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0771 771.0 3 7 770.7038 .21 18.06 N E
MEGASCOLIDES_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0884 884.0 4 7 883.4916 1.05 24.91 N E
MEGASCOLIDES_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 0987 987.0 5 357 986.17437 1.25 32.96 N E
MEGASCOLIDES_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1090 1090.0 5.5 347 1088.74412 .09 42.25 N W
MEGASCOLIDES_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1193 1193.0 5.75 338 1191.25009 3.13 51.85 N W
MEGASCOLIDES_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1296 1296.0 4.75 357 1293.82442 5.29 60.89 N W
MEGASCOLIDES_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1399 1399.0 4 352 1396.52393 6.01 68.71 N W
MEGASCOLIDES_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1493 1493.0 4.5 350 1490.26521 7.11 75.58 N W
MEGASCOLIDES_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1596 1596.0 3.25 354 1593.02788 8.12 82.47 N W
MEGASCOLIDES_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1710 1710.0 3 47 1706.88069 6.27 87.72 N W
MEGASCOLIDES_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1821 1821.0 2.25 68 1817.76595 2.13 90.51 N W
MEGASCOLIDES_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 1915 1915.0 3.75 96 1911.63915 2.64 90.88 N E
MEGASCOLIDES_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2006 2006.0 6.75 79 2002.25212 10.85 91.59 N E
MEGASCOLIDES_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2053 2053.0 8.5 77 2048.83481 16.95 92.9 N E
MEGASCOLIDES_2_DIR OIL_CO_DATA:3: DEVIATION SRVY 2130 2130.0 8.5 77 2124.98903 28.04 95.46 N E
MEGASCOLIDES_2_MASTR MASTER:1: DEVIATION SRVY 01 SURVEY_ID =MEGASCOLIDES_2_MASTR
MEGASCOLIDES_2_MASTR MASTER:1: DEVIATION SRVY 02 SURVEY_COMPANY =TOTCO
MEGASCOLIDES_2_MASTR MASTER:1: DEVIATION SRVY 05 SURVEY_TYPE =DIR
MEGASCOLIDES_2_MASTR MASTER:1: DEVIATION SRVY 06 STORAGE_UNIT =Metres
MEGASCOLIDES_2_MASTR MASTER:1: DEVIATION SRVY 09 COMPUTE_METHOD =MC
MEGASCOLIDES_2_MASTR MASTER:1: DEVIATION SRVY 10 EW_MAGNETIC_DECLINATION =U
MEGASCOLIDES_2_MASTR MASTER:1: DEVIATION SRVY 11 MAGNETIC_DECLINATION =12
MEGASCOLIDES_2_MASTR MASTER:1: DEVIATION SRVY 13 AZIMUTH_NORTH_TYPE =T
MEGASCOLIDES_2_MASTR MASTER:1: DEVIATION SRVY 14 TOP_DEPTH =67
MEGASCOLIDES_2_MASTR MASTER:1: DEVIATION SRVY 16 BASE_DEPTH =2130
MEGASCOLIDES_2_MASTR MASTER:1: DEVIATION SRVY 18 SOURCE =MASTER
MEGASCOLIDES_2_MASTR MASTER:1: DEVIATION SRVY 18 SOURCE =MASTER [Note: surveys with a SOURCE of MASTER should usually be just a copy of one of the original surveys run in the well. The MASTER survey is used by the database to display/calculate well paths etc]
MEGASCOLIDES_2_MASTR MASTER:1: DEVIATION SRVY 20 REMARK = Data source, Page 9 and 10. 22 Points (PE913232). Contained in Volume 1 : Basic Geology Well Completion Report Karoon Gas September 2007. North reference assumed.
MEGASCOLIDES_2_MASTR MASTER:1: DEVIATION SRVY 21 POINT COUNT = 22
MEGASCOLIDES_2_MASTR MASTER:2: DEVIATION SRVY STATION_MD INCLINATION AZIMUTH STATION_ID STATION_TVD X_OFFSET Y_OFFSET VERTICAL_SECTION NS_DIRECTION EW_DIRECTION DOG_LEG_SEVERITY REMARK
MEGASCOLIDES_2_MASTR MASTER:3: DEVIATION SRVY 0067 67.0 0 360 67 0 0 N E
MEGASCOLIDES_2_MASTR MASTER:3: DEVIATION SRVY 0166 166.0 1.25 360 165.99215 0 1.08 N W
MEGASCOLIDES_2_MASTR MASTER:3: DEVIATION SRVY 0204 204.0 1 360 203.98479 0 1.83 N W
MEGASCOLIDES_2_MASTR MASTER:3: DEVIATION SRVY 0316 316.0 1.5 360 315.95778 0 4.27 N W
MEGASCOLIDES_2_MASTR MASTER:3: DEVIATION SRVY 0419 419.0 .75 360 418.93719 0 6.29 N W
MEGASCOLIDES_2_MASTR MASTER:3: DEVIATION SRVY 0503 503.0 1 360 502.92733 0 7.57 N W
MEGASCOLIDES_2_MASTR MASTER:3: DEVIATION SRVY 0705 705.0 3 360 704.79403 0 14.62 N W
MEGASCOLIDES_2_MASTR MASTER:3: DEVIATION SRVY 0771 771.0 3 7 770.7038 .21 18.06 N E
MEGASCOLIDES_2_MASTR MASTER:3: DEVIATION SRVY 0884 884.0 4 7 883.4916 1.05 24.91 N E
MEGASCOLIDES_2_MASTR MASTER:3: DEVIATION SRVY 0987 987.0 5 357 986.17437 1.25 32.96 N E
MEGASCOLIDES_2_MASTR MASTER:3: DEVIATION SRVY 1090 1090.0 5.5 347 1088.74412 .09 42.25 N W
MEGASCOLIDES_2_MASTR MASTER:3: DEVIATION SRVY 1193 1193.0 5.75 338 1191.25009 3.13 51.85 N W
MEGASCOLIDES_2_MASTR MASTER:3: DEVIATION SRVY 1296 1296.0 4.75 357 1293.82442 5.29 60.89 N W
MEGASCOLIDES_2_MASTR MASTER:3: DEVIATION SRVY 1399 1399.0 4 352 1396.52393 6.01 68.71 N W
MEGASCOLIDES_2_MASTR MASTER:3: DEVIATION SRVY 1493 1493.0 4.5 350 1490.26521 7.11 75.58 N W
MEGASCOLIDES_2_MASTR MASTER:3: DEVIATION SRVY 1596 1596.0 3.25 354 1593.02788 8.12 82.47 N W
MEGASCOLIDES_2_MASTR MASTER:3: DEVIATION SRVY 1710 1710.0 3 47 1706.88069 6.27 87.72 N W
MEGASCOLIDES_2_MASTR MASTER:3: DEVIATION SRVY 1821 1821.0 2.25 68 1817.76595 2.13 90.51 N W
MEGASCOLIDES_2_MASTR MASTER:3: DEVIATION SRVY 1915 1915.0 3.75 96 1911.63915 2.64 90.88 N E
MEGASCOLIDES_2_MASTR MASTER:3: DEVIATION SRVY 2006 2006.0 6.75 79 2002.25212 10.85 91.59 N E
MEGASCOLIDES_2_MASTR MASTER:3: DEVIATION SRVY 2053 2053.0 8.5 77 2048.83481 16.95 92.9 N E
MEGASCOLIDES_2_MASTR MASTER:3: DEVIATION SRVY 2130 2130.0 8.5 77 2124.98903 28.04 95.46 N E
PPDM_AUDIT_HISTORY: WELL_NAME=HISTWELL200006781884