Earth Resources Policy and Programs : dbMap DATABASE DUMP
GILBERT1
*** GILBERT1 ***
gilbert1 000 LINKS HYPERLINKAGESGIPPSLAND_OFFSHORE_EXPLO_WELLSGIPPSLAND_OFFSHORE_DEVEL_WELLS
LINKS HYPERLINKAGESGIPPSLAND_WELLSGIPPSLAND_ON_SHORE_WELLSGIPPSLAND_OFFSHORE_WELLS
Geoscience Australia may also have other information: (see the GA Well Summary page for the well with this ENO (363532):
Geoscience Australia may also have other information: (see the GA well search page: http://dbforms.ga.gov.au/www/npm.well.search ) *** ENO=363532 -- GILBERT 1
HDR WELL_NAME = GILBERT-1
HDR A GEOGRAPHICALLY VERY CLOSE WELL TO THIS WELL: WELL_NAME= GILBERT-1A
HDR DATE 1: SPUD_DATE = 04-OCT-05
HDR DATE 3: RIG_RELEASE_DATE = 14-OCT-05
HDR DATE 4: DB_ENTRY_BY = EF03_SW (database header data entry)
HDR DATE 4: DB_ENTRY_DATE = 03-OCT-05 (database header data entry date)
HDR DATE 5: DB_ROW_UPDATER = KG10_SW (database header data entry last updated by)
HDR DATE 5: DB_ROW_UPDATE_DATE = 13-JAN-11 (database header data entry last update date)
HDR DATE 6: THEORETICAL OPENFILE BASIC DATE= 15-OCT-07
HDR DATE 6: THEORETICAL OPENFILE INTERPRETIVE DATE= 14-NOV-10
HDR DEVIATION_IND = N (i.e. has this hole been deviated?)
HDR LOC: BASIN DESCRIPTION= Gippsland Basin
HDR LOC: BASIN_CODE = GIPPSLAND
HDR LOC: COUNTRY = AUSTRALIA
HDR LOC: FIELD_NAME = UNKNOWN FIELD
HDR LOC: ONSHORE_IND = N
HDR LOC: PROVINCE_STATE = VIC
HDR LOC: TITLE_NAME = VIC/P47
HDR LOC: TITLE_NAME: SDO: CURRENT TITLE (Current as at 23-FEB-12) BY LOCATION: ENCLOSING GILBERT-1 : TITLE_NAME=VIC/P47
HDR OPERATOR = Lakes Oil NL
HDR PLATFORM_IND = N (i.e. is this hole off a platform?)
HDR SIDETRACK_IND = N (i.e. is this hole a sidetrack?)
HDR DPH GREATEST OF DEPTHS = 107
HDR DPH: DRILL_TD = 107
HDR DPH: DRILL_TD = DRILLERS TOTAL DEPTH: Total or maximum depth of the well as reported by the operator/driller (PPDM definition).
HDR DPH: FINAL_TD = 107
HDR DPH: FINAL_TD = FINAL TOTAL DEPTH: The actual measurement along the well path from the reference datum to the bottom of the well (PPDM definition).
HDR DPH: MAX_TVD = 107
HDR DPH: MAX_TVD = MAXIMUM TRUE VERTICAL DEPTH: The maximum true vertical depth from the surface datum reference to the final total depth or deepest point, measured on a straight line (PPDM definition).
HDR ELEV: DEPTH_DATUM = RT
HDR ELEV: DEPTH_DATUM LONGNM= Rotary Table
HDR ELEV: DEPTH_DATUM_ELEV = 21.5
HDR ELEV: ELEVATION_REF = RT
HDR ELEV: ELEVATION_REF LN = Rotary Table
HDR ELEV: REF_ELEV = 21.5
HDR ELEV: RT_ELEV = 21.5
HDR ELEV: WATER_DEPTH = -51.3
HDR STORAGE_UNIT = Metres
HDR CURRENT_CLASS = E_WILDCAT
HDR CURRENT_CLASS LONG_NAME = Exploration Wildcat
HDR CURRENT_STATUS = P&A
HDR CURRENT_STATUS LONG_NAME= Plugged and Abandoned
HDR INITIAL_CLASS = E_WILDCAT
HDR INITIAL_CLASS LONG_NAME = Exploration Wildcat
HDR PLOT SYMBOL DESCRIPTION = Plugged and Abandoned --- DRY HOLE
HDR PLOT_SYMBOL = 104
WELL_ALIAS BOREHOLE_NAME = UNKNOWN PARISH-0 : [WELL_BORE] WELL_BORE: the BOREHOLE and BORE NUMBER of the well
WELL_ALIAS BOREHOLE_SITE_ID=SIT958889 : equivalent BOREHOLE_NAME=UNKNOWN PARISH 0
WELL_ALIAS PLOT_NAME= GILBERT-1
WELL_ALIAS UWI= 200004739760
WELL_ALIAS WELL_NAME= 363532 : [WELL_PEDIN_E] WELL_PEDIN_ENO Geoscience Australia ENO
WELL_ALIAS WELL_NAME= 958889 : [WELL_SITE_ID] WELL_SITE_ID -- GEDIS Boreholes Database SITE ID
WELL_ALIAS WELL_NAME= GILBERT-1 : [WELL_GENERIC] WELL_GENERIC -- a generic wellname
WELL_ALIAS WELL_NAME= W1447 : [WELL_BOX_NO] WELL_BOX_NO: the W Number (Well Box No) of the well
WELL_ALIAS WELL_NAME= W3200525 : [WELL_PEDIN] WELL_PEDIN -- the PEDIN AGSO database UNO
NODE_COORD BOTTOM HOLE LAT & LONG = -37.952978 148.373861
NODE_COORD SURFACE LAT & LONG = -37.952978 148.373861
NODE_COORD DATUM = COORD_SYSTEM_ID=218 GEODETIC_DATUM_ID=4283
GENERAL REMARKS 001 RMK_TYPE= FAKE_DIRSRVY RMK= Fake directional survey data was put into the database for this well. The survey data could not be found for this well as at 29-JAN-2009.
GENERAL REMARKS 002 RMK_TYPE= RESPUDDING RMK= Gilbert-1A was a complete re-spud of Gilbert-1. This was due to an obstruction encountered in Gilbert-1, that was 6 metres below the seabed. The rig was moved 9.5 metres to spud Gilbert-1A (p.14, Interpretive WCR).
ASSETS (BRIEF) DATA_TYPE DATA_SUB_TYPE BARCODE ITEM_NAME [MEDIA_TYPE] SCANNED_OR_DIGITAL_FILES
ASSETS (BRIEF) GENERAL DATA_CD_DVD PE911508 GILBERT-1/1A WCR [CD] 2006 PE911508__((_GILBERT-1_1A__WCR_))_.TAR.GZ(284.4m).........PE911508__((_GILBERT-1_1A__WCR_))_.TAR.GZ(284.4m).........SAM2_085_PE911508__((_GILBERT-1_1A__WCR_))_I_MEDIA_LABELLING.JPG(3.0m).........PE911508__((_GILBERT-1_1A__WCR_))__FILES_LISTING.TXT(0.0m).........PE911508__((_GILBERT-1_1A__WCR_))__FILES_LISTING.TXT(0.0m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) GENERAL ESUBS_CD_DVD PE911536 DDRs, Well & Permit Data 2005 to 2007 [DVD] 2007 (3259 DIGITAL FILES) in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) WELL DAILY_RPT PE907806 Daily Drilling Reports. Various Wells. [CD] 2006 PE907806__((_DAILY_DRILLING_REPORTS._VARIOUS_WELLS._))_.TAR.GZ(383.8m).........SAM1_579_PE907806__((_DAILY_DRILLING_REPORTS._VARIOUS_WELLS._))_I_MEDIA_LABELLING.JPG(2.8m).........PE907806__((_DAILY_DRILLING_REPORTS._VARIOUS_WELLS._))__FILES_LISTING.TXT(0.4m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) WELL DAILY_RPT PE915095 Multiple Wells Drill Reports/Mud Logs CD [CD] 2006 PE915095__((_MULTIPLE_WELLS_DRILL_REPORTS_MUD_LOGS_CD_))_.TAR.GZ(383.6m).........SAM3_345_PE915095__((_MULTIPLE_WELLS_DRILL_REPORTS_MUD_LOGS_CD_))__MEDIA_LABELLING.JPG(2.6m).........PE915095__((_MULTIPLE_WELLS_DRILL_REPORTS_MUD_LOGS_CD_))__BASKER-5_BASKER-5_12__MWD_SURVEYS.TXT(0.0m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) WELL WCR_RPT PE909784 GILBERT-1/1A WCR (interpretive) [CD] 2006 PE909784__((_GILBERT-1_1A_WCR__INTERPRETIVE__))_.TAR.GZ(15.5m).........PE909784__((_GILBERT-1_1A_WCR__INTERPRETIVE__))_.TAR.GZ(15.5m).........SAM1_891_PE909784__((_GILBERT-1_1A_WCR__INTERPRETIVE__))_I_MEDIA_LABELLING.JPG(3.0m).........PE909784__((_GILBERT-1_1A_WCR__INTERPRETIVE__))__FILES_LISTING.TXT(0.0m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) WELL WCR_RPT PE911507 GILBERT-1/1A WCR [CD] 2006 PE911507__((_GILBERT-1_1A_WCR_))_.TAR.GZ(98.6m).........PE911507__((_GILBERT-1_1A_WCR_))_.TAR.GZ(98.6m).........SAM2_084_PE911507__((_GILBERT-1_1A_WCR_))_I_MEDIA_LABELLING.JPG(2.9m).........PE911507__((_GILBERT-1_1A_WCR_))__FILES_LISTING.TXT(0.0m).........PE911507__((_GILBERT-1_1A_WCR_))__FILES_LISTING.TXT(0.0m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) WELL BIOSTRAT PE909784_1 GILBERT-1/1A Palynology Rpt in WCR,2005 [CD] 2005 PE909784__((_GILBERT-1_1A_WCR__INTERPRETIVE__))_.TAR.GZ(15.5m).........PE909784__((_GILBERT-1_1A_WCR__INTERPRETIVE__))_.TAR.GZ(15.5m).........SAM1_891_PE909784__((_GILBERT-1_1A_WCR__INTERPRETIVE__))_I_MEDIA_LABELLING.JPG(3.0m).........PE909784__((_GILBERT-1_1A_WCR__INTERPRETIVE__))__FILES_LISTING.TXT(0.0m)......... in: WCR_RPT GILBERT-1/1A WCR
ASSETS (BRIEF) WELL BIOSTRAT PE911507_1 GILBERT-1/1A Palynology Rpt in WCR,2005 [CD] 2005 PE911507__((_GILBERT-1_1A_WCR_))_.TAR.GZ(98.6m).........PE911507__((_GILBERT-1_1A_WCR_))_.TAR.GZ(98.6m).........SAM2_084_PE911507__((_GILBERT-1_1A_WCR_))_I_MEDIA_LABELLING.JPG(2.9m).........PE911507__((_GILBERT-1_1A_WCR_))__FILES_LISTING.TXT(0.0m).........PE911507__((_GILBERT-1_1A_WCR_))__FILES_LISTING.TXT(0.0m)......... in: WCR_RPT GILBERT-1/1A WCR
ASSETS (BRIEF) WELL DAILY_RPT PE911536_5 Daily Drilling, Geol, Workover, Mud Rpts [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007
ASSETS (BRIEF) WELL DRILL_RPT PE911536_9 Drilling Data, Logs, TD Curves & Reports [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007
ASSETS (BRIEF) WELL GEOCHEM PE911507_161GILBERT-1/1A Geochemistry Report in WCR [CD] 2007 PE911507__((_GILBERT-1_1A_WCR_))_.TAR.GZ(98.6m).........PE911507__((_GILBERT-1_1A_WCR_))_.TAR.GZ(98.6m).........SAM2_084_PE911507__((_GILBERT-1_1A_WCR_))_I_MEDIA_LABELLING.JPG(2.9m).........PE911507__((_GILBERT-1_1A_WCR_))__FILES_LISTING.TXT(0.0m).........PE911507__((_GILBERT-1_1A_WCR_))__FILES_LISTING.TXT(0.0m)......... in: WCR_RPT GILBERT-1/1A WCR
ASSETS (BRIEF) WELL GEOCHEM PE911507_474GILBERT-1/1A Gas Log in WCR [CD] 2007 PE911507__((_GILBERT-1_1A_WCR_))_.TAR.GZ(98.6m).........PE911507__((_GILBERT-1_1A_WCR_))_.TAR.GZ(98.6m).........SAM2_084_PE911507__((_GILBERT-1_1A_WCR_))_I_MEDIA_LABELLING.JPG(2.9m).........PE911507__((_GILBERT-1_1A_WCR_))__FILES_LISTING.TXT(0.0m).........PE911507__((_GILBERT-1_1A_WCR_))__FILES_LISTING.TXT(0.0m)......... in: WCR_RPT GILBERT-1/1A WCR
ASSETS (BRIEF) WELL LOG_TAPE_OR_DISK PE911508_2 GILBERT-1/1A WCR [CD] 2006 PE911508__((_GILBERT-1_1A__WCR_))_.TAR.GZ(284.4m).........PE911508__((_GILBERT-1_1A__WCR_))_.TAR.GZ(284.4m).........SAM2_085_PE911508__((_GILBERT-1_1A__WCR_))_I_MEDIA_LABELLING.JPG(3.0m).........PE911508__((_GILBERT-1_1A__WCR_))__FILES_LISTING.TXT(0.0m).........PE911508__((_GILBERT-1_1A__WCR_))__FILES_LISTING.TXT(0.0m)......... in: CD GILBERT-1/1A Well Completion Report
ASSETS (BRIEF) WELL LOG_TAPE_OR_DISK PE911536_16 Digital Well Logs [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007
ASSETS (BRIEF) WELL MUD_LOG PE911536_6 Mudlogs [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007
ASSETS (BRIEF) WELL WCR_RPT PE911508_1 GILBERT-1/1A WCR [CD] 2006 PE911508__((_GILBERT-1_1A__WCR_))_.TAR.GZ(284.4m).........PE911508__((_GILBERT-1_1A__WCR_))_.TAR.GZ(284.4m).........SAM2_085_PE911508__((_GILBERT-1_1A__WCR_))_I_MEDIA_LABELLING.JPG(3.0m).........PE911508__((_GILBERT-1_1A__WCR_))__FILES_LISTING.TXT(0.0m).........PE911508__((_GILBERT-1_1A__WCR_))__FILES_LISTING.TXT(0.0m)......... in: CD GILBERT-1/1A Well Completion Report
ASSETS (BRIEF) WELL WELL_LOG PE911536_14 Well Log Images [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007
LINKS HYPERLINKAGESCOPYRIGHT_DISCLAIMERABOUT_DBMAPHOW_TO_GET_OR_SUBMIT_DATA This data has been dumped from Victorian Govt (http://www.dpi.vic.gov.au) dbMap database on 23-FEB-12
ASSETS *** ALSO: Search the Geoscience Australia database for other information: (see http://dbforms.ga.gov.au/www/npm.well.search ) *** ENO=363532 GILBERT-1
ASSET Counts Summary: GENERAL DATA_CD_DVD [CD] 1
ASSET Counts Summary: GENERAL ESUBS_CD_DVD [DVD] 1
ASSET Counts Summary: GENERAL NOTE [] 1
ASSET Counts Summary: WELL BIOSTRAT [CD] 2
ASSET Counts Summary: WELL DAILY_RPT [CD] 2
ASSET Counts Summary: WELL DAILY_RPT [DVD] 1
ASSET Counts Summary: WELL DRILL_RPT [DVD] 1
ASSET Counts Summary: WELL GEOCHEM [CD] 2
ASSET Counts Summary: WELL LOG_TAPE_OR_DISK [CD] 1
ASSET Counts Summary: WELL LOG_TAPE_OR_DISK [DVD] 1
ASSET Counts Summary: WELL MUD_LOG [DVD] 1
ASSET Counts Summary: WELL WCR_RPT [CD] 3
ASSET Counts Summary: WELL WELL_LOG [DVD] 1
A WELL_DRILL_HISTORY: DRILL_OBS_NO DRILL_DATE DEPTH DEPTH_TVD HOLE_IND MUD_WT REMARK source
B WELL_DRILL_HISTORY:001 02-OCT-05 .0 9999.99 Tow rig from Basker 2 location. Drop #5 anchor and run all 7 other anchors. Operations For Period 0000 Hrs to 2400 Hrs on 02 Oct 2005 Tow rig from Basker 2 location. Drop #5 anchor and run all 7 other anchors. Operations For Period 0000 Hrs to 2400 Hrs on 02 Oct 2005 From To Hrs Phse Cls (RC) Op Depth Activity Description 0800 1530 7.50 MOB P RM 0.0m On tow from Basker - 2 location to Gilbert - 1 Location Held pre-spud meeting with one crew 1530 2400 8.50 MOB P HA 0.0m # 5 anchor on bottom at 15:18hrs, PCC to rig at 16:28hrs # 1 PCC to boat=16:43, Anchor on btm=18:37, PCC to rig=19:03 # 4 PCC to boat=19:15, Anchor on btm=19:41, PCC to rig=20:31 # 8 PCC to boat=20:27, Anchor on btm=21:08, PCC to rig=21:31 # 3 PCC to boat=20:46, Anchor on btm=21:19, PCC to rig=21:55 # 7 PCC to boat=21:45, Anchor on btm=22:22, PCC to rig=22:51 # 2 PCC to boat=22:03, Anchor on btm=22:33, PCC to rig=23:26 # 6 PCC to boat=23:03, Anchor on btm=23:43, PCC to rig=00:12 Held pre-spud meeting with other crew Operations For Period 0000 Hrs to 0600 Hrs on 03 Oct 2005 From To Hrs Phse Cls (RC) Op Depth Activity Description 0000 0600 6.00 MOB P HA 0.0m Started de-ballasting to operational draft. Moved rig over well and storm tensioned anchors. # 4 and # 6 anchors slipping # 4 PCC passed to boat 03:19, At anchor at 03:39, Far Grip repositioned anchor but still not holding. Far Grip lifting anchor to Bolster as anchor upsidedown Bulk Stocks Name Unit In Used Adjust Balance Barite MT 0 0.0 Gel MT 59.81 59.8 Cement MT 76.04 76.0 Fuel Oil m� 334 334.0 Potable Water m� 248.4 248.4 Drill Water m� 248.4 248.4 Personnel On Board Job Title Personnel Company Pax DOGC 47 BSOC 3 ESS 8 MI Swaco 2 Dowell Schlumberger 2 Fugro 6 Fugro 2 Dril-Quip 1 RPS Hyrdrosearch 1 Copyright IDS, 21/09/2004, Labrador_drllg (TF) Page 1 Printed on 02 ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:002 03-OCT-05 81.0 9999.99 Ballasted down rig while storm tensioning anchors. 2 anchors not holding storm tension. Ballasted down rig to operational draft and picked up 5"DP while boat attempted to get anchors to hold, #4 anchor held storm tension, #6 anchor unable to hold storm tension. Winds over 40kts shut down cranes, Waited on weather. Winds died down and picked up 36" BHA but seas still too rough to jump ROV Operations For Period 0000 Hrs to 2400 Hrs on 03 Oct 2005 Ballasted down rig while storm tensioning anchors. 2 anchors not holding storm tension. Ballasted down rig to operational draft and picked up 5"DP while boat attempted to get anchors to hold, #4 anchor held storm tension, #6 anchor unable to hold storm tension. Winds over 40kts shut down cranes, Waited on weather. Winds died down and picked up 36" BHA but seas still too rough to jump ROV Operations For Period 0000 Hrs to 2400 Hrs on 03 Oct 2005 From To Hrs Phse Cls (RC) Op Depth Activity Description 0000 0130 1.50 MOB P HA 0.0m Started ballasting rig down to operational draft. Moved rig over well and storm tensioned anchors. Anchors #4 and #6 not holding storm tension 0130 0530 4.00 MOB TP (ANC) HA 0.0m Stopped ballasting operations while re-running #4 anchor. #4 anchor flipped, pulled to bollard of boat to turn and re-set on bottom. 0530 0730 2.00 MOB P HA 0.0m Resumed ballasting operations down to drilling draft 0730 1730 10.00 MOB TP (ANC) HA 0.0m #4 anchor set and holding storm tension - OK Working on #6 anchor to get it to hold storm tension Meanwhile picked up drill pipe for whole well and racked in derrick. Made up cement stand and 30" running tool stand. Made up EDPHOT stand and picked up 18 joints of 5" HWDP. Unable to set # 6 anchor. Abandoned attempts due to bad weather. Decision made to continue with only 7 anchors out. 1730 2200 4.50 CONH TP (WEA) HBHA 0.0m ROV cannot launch to do seabed survey. Cranes down due to high winds and cannot pick up BHA Mixed... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:003 04-OCT-05 107.0 9999.99 Picked up 36" BHA. Waited on weather to junp ROV. ROV conducted seabed survey. Spudded well with 36" hole opener BHA. Drilled to 107m. Circulated hole to PHG. Wiper trip to seafloor. POOH and ran 30" conductor. 30" conductor held up at 79m and unable to pass. POOH conductor and leave in moonpool. Ran in hole with 36" hole opener BHA but unable to run past 79m without rotation. Hole abandoned at 22:30 hrs Operations For Period 0000 Hrs to 2400 Hrs on 04 Oct 2005 Picked up 36" BHA. Waited on weather to junp ROV. ROV conducted seabed survey. Spudded well with 36" hole opener BHA. Drilled to 107m. Circulated hole to PHG. Wiper trip to seafloor. POOH and ran 30" conductor. 30" conductor held up at 79m and unable to pass. POOH conductor and leave in moonpool. Ran in hole with 36" hole opener BHA but unable to run past 79m without rotation. Hole abandoned at 22:30 hrs Operations For Period 0000 Hrs to 2400 Hrs on 04 Oct 2005 From To Hrs Phse Cls (RC) Op Depth Activity Description 0000 0130 1.50 CONH P HBHA 0.0m Continued to pick up and run in hole with 36" hole opener BHA. Drifted all components with 2 5/8" drift. ROV still unable to jump due to high swells. 0100hrs, 30kt wind, Seas 1.0m, Swells 4.0m 0130 0600 4.50 CONH TP (WEA) HBHA 0.0m Waiting on weather to subside as unable to jump ROV due to high swells. ROV to be on seabed for seabed survey prior to spud and observe well spudding. 0200hrs, 30kt winds, Seas 1.0m, Swells 4.0m 0300hrs, 30kt winds, Seas 1.0m, Swells 4.0m 0400hrs, 30kt winds, Seas 1.0m, Swells 4.0m 0500hrs, 20kt winds, Seas 1.0m, Swells 3.0m Completed testing C & K manifold to 200 / 3000 psi for 5 / 10 mins 0600 0700 1.00 CONH TP (WEA) ROV 0.0m ROV launched and conducted seabed survey prior to spudding well. This would normally be done in conjunction with other operations but due to weather, rig was waiting until seabed survey had been completed before spudding well. 0700 0730 0.50 CONH P TI 0.0m Tagged... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:004 07-OCT-05 336.0 9999.99 Ran BOP Operations For Period 0000 Hrs to 2400 Hrs on 07 Oct 2005 Ran BOP Operations For Period 0000 Hrs to 2400 Hrs on 07 Oct 2005 From To Hrs Phse Cls (RC) Op Depth Activity Description 0000 0030 0.50 IH P CMC 336.0m Rig up cement line. 0030 0200 1.50 IH P CMC 336.0m Mix and pump 128.7 bbls Lead slurry @ 12.5 ppg.( 100 bbls mix water ) Mix and pump 84 bbls Tail slurry @ 15.8 ppg. ( 50 bbls mix water ) Bump plug with 1500 psi 10 mins. Good returns to mudline, dye return noted. 0200 0230 0.50 IH P TO 336.0m Release R/T and recover same. 0230 0400 1.50 IH P TO 336.0m Service break and laid down plug launcher and cement head. 0400 0530 1.50 EI P BOP 336.0m Rig up marine riser running equipment. 0530 1200 6.50 EI P BOP 336.0m Make up double of riser and connect to BOP, install guide line and beacon. Test C & K Lines 250 / 3000 psi 10mins. Pick up and install slip joint. 1200 2400 12.00 EI P BOP 336.0m Pick up landing joint and tensioner ring. Install and test C& K goosenecks 250 / 3000 psi 10 min. Connect tensioners #2 & #8 , position rig over hole. Land BOP and confirm Latched with 50Kips O/Pull on both pods. Rig up storm saddles attach RBQ plates. Lay out landing joint and install divertor. Operations For Period 0000 Hrs to 0600 Hrs on 08 Oct 2005 From To Hrs Phse Cls (RC) Op Depth Activity Description 0000 0100 1.00 EI P BOP 336.0m Rig down riser running equipment 0100 0230 1.50 EI P PTB 336.0m Make up and run test plug, test BOP connector and LMRP connector with 250 / 3000psi 10mins. 0230 0300 0.50 EI P PTB 336.0m Recover test plug and lay down same. 0300 0400 1.00 EI P HBHA 336.0m Lay down 17 1/2" BHA 0400 0600 2.00 EI P HBHA 336.0m Pick up 12 1/4" BHA Operations For Period Hrs to Hrs on WBM Data Cost Today $ 20988 Mud Type: PHPA Sample-From: Active Time: 22:00 Weight: 1.06ppg Temp: API FL: 8.0cc Filter-Cake: 1/32nd" HTHP... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:005 08-OCT-05 626.0 9999.99 Cemented casing, drilled float equipment and performed FIT. Operations For Period 0000 Hrs to 2400 Hrs on 08 Oct 2005 Cemented casing, drilled float equipment and performed FIT. Operations For Period 0000 Hrs to 2400 Hrs on 08 Oct 2005 From To Hrs Phse Cls (RC) Op Depth Activity Description 0000 0100 1.00 EI P BOP 336.0m Rig down riser running equipment 0100 0230 1.50 EI P PTB 336.0m Make up and run test plug, test BOP connector and LMRP connector with 250 / 3000psi 10mins. 0230 0300 0.50 EI P PTB 336.0m Recover test plug and lay down same. 0300 0400 1.00 EI P HBHA 336.0m Lay down 17 1/2" BHA 0400 0500 1.00 EI P HBHA 336.0m Pick up 12 1/4" BHA 0500 0530 0.50 EI P HBHA 336.0m Up-load MWD. 0530 0630 1.00 EI P HBHA 336.0m Cont to pick up 12 1/4" BHA 0630 0700 0.50 EI TU (BOP) HBHA 336.0m Replace blown hose on divertor insert locking dog. 0700 1030 3.50 EI P TI 336.0m Cont to run in hole and tag cement at 303m 1030 1430 4.00 EI P DFS 336.0m Drill cement float and shoe, clean out rat hole down to 336m 1430 1530 1.00 EI P D 339.0m Drill 3m of 12 1/4" hole from 336m to 339m 1530 1630 1.00 EI P CIR 339.0m Displace hole to 8.8 ppg KCL/PHPA mud 1630 1730 1.00 EI P LOT 339.0m Perform FIT, pressure leaked of at 183psi = EMW 12 ppg 1730 1930 2.00 EI P CIR 339.0m Circulate and condition mud. Polymers not sheared, losses at 250 GPM at shakers. Dilute back with brine to thin mud, stage pumps up to 750 GPM for MWD detection, and sustainable loss rate to allow drilling. 1930 2400 4.50 EI P D 510.0m Drill 12 1/4" hole from 339m to 510m. Start drilling at 750 GPM, stage pumps up as shakers allowed to 900 GPM. Operations For Period 0000 Hrs to 0600 Hrs on 09 Oct 2005 From To Hrs Phse Cls (RC) Op Depth Activity Description 0000 0200 2.00 EI P D 510.0m Drill 12 1/4" hole from 510 m to 568m. 0200 0600 4.00 EI P D 626.0m ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:006 09-OCT-05 810.0 9999.99 Drill 12 1/4" hole to TD. Operations For Period 0000 Hrs to 2400 Hrs on 09 Oct 2005 Drill 12 1/4" hole to TD. Operations For Period 0000 Hrs to 2400 Hrs on 09 Oct 2005 From To Hrs Phse Cls (RC) Op Depth Activity Description 0000 2000 20.00 EI P D 810.0m Drill 12 1/4" hole from 510 m to 568m. Control drill @ 20m/hr from 568m to 680m. Control drill @ 25m/hr from 680m to 810m 2000 2100 1.00 EI P CIR 810.0m Circulate shakers clean, take survey and flow check. Well static. 2100 2200 1.00 EI P TOT 810.0m Slug pipe and pull out from 810m to 615m. Hole started to take 40k o/pull and began to swab. Unable to wipe clean. 2200 2400 2.00 EI P RW 810.0m Backream from 615m to 332m. Operations For Period 0000 Hrs to 0600 Hrs on 10 Oct 2005 From To Hrs Phse Cls (RC) Op Depth Activity Description 0000 0100 1.00 EI P CIR 810.0m Circulate hole clean, at 13 3/8 shoe. 0100 0200 1.00 EI P TI 810.0m Run in hole from 327m to 810m. 0200 0300 1.00 EI P CIR 810.0m Circulate hole clean and boost riser. Bottoms up gas 2.7 % . 0300 0600 3.00 EI P TO 810.0m Flow check, and pull out of hole. Hole condition good. Operations For Period Hrs to Hrs on WBM Data Cost Today $ 5003 Mud Type: PHPA Sample-From: Active Time: 19:30 Weight: 1.08ppg Temp: 48.0C� API FL: 5.6cc Filter-Cake: 1/32nd" HTHP-FL: HTHP-cake: 1/32nd" Cl: 0.2mg/l Hard/Ca: 600.0mg/l MBT: 5 PM: 0.4 PF: 0.1 pH: 8 Solids: 3 H2O: 97% Oil: Sand: Glycol: KCl: 5% PHPA: Viscosity 56sec/qt PV 16cp YP 26lb/100ft� Gels 10s 10 Gels 10m 14 Fann 003 7 Fann 006 10 Fann 100 26 Fann 200 35 Fann 300 42 Fann 600 58 Comment Cummulative cost $ 42717.45 Shakers, Volumes and Losses Data Engineer : Gordon Howie Equip. Descr. Mesh Size Shaker 1 VSM 100 4 x 165 Shaker 2 VSM 100 2 x 180, 2 x 165 Shaker 3 VSM 100 4 x 165 Shaker 4 VSM 100 4 x 165 Available 2009bbl Losses 148bbl Comments Active 47... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:100 11-OCT-05 810.0 9999.99 Complete logging program. Operations For Period 0000 Hrs to 2400 Hrs on 11 Oct 2005 Complete logging program. Operations For Period 0000 Hrs to 2400 Hrs on 11 Oct 2005 From To Hrs Phse Cls (RC) Op Depth Activity Description 0000 1400 14.00 EI P LOG 810.0m Continue log #3, MDT. Attempt to read pressure from 11 stations for a total of 31 attempts. Total of 13 valid pressures read. Commence sampling program. Pull out and lay down tool string. 1400 1700 3.00 EI P LOG 810.0m Made up and ran log #4, MSCT. Pull out and lay down tool string. 1700 1730 0.50 EI P LOG 810.0m Rig down wireline. 1730 2100 3.50 PA P TI 810.0m Pick up 178m of 2 7/8" tubing stinger with mule shoe and run in on DP to 810m 2100 2130 0.50 PA P CMD 810.0m Circulate bottoms up. 2130 2400 2.50 PA P CMP 810.0m Mix and pump cmt plug #1a.total slurry 74.6bbls @ 15.8ppg w/- 44.2bbls mix water. Set from 810m to 690m. Pulled out from 810m to 690m. Mix and pump cmt plug #1b.total slurry 74.6bbls @ 15.8ppg w/- 44.2bbls mix water. Set from 690m to 570m. Pulled out from 690m to 570m. Operations For Period 0000 Hrs to 0600 Hrs on 12 Oct 2005 From To Hrs Phse Cls (RC) Op Depth Activity Description 0000 0030 0.50 PA P CIR 810.0m Circulate bottoms up @ 570m. Dump 50bbls contaminated mud. 0030 0130 1.00 PA P TO 810.0m Pull out from 570m to 420m and spot 20bbls Hi-vis Mud. 0130 0200 0.50 PA P TO 810.0m Pull out from 420m to 370m and rig up cmt line. 0200 0300 1.00 PA P CMP 810.0m Mix and pump cmt plug #2. total slurry 54.2bbls@ 15.8ppg w/- 32.7bbls mix water. Set from 370m to 270m. 0300 0330 0.50 PA P CIR 810.0m Pull out from 370m to 270m. Circulate and condition mud, dump 80bbls contaminated mud. 0330 0600 2.50 PA P LDP 810.0m Wait on cmt. Lay down excess tubulars from derrick. Operations For Period Hrs to Hrs on Copyright IDS, 21/09/2004, Labrador_drllg (TF) Page 1 Printed on 11 Oct 200... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:100 12-OCT-05 810.0 9999.99 All P & A cement plugs in place. Operations For Period 0000 Hrs to 2400 Hrs on 12 Oct 2005 All P & A cement plugs in place. Operations For Period 0000 Hrs to 2400 Hrs on 12 Oct 2005 From To Hrs Phse Cls (RC) Op Depth Activity Description 0000 0030 0.50 PA P CIR 810.0m Circulate bottoms up @ 570m. Dump 50bbls contaminated mud. 0030 0130 1.00 PA P TO 810.0m Pull out from 570m to 420m and spot 20bbls Hi-vis Mud. 0130 0200 0.50 PA P TO 810.0m Pull out from 420m to 370m and rig up cmt line. 0200 0300 1.00 PA P CMP 810.0m Mix and pump cmt plug #2. total slurry 54.2bbls@ 15.8ppg w/- 32.7bbls mix water. Set from 370m to 270m. 0300 0330 0.50 PA P CIR 810.0m Pull out from 370m to 270m. Circulate and condition mud, dump 80bbls contaminated mud. 0330 1030 7.00 PA P LDP 810.0m Wait on cmt. Lay down excess tubulars from derrick. 1030 1100 0.50 PA P TI 810.0m Run in hole and tag cmt plug #2 @ 271m w/- 10000lbs 1100 1130 0.50 PA P CIR 810.0m Displace hole with 175bbls inhibited mud @ 9ppg. 1130 1330 2.00 PA P LDP 810.0m Pull out and lay down DP and 2 7/8" stinger from 271m. 1330 1730 4.00 PA P SPK 810.0m Made up and ran 13 3/8" bridge plug on DP to 160m. Set bridge plug and sting out of same. Pressure test bridge plug with 1000 psi. Good test. Pull out from 160m. 1730 1830 1.00 PA P TI 810.0m Run in hole OEDP and tag bridge plug with 5000lbs pick up and rig up cmt lines. 1830 1930 1.00 PA P CMP 810.0m Mix and pump cmt plug #3, total slurry 29.4bbls @ 15.8ppg w/- 17.8bbls mix water. Plug set from 160m to 100m. Pull back to 95m and circulate, no cmt returns to surface. 1930 2030 1.00 PA P CHC 810.0m Displace well to s/water, flush choke and kill and booster lines. Flush C & K mainfold. 2030 2200 1.50 PA P HBHA 810.0m Lay down excess drill collars from derrick. 2200 2400 2.00 PA P TO 810.0m Made up jetting sub under wear bushing running tool, run... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:101 13-OCT-05 810.0 9999.99 Complete P & A Operations For Period 0000 Hrs to 2400 Hrs on 13 Oct 2005 Complete P & A Operations For Period 0000 Hrs to 2400 Hrs on 13 Oct 2005 From To Hrs Phse Cls (RC) Op Depth Activity Description 0000 0200 2.00 PA P HBHA 810.0m Make up casing cutting assy and rack same in derrick. 0200 0330 1.50 PA P LDP 810.0m Lay down excess drill pipe from derrick. 0330 0400 0.50 PA P BOP 810.0m Hold JSA, Rig up marine riser handling equipment . 0400 1400 10.00 PA P BOP 810.0m Pull BOP'S and rack same on carrier. Rig down handling equipment. NOTE * H.A.C. released with ROV. Positive indication noted. 1400 1500 1.00 PA P CCW 810.0m Run in with 20" casing cutter to 78m 1500 1530 0.50 PA P CCW 810.0m Cut 20" casing @ 78m 1530 2230 7.00 PA P HT 810.0m Recover 18 3/4" Hsg and PGB, rack PGB in moonpool and lay down 18 3/4" Hsg. Start to de-ballast @ 16:30 hrs. Lay down all remaining tubulars from derrick. NOTE * Sea bed survey conducted by ROV and recorded. 2230 2400 1.50 PA P HA 810.0m Start to Pull anchors while continue to de-ballast. #6- P.C.C. Passed to Far Grip @ 22:30 hrs , anchor off bottom @ 23:08 hrs. #3- P.C.C. Passed to Pacific Wrangler @ 23:34 hrs. Operations For Period 0000 Hrs to 0600 Hrs on 14 Oct 2005 From To Hrs Phse Cls (RC) Op Depth Activity Description 0000 0600 6.00 PA P HA 810.0m Continue to pull anchors. Anchor #3 off bottom @ 00:03hrs. Racked at 01:32hrs. Pass #2 P.C.C. to Pacific Wrangler @ 01:57 hrs , anchor off bottom @ 02:29 hrs, racked 03:41 hrs. Anchor #6 racked @ 02:21 hrs, appears damaged. Pass #7 P.C.C. to Far Grip @ 02:47 hrs , anchor off bottom @ 03:10 hrs, racked 04:10 hrs. Pass #4 P.C.C. to Pacific Wrangler @ 03:59 hrs, anchor off bottom 04:34 hrs. Operations For Period Hrs to Hrs on WBM Data Cost Today $ 1217 Mud Type: PHPA Sample-From: Active Time: Weight: Temp: API FL: Filter-Cake: HTHP-FL: HTHP-cake: Cl: Hard/Ca: MBT: ... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:101 14-OCT-05 810.0 9999.99 Pull anchors and depart location Operations For Period 0000 Hrs to 2400 Hrs on 14 Oct 2005 Pull anchors and depart location Operations For Period 0000 Hrs to 2400 Hrs on 14 Oct 2005 From To Hrs Phse Cls (RC) Op Depth Activity Description 0000 0600 6.00 PA P HA 810.0m Continue to pull anchors. Anchor #3 off bottom @ 00:03hrs. Racked at 01:32hrs. Pass #2 P.C.C. to Pacific Wrangler @ 01:57 hrs , anchor off bottom @ 02:29 hrs, racked 03:41 hrs. Anchor #6 racked @ 02:21 hrs, appears damaged. Pass #7 P.C.C. to Far Grip @ 02:47 hrs , anchor off bottom @ 03:10 hrs, racked 04:10 hrs. Pass #4 P.C.C. to Pacific Wrangler @ 03:59 hrs, anchor off bottom 04:34 hrs. 0600 1200 6.00 PA P HA 810.0m Anchor #4 racked @ 06:44hrs. Pass #8 P.C.C. to Pacific Wrangler @ 07:09hrs, anchor off bottom @ 07:30hrs, racked @ 09:55hrs. Pass #1 P.C.C. to Pacific Wrangler @ 10:10hrs, anchor off bottom @ 10:35hrs, racked @ 11:42hrs. 1200 1400 2.00 PA P HA 810.0m Pass #5 P.C.C. to Pacific Wrangler @ 12:08hrs, anchor off bottom @ 12:33hrs, racked @ 13:47hrs. Rig under tow to Maclean #1 location @ 14:00hrs. Statement of facts obtained. Operations For Period Hrs to Hrs on WBM Data Cost Today Mud Type: PHPA Sample-From: Active Time: Weight: Temp: API FL: Filter-Cake: HTHP-FL: HTHP-cake: Cl: Hard/Ca: MBT: PM: PF: pH: Solids: H2O: Oil: Sand: Glycol: KCl: PHPA: Viscosity PV YP Gels 10s Gels 10m Fann 003 Fann 006 Fann 100 Fann 200 Fann 300 Fann 600 Comment Cummulative cost $ 44832 Shakers, Volumes and Losses Data Engineer : Equip. Descr. Mesh Size Shaker 1 VSM 100 4 x 165 Shaker 2 VSM 100 4 x 84 Shaker 3 VSM 100 4 x 165 Shaker 4 VSM 100 1x 84, 3x165 Available 0bbl Losses 0bbl Comments Active Downhole Mixing Surf+ Equip 0bbl Hole Dumped Slug De-Gasser Reserve De-Sander Kill De-Silter Centrifuge Copyright IDS, 21/09/2004, Labrador_drllg (TF) Page 1 Printed on 14 Oct 20... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:200 05-OCT-05 107.0 9999.99 Ran and cemented 30" conductor. Making up 17�" BHA. Operations For Period 0000 Hrs to 2400 Hrs on 05 Oct 2005 Ran and cemented 30" conductor. Making up 17�" BHA. Operations For Period 0000 Hrs to 2400 Hrs on 05 Oct 2005 From To Hrs Phse Cls (RC) Op Depth Activity Description 0000 0330 3.50 CONH P D 78.0m Continued drilling 36" hole from 78 - 107m Drilled with low RPM, SPM and WOB until hole opener through hard band encountered at 79m. Then increased parameters to full drilling rates 0330 0400 0.50 CONH P CHC 107.0m Took Anderdrift survey on bottom = 1/2 deg Swept 100 PHG around hole 0400 0430 0.50 CONH P WT 107.0m Made short trip to mudline with hole opener. No drag coming out or going back in hole 0430 0530 1.00 CONH P TO 107.0m Spotted 220 bbls PHG to fill up hole prior to pulling out of hole to run casing. Pulled out of hole and racked back 36" BHA. 0530 0630 1.00 CONH P WH 107.0m Made up double of 5" DP to running tool and install running tool into 30" housing. 0630 0830 2.00 CONH P RC 107.0m Ran in to sea level with 30" casing, fill same and close valve on running tool. Continued to run casing on landing string. Shoe @ 106m RT Bullseye reading 1 degree stb/fwd. 0830 0930 1.00 CONH P CMC 107.0m Rigged up cement lines and test surface lines with 2000 psi, low torque valve in rig up leaked. Changed out and re-tested to 2000 psi, good test. 0930 1100 1.50 CONH P CMC 107.0m Pumped 20 bbls green dye, mix and pumped 182 bbls cement slurry @ 15.8 ppg. Displaced with 26 bbls sea water. 1100 1700 6.00 CONH P WOC 107.0m Wait on cement. 1700 1800 1.00 IH P HT 107.0m Release well head running tool and recovered same on landing string. Break and lay down running tool and cement stand. * Bullseye, 1 degree stb/fwd. 1800 1930 1.50 IH P HT 107.0m Made up 18 3/4" wellhead housing running tool and laid out same. Made up Deep Sea Express cement head and rack back same. 193... [From:WELL_DAILY]
B WELL_DRILL_HISTORY:200 06-OCT-05 336.0 9999.99 Completed 17 1/2" hole section Operations For Period 0000 Hrs to 2400 Hrs on 06 Oct 2005 Completed 17 1/2" hole section Operations For Period 0000 Hrs to 2400 Hrs on 06 Oct 2005 From To Hrs Phse Cls (RC) Op Depth Activity Description 0000 0030 0.50 IH P HBHA 107.0m Continue to make up BHA 0030 0130 1.00 IH P DC 107.0m Tag TOC @ 101m, Drill out cement and shoe and clean out rat hole to 107m 0130 0900 7.50 IH P D 336.0m Drill 17 1/2" hole from 107m to 220m, sweep mid and stand down with PHG . Total depth 336m . 0900 1000 1.00 IH P CHC 336.0m Sweep hole with 50 bbls PHG then displace hole with 320 bbls PHG. Drop totco survey. 1000 1130 1.50 IH P WT 336.0m Perform wiper trip from 336m to 105m. Recover totco at shoe, zero degrees. Run to bottom 336m. 1130 1200 0.50 IH P CHC 336.0m Sweep hole with 50 bbls PHG, and then displace hole to PHG mud. 1200 1500 3.00 IH P TO 336.0m Pulled out of hole from 336m, rack back BHA, laid down MWD tools. 1500 1600 1.00 IH P RRC 336.0m Hold JSA, Rig up to run 13 3/8" csg. 1600 1800 2.00 IH P RC 336.0m Picked up and tested float and shoe joints. Installed guide ropes. Rigged up and function tested Tam Packer. 1800 2030 2.50 IH P RC 336.0m Run 13 3/8" casing as per program. 2030 2230 2.00 IH P RC 336.0m Pick up 18 3/4'' Wellhead HSG, install plug launcher. Run in same and fill with sea water, close R/T valve with ROV. 2230 2300 0.50 IH P RC 336.0m Confirm up and down weights, landout 18 3/4" HSG into 30" HSG. Confirm same with 50000lb over pull. ( shoe depth 331m ) 2300 2330 0.50 IH P CIC 336.0m Circulate 150 bbls s/water @ 7 bbl/min. 2330 2400 0.50 IH P CMC 336.0m Rig up cement line and attempted to pressure test lo-torque valve. Operations For Period 0000 Hrs to 0600 Hrs on 07 Oct 2005 From To Hrs Phse Cls (RC) Op Depth Activity Description 0000 0030 0.50 IH P CMC 336.0m Rig up cement... [From:WELL_DAILY]
HDR A GEOGRAPHICALLY _VERY_ CLOSE WELL TO THIS WELL: WELL_NAME= GILBERT-1A
--- LISTING OF GEOGRAPHICALLY CLOSE WELLS TO THIS WELL ---
DISTANCE= 00.0 km (very approx) Onshore?=N WELL_NAME= GILBERT-1A
DISTANCE= 07.0 km (very approx) Onshore?=N WELL_NAME= BALEEN-1
DISTANCE= 07.2 km (very approx) Onshore?=N WELL_NAME= BALEEN-2
DISTANCE= 07.2 km (very approx) Onshore?=N WELL_NAME= BALEEN-3
DISTANCE= 07.2 km (very approx) Onshore?=N WELL_NAME= BALEEN-3 ST1
DISTANCE= 07.2 km (very approx) Onshore?=N WELL_NAME= BALEEN-4
DISTANCE= 08.6 km (very approx) Onshore?=N WELL_NAME= SPERM WHALE-1
DISTANCE= 08.8 km (very approx) Onshore?=N WELL_NAME= PATRICIA-1
DISTANCE= 08.8 km (very approx) Onshore?=N WELL_NAME= PATRICIA-2
DISTANCE= 12.7 km (very approx) Onshore?=N WELL_NAME= LONGTOM-3 ST1
DISTANCE= 12.7 km (very approx) Onshore?=N WELL_NAME= LONGTOM-3H
DISTANCE= 12.7 km (very approx) Onshore?=N WELL_NAME= LONGTOM-3P
DISTANCE= 12.7 km (very approx) Onshore?=N WELL_NAME= MOBY-1
DISTANCE= 12.7 km (very approx) Onshore?=Y WELL_NAME= EAST END-1
DISTANCE= 13.0 km (very approx) Onshore?=N WELL_NAME= LONGTOM-4
DISTANCE= 13.0 km (very approx) Onshore?=N WELL_NAME= LONGTOM-4H
DISTANCE= 13.0 km (very approx) Onshore?=N WELL_NAME= LONGTOM-4P
DISTANCE= 13.1 km (very approx) Onshore?=N WELL_NAME= LONGTOM-1
DISTANCE= 13.1 km (very approx) Onshore?=N WELL_NAME= LONGTOM-1 ST1
DISTANCE= 13.3 km (very approx) Onshore?=N WELL_NAME= LONGTOM-2
DISTANCE= 13.3 km (very approx) Onshore?=N WELL_NAME= LONGTOM-2 ST1
DISTANCE= 13.9 km (very approx) Onshore?=N WELL_NAME= SOUTH EAST LONGTOM-1
DISTANCE= 14.5 km (very approx) Onshore?=N WELL_NAME= FLATHEAD-1
DISTANCE= 15.8 km (very approx) Onshore?=Y WELL_NAME= TILDESLEY EAST-3
DISTANCE= 16.3 km (very approx) Onshore?=N WELL_NAME= GARFISH-1
DISTANCE= 16.3 km (very approx) Onshore?=N WELL_NAME= MACLEAN-1
DISTANCE= 16.3 km (very approx) Onshore?=N WELL_NAME= WHALE-1
SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = G69B-353
SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = GB79-136
SDO: HISTORICAL TITLES: 1. ENCLOSING GILBERT-1 : TITLE_NAME=PEP38
SDO: HISTORICAL TITLES: 1. ENCLOSING GILBERT-1 : TITLE_NAME=VIC/P1
SDO: HISTORICAL TITLES: 1. ENCLOSING GILBERT-1 : TITLE_NAME=VIC/P11
SDO: HISTORICAL TITLES: 1. ENCLOSING GILBERT-1 : TITLE_NAME=VIC/P47
SDO: HISTORICAL TITLES: 2. NEAR GILBERT-1 : TITLE_NAME=PEP38 : Distance=0
SDO: HISTORICAL TITLES: 2. NEAR GILBERT-1 : TITLE_NAME=PEP42 : Distance=3.18
SDO: HISTORICAL TITLES: 2. NEAR GILBERT-1 : TITLE_NAME=VIC/L21 : Distance=5.06
SDO: HISTORICAL TITLES: 2. NEAR GILBERT-1 : TITLE_NAME=VIC/L29 : Distance=14.73
SDO: HISTORICAL TITLES: 2. NEAR GILBERT-1 : TITLE_NAME=VIC/L9 : Distance=14.32
SDO: HISTORICAL TITLES: 2. NEAR GILBERT-1 : TITLE_NAME=VIC/P1 : Distance=0
SDO: HISTORICAL TITLES: 2. NEAR GILBERT-1 : TITLE_NAME=VIC/P1 : Distance=11.88
SDO: HISTORICAL TITLES: 2. NEAR GILBERT-1 : TITLE_NAME=VIC/P1 : Distance=14.68
SDO: HISTORICAL TITLES: 2. NEAR GILBERT-1 : TITLE_NAME=VIC/P1 : Distance=14.78
SDO: HISTORICAL TITLES: 2. NEAR GILBERT-1 : TITLE_NAME=VIC/P11 : Distance=0
SDO: HISTORICAL TITLES: 2. NEAR GILBERT-1 : TITLE_NAME=VIC/P38 : Distance=3.44
SDO: HISTORICAL TITLES: 2. NEAR GILBERT-1 : TITLE_NAME=VIC/P40(V) : Distance=10.92
SDO: HISTORICAL TITLES: 2. NEAR GILBERT-1 : TITLE_NAME=VIC/P47 : Distance=0
SDO: HISTORICAL TITLES: 2. NEAR GILBERT-1 : TITLE_NAME=VIC/P54 : Distance=3.44
SDO: HISTORICAL TITLES: 2. NEAR GILBERT-1 : TITLE_NAME=VIC/P8 : Distance=3.18
SDO: HISTORICAL TITLES: 2. NEAR GILBERT-1 : TITLE_NAME=VIC/RL5 : Distance=5.06
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE911508 a GILBERT-1/1A WCR [CD] PE911508__((_GILBERT-1_1A__WCR_))_.TAR.GZ(284.4m).........PE911508__((_GILBERT-1_1A__WCR_))_.TAR.GZ(284.4m).........SAM2_085_PE911508__((_GILBERT-1_1A__WCR_))_I_MEDIA_LABELLING.JPG(3.0m).........PE911508__((_GILBERT-1_1A__WCR_))__FILES_LISTING.TXT(0.0m).........PE911508__((_GILBERT-1_1A__WCR_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE911508 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE911508 c DESC=GILBERT-1/1A Well Completion Report, Basic Digital Data (Vol 2 of 2), LWD (PDF, ASCII and LIS format). Bass Strait Oil. Feb. 2006. W1447
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE911508 d WELL_NAME=GILBERT-1
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE911508 d WELL_NAME=GILBERT-1A
ASSETS (DETAIL) GENERAL ESUBS_CD_DVD PE911536 a DDRs, Well & Permit Data 2005 to 2007 [DVD] (3259 DIGITAL FILES)
ASSETS (DETAIL) GENERAL ESUBS_CD_DVD PE911536 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) GENERAL ESUBS_CD_DVD PE911536 c DESC=Daily Drilling reports, Well Data & Permit Data for the years 2005 to 2007. Reports submitted via email to DPI. Saved by Kourosh Mehin, Mary Jane, Hannah Wallace. NOTE! Some files corrupted. See Remarks.
ASSETS (DETAIL) GENERAL NOTE NOTE4095 a wells Without deviation survey data []
ASSETS (DETAIL) WELL BIOSTRAT PE909784_1 a GILBERT-1/1A Palynology Rpt in WCR,2005 [CD] PE909784__((_GILBERT-1_1A_WCR__INTERPRETIVE__))_.TAR.GZ(15.5m).........PE909784__((_GILBERT-1_1A_WCR__INTERPRETIVE__))_.TAR.GZ(15.5m).........SAM1_891_PE909784__((_GILBERT-1_1A_WCR__INTERPRETIVE__))_I_MEDIA_LABELLING.JPG(3.0m).........PE909784__((_GILBERT-1_1A_WCR__INTERPRETIVE__))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) WELL BIOSTRAT PE909784_1 b (located in::PE909784= GILBERT-1/1A WCR)
ASSETS (DETAIL) WELL BIOSTRAT PE909784_1 c DESC=GILBERT-1/1A Palynology Report in WCR (Interpretive Data). Appendix 3. (12 Pages). By Alan Partridge. Biostrata Report 2005/32A. 12-DEC-2005.
ASSETS (DETAIL) WELL BIOSTRAT PE909784_1 d WELL_NAME=GILBERT-1
ASSETS (DETAIL) WELL BIOSTRAT PE909784_1 d WELL_NAME=GILBERT-1A
ASSETS (DETAIL) WELL BIOSTRAT PE911507_1 a GILBERT-1/1A Palynology Rpt in WCR,2005 [CD] PE911507__((_GILBERT-1_1A_WCR_))_.TAR.GZ(98.6m).........PE911507__((_GILBERT-1_1A_WCR_))_.TAR.GZ(98.6m).........SAM2_084_PE911507__((_GILBERT-1_1A_WCR_))_I_MEDIA_LABELLING.JPG(2.9m).........PE911507__((_GILBERT-1_1A_WCR_))__FILES_LISTING.TXT(0.0m).........PE911507__((_GILBERT-1_1A_WCR_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) WELL BIOSTRAT PE911507_1 b (located in::PE911507= GILBERT-1/1A WCR)
ASSETS (DETAIL) WELL BIOSTRAT PE911507_1 c DESC=GILBERT-1/1A Palynology Report & Basic Distribution Chart. Appendix 12. (7 Pages). By Alan D. Partridge, Biostrata Pty Ltd. Biostrata Report 2005/32B. 08-DEC-2005. W1447
ASSETS (DETAIL) WELL BIOSTRAT PE911507_1 d WELL_NAME=GILBERT-1
ASSETS (DETAIL) WELL BIOSTRAT PE911507_1 d WELL_NAME=GILBERT-1A
ASSETS (DETAIL) WELL DAILY_RPT PE907806 a Daily Drilling Reports. Various Wells. [CD] PE907806__((_DAILY_DRILLING_REPORTS._VARIOUS_WELLS._))_.TAR.GZ(383.8m).........SAM1_579_PE907806__((_DAILY_DRILLING_REPORTS._VARIOUS_WELLS._))_I_MEDIA_LABELLING.JPG(2.8m).........PE907806__((_DAILY_DRILLING_REPORTS._VARIOUS_WELLS._))__FILES_LISTING.TXT(0.4m).........
ASSETS (DETAIL) WELL DAILY_RPT PE907806 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) WELL DAILY_RPT PE907806 c DESC=Daily Drilling and Geological Reports, drilling updates, approvals, mud logs, for Development and Exploration Wells, 24 January 2005 to 24 May 2006. Format: pdf, zip, doc; occasional las, xls, txt, ASCII, pds, jpg, wmf, ai. Taken from Kourosh Mehin.
ASSETS (DETAIL) WELL DAILY_RPT PE911536_5 a Daily Drilling, Geol, Workover, Mud Rpts [DVD] (3259 DIGITAL FILES)
ASSETS (DETAIL) WELL DAILY_RPT PE911536_5 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007)
ASSETS (DETAIL) WELL DAILY_RPT PE911536_5 c DESC=Daily Drilling, Geol, Workover, Mud Reports, 2005-2007.
ASSETS (DETAIL) WELL DAILY_RPT PE915095 a Multiple Wells Drill Reports/Mud Logs CD [CD] PE915095__((_MULTIPLE_WELLS_DRILL_REPORTS_MUD_LOGS_CD_))_.TAR.GZ(383.6m).........SAM3_345_PE915095__((_MULTIPLE_WELLS_DRILL_REPORTS_MUD_LOGS_CD_))__MEDIA_LABELLING.JPG(2.6m).........PE915095__((_MULTIPLE_WELLS_DRILL_REPORTS_MUD_LOGS_CD_))__BASKER-5_BASKER-5_12__MWD_SURVEYS.TXT(0.0m).........
ASSETS (DETAIL) WELL DAILY_RPT PE915095 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) WELL DAILY_RPT PE915095 c DESC=Multiple Wells Drill Reports & Mud Logs. Contains daily reports, daily geological reports, mudlogs, abandonment programs, well approvals, drilling logs, daily ops reports, progress reports, MWD reports, sampling data, well logs for 30 wells.
ASSETS (DETAIL) WELL DAILY_RPT PE915095 d (more than 25 wells for this asset item)
ASSETS (DETAIL) WELL DRILL_RPT PE911536_9 a Drilling Data, Logs, TD Curves & Reports [DVD] (3259 DIGITAL FILES)
ASSETS (DETAIL) WELL DRILL_RPT PE911536_9 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007)
ASSETS (DETAIL) WELL DRILL_RPT PE911536_9 c DESC=Drilling Data, Logs, TD Curves & Reports.
ASSETS (DETAIL) WELL GEOCHEM PE911507_161 a GILBERT-1/1A Geochemistry Report in WCR [CD] PE911507__((_GILBERT-1_1A_WCR_))_.TAR.GZ(98.6m).........PE911507__((_GILBERT-1_1A_WCR_))_.TAR.GZ(98.6m).........SAM2_084_PE911507__((_GILBERT-1_1A_WCR_))_I_MEDIA_LABELLING.JPG(2.9m).........PE911507__((_GILBERT-1_1A_WCR_))__FILES_LISTING.TXT(0.0m).........PE911507__((_GILBERT-1_1A_WCR_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) WELL GEOCHEM PE911507_161 b (located in::PE911507= GILBERT-1/1A WCR)
ASSETS (DETAIL) WELL GEOCHEM PE911507_161 c DESC=GILBERT-1/1A Geochemistry Report in WCR. Appendix 11. Contains: Solvent Extraction Data, Chromatogram, Saturated/Aromatic Hydrocarbons. By Geotechnical Services Pty Ltd.
ASSETS (DETAIL) WELL GEOCHEM PE911507_161 d WELL_NAME=GILBERT-1
ASSETS (DETAIL) WELL GEOCHEM PE911507_161 d WELL_NAME=GILBERT-1A
ASSETS (DETAIL) WELL GEOCHEM PE911507_474 a GILBERT-1/1A Gas Log in WCR [CD] PE911507__((_GILBERT-1_1A_WCR_))_.TAR.GZ(98.6m).........PE911507__((_GILBERT-1_1A_WCR_))_.TAR.GZ(98.6m).........SAM2_084_PE911507__((_GILBERT-1_1A_WCR_))_I_MEDIA_LABELLING.JPG(2.9m).........PE911507__((_GILBERT-1_1A_WCR_))__FILES_LISTING.TXT(0.0m).........PE911507__((_GILBERT-1_1A_WCR_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) WELL GEOCHEM PE911507_474 b (located in::PE911507= GILBERT-1/1A WCR)
ASSETS (DETAIL) WELL GEOCHEM PE911507_474 c DESC=GILBERT-1/1A Gas Log in WCR. Enclosure 4. By Geoservices.
ASSETS (DETAIL) WELL GEOCHEM PE911507_474 d WELL_NAME=GILBERT-1
ASSETS (DETAIL) WELL GEOCHEM PE911507_474 d WELL_NAME=GILBERT-1A
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911508_2 a GILBERT-1/1A WCR [CD] PE911508__((_GILBERT-1_1A__WCR_))_.TAR.GZ(284.4m).........PE911508__((_GILBERT-1_1A__WCR_))_.TAR.GZ(284.4m).........SAM2_085_PE911508__((_GILBERT-1_1A__WCR_))_I_MEDIA_LABELLING.JPG(3.0m).........PE911508__((_GILBERT-1_1A__WCR_))__FILES_LISTING.TXT(0.0m).........PE911508__((_GILBERT-1_1A__WCR_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911508_2 b (located in::PE911508= GILBERT-1/1A Well Completion Report)
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911508_2 c DESC=GILBERT-1/1A Well Completion Report, Basic Digital Data (Vol 2 of 2), LWD (PDF, ASCII and LIS format). Bass Strait Oil. Feb 2006. W1447
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911508_2 d WELL_NAME=GILBERT-1
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911508_2 d WELL_NAME=GILBERT-1A
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 a Digital Well Logs [DVD] (3259 DIGITAL FILES)
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007)
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 c DESC=Digital Well Logs. In LAS format.
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=BREAM-A19A
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=BREAM-A6A
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=BREAM-A9B
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=CHILDERS COVE-1
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=CRC-1
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=FUR SEAL-1
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=GALLOWAY-1
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=GILBERT-1
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=GLENAIRE-1
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=GLENAIRE-1 ST1
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=LONGTOM-3
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=LONGTOM-3 ST1
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=LONGTOM-3H
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=LONGTOM-3P
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=MACLEAN-1
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=MEGASCOLIDES-1 RE ST1
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=PATROBUS-1
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=WEST KINGFISH-W18A
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=WEST KINGFISH-W19A
ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE911536_16 d WELL_NAME=WEST KINGFISH-W20A
ASSETS (DETAIL) WELL MUD_LOG PE911536_6 a Mudlogs [DVD] (3259 DIGITAL FILES)
ASSETS (DETAIL) WELL MUD_LOG PE911536_6 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007)
ASSETS (DETAIL) WELL MUD_LOG PE911536_6 c DESC=Mudlogs.
ASSETS (DETAIL) WELL WCR_RPT PE909784 a GILBERT-1/1A WCR (interpretive) [CD] PE909784__((_GILBERT-1_1A_WCR__INTERPRETIVE__))_.TAR.GZ(15.5m).........PE909784__((_GILBERT-1_1A_WCR__INTERPRETIVE__))_.TAR.GZ(15.5m).........SAM1_891_PE909784__((_GILBERT-1_1A_WCR__INTERPRETIVE__))_I_MEDIA_LABELLING.JPG(3.0m).........PE909784__((_GILBERT-1_1A_WCR__INTERPRETIVE__))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) WELL WCR_RPT PE909784 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) WELL WCR_RPT PE909784 c DESC=GILBERT-1/1A Well Completion Report, October 2006. Interpretative data, Bass Strait Oil. PDF Report and data. VIC/P47
ASSETS (DETAIL) WELL WCR_RPT PE909784 d WELL_NAME=GILBERT-1
ASSETS (DETAIL) WELL WCR_RPT PE909784 d WELL_NAME=GILBERT-1A
ASSETS (DETAIL) WELL WCR_RPT PE911507 a GILBERT-1/1A WCR [CD] PE911507__((_GILBERT-1_1A_WCR_))_.TAR.GZ(98.6m).........PE911507__((_GILBERT-1_1A_WCR_))_.TAR.GZ(98.6m).........SAM2_084_PE911507__((_GILBERT-1_1A_WCR_))_I_MEDIA_LABELLING.JPG(2.9m).........PE911507__((_GILBERT-1_1A_WCR_))__FILES_LISTING.TXT(0.0m).........PE911507__((_GILBERT-1_1A_WCR_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) WELL WCR_RPT PE911507 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes)
ASSETS (DETAIL) WELL WCR_RPT PE911507 c DESC=GILBERT-1/1A Well Completion Report, Basic Digital Data (Vol 1 of 2), Bass Strait Oil. Feb. 2006.
ASSETS (DETAIL) WELL WCR_RPT PE911507 d WELL_NAME=GILBERT-1
ASSETS (DETAIL) WELL WCR_RPT PE911507 d WELL_NAME=GILBERT-1A
ASSETS (DETAIL) WELL WCR_RPT PE911508_1 a GILBERT-1/1A WCR [CD] PE911508__((_GILBERT-1_1A__WCR_))_.TAR.GZ(284.4m).........PE911508__((_GILBERT-1_1A__WCR_))_.TAR.GZ(284.4m).........SAM2_085_PE911508__((_GILBERT-1_1A__WCR_))_I_MEDIA_LABELLING.JPG(3.0m).........PE911508__((_GILBERT-1_1A__WCR_))__FILES_LISTING.TXT(0.0m).........PE911508__((_GILBERT-1_1A__WCR_))__FILES_LISTING.TXT(0.0m).........
ASSETS (DETAIL) WELL WCR_RPT PE911508_1 b (located in::PE911508= GILBERT-1/1A Well Completion Report)
ASSETS (DETAIL) WELL WCR_RPT PE911508_1 c DESC=GILBERT-1/1A Well Completion Report, Basic Digital Data (Vol 2 of 2), LWD (PDF, ASCII and LIS format). Bass Strait Oil. Feb. 2006. W1447
ASSETS (DETAIL) WELL WCR_RPT PE911508_1 d WELL_NAME=GILBERT-1
ASSETS (DETAIL) WELL WCR_RPT PE911508_1 d WELL_NAME=GILBERT-1A
ASSETS (DETAIL) WELL WELL_LOG PE911536_14 a Well Log Images [DVD] (3259 DIGITAL FILES)
ASSETS (DETAIL) WELL WELL_LOG PE911536_14 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007)
ASSETS (DETAIL) WELL WELL_LOG PE911536_14 c DESC=Well Log Images.
GILBERT_1 OIL_CO:1: DEVIATION SRVY 01 SURVEY_ID =GILBERT_1
GILBERT_1 OIL_CO:1: DEVIATION SRVY 02 SURVEY_COMPANY =Sperry
GILBERT_1 OIL_CO:1: DEVIATION SRVY 03 SURVEY_DATE =14-OCT-05
GILBERT_1 OIL_CO:1: DEVIATION SRVY 05 SURVEY_TYPE =DIR
GILBERT_1 OIL_CO:1: DEVIATION SRVY 06 STORAGE_UNIT =Metres
GILBERT_1 OIL_CO:1: DEVIATION SRVY 09 COMPUTE_METHOD =MC
GILBERT_1 OIL_CO:1: DEVIATION SRVY 11 MAGNETIC_DECLINATION =13.95
GILBERT_1 OIL_CO:1: DEVIATION SRVY 13 AZIMUTH_NORTH_TYPE =G
GILBERT_1 OIL_CO:1: DEVIATION SRVY 14 TOP_DEPTH =354.01
GILBERT_1 OIL_CO:1: DEVIATION SRVY 16 BASE_DEPTH =810
GILBERT_1 OIL_CO:1: DEVIATION SRVY 18 SOURCE =OIL_CO
GILBERT_1 OIL_CO:1: DEVIATION SRVY 20 REMARK =From WCR PE911507, page 157. Points above 354m MD assumed to be zero inclination and azimuth.
GILBERT_1 OIL_CO:1: DEVIATION SRVY 21 POINT COUNT = 2
GILBERT_1 OIL_CO:2: DEVIATION SRVY STATION_MD INCLINATION AZIMUTH STATION_ID STATION_TVD X_OFFSET Y_OFFSET VERTICAL_SECTION NS_DIRECTION EW_DIRECTION DOG_LEG_SEVERITY REMARK
GILBERT_1 OIL_CO:3: DEVIATION SRVY 0000 .0 0 0 Assumed to be zero.
GILBERT_1 OIL_CO:3: DEVIATION SRVY 0107 107.0 0 0 Assumed to be zero.
GILBERT_1_MSTR MASTER:1: DEVIATION SRVY 01 SURVEY_ID =GILBERT_1_MSTR
GILBERT_1_MSTR MASTER:1: DEVIATION SRVY 02 SURVEY_COMPANY =Sperry
GILBERT_1_MSTR MASTER:1: DEVIATION SRVY 03 SURVEY_DATE =14-OCT-05
GILBERT_1_MSTR MASTER:1: DEVIATION SRVY 05 SURVEY_TYPE =DIR
GILBERT_1_MSTR MASTER:1: DEVIATION SRVY 06 STORAGE_UNIT =Metres
GILBERT_1_MSTR MASTER:1: DEVIATION SRVY 09 COMPUTE_METHOD =MC
GILBERT_1_MSTR MASTER:1: DEVIATION SRVY 11 MAGNETIC_DECLINATION =13.95
GILBERT_1_MSTR MASTER:1: DEVIATION SRVY 13 AZIMUTH_NORTH_TYPE =G
GILBERT_1_MSTR MASTER:1: DEVIATION SRVY 14 TOP_DEPTH =354.01
GILBERT_1_MSTR MASTER:1: DEVIATION SRVY 16 BASE_DEPTH =810
GILBERT_1_MSTR MASTER:1: DEVIATION SRVY 18 SOURCE =MASTER
GILBERT_1_MSTR MASTER:1: DEVIATION SRVY 18 SOURCE =MASTER [Note: surveys with a SOURCE of MASTER should usually be just a copy of one of the original surveys run in the well. The MASTER survey is used by the database to display/calculate well paths etc]
GILBERT_1_MSTR MASTER:1: DEVIATION SRVY 20 REMARK =From WCR PE911507, page 157. Points above 354m MD assumed to be zero inclination and azimuth.
GILBERT_1_MSTR MASTER:1: DEVIATION SRVY 21 POINT COUNT = 2
GILBERT_1_MSTR MASTER:2: DEVIATION SRVY STATION_MD INCLINATION AZIMUTH STATION_ID STATION_TVD X_OFFSET Y_OFFSET VERTICAL_SECTION NS_DIRECTION EW_DIRECTION DOG_LEG_SEVERITY REMARK
GILBERT_1_MSTR MASTER:3: DEVIATION SRVY 0000 .0 0 0 0 0 0 N E Assumed to be zero.
GILBERT_1_MSTR MASTER:3: DEVIATION SRVY 0107 107.0 0 0 107 0 0 N E Assumed to be zero.
PPDM_AUDIT_HISTORY: WELL_NAME=HISTWELL200004739760