GSV: Geological Survey of Victoria   Geological Survey of Victoria

BASKER4




*** BASKER4 ***

basker4 000 LINKS HYPERLINKAGES GIPPSLAND_OFFSHORE_EXPLO_WELLS GIPPSLAND_OFFSHORE_DEVEL_WELLS LINKS HYPERLINKAGES GIPPSLAND_WELLS GIPPSLAND_ON_SHORE_WELLS GIPPSLAND_OFFSHORE_WELLS Geoscience Australia may also have other information: (see the GA Well Summary page for the well with this ENO (436058):
Geoscience Australia may also have other information: (see the GA well search page: http://dbforms.ga.gov.au/www/npm.well.search ) *** ENO=436058 -- BASKER 4
HDR WELL_NAME = BASKER-4
HDR A GEOGRAPHICALLY VERY CLOSE WELL TO THIS WELL: WELL_NAME= BASKER-2 HDR A GEOGRAPHICALLY VERY CLOSE WELL TO THIS WELL: WELL_NAME= BASKER-3 HDR A GEOGRAPHICALLY VERY CLOSE WELL TO THIS WELL: WELL_NAME= BASKER-5 HDR A GEOGRAPHICALLY VERY CLOSE WELL TO THIS WELL: WELL_NAME= BASKER-7
HDR DATE 1: SPUD_DATE = 27-FEB-06 HDR DATE 3: RIG_RELEASE_DATE = 24-MAY-06 HDR DATE 4: DB_ENTRY_BY = EF03_SW (database header data entry) HDR DATE 4: DB_ENTRY_DATE = 15-FEB-07 (database header data entry date) HDR DATE 5: DB_ROW_UPDATER = EF03_TW (database header data entry last updated by) HDR DATE 5: DB_ROW_UPDATE_DATE = 28-SEP-10 (database header data entry last update date) HDR DATE 6: THEORETICAL OPENFILE BASIC DATE= 25-MAY-07 HDR DATE 6: THEORETICAL OPENFILE INTERPRETIVE DATE= 24-JUN-11
HDR DEVIATION_IND = Y (i.e. has this hole been deviated?) HDR LOC: BASIN DESCRIPTION= Gippsland Basin HDR LOC: BASIN_CODE = GIPPSLAND HDR LOC: COUNTRY = AUSTRALIA HDR LOC: FIELD_NAME = BASKER FIELD HDR LOC: ONSHORE_IND = N HDR LOC: PROVINCE_STATE = VIC HDR LOC: TITLE_NAME = VIC/L26 HDR LOC: TITLE_NAME: SDO: CURRENT TITLE (Current as at 23-FEB-12) BY LOCATION: ENCLOSING BASKER-4 : TITLE_NAME=VIC/L26 HDR OPERATOR = Anzon Australia Limited HDR PLATFORM_IND = N (i.e. is this hole off a platform?) HDR SIDETRACK_IND = N (i.e. is this hole a sidetrack?)
HDR DPH GREATEST OF DEPTHS = 3480 HDR DPH: DRILL_TD = 3480 HDR DPH: DRILL_TD = DRILLERS TOTAL DEPTH: Total or maximum depth of the well as reported by the operator/driller (PPDM definition). HDR DPH: FINAL_TD = 3480 HDR DPH: FINAL_TD = FINAL TOTAL DEPTH: The actual measurement along the well path from the reference datum to the bottom of the well (PPDM definition). HDR DPH: MAX_TVD = 3301.2 HDR DPH: MAX_TVD = MAXIMUM TRUE VERTICAL DEPTH: The maximum true vertical depth from the surface datum reference to the final total depth or deepest point, measured on a straight line (PPDM definition). HDR ELEV: DEPTH_DATUM = RT HDR ELEV: DEPTH_DATUM LONGNM= Rotary Table HDR ELEV: DEPTH_DATUM_ELEV = 21.5 HDR ELEV: ELEVATION_REF = RT HDR ELEV: ELEVATION_REF LN = Rotary Table HDR ELEV: REF_ELEV = 21.5 HDR ELEV: RT_ELEV = 21.5 HDR ELEV: WATER_DEPTH = -154.5 HDR STORAGE_UNIT = Metres
HDR CURRENT_CLASS = D_HC_PROD HDR CURRENT_CLASS LONG_NAME = Development Well --Hydrocarbon PRODUCTION Well HDR CURRENT_STATUS = PRODUCER HDR CURRENT_STATUS LONG_NAME= Producing Well HDR INITIAL_CLASS = D_HC_PROD HDR INITIAL_CLASS LONG_NAME = Development Well --Hydrocarbon PRODUCTION Well HDR PLOT SYMBOL DESCRIPTION = Oil and gas well/discovery --- OIL & GAS WELL HDR PLOT_SYMBOL = 141
WELL_ALIAS BOREHOLE_NAME = UNKNOWN PARISH-0 : [WELL_BORE] WELL_BORE: the BOREHOLE and BORE NUMBER of the well WELL_ALIAS BOREHOLE_SITE_ID=SIT959638 : equivalent BOREHOLE_NAME=UNKNOWN PARISH 0 WELL_ALIAS PLOT_NAME= BASKER-4 WELL_ALIAS UWI= 200006781942 WELL_ALIAS WELL_NAME= 436058 : [WELL_PEDIN_E] WELL_PEDIN_ENO Geoscience Australia ENO WELL_ALIAS WELL_NAME= 959638 : [WELL_SITE_ID] WELL_SITE_ID -- GEDIS Boreholes Database SITE ID WELL_ALIAS WELL_NAME= BASKER-4 : [WELL_GENERIC] WELL_GENERIC -- a generic wellname WELL_ALIAS WELL_NAME= W1462 : [WELL_BOX_NO] WELL_BOX_NO: the W Number (Well Box No) of the well
NODE_COORD BOTTOM HOLE LAT & LONG = -38.299686 148.706547 NODE_COORD SURFACE LAT & LONG = -38.299686 148.706547 NODE_COORD DATUM = COORD_SYSTEM_ID=218 GEODETIC_DATUM_ID=4283
FORMATION_TOPS SOURCE=WCR 0177 FORM_ID= SEAFLOOR TOP_DEPTH= 176.9 BASE_DEPTH= SEAFLOOR (Age:SEAFLOOR ) >>> REMARK =From PE913222 Page 12 (WCR=Well Completion Report) FORMATION_TOPS SOURCE=WCR 1825 FORM_ID= LAKES ENTRANCE FM TOP_DEPTH= 1824.5 BASE_DEPTH= Lakes Entrance Formation (Age:Tertiary ) ...Member of....SEASPRAY GROUP (WCR=Well Completion Report) FORMATION_TOPS SOURCE=WCR 2190 FORM_ID= LATROBE GROUP TOP_DEPTH= 2189.8 BASE_DEPTH= Latrobe Group (Age:Cretaceous ) (WCR=Well Completion Report) FORMATION_TOPS SOURCE=WCR 3169 FORM_ID= ZONE 0 RESERV EQUIV TOP_DEPTH= 3168.4 BASE_DEPTH= Zone 0 Reservoir Equivalent (Age:undisclosed ) >>> REMARK =From PE913222 Page 12 (WCR=Well Completion Report) FORMATION_TOPS SOURCE=WCR 3232 FORM_ID= ZONE 1.2 RESERVOIR TOP_DEPTH= 3231.8 BASE_DEPTH= ZONE 1.2 RESERVOIR (Age:CRETATEOUS ) (WCR=Well Completion Report) FORMATION_TOPS SOURCE=WCR 3244 FORM_ID= ZONE 2 RESERVOIR TOP_DEPTH= 3243.2 BASE_DEPTH= ZONE 2 RESERVOIR (Age:CRETATEOUS ) (WCR=Well Completion Report) FORMATION_TOPS SOURCE=WCR 3294 FORM_ID= ZONE 4 RESERVOIR TOP_DEPTH= 3293.6 BASE_DEPTH= ZONE 4 RESERVOIR (Age:CRETATEOUS ) (WCR=Well Completion Report) FORMATION_TOPS SOURCE=WCR 3365 FORM_ID= ZONE 5 RESERV EQUIV TOP_DEPTH= 3364.7 BASE_DEPTH= Zone 5 Reservoir Equivalent (Age:undisclosed ) >>> REMARK =From PE913222 Page 12 (WCR=Well Completion Report) FORMATION_TOPS SOURCE=WCR 3397 FORM_ID= ZONE 6.2 RESV EQUIV TOP_DEPTH= 3396.1 BASE_DEPTH= Zone 6.2 Reservoir Equivalent (Age:undisclosed ) >>> REMARK =From PE913222 Page 12 (WCR=Well Completion Report) FORMATION_TOPS SOURCE=WCR 3430 FORM_ID= ZONE 7 RESERVOIR TOP_DEPTH= 3430 BASE_DEPTH= ZONE 7 RESERVOIR (Age:CRETATEOUS ) (WCR=Well Completion Report) FORMATION_TOPS SOURCE=WCR 3445 FORM_ID= VOLCANICS UNIT 1 TOP_DEPTH= 3445 BASE_DEPTH= VOLCANICS UNIT 1 (Age:CRETATEOUS ) >>> REMARK =From PE913222 Page 12 (WCR=Well Completion Report)
ASSETS (BRIEF) DATA_TYPE DATA_SUB_TYPE BARCODE ITEM_NAME [MEDIA_TYPE] SCANNED_OR_DIGITAL_FILES
ASSETS (BRIEF) GENERAL DATA_CD_DVD PE915209 BASKER-4 Wireline Logs and Data [CD] 2006 PE915209__((_BASKER-4_WIRELINE_LOGS_AND_DATA_))_.TAR.GZ(477.2m)......... SAM2_167_PE915209__((_BASKER-4_WIRELINE_LOGS_AND_DATA_))__MEDIA_LABELLING.JPG(2.9m)......... PE915209__((_BASKER-4_WIRELINE_LOGS_AND_DATA_))__FILES_LISTING.TXT(0.0m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes ASSETS (BRIEF) GENERAL ESUBS_CD_DVD PE911536 DDRs, Well & Permit Data 2005 to 2007 [DVD] 2007 (3259 DIGITAL FILES) in: COMPACTUS Bay of COMPACTUS_1 used to store tapes ASSETS (BRIEF) WELL DAILY_RPT PE909654 BASKER-4 Daily Drilling & Workover Rpts [CD] 2006 (179 DIGITAL FILES) in: COMPACTUS Bay of COMPACTUS_1 used to store tapes ASSETS (BRIEF) WELL WCR_RPT PE909778 BASKER-4 WCR, Vol1 [CD] 2006 PE909778__((_BASKER-4_WCR,_VOL1_))_.TAR.GZ(860.8m)......... SAM1_757_PE909778__((_BASKER-4_WCR,_VOL1_))_I_MEDIA_LABELLING.JPG(2.7m)......... PE909778__((_BASKER-4_WCR,_VOL1_))__FILES_LISTING.TXT(0.1m)......... PE909778__((_BASKER-4_WCR,_VOL1_))__MINUSLOGS.ZIP(393.3m)......... PE909778__((_BASKER-4_WCR,_VOL1_))__READ_ME.DOC(0.0m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes ASSETS (BRIEF) WELL WCR_RPT PE913222 BASKER-4 WCR Vol.2 Interpretation [CD] 2007 PE913222__((_BASKER-4_WCR_VOL.2_INTERPRETATION_))_.TAR.GZ(9.9m)......... SAM3_270_PE913222__((_BASKER-4_WCR_VOL.2_INTERPRETATION_))_I_MEDIA_LABELLING.JPG(2.6m)......... PE913222__((_BASKER-4_WCR_VOL.2_INTERPRETATION_))__FILES_LISTING.TXT(0.0m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) WELL DAILY_RPT PE911536_5 Daily Drilling, Geol, Workover, Mud Rpts [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007 ASSETS (BRIEF) WELL DIRECTIONAL PE909778_195BASKER-4 deviation survey data [CD] 2007 PE909778__((_BASKER-4_WCR,_VOL1_))_.TAR.GZ(860.8m)......... SAM1_757_PE909778__((_BASKER-4_WCR,_VOL1_))_I_MEDIA_LABELLING.JPG(2.7m)......... PE909778__((_BASKER-4_WCR,_VOL1_))__FILES_LISTING.TXT(0.1m)......... PE909778__((_BASKER-4_WCR,_VOL1_))__MINUSLOGS.ZIP(393.3m)......... PE909778__((_BASKER-4_WCR,_VOL1_))__READ_ME.DOC(0.0m)......... in: WCR_RPT BASKER-4 WCR, Vol1 ASSETS (BRIEF) WELL DIRECTIONAL PE911536_8 Geodetic Survey Data [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007 ASSETS (BRIEF) WELL DRILL_RPT PE911536_9 Drilling Data, Logs, TD Curves & Reports [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007 ASSETS (BRIEF) WELL FWR_RPT_AND_ASSOC PE911536_15 Various Data and Reports [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007 ASSETS (BRIEF) WELL LOG_TAPE_OR_DISK PE915209_2 BASKER-4 Wireline Log Data [CD] 2006 PE915209__((_BASKER-4_WIRELINE_LOGS_AND_DATA_))_.TAR.GZ(477.2m)......... SAM2_167_PE915209__((_BASKER-4_WIRELINE_LOGS_AND_DATA_))__MEDIA_LABELLING.JPG(2.9m)......... PE915209__((_BASKER-4_WIRELINE_LOGS_AND_DATA_))__FILES_LISTING.TXT(0.0m)......... in: CD BASKER-4 Wireline Logs and Data ASSETS (BRIEF) WELL MUD_LOG PE911536_6 Mudlogs [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007 ASSETS (BRIEF) WELL PROD_RPT PE911536_10 Basker-Manta-Gummy Reserves Review [DVD] 2006 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007 ASSETS (BRIEF) WELL RPT PE911536_12 Basker-Manta-Gummy Intgtd Field Dev Plan [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007 ASSETS (BRIEF) WELL VELOCITY_RPT PE915209_3 BASKER-4 Check Shot Survey Report [CD] 2006 PE915209__((_BASKER-4_WIRELINE_LOGS_AND_DATA_))_.TAR.GZ(477.2m)......... SAM2_167_PE915209__((_BASKER-4_WIRELINE_LOGS_AND_DATA_))__MEDIA_LABELLING.JPG(2.9m)......... PE915209__((_BASKER-4_WIRELINE_LOGS_AND_DATA_))__FILES_LISTING.TXT(0.0m)......... in: CD BASKER-4 Wireline Logs and Data ASSETS (BRIEF) WELL WELL_LOG PE911536_14 Well Log Images [DVD] 2007 (3259 DIGITAL FILES) in: DVD DDRs, Well & Permit Data 2005 to 2007 ASSETS (BRIEF) WELL WELL_LOG PE915209_1 BASKER-4 Wireline Logs [CD] 2006 PE915209__((_BASKER-4_WIRELINE_LOGS_AND_DATA_))_.TAR.GZ(477.2m)......... SAM2_167_PE915209__((_BASKER-4_WIRELINE_LOGS_AND_DATA_))__MEDIA_LABELLING.JPG(2.9m)......... PE915209__((_BASKER-4_WIRELINE_LOGS_AND_DATA_))__FILES_LISTING.TXT(0.0m)......... in: CD BASKER-4 Wireline Logs and Data
ASSETS (BRIEF) GENERAL FIELD_DEV PE805508 Basker Manta Gummy Development Update [PAPER] 2008 in:FIELD_BOX Recent Fields Box 3 of 3 All Basins ASSETS (BRIEF) GENERAL REGISTRY_FILE F7718773 PE/16/0546(Part-1} Registry File [PAPER] 2007 in:COMPACTUS COMPACTUS_1 55 Collins St ASSETS (BRIEF) TITLE FIELD_RPT PE802638 Basker Manta Update [PAPER] 2006 in:WELL_BOX Well Box - Recent Wells 1
LINKS HYPERLINKAGES COPYRIGHT_DISCLAIMER ABOUT_DBMAP HOW_TO_GET_OR_SUBMIT_DATA This data has been dumped from Victorian Govt (http://www.dpi.vic.gov.au) dbMap database on 23-FEB-12
ASSETS *** ALSO: Search the Geoscience Australia database for other information: (see http://dbforms.ga.gov.au/www/npm.well.search ) *** ENO=436058 BASKER-4
CORE/CUTTINGS Basker-4 Cutts : SAMPLE_TYPE=CUTT 01020 DEPTH_RANGE= 1020.000 TO 3480.000M STORAGE_BAY=239 ROW=T TO T #TRAYS=10 [ <--this shows the actual cores and cuttings that DPI has stored in the DPI Werribee core shed ]
ASSET Counts Summary: GENERAL DATA_CD_DVD [CD] 1 ASSET Counts Summary: GENERAL ESUBS_CD_DVD [DVD] 1 ASSET Counts Summary: GENERAL FIELD_DEV [PAPER] 1 ASSET Counts Summary: GENERAL REGISTRY_FILE [PAPER] 1 ASSET Counts Summary: TITLE FIELD_RPT [PAPER] 1 ASSET Counts Summary: WELL DAILY_RPT [CD] 1 ASSET Counts Summary: WELL DAILY_RPT [DVD] 1 ASSET Counts Summary: WELL DIRECTIONAL [CD] 1 ASSET Counts Summary: WELL DIRECTIONAL [DVD] 1 ASSET Counts Summary: WELL DRILL_RPT [DVD] 1 ASSET Counts Summary: WELL FWR_RPT_AND_ASSOC [DVD] 1 ASSET Counts Summary: WELL LOG_TAPE_OR_DISK [CD] 1 ASSET Counts Summary: WELL MUD_LOG [DVD] 1 ASSET Counts Summary: WELL PROD_RPT [DVD] 1 ASSET Counts Summary: WELL RPT [DVD] 1 ASSET Counts Summary: WELL VELOCITY_RPT [CD] 1 ASSET Counts Summary: WELL WCR_RPT [CD] 2 ASSET Counts Summary: WELL WELL_LOG [CD] 1 ASSET Counts Summary: WELL WELL_LOG [DVD] 1
A WELL_DRILL_HISTORY: DRILL_OBS_NO DRILL_DATE DEPTH DEPTH_TVD HOLE_IND MUD_WT REMARK source B WELL_DRILL_HISTORY:001 27-FEB-06 210.0 194.00 Move rig from Basker 5 to Basker 4. Make up BHA, spud in and drill36" hole to 191m. Pull out and change BHA. Run in and attempt to enter 36" well bore. Operations For Period 0000 Hrs to 2400 Hrs on 27 Feb 2006 Move rig from Basker 5 to Basker 4. Make up BHA, spud in and drill36" hole to 191m. Pull out and change BHA. Run in and attempt to enter 36" well bore. Operations For Period 0000 Hrs to 2400 Hrs on 27 Feb 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description CH P TI 0800 0900 1.00 0.0m Run in with 36" drilling BHA and prepare to move rig to Basker 4 CH P TI 0900 1200 3.00 0.0m On location. Run in with 36" BHA while centering rig over Basker 4. Shallow pulse test Anderdrift with 650 GPM. 2.5 degrees. Run in and tag sea floor at 176m LAT, water depth = 154.4m LAT. Survey @ 176m = 1.5 deg. Pick up and pusk BHA with ROV stbd/fwd and set bit on seafloor. Re-survey=2.5 deg. Pick up and push BHA with ROV port/fwd. Set bit on sea floor and re-survey = 1 deg. CH P DA 1200 1330 1.50 191.0m Spud in and drill 36" hole from 176m to 181m MDRT. Survey= 1.5 deg. Drill from 181m to 191m MDRT. Survey = 3 deg. Ream hole 5 times and re-survey=2.5 deg. Ream hole 5 times and re-survey=2.5 deg. Spot 50 bbl PHG and displace drillstring wit hsewater. CH TP (OTH) SVY 1330 1400 0.50 191.0m Pick up and run Totco survey = mis-run CH P DA 1400 1430 0.50 194.0m Make up TDS. Wash and ream hole. Take Anderdrift survey= 3.5 deg. Drill from 191m to 194m MDRT. CH TP (OTH) SVY 1430 1500 0.50 194.0m Wash and ream hole and run Totco survey=3.5 deg. CH TP (OTH) TO 1500 1600 1.00 194.0m Pull out from 194m MDRT CH TP (OTH) HBHA 1600 1730 1.50 194.0m Break out bit and hole opener. Lay out Anderdrift tool CH TP (OTH) HBHA 1730 1930 2.00 194.0m Pick up 2nd 36" hole opener and 3m 9" pony DC and make up in BHA CH TP (OTH) HBHA 1930 2230 3.00 194.0m Pick up and make up MWD. Shallow pulse test MWD on H... [From:WELL_DAILY] B WELL_DRILL_HISTORY:002 28-FEB-06 210.0 210.00 Pull out with 36" drilling BHA. Run and cement 30" X 20" conductor casing. Perform top up cement job. Move to Basker 5 to verify TOC Operations For Period 0000 Hrs to 2400 Hrs on 28 Feb 2006 Pull out with 36" drilling BHA. Run and cement 30" X 20" conductor casing. Perform top up cement job. Move to Basker 5 to verify TOC Operations For Period 0000 Hrs to 2400 Hrs on 28 Feb 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description CH TP (OTH) TO 0000 0100 1.00 194.0m Pull out with 36" BHA from 176m MDRT and change out MWD collar CH TP (OTH) TI 0100 0200 1.00 194.0m Run in with 36" BHA and shallow pulse test MWD. Reposition rig 4 metres Stbd/Aft while running in CH TP (OTH) SVY 0200 0300 1.00 194.0m Attempt to re-enter 36" wellbore with ROV assist, no success. Move rig 4 additional metres Aft. and enter well bore to 184m MDRT. Take survey at 183m=0.32 deg CH TP (OTH) RW 0300 0330 0.50 194.0m Wash and ream from 183m MDRT to 194m MDRT with 1000 GPM and 100-140 RPM. Take survey with bit at 193m =0.03 deg (survey depth = 173.58m) CH P DA 0330 0400 0.50 210.0m Drill ahead 36" hole from 194m to 210m MDRT. Pump 50 bbl PHG sweep at 1/2 stand and displace hole to 100 bbl PHG at connection. Work string 10m prior to connection. CH P CHC 0400 0500 1.00 210.0m Work string, ream and clean hole from TD Pump PHG sweeps. Take Survey at TD. Survey depth=189.95, inc=0.31 deg. Dispalce hole to PHG and displace DP to seawater. CC P TO 0500 0630 1.50 210.0m Pull out with 36" BHA from 210m MDRT and rack back in derrick CC P RRC 0630 0700 0.50 210.0m Hold Pre job safety meeting. Rig up to run 30" conductor casing. Move trolley with PGB under rotary table CC P CRN 0700 0830 1.50 210.0m Run 30" X 20" conductor casing. Check float shoe with seawater CC P CRN 0830 1000 1.50 210.0m Make up 5" DP stinger to 30" running tool and make up 30" running tool to 30" housing. Land 30" housing in PGB on... [From:WELL_DAILY] B WELL_DRILL_HISTORY:100 05-MAR-06 755.0 633.80 Service and change out well head R/tool, make up Dowell express head and rack in derrick. Make up 445mm (17 1/2") BHA, skid rig over Basker 4 and establish guide lines. RIH and drill out cement/ rat hole. Drill 445mm (171/2") hole from 210m MDRT to 634m MDRT as per directional plan. Operations For Period 0000 Hrs to 2400 Hrs on 05 Mar 2006 Service and change out well head R/tool, make up Dowell express head and rack in derrick. Make up 445mm (17 1/2") BHA, skid rig over Basker 4 and establish guide lines. RIH and drill out cement/ rat hole. Drill 445mm (171/2") hole from 210m MDRT to 634m MDRT as per directional plan. Operations For Period 0000 Hrs to 2400 Hrs on 05 Mar 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description SH P CMC 0330 0430 1.00 210.0m Change out well head running tool in derrick for back up unit, seal lost during Basker 3 job. Rack in derrick. SH P CMC 0430 0530 1.00 210.0m Make up Dowell deep sea express head and rack in derrick. SH P HBHA 0530 0830 3.00 210.0m Commence making up 445mm (17 1/2") directional BHA. Skid rig over location at 0645hrs. Attach guide ropes from BHA to guide lines. SH P ROV 0830 0900 0.50 210.0m Establish guide lines to Basker 4 with ROV, remove debri cap from 762mm (30") housing. SH P HBHA 0900 1100 2.00 210.0m Run in open water and shallow test MWD and Motor with 1000gpm @ 1300psi, ok. Continue to run in hole to top of cement at 203.92m MDRT. SH P DFS 1100 1200 1.00 210.0m Drill out cement and 508mm (30"/20") casing shoe@ 207m MDRT. SH P DFS 1200 1230 0.50 210.0m Drill and clean out rat hole from 207m MDRT to 210m MDRT. SH P DM 1230 2400 11.50 634.0m Commence drilling 445mm (17 1/2") hole from 210m MDRT to 634m MDRT. WOB 10-15klbs, Torque 2-4000lbs, GPM 950-1000, PSI 1800-2000, RPM 80, RPM DH 210, Rotating wt 185klbs, up wt 185klbs, down wt 185klbs Take survey each stand down with MWD, pump 50bbls sweep mid stand and 75bbls prior... [From:WELL_DAILY] B WELL_DRILL_HISTORY:100 06-MAR-06 1010.0 997.70 Drill 445mm (17 1/2") hole from 634m MDRT to 1010m MDRT Operations For Period 0000 Hrs to 2400 Hrs on 06 Mar 2006 Drill 445mm (17 1/2") hole from 634m MDRT to 1010m MDRT Operations For Period 0000 Hrs to 2400 Hrs on 06 Mar 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description SH P DM 0000 2300 23.00 1,010.0m Drilling 445mm (17 1/2") hole from 634m MDRT to 1010m MDRT WOB 20-25klbs, Torque 4-7000lbs, GPM 1000, PSI 2400, RPM 100, RPM DH 230, Rotating wt 210klbs, up wt 220klbs, down wt 195klbs Take survey each stand down with MWD, pump 50bbls sweep mid stand and 75bbls prior to connections ensuring sweep is around BHA. @970.51m MDRT, 18.49 incl, 263.81 azimuth, 960.31m TVD. Average ROP 16.34mhr SH P DIS 2300 2400 1.00 1,010.0m Pump 150bbls of PHG sweep, displace with sea water, pump 1200bbls of PHG. Operations For Period 0000 Hrs to 0600 Hrs on 07 Mar 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description SH P TO 0000 0230 2.50 1,010.0m Pull out of hole from 1010m MDRT. No hole problems observed. Stop at RGB to jet same, current too strong and string taken 4m off well center, string starting to drift around guide wires. Check with ROV around 762mm(30") housing to check if debris was PHG cloud or cuttings. Debris washed away easily, continue to POOH. SH P TO 0230 0430 2.00 1,010.0m Pull out of hole from 762mm (30") housing to surface, remove MWD probe. Break off bit and rack all BHA. Bit grading 1-1-WT-A-E-I-No-TD SC P RRC 0430 0530 1.00 1,010.0m Hold pre job safety meeting with all crews, rig up for 340mm (13 3/8") casing. SC P CRN 0530 0600 0.50 1,010.0m Make up shoe track, test float and shoe, baker lock connections and install centralisers as per tally. Attach guide ropes to guide lines. Run 340mm (13 3/8") casing as per tally Phase Data to 2400hrs, 06 Mar 2006 Phase Phase Hrs Start On Finish On Cum Hrs Cum Days Max Depth PRESPUD(PS) 3 27 Feb 2006 27 ... [From:WELL_DAILY] B WELL_DRILL_HISTORY:100 07-MAR-06 1010.0 997.70 Displace hole to PHG, POOH for casing. Run 340mm (13 3/8") casing and cement same. POOH and lay down running tools, service blocks and TDS. Disconnect guide lines and skid rig to Basker 5. Operations For Period 0000 Hrs to 2400 Hrs on 07 Mar 2006 Displace hole to PHG, POOH for casing. Run 340mm (13 3/8") casing and cement same. POOH and lay down running tools, service blocks and TDS. Disconnect guide lines and skid rig to Basker 5. Operations For Period 0000 Hrs to 2400 Hrs on 07 Mar 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description SC P TO 0000 0230 2.50 1,010.0m Pull out of hole from 1010m MDRT. No hole problems observed. Stop at RGB to jet same, current too strong and string taken 4m off well center, string starting to drift around guide wires. Check with ROV around 762mm(30") housing to check if debris was PHG cloud or cuttings. Debris washed away easily, continue to POOH. SC P TO 0230 0430 2.00 1,010.0m Pull out of hole from 762mm (30") housing to surface, remove MWD probe. Break off bit and rack all BHA. Bit grading 1-1-WT-A-E-I-No-TD SC P RRC 0430 0530 1.00 1,010.0m Hold pre job safety meeting with all crews, rig up for 340mm (13 3/8") casing. SC P CRN 0530 0700 1.50 1,010.0m Make up shoe track, test float and shoe, baker lock connections and install centralisers as per tally. Attach guide ropes to guide lines. Run 340mm (13 3/8") casing as per tally. Make up Tam packer and test same, ok. SC P CRN 0700 1230 5.50 1,010.0m Run 340mm (13 3/8") casing to 812mj MDRT. SC P CRN 1230 1430 2.00 1,010.0m Pick up well head joint and make up to string. Install Plug launcher on running tool stand in derrick and make up to string. Run in hole to 990m MDRT on drifted HWDP. SC P CRN 1430 1500 0.50 1,010.0m Rig up cement lines and express head control lines. Land out casing in 30" housing with 20klbs down. Verify latch with 50klb overpull test, ok. SC P CIC 1500 1600 1.00 1,010.0m ... [From:WELL_DAILY] B WELL_DRILL_HISTORY:200 02-MAY-06 1010.0 997.70 Skid rig from Basker #3 to Basker #4. Land and lock BOP's, overpull test on both pods, pressure test VX wellhead gasket 250/2000psi. Made up 244mm (9 5/8") casing R/T. Service top drive. Authorized Crystal Ocean to resume normal operations on Basker #2 @2200hrs. Skid rig from Basker #3 to Basker #4. Land and lock BOP's, overpull test on both pods, pressure test VX wellhead gasket 250/2000psi. Made up 244mm (9 5/8") casing R/T. Service top drive. Authorized Crystal Ocean to resume normal operations on Basker #2 @2200hrs. FORMATION Name Top Reservoir Zone 6.2 Sand Reservoir Zone 7 Sand Volcanics (Unit 1) Reservoir Zone 8 Sand Total Depth Operations for Period 0000 Hrs to 2400 Hrs on 02 May 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description IH P SKR 1900 2130 2.50 1010.0m Skid rig from Basker #3 to Basker #4. Rig at 21.5m draft for BOP handling operations . IH P BOP 2130 2200 0.50 1010.0m Land BOP's on Basker #4 well head. Lock and perform 50klb over pull test on both yellow and blue pods. Bullseye readings: PGB aft - 0.5deg stbd/aft. PGB fwd - 0deg. BOP - 0.75 stbd/aft. Flex jnt - 0.5deg stbd fwd. Flex jnt - 0.5deg port. IH P BOP 2200 2300 1.00 1010.0m Pulled out of BOP's with handling tool. Closed shear rams and tested VX gasket against 340mm (13 3/8") casing 250/2000psi, 5/5minutes. Ballast rig down 2m to normal drilling draft of 23.5m. Authorize Crystal Ocean to resume normal operations on Basker #2. IH P RS 2300 2330 0.50 1010.0m Service travelling blocks and top drive. IH P CRN 2330 2400 0.50 1010.0m Pick up 244mm (9 5/8") casing running tool.Check operation with Cameron hand. Operations for Period 0000 Hrs to 0600 Hrs on 03 May 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description IH P CRN 0000 0030 0.50 1010.0m Complete making up cameron 244mm (9 5/8") casing running tool, make up 4m drill pipe pup to top, Dowell x/o to bottom. Lay out. IH P ... [From:WELL_DAILY] B WELL_DRILL_HISTORY:301 14-MAY-06 3284.0 3062.00 Drill and survey 311mm (12 1/4") hole from 3133m MDRT to 3241m MDRT Drill and survey 311mm (12 1/4") hole from 3133m MDRT to 3241m MDRT FORMATION Name Top Reservoir Zone 6.2 Sand Reservoir Zone 7 Sand Volcanics (Unit 1) Reservoir Zone 8 Sand Total Depth Operations for Period 0000 Hrs to 2400 Hrs on 14 May 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description IH P DA 0000 0100 1.00 3144.0m Drill ahead 311mm (12 1/4") hole from 3133m MDRT to 3144m MDRT with 10-20 klbs WOB, 850 GPM, 3500 psi, 90-110 RPM, 15-18000 ftlbs torque Average ROP = 11m/hr IH TP (JNK) WTH 0100 0230 1.50 3144.0m Work junk on stand down at 3144m MDRT. Pulling tight from bottom with 50-60 klbs over pull. No rotation, jars not firing. Work pipe while circualting at 850-925 GPM. Pull pipe free with 50 klbs overpull. Work stand to and from bottom with rotation and circulation until obstruction was cleared. IH P DA 0230 1200 9.50 3189.0m Drill ahead and survey 311mm (12 1/4") hole from 3144m MDRT to 3189m MDRT with 30-40 klbs WOB, 920-950 GPM, 3500-3600 psi, 90-130 RPM, 15-19000 ftlbs torque Average ROP = 4.7m/hr IH P DA 1200 2400 12.00 3241.0m Drill ahead and survey 311mm (12 1/4") hole from 3189m MDRT to 3241m MDRT with 30-40 klbs WOB, 920-950 GPM, 3500-3600 psi, 90-150 RPM, 15-19000 ftlbs torque Average ROP = 4.3m/hr Operations for Period 0000 Hrs to 0600 Hrs on 15 May 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description IH P DA 0000 0600 6.00 3284.0m Drill ahead and survey 311mm (12 1/4") hole from 3241m MDRT to 3284m MDRT with 35-45 klbs WOB, 920-950 GPM, 3500-3600 psi, 100-130 RPM, 17-19000 ftlbs torque Average ROP = 7.2m/hr Phase Data to 2400hrs, 14 May 2006 Phase Phase Hrs Start On Finish On Cum Hrs Cum Days Max Depth PRESPUD(PS) 3 27 Feb 2006 27 Feb 2006 3.00 0.125 0.0m RIG MOVE/RIG-UP/PRESPUD(RM) 1 27 Feb 2006 27 Feb 2006 4.00 0.167 0.0m CONDUCTOR HOLE(CH) ... [From:WELL_DAILY] B WELL_DRILL_HISTORY:301 15-MAY-06 3290.0 3107.40 Drill 311mm (12 1/4") hole from 3241m MDRT to 3286m MDRT. POOH, pick up new bit and junk sub assembly and RIH to 3286m MDRT Drill 311mm (12 1/4") hole from 3241m MDRT to 3286m MDRT. POOH, pick up new bit and junk sub assembly and RIH to 3286m MDRT FORMATION Name Top Reservoir Zone 6.2 Sand Reservoir Zone 7 Sand Volcanics (Unit 1) Reservoir Zone 8 Sand Total Depth Operations for Period 0000 Hrs to 2400 Hrs on 15 May 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description IH P DA 0000 0900 9.00 3286.0m Drill ahead and survey 311mm (12 1/4") hole from 3241m MDRT to 3286m MDRT with 35-45 klbs WOB, 920-950 GPM, 3500-3600 psi, 100-130 RPM, 17-19000 ftlbs torque 3241m - 3284m; Average ROP = 7.2m/hr 3284m - 3286m; Average ROP = 0.7m/hr IH P TO 0900 1400 5.00 3286.0m Flow check well and POOH from 3286m MDRT to 278m MDRT. Hole in good condition. No tight hole IH P HBHA 1400 1500 1.00 3286.0m POOH with BHA from 278m MDRT. Break out bit (Graded 7-8-JD-A-E-I-SD-PR). IH P HBHA 1500 1700 2.00 3286.0m Initialise MWD and lay out near bit stabilizer. IH P RS 1700 1730 0.50 3286.0m Service top drive IH P HBHA 1730 1900 1.50 3286.0m Make up new bit and 2 X junk subs. RIH with BHA and HWDP to 280m MDRT IH P TI 1900 2400 5.00 3286.0m RIH with BHA on 5" DP from 280m MDRT to 3286m MDRT. Hole in good condition. No tight hole or junk noticed on trip Operations for Period 0000 Hrs to 0600 Hrs on 16 May 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description IH P DA 0000 0200 2.00 3290.0m Tag bottom with 2 klbs WOB, rotate drill string at 30 RPM, Cycle pumps at 800 GPM, 3600 psi to work junk subs. Drill 1m, work pipe and cycle pumps to work junk on bottom. Drill to 3290m MDRT and work junk subs. Pump at 900 GPM with 3900 psi. Cycle pumps prior to POOH IH P TO 0200 0600 4.00 3290.0m Flow check well and POOH from 3290m MDRT. Hole in good condition. No tight hole.... [From:WELL_DAILY] B WELL_DRILL_HISTORY:302 16-MAY-06 3520.0 3143.60 Drill 311mm (12 1/4") hole and work junk baskets in hole from 3286m MDRT to 3290m MDRT. POOH, lay out Junk run assembly and RIH with rotary hold BHA. Drill and survey 311mm (12 1/4") hole from 3290m MDRT to3322m MDRT Drill 311mm (12 1/4") hole and work junk baskets in hole from 3286m MDRT to 3290m MDRT. POOH, lay out Junk run assembly and RIH with rotary hold BHA. Drill and survey 311mm (12 1/4") hole from 3290m MDRT to3322m MDRT FORMATION Name Top Reservoir Zone 6.2 Sand Reservoir Zone 7 Sand Volcanics (Unit 1) Reservoir Zone 8 Sand Total Depth Operations for Period 0000 Hrs to 2400 Hrs on 16 May 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description IH P DA 0000 0200 2.00 3290.0m Tag bottom with 2 klbs WOB, rotate drill string at 30 RPM, Cycle pumps at 800 GPM, 3600 psi to work junk subs. Drill 1m, work pipe and cycle pumps to work junk on bottom. Drill to 3290m MDRT and work junk subs. Pump at 900 GPM with 3900 psi. Cycle pumps prior to POOH IH P TO 0200 0700 5.00 3290.0m Flow check well and POOH from 3290m MDRT. Hole in good condition. No tight hole. IH P HBHA 0700 0730 0.50 3290.0m Break out bit (graded 1-3-WT-H-E-I-SD-BHA). Lay down 12 1/4" junk assembly and clear junk baskets. Recover 440 grams of metal. IH P HBHA 0730 0800 0.50 3290.0m Make up rotary hold BHA with new bit IH P HBHA 0800 0930 1.50 3290.0m Make up and initialise MWD tool IH P HBHA 0930 1200 2.50 3290.0m Shallow pulse test MWD and RIH with BHA to 998m MDRT. IH P SC 1200 1330 1.50 3290.0m Slip and cut 104 ft of drilling line IH P TI 1330 1730 4.00 3290.0m RIH 12 1/4" BHA on 5" DP from 998m MDRT to 3290m MDRT. Hole in good condition, no tight hole or junk noted on trip IH P DA 1730 2400 6.50 3322.0m Circulate off bottom at maximum rate for 15 minutes to ensure bottom of hole is clean. Break in bit and drill ahead and survey 311mm (12 1/4") hole from 3290m MDRT to 3322m MDRT with 35-4... [From:WELL_DAILY] B WELL_DRILL_HISTORY:302 17-MAY-06 3535.0 3208.30 Drill and survey 311mm (12 1/4") hole from 3322m MDRT to 3387m MDRT. POOH to change bit and BHA configuration Drill and survey 311mm (12 1/4") hole from 3322m MDRT to 3387m MDRT. POOH to change bit and BHA configuration FORMATION Name Top Reservoir Zone 6.2 Sand Reservoir Zone 7 Sand Volcanics (Unit 1) Reservoir Zone 8 Sand Total Depth Operations for Period 0000 Hrs to 2400 Hrs on 17 May 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description IH P DA 0000 1200 12.00 3375.0m Drill ahead and survey 311mm (12 1/4") hole from 3322m MDRT to 3375m MDRT with 35-45 klbs WOB, 920-950 GPM, 3600-3800 psi, 90-130 RPM, 12-16000 ftlbs torque 3322m to 3354m MDRT Average ROP = 5.3m/hr 3354m to 3375m MDRT Average ROP = 3.5m/hr Drillstring torque increasing from connection at 3343m MDRT. High torque at connection while lowering string, 1 m off bottom. Work free, continue to bottom, fan bottom for 15 minutes and continue drilling IH P DA 1200 2030 8.50 3387.0m Drill ahead and survey 311mm (12 1/4") hole from 3375m MDRT to 3387m MDRT with 35-45 klbs WOB, 920-950 GPM, 3600-3800 psi, 90-130 RPM, 12-16000 ftlbs torque 3322m to 3354m MDRT Average ROP = 1.4m/hr IH P TO 2030 2400 3.50 3387.0m Flow check well. POOH from 3387m MDRT to 1883m MDRT. Pipe pulled tight at3302m MDRT with 50klbs over pull, 3290m MDRT with 70klbs over pull and 3269m MDRT with 60klbs over pull. Work pipe free and continue POOH. Hole from 3269m MDRT in good condition with no tight hole Operations for Period 0000 Hrs to 0600 Hrs on 18 May 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description IH P TO 0000 0330 3.50 3387.0m Continue to POOH from 1883m MDRT IH P HBHA 0330 0500 1.50 3387.0m POOH with BHA. Download MWD, lay out bit (graded 3-8-JD-A-F-3-LT-PR). lay out stabiliser and drill collar. IH P HBHA 0500 0600 1.00 3387.0m Make up new bit and stabilized 12 1/4" BHA. Phase Data to 2400hrs, 17 May 2006... [From:WELL_DAILY] B WELL_DRILL_HISTORY:302 18-MAY-06 3512.0 3259.10 POOH. Change bit and BHA. RIH to 3387m MDRT. Drill and survey 311mm (12 1/4") hole from 3387m MDRT to 3438m MDRT POOH. Change bit and BHA. RIH to 3387m MDRT. Drill and survey 311mm (12 1/4") hole from 3387m MDRT to 3438m MDRT FORMATION Name Top Reservoir Zone 6.2 3394.60m Reservoir Zone 7 3426.20m Volcanics (Unit 1) 3266.31m Reservoir Zone 8 Sand Total Depth Operations for Period 0000 Hrs to 2400 Hrs on 18 May 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description IH P TO 0000 0330 3.50 3387.0m Continue to POOH from 1883m MDRT IH P HBHA 0330 0500 1.50 3387.0m POOH with BHA. Download MWD, lay out bit (graded 3-8-JD-A-F-3-LT-PR). lay out stabiliser and drill collar. IH P HBHA 0500 0700 2.00 3387.0m Make up new bit and stabilized 12 1/4" BHA. Shallow pulse test MWD IH P TI 0700 0830 1.50 3387.0m RIH with 12 1/4" BHA on 5" DP to 998m MDRT IH P RS 0830 0900 0.50 3387.0m Service top drive IH P TI 0900 1330 4.50 3387.0m Continue to RIH with 12 1/4" BHA on 5" DP from 998m MDRT to 3387m MDRT. Hole in good condition. No tight hole or junk seen on trip IH P CHC 1330 1400 0.50 3387.0m Fan bottom with 920 GPM and 3900 psi. Work junk basket at 3387m MDRT. Work bit to bottom with minimum RPM and weight to verify hole is clean IH P DA 1400 2400 10.00 3438.0m Drill ahead and survey 311mm (12 1/4") hole from 3387m MDRT to 3438m MDRT with 20-45 klbs WOB, 900-930 GPM, 3700-3900 psi, 80-100 RPM, 11-14000 ftlbs torque Average ROP = 5.1m/hr High torque at 3425m MDRT and 3435m MDRT stalling out top drive. Pick up off bottom with 50 klbs over pull to free drill string. Fan and clean bottom prior to re-commencing drilling Operations for Period 0000 Hrs to 0600 Hrs on 19 May 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description IH P DA 0000 0600 6.00 3469.0m Drill ahead and survey 311mm (12 1/4") hole from 3438m MDRT to 3469m MDRT with 35-45 klbs WOB, 900-9... [From:WELL_DAILY] B WELL_DRILL_HISTORY:302 19-MAY-06 3575.0 3301.20 Drill and survey 311mm (12 1/4") hole from 3438m MDRT to 3480m LAT. Circ bottoms up and POOH. Rig up to log Drill and survey 311mm (12 1/4") hole from 3438m MDRT to 3480m LAT. Circ bottoms up and POOH. Rig up to log FORMATION Name Top Reservoir Zone 6.2 3394.60m Reservoir Zone 7 3426.20m Volcanics (Unit 1) 3445.00m Reservoir Zone 8 Sand Total Depth 3480.00m Operations for Period 0000 Hrs to 2400 Hrs on 19 May 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description IH P DA 0000 1200 12.00 3479.0m Drill ahead and survey 311mm (12 1/4") hole from 3438m MDRT to 3479m MDRT with 35-45 klbs WOB, 900-930 GPM, 3700-3900 psi, 80-100 RPM, 11-14000 ftlbs torque Average ROP = 3.4m/hr IH P DA 1200 1230 0.50 3480.0m Drill ahead and survey 311mm (12 1/4") hole from 3479m MDRT to 3480m LAT with 35-45 klbs WOB, 900-930 GPM, 3700-3900 psi, 80-100 RPM, 11-14000 ftlbs torque Average ROP = 2m/hr Survey at final total depth IH P CHC 1230 1400 1.50 3480.0m Circulate hole clean prior to POOH IH P TO 1400 2030 6.50 3480.0m Flow check well and POOH from 3480m MDRT to 270m MDRT Tight spots at 3420m, 3370m, 3274m, 3230, 3216m and 3174m MDRT with 50-70klbs overpull. Wiped tight spots until zero overpull IH P HBHA 2030 2230 2.00 3480.0m POOH with BHA. Power down MWD. Break out bit (graded 1-3-WT-H-E-IN-CT-TD) and lay out MWD, stabiliser and junk basket. Clean junk basket and recover 960 grams of metal E1 P LOG 2230 2330 1.00 3480.0m Rig up to run wireline logs E1 P LOG 2330 2400 0.50 3480.0m Pick up and make up wireline logging run #1; HRLA-PEX-HNGS-SP Operations for Period 0000 Hrs to 0600 Hrs on 20 May 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description E1 P LOG 0000 0100 1.00 3480.0m Continue to make up log Run 1: HRLA-PEX-HNGS-SP E1 P LOG 0100 0530 4.50 3480.0m RIH and perform log Run 1: HRLA-PEX-HNGS-SP. Tools on depth of 3575m at 03:00 hrs E1 P LOG 0... [From:WELL_DAILY] B WELL_DRILL_HISTORY:302 20-MAY-06 3480.0 3301.20 Perform logging runs 1: HRLA-PEX-HNGS-SP 2: FMI-DSI-GR Pick up, trouble shoot and RIH with run 3: MDT-GR Perform logging runs 1: HRLA-PEX-HNGS-SP 2: FMI-DSI-GR Pick up, trouble shoot and RIH with run 3: MDT-GR FORMATION Name Top Reservoir Zone 6.2 3394.60m Reservoir Zone 7 3426.20m Volcanics (Unit 1) 3445.00m Reservoir Zone 8 Sand Total Depth 3480.00m Operations for Period 0000 Hrs to 2400 Hrs on 20 May 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description E1 P LOG 0000 0100 1.00 3480.0m Continue to make up log Run 1: HRLA-PEX-HNGS-SP E1 P LOG 0100 0530 4.50 3480.0m RIH and perform log Run 1: HRLA-PEX-HNGS-SP. Tools on depth of 3475m at 03:00 hrs E1 P LOG 0530 0630 1.00 3480.0m Run # 1 tools at surface. Lay down Run #1 tools. E1 P LOG 0630 0700 0.50 3480.0m Pick up and make up Run #2; FMI-DSI-GR E1 P LOG 0700 1430 7.50 3480.0m RIH and perform logging run #2; FMI-DSI-GR E1 P LOG 1430 1500 0.50 3480.0m Run #2 tools at surface. Lay out FMI-DSI-GR E1 TP (VE) LOG 1500 2100 6.00 3480.0m Pick up and make up Run #3; MDT-GR. Trouble shoot MDT tool string. Primary and back up LFA module failures. Lay out LFA and make up MDT tool string E1 P LOG 2100 2400 3.00 3480.0m RIH and perform logging run #3; MDT-GR 4 Pressures obtained Wellbore losses = 27.3 bbls at 24:00 hrs = 1.1 bph Operations for Period 0000 Hrs to 0600 Hrs on 21 May 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description E1 P LOG 0000 0600 6.00 3480.0m Continue with logging run #3; MDT-GR Pressures obtained = 21 Pump outs performed = 7 total wellbore losses = 37.6 bbls at 06:00 hrs = 1.25 bph Last BOP Test: 03 May 2006 'Copyright IDS 2006', TF/JG 20060419, ANZON_AU_drllg Page 1 Printed on 20 May 2006 Phase Data to 2400hrs, 20 May 2006 Phase Phase Hrs Start On Finish On Cum Hrs Cum Days Max Depth CONDUCTOR HOLE(CH) 21 27 Feb 2006 28 Feb 2006 21.00 0.875 21... [From:WELL_DAILY] B WELL_DRILL_HISTORY:302 21-MAY-06 3480.0 3301.20 Continue with loggin run 3; MDT-GR Continue with loggin run 3; MDT-GR FORMATION Name Top Reservoir Zone 6.2 3394.60m Reservoir Zone 7 3426.20m Volcanics (Unit 1) 3445.00m Reservoir Zone 8 Sand Total Depth 3480.00m Operations for Period 0000 Hrs to 2400 Hrs on 21 May 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description E1 P LOG 0000 2400 24.00 3480.0m Continue with logging run #3; MDT-GR Pressures obtained = 54 Pump outs performed =27 Samples taken = 2 total wellbore losses = 62 bbls at 24:00 hrs = 1.3 bph Operations for Period 0000 Hrs to 0600 Hrs on 22 May 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description E1 P LOG 0000 0400 4.00 3480.0m Continue with logging run #3; MDT-GR Total pressures obtained = 54, 39 valid, 13 low perm, 1 no seal, 1 other Total pump outs performed =28, including 3 sample depths Total samples taken = 6 X 450cc at 3 depths Pump out Volumes; Water = 132.4 litres Oil = 130.6 litres Gas = 82.9 litres Total wellbore losses to 04:00 hrs = 67 bbls = 1.24 bph E1 P LOG 0400 0600 2.00 3480.0m Tools at surface. Lay out run 3: MDT-GR. Rig down wireline equipment Phase Data to 2400hrs, 21 May 2006 Phase Phase Hrs Start On Finish On Cum Hrs Cum Days Max Depth CONDUCTOR HOLE(CH) 21 27 Feb 2006 28 Feb 2006 21.00 0.875 210.0m CONDUCTOR CASING(CC) 15.5 28 Feb 2006 05 Mar 2006 36.50 1.521 210.0m SURFACE CASING(SC) 18 05 Mar 2006 07 Mar 2006 54.50 2.271 1010.0m SURFACE HOLE(SH) 47 05 Mar 2006 07 Mar 2006 101.50 4.229 1010.0m INTERMEDIATE HOLE(IH) 411.5 02 May 2006 19 May 2006 513.00 21.375 3480.0m EVALUATION PHASE (1)(E1) 49.5 19 May 2006 21 May 2006 562.50 23.438 3480.0m Last BOP Test: 03 May 2006 'Copyright IDS 2006', TF/JG 20060419, ANZON_AU_drllg Page 1 Printed on 21 May 2006 WBM Data Cost Today $ 0 Mud Type: PHPA/KCL/Glycol Sample-From: Active pit Time: 19:00 Weight: 9.50ppg Temp: 49C� API FL: 4.3c... [From:WELL_DAILY] B WELL_DRILL_HISTORY:402 23-MAY-06 3480.0 3301.20 Run and cement 9 5/8" production casing Run and cement 9 5/8" production casing FORMATION Name Top Reservoir Zone 6.2 3394.60m Reservoir Zone 7 3426.20m Volcanics (Unit 1) 3445.00m Reservoir Zone 8 Sand Total Depth 3480.00m Operations for Period 0000 Hrs to 2400 Hrs on 23 May 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description PC P RRC 0000 0030 0.50 3480.0m Hold pre job safety meeting. Rig up to run 9 5/8" casing PC P CRN 0030 0100 0.50 3480.0m Make up 3 jts 9 5/8" 53.5 lb/ft L-80 New Vam shoe track and check floats. Make up X/O PC P RRC 0100 0130 0.50 3480.0m Rig up 500t bails and elevators. Rig up Tam circulating packer. PC P CRN 0130 1630 15.00 3480.0m Continue to run; 36 jts 9 5/8" 53.5 lb/ft Cr-13 Vam Top 1 jt Vam Top/ New Vam X/O 16 jts 9 5/8" 53.5 lb/ft L-80 New Vam 183 jts 9 5/8" 47 lb/ft L-80 New Vam Fill casing each 5 joints N.B. pip tags installed at land out depths of 3333.11m and 3034.01m PC P CRN 1630 1730 1.00 3480.0m Rig down Tam circulating packer and 500t elevators. Pick up and make up casing hanger assembly PC P CRN 1730 1800 0.50 3480.0m Continue to RIH with casing on 5" DP landing string and land out in 18 3/4" wellhead housing at 173.13 LAT. Casing shoe at 3472.80m LAT PC P RUC 1800 1900 1.00 3480.0m Make up top drive, cementing lines and control lines to Dowell cement head PC P CIC 1900 1930 0.50 3480.0m Circulate casing - open hole volume of 450 bbls with 586 GPM and 1700psi. Hold pre job safety meeting with crew prior to cementing operations PC P BKC 1930 2130 2.00 3480.0m Pump 15 bbl Chem-wash pre flush. Pressure test cementing line to 4500 psi. Pump 45 bbl Chem-wash pre flush. Cement casing with 205 bbls 15.8 ppg HTB cement + additives and 124 bbls 15.8 ppg Gasblok HTB + additives. PC P CMC 2130 2330 2.00 3480.0m Displace cement with 15 bbls Drill water from Dowell. Switch to rig pumps and pump 783 bbls 9.0 ppg Bri... [From:WELL_DAILY] B WELL_DRILL_HISTORY:402 24-MAY-06 3480.0 3301.20 Rig down cementing equipment. Set and pressure test seal assembly. Pressure test BOP. Change out drilling line. Run wear bushing and rig up for CBL log Rig down cementing equipment. Set and pressure test seal assembly. Pressure test BOP. Change out drilling line. Run wear bushing and rig up for CBL log FORMATION Name Top Reservoir Zone 6.2 3394.60m Reservoir Zone 7 3426.20m Volcanics (Unit 1) 3445.00m Reservoir Zone 8 Sand Total Depth 3480.00m Operations for Period 0000 Hrs to 2400 Hrs on 24 May 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description PC P RUC 0000 0030 0.50 3480.0m Rig down cementing equipment PC P CRN 0030 0100 0.50 3480.0m Set casing hanger seal assembly with landing string weight set down and 5 rotations right. landing string dropped approx 8 inches. Close annular preventer and apply 2000 psi to top of seal assembly with Dowell to assist seal setting. Confirm seals set with index line measure. PC P PT 0100 0130 0.50 3480.0m Line up and pressure test seal assembly and lower pipe rams with 300 psi/5 minutes and 5000 pis/10 minutes C P PT 0130 0800 6.50 3480.0m Pressure test BOP with Blue pod from driller's panel 250 psi/5 minutes and 5000 psi/10 minutes each. Upper and lower annulars 250 psi/5 minutes and 4500 psi/10 minutes. Function test with Yellow pod from Koomey unit. Obtain partial pressure test on choke and kill manifold valves with 250psi/5 minutes and 5000 pis/10 minutes C P PT 0800 0900 1.00 3480.0m Release hanger running tool with 55 klbs over pull and POOH PC P CMC 0900 1030 1.50 3480.0m Lay down Dowell plug launcher, X/O, casing hanger running tool and pup joint PC P CMC 1030 1130 1.00 3480.0m Lay down Dowell cementing stand with Deepsea Express head C P SC 1130 1200 0.50 3480.0m Rig down iron roughneck tracks, bails and elevators, install padeye sub in TDS in preparation to change out drilling line C P SC 1200 2000 8.00 348... [From:WELL_DAILY] B WELL_DRILL_HISTORY:402 25-MAY-06 3480.0 3301.20 Complete CBL, test TDS valves, make up packer BHA and check tools, rig up and run VSP logs, rig down wire line. Run storm valve and set at 215m MDRT, pressure test,ok. Pulled out of hole running string. Complete CBL, test TDS valves, make up packer BHA and check tools, rig up and run VSP logs, rig down wire line. Run storm valve and set at 215m MDRT, pressure test,ok. Pulled out of hole running string. FORMATION Name Top Reservoir Zone 6.2 3394.60m Reservoir Zone 7 3426.20m Volcanics (Unit 1) 3445.00m Reservoir Zone 8 Sand Total Depth 3480.00m Operations for Period 0000 Hrs to 2400 Hrs on 25 May 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description C P LOG 0000 0400 4.00 3480.0m RIH and perform CBL log; See Geological report for evaluation; Pressure test remaining Choke and Kill manifold valves 250 psi/5 minutes and 5000 psi/5 minutes each C P LOG 0400 0500 1.00 3480.0m Tools at surface. Rig down CBL tools and wireline equipment C TP (VE) LOG 0500 0700 2.00 3480.0m While preparing VSP equipment onboard Pacific Wrangler. Pressure test TDS and standpipe valves 250 psi/5 minutes, 5000 psi/5 minutes (3 tests) C TP (VE) LOG 0700 1200 5.00 3480.0m While preparing VSP equipment onboard the Wrangler.Run stand of 203mm(8") drill collars from derrick containing jars in hole. Lay out jars and pick up 1 dc, rack in derrick. Make up Dowell storm valve to pup joint, service break and torque connections. Lay assembly back out with crane. While preparing VSP equipment onboard the Wrangler. C P LOG 1200 1300 1.00 3480.0m Rigged up Schlumberger wire line for VSP. C P LOG 1300 1930 6.50 3480.0m Made up and ran in hole with VSP tool string. Two Check Shots were taken while RIH. However at the start of the survey the sea conditions became worse with waves swell and current apposing causing a confused sea. The survey was therefore reduce to 3 station depths: 3430m close to the Volcanics, 3243m Top... [From:WELL_DAILY] B WELL_DRILL_HISTORY:503 05-JUN-06 3480.0 3301.20 Skid rig from Basker #3 to #4, establish guide lines. Land and lock BOP's, overpull, pressure test, ok. Pulled BOP lifting assembly out of hole, pulled storm valve, pressure tested VX/ well head gasket 4500psi, ok. Made up clean out assembly and ran in hole, washed and reamed packer intervals. Skid rig from Basker #3 to #4, establish guide lines. Land and lock BOP's, overpull, pressure test, ok. Pulled BOP lifting assembly out of hole, pulled storm valve, pressure tested VX/ well head gasket 4500psi, ok. Made up clean out assembly and ran in hole, washed and reamed packer intervals. FORMATION Name Top Reservoir Zone 6.2 3394.60m Reservoir Zone 7 3426.20m Volcanics (Unit 1) 3445.00m Reservoir Zone 8 Sand Total Depth 3480.00m Operations for Period 0000 Hrs to 2400 Hrs on 05 Jun 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description C P RM 0830 0930 1.00 3480.0m Move rig from Basker #3 to Basker #4. C P BOP 0930 1000 0.50 3480.0m Establish guide lines with ROV assistance. C P BOP 1000 1030 0.50 3480.0m Land BOPs. Confirm latch with ROV visual and gallon count. Perform overpull of 50klbs over landing weight on yellow, swap to blue pod and repeat as per GEMs.. Pressure test VX/ wellhead on Blue pod, 300psi/1500psi, 5/10mins. As per GEMs swap to yellow pod and pressure test 500psi/5mins. C P BOP 1030 1100 0.50 3480.0m Pulled out of the hole with BOP lifting assembly, laid out tool. C P RPK 1100 1200 1.00 3480.0m Made up Dowell Storm valve retrieval tool tool and ran in hole to 215m MDRT. Engage and unseat packer, allowed elements to relax for 10mins. C P BOP 1200 1400 2.00 3480.0m Pulled out of hole with storm packer, laid down. Tested well head connection against 244mm (9 5/8") casing/ shear rams 4500psi/10mins while racking DC's from below storm valve. C P CHC 1400 1500 1.00 3480.0m Picked up and made up clean out BHA. 216mm (8 1/2") bit/ bit sub/ 1 x 127mm HWDP, 244mm (9 ... [From:WELL_DAILY] B WELL_DRILL_HISTORY:503 06-JUN-06 3480.0 3301.20 Circulated hole clean with clean-out pills, displaced to 9ppg Inhibiterd brine, spot HEC pill, pooh laying down drill string. During this operation there was an accident involving a roustabout requiring a Medi-vac helicoptor. IP is currently in hospital under observation. Circulated hole clean with clean-out pills, displaced to 9ppg Inhibiterd brine, spot HEC pill, pooh laying down drill string. During this operation there was an accident involving a roustabout requiring a Medi-vac helicoptor. IP is currently in hospital under observation. FORMATION Name Top Reservoir Zone 6.2 3394.60m Reservoir Zone 7 3426.20m Volcanics (Unit 1) 3445.00m Reservoir Zone 8 Sand Total Depth 3480.00m Operations for Period 0000 Hrs to 2400 Hrs on 06 Jun 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description C P TI 0000 0100 1.00 3480.0m Picked up riser brush and continues to run clean out assembly in the hole to PBTD of 3445m MDRT. Washed last single in hole, 1-2klbs to wash down, no torque increase. C P CHC 0100 0230 1.50 3480.0m Pump the following clean out pills: 70bbls Duo-Vis, 60bbls Surfacant, 70bbls Duo-Vis. Circulate out with 1435bbls of sea water until returns NTU's @30 after 1 1/2 circulations. C P CHC 0230 0330 1.00 3480.0m Displaced well with 967bbls of 9ppg inhibited brine. Pumped 80bbls of HEC pill, spot with 176bbls of brine, slug pipe with 9.5ppg filtered brine. C P PLD 0330 0800 4.50 3480.0m Pulled out of hole with clean out assembly laying out 127mm (5") drill pipe. 2kg of pipe scale recovered from riser brush C U (OTH) ACC 0800 0830 0.50 3480.0m Incident on main deck involving a slung load of 10 joints of 127mm (5", 19.5ppf) drill pipe. Operations shut down while injured man was transfered to rig hospital. Time-out for safety called with all crews on incident. Injured party Medivaced via Air Ambulance @1101hrs C P PLD 0830 1500 6.50 3480.0m Continued to lay down drill pipe. Tota... [From:WELL_DAILY] B WELL_DRILL_HISTORY:503 07-JUN-06 3480.0 3301.20 Pulled out of hole clean out assembly, laying out BHA. Rig up Schlumberger wireline. Assemble and run Perforation guns #1, POOH, run perforation guns #2, POOH, run perforation #3. All shots fired, no fluid loses following perforation. Pulled out of hole clean out assembly, laying out BHA. Rig up Schlumberger wireline. Assemble and run Perforation guns #1, POOH, run perforation guns #2, POOH, run perforation #3. All shots fired, no fluid loses following perforation. FORMATION Name Top Reservoir Zone 6.2 3394.60m Reservoir Zone 7 3426.20m Volcanics (Unit 1) 3445.00m Reservoir Zone 8 Sand Total Depth 3480.00m Operations for Period 0000 Hrs to 2400 Hrs on 07 Jun 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description C P PLD 0000 0100 1.00 3480.0m Conitued to pull out of hole racking DP in derrick. C P PLD 0100 0300 2.00 3480.0m Laid down 127mm (5") HWDP and clean out BHA components. Well patroler recovery 200g. C P PER 0300 0500 2.00 3480.0m Rigged up for Schlumberger wireline. Made up guns. 5 shot per ft Powerjet Omega 4505 HMX charges. C P PER 0500 0630 1.50 3480.0m Made up Perforation assembly #1 and CCL. C P PER 0630 1030 4.00 3480.0m Run in the hole Perforation assembly #1 and CCL. 5 shot per ft Powerjet Omega 4505 HMX charges. Correlate and perf 1st interval @3413.5m -3415.5m MDRT- 3417m -3420m MDRT Correlate and perf 2nd interval @3302m - 3304m MDRT. Correlate and perf 3rd interval @3276.5m - 3278m MDRT. C P PER 1030 1300 2.50 3480.0m Pulled out of hole with assembly #1, all shots fired. No fluid losses following perforation or trip out. C P PER 1300 1500 2.00 3480.0m Prepared #2 perforation assembly. Well static. C P PER 1500 2030 5.50 3480.0m Run in the hole Perforation assembly #2 and CCL. 5 shot per ft Powerjet Omega 4505 HMX charges. Correlate and perf 4th interval @3256m -3263m MDRT. Correlate and perf 5th interval @3225m - 3229m MDRT. Correlate and pe... [From:WELL_DAILY] B WELL_DRILL_HISTORY:503 08-JUN-06 3480.0 3301.20 Complete perforations, run gauge-junk run with 8.5" gauge ring, no-go. Pulled out of hole and ran 8.375", ok. Retrieved wear bushing, Functions BOPs, Ran L.I.T. Commenced running completion string. Complete perforations, run gauge-junk run with 8.5" gauge ring, no-go. Pulled out of hole and ran 8.375", ok. Retrieved wear bushing, Functions BOPs, Ran L.I.T. Commenced running completion string. FORMATION Name Top Reservoir Zone 6.2 3394.60m Reservoir Zone 7 3426.20m Volcanics (Unit 1) 3445.00m Reservoir Zone 8 Sand Total Depth 3480.00m Operations for Period 0000 Hrs to 2400 Hrs on 08 Jun 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description C P PER 0000 0230 2.50 3480.0m Run in the hole Perforation assembly #3 and CCL. 5 shot per ft Powerjet Omega 4505 HMX charges. Correlate and perf 7th interval @3184m - 3189m MDRT, 3193m - 3196m MDRT. Correlate and perf 8th interval @3206m - 3209m MDRT. Fire guns, well static. Pulled out of hole. C P PER 0230 0300 0.50 3480.0m Lay down assembly #3. All shots fired, well static. C P PER 0300 0430 1.50 3480.0m Rig up 216mm (8 1/2") gauge/ junk basket/ GR/ CCL. C TP (HC) PER 0430 0800 3.50 3480.0m Run in hole (8 1/2") gauge/ junk basket/ GR/ CCL. Tools hung up at 3175m MDRT. Pulled out of hole with tool, 1 x piece of rubber recovered from junk basket, 2"L x 1"W x 1/2" thickness. C P PER 0800 1130 3.50 3480.0m Remove 216mm (8.5") gauge ring and installed 212.7mm (8.375") . Ran in the hole to 3435m MDRT, ok. Pulled out of the hole, junk basket empty. Rigged down wireline equipment. C P TI 1130 1300 1.50 3480.0m Made up jet sub and wear bushing retrieval tool. Ran in hole to wear bushing profile, jet with 850gpm. Landed out R/Tool in wear bushing. C P BOP 1300 1330 0.50 3480.0m Function Rams and annulars to void cavities of debris. C P TO 1330 1430 1.00 3480.0m Pulled wear bushing with 35klbs over string wt. Pulled assembly through ... [From:WELL_DAILY] B WELL_DRILL_HISTORY:603 12-JUN-06 3480.0 3301.20 Rig up for BOP recovery. Wait on weather 8.5hrs, Recover BOPs. Rig up for BOP recovery. Wait on weather 8.5hrs, Recover BOPs. FORMATION Name Top Reservoir Zone 6.2 3394.60m Reservoir Zone 7 3426.20m Volcanics (Unit 1) 3445.00m Reservoir Zone 8 Sand Total Depth 3480.00m Operations for Period 0000 Hrs to 2400 Hrs on 12 Jun 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description C P RR2 0000 0200 2.00 3480.0m Rigged up for pulling BOP's. C P RR2 0200 0430 2.50 3480.0m Made up Divertor R/Tool, engaged and laid out divertor. Picked up landing joint and made up to slip joint inner barrel. C TP (WOW) RR2 0430 1300 8.50 3480.0m Operations suspended due to weather. 0500hrs 35kn 2m wave height 4.0m swell 0.5/ 1 deg pitch/roll. 0600hrs 30kn 2m wave height 5.0m swell 0.5/ 1 deg pitch/roll. 0700hrs 30kn 2m wave height 5.0m swell 0.5/ 1 deg pitch/roll. 0800hrs 30kn 2m wave height 5.0m swell 0.5/ 1 deg pitch/roll. 0900hrs 30kn 2m wave height 4.5m swell 0.5/ 1 deg pitch/roll. 1000hrs 25kn 1.8m wave height 4.0m swell 0.4/ 0.6 deg pitch/roll. 1100hrs 25kn 1.6m wave height 4.0m swell 0.4/ 0.6 deg pitch/roll. 1200hrs 28kn 1.6m wave height 4.0m swell 0.4/ 0.6 deg pitch/roll. C P RR2 1300 1500 2.00 3480.0m commenced BOP recovery operations. Pull subsea camera and remove from guide wires. remove RBQ plates from pod reels. Close slip joint and lock. Un-latch BOP's with ROV visual assistance. C P RR2 1500 1530 0.50 3480.0m Disconnect guide wires with ROV and skid rig off location 12m. C P RR2 1530 1600 0.50 3480.0m Rig down all slip joint accessories. C P RR2 1600 1700 1.00 3480.0m Removed 4 MRT lines off the SDL ring for completion riser tension joint, C P RR2 1700 1830 1.50 3480.0m Latch SDL ring. Lower and remove choke/ kill/ boost lines from slip joint. Remove stroem saddles. C P RR2 1830 2000 1.50 3480.0m Lay down landing joint and slip joint. C P RR2 2000 2330 3.50 ... [From:WELL_DAILY] B WELL_DRILL_HISTORY:603 13-JUN-06 3480.0 3301.20 Recover BOPs. Rig up to run SST. 1000hrs to 1800hrs Basker #2 tree cap recovery. Stack up SST and prepare to run on basker #4. Recover BOPs. Rig up to run SST. 1000hrs to 1800hrs Basker #2 tree cap recovery. Stack up SST and prepare to run on basker #4. FORMATION Name Top Reservoir Zone 6.2 3394.60m Reservoir Zone 7 3426.20m Volcanics (Unit 1) 3445.00m Reservoir Zone 8 Sand Total Depth 3480.00m Operations for Period 0000 Hrs to 2400 Hrs on 13 Jun 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description C P RR2 0000 0300 3.00 3480.0m Complete securing of BOPs. Split from double of riser and skid to starboard park position. C P RR2 0300 0330 0.50 3480.0m Laid down one of the remaining joints of bouyed riser. C P XT 0330 0430 1.00 3480.0m Lift skid cart off Far Grip and place in moon pool. Install in moon pool C P RR2 0430 0530 1.00 3480.0m Lay our remaining joint of riser and termination spool, rig down all riser handling equipment and clear rig floor in preperation for SST running. C P XT 0530 0730 2.00 3480.0m Rigged up Weatherford tongs, jam unit, and completion riser handling gear. C P XT 0730 0930 2.00 3480.0m Make up SST stress joint to a stand of tubing. Load SST onto skid cart. C P XT 0930 1000 0.50 3480.0m Change in operations, lay down stress joint. Decision made to recover Basker #2 tree cap. C P XT 1800 2400 6.00 3480.0m Make up SST stress joint to a stand of tubing. Skid SST below well center, lower and lock TRT to SST. Install turn down sheaves for umbilicals complete with umbilicals. Connect annulus line, secure umbilicals to stress joint. Raise SST and transverse skid cart, install guide lines. Install bullseye and HFL and UH550 plug parking assembly onto stress joint. Install guide ropes for TRT recovery. Operations for Period 0000 Hrs to 0600 Hrs on 14 Jun 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description C P XT 0000... [From:WELL_DAILY] B WELL_DRILL_HISTORY:604 14-JUN-06 3480.0 3301.20 Ran and landed SST. Pressure tested surface lines, well head gasket, test ESD's.Dsiplaced completion riser to 9ppg brine. Made up lubricator and tested. Ran in and recovered debris/trash catcher in hanger.Rigged up tantem shifting tool and test lubricator, no test, change out seals and continue to repair leaks on lubricator assembly. Ran and landed SST. Pressure tested surface lines, well head gasket, test ESD's.Dsiplaced completion riser to 9ppg brine. Made up lubricator and tested. Ran in and recovered debris/trash catcher in hanger.Rigged up tantem shifting tool and test lubricator, no test, change out seals and continue to repair leaks on lubricator assembly. FORMATION Name Top Reservoir Zone 6.2 3394.60m Reservoir Zone 7 3426.20m Volcanics (Unit 1) 3445.00m Reservoir Zone 8 Sand Total Depth 3480.00m Operations for Period 0000 Hrs to 2400 Hrs on 14 Jun 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description C P XT 0000 0130 1.50 3480.0m Complete pre-submergence work and checks. Remove securing tuggers. C P XT 0130 0300 1.50 3480.0m Ran SST and install 1st umbilical clamps with tree 18m below water line. Ran SST on 140mm (5 1/2") completion tubing, install umbilical clamps every joint following the splash stand. C P XT 0300 0430 1.50 3480.0m Picked up tensioner joint, space out pup joints, x/o. Installed bullseye on tension joint. C TP (CP) XT 0430 0600 1.50 3480.0m Problems picking up flow head and stiff joint. Slinging arangement. One sling required cutting off the flowhead with the oxy & acet due to being wedged behind the wing valve studs. C P XT 0600 0800 2.00 3480.0m Picked up flowhead and stiff joint and make up to 228mm (9") Otis quick coupling. Lower string until MRT's can be attached to tensioner ring, attach 4 x MRTs. During this operation skid rig over well head. C P XT 0800 1000 2.00 3480.0m Establish guide lines, make up coflexip production hose, kill hose and ... [From:WELL_DAILY] B WELL_DRILL_HISTORY:604 15-JUN-06 3480.0 3301.20 RIH with Slickline, open XD sliding sleeve, displace tubing to diesel and close sliding sleeve. Pressure test tubing, cylcle open FBIV. Displace riser to seawter and suspend well to wait on weather RIH with Slickline, open XD sliding sleeve, displace tubing to diesel and close sliding sleeve. Pressure test tubing, cylcle open FBIV. Displace riser to seawter and suspend well to wait on weather FORMATION Name Top Reservoir Zone 6.2 3394.60m Reservoir Zone 7 3426.20m Volcanics (Unit 1) 3445.00m Reservoir Zone 8 Sand Total Depth 3480.00m Operations for Period 0000 Hrs to 2400 Hrs on 15 Jun 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description C TP (VE) SLK 0000 0200 2.00 3480.0m Remove slickline tool string from lubricator. Remove lubricator from lifting hoist and lower to rig floor. Break out quick test sub. Make up 2.5m (8' x 5") section of lubricator, re-assembled tool string and lubricator onto slickline BOP's. C P SLK 0200 0230 0.50 3480.0m Pressure test slickline lubricator with Dowell 500/5000psi, 5/5mins, ok. C P SLK 0230 0400 1.50 3480.0m Run in hole with slickline tandem shifting tool and open XD sliding sleeve. C P DIS 0400 0430 0.50 3480.0m Open annulus master valve and increase SSSV pressure to 7000psi. Commence transfer of diesel to Dowell pump. Note: no diesel taken into displacement tank. C P DIS 0430 0530 1.00 3480.0m Pump diesel @1.3 bpm/ 100psi. Brine returns observed thru annulus access line to pits. @0600hrs 117bbls pumped, tubing head pressure 800psi.. Delivery rate of deisel pump 1.3bpm. C TP (RE) DIS 0530 0630 1.00 3480.0m NPT due to slow delivery of diesel. This is due to the high volume pump being inoperable. C P SLK 0630 0800 1.50 3480.0m Pull out with Slickline tandem shiding tool and close XD sliding sleeve. POOH with slickline tools C P OA 0800 1100 3.00 3480.0m Open LV. Pressure test tubing and sliding sleeve with 300psi/5 min and 40... [From:WELL_DAILY] B WELL_DRILL_HISTORY:604 16-JUN-06 3480.0 3301.20 Wait on weather. Perform flow test and sampling of lower and upper zones. Shut in well. Flush SST, riser and flowhead. Prepare to suspend well. Wait on weather. Perform flow test and sampling of lower and upper zones. Shut in well. Flush SST, riser and flowhead. Prepare to suspend well. FORMATION Name Top Reservoir Zone 6.2 3394.60m Reservoir Zone 7 3426.20m Volcanics (Unit 1) 3445.00m Reservoir Zone 8 Sand Total Depth 3480.00m Operations for Period 0000 Hrs to 2400 Hrs on 16 Jun 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description C TP (WOW) WOW 0000 0700 7.00 3480.0m Wait on weather to test well Time-----Wind----Seas------Swells-----Pitch/Roll 01:00-----35------3.0--------4.0--------.8/.5 03:00-----35------3.0--------4.0--------.8/.5 05:00-----30------3.0--------3.0--------.8/.5 07:00-----30......2.8--------3.0--------.8/.5 Riser bullseyes at 1 degree -Perform general rig maintenance, painting and PM's -Repair diesel transfer pump -Continue to configure ROV hydraulic intensifier C P PT 0700 0730 0.50 3480.0m Pressure test production riser 500psi/5 min and 5000psi/10 min C P FLO 0730 1230 5.00 3480.0m Perform clean up, flow test and obtain samples from lower zone as per program C P OA 1230 1300 0.50 3480.0m Close LV and bleed down tubing pressure to 0 psi C P FLO 1300 2000 7.00 3480.0m Open ICV. Perform clean up, flow test and obtain samples from upper zone as per program C P PT 2000 2130 1.50 3480.0m Shut in well. Close SSSV and bleed off tubing pressure to 1000 psi and perform inflow test on SSSV. C P WOW 2130 2400 2.50 3480.0m Bleed tubing pressure to 0 psi. Close PMV and pressure test to 500psi/5 min and 5000psi/ 10 min. Flush annulus access line, riser, flowhead and well test equipment with 20 bbl Chemwash, 20 bbl seawtaer and 20 bbl inhibited seawater Operations for Period 0000 Hrs to 0600 Hrs on 17 Jun 2006 Phse Cls (RC) Op From To Hrs Depth A... [From:WELL_DAILY] B WELL_DRILL_HISTORY:604 17-JUN-06 3480.0 3301.20 Perform final SST suspension testing. POOH with production riser. Run and pressure test tree cap. Release rig Perform final SST suspension testing. POOH with production riser. Run and pressure test tree cap. Release rig FORMATION Name Top Reservoir Zone 6.2 3394.60m Reservoir Zone 7 3426.20m Volcanics (Unit 1) 3445.00m Reservoir Zone 8 Sand Total Depth 3480.00m Operations for Period 0000 Hrs to 2400 Hrs on 17 Jun 2006 Phse Cls (RC) Op From To Hrs Depth Activity Description C P PT 0000 0400 4.00 3480.0m Perform final SST suspension pressure testing with Dowell 500 psi/5 min and 5000psi/ 10 min Test #1; PMV downstream/XOV upstream/CIV1 upstream/CIV2 upstream Test #2; PWV upstreram Test #3; AMV downstream/AWV upstream/ACI upstream Test #4; AAV downstream Test #5; PSV upstream Test #6; PSV downstream C P XT 0400 0600 2.00 3480.0m Disconnect UH 550 Annulus Access connector and hot stab from LD-1 receptacle with ROV and hang on stress joint hanger. Attempt to pull UH 550 plug from hook on stress joint with no success. The plug hook on the stress joint spinning preventing ROV from accessing plug. Rig down slickline lubricator and BOP. Rig down surface lines from flowhead. C TP (VE) XT 0600 0700 1.00 3480.0m Return ROV to surface for spare UH 550 plug and re deploy ROV C P XT 0700 0730 0.50 3480.0m Install UH 550 plug in Annulus Access receptacle and perform Final suspension test via IWOC Annulus Monitor Line to 500 psi/5 min and 5000 psi/10 min Test #7; AA plug upstream C TP (VE) XT 0730 0900 1.50 3480.0m ROV with camera problems. Return to surface. Hydraulics problem preventing recovery of ROV. Repair Hydraulics (low oil in reservoir) and camera (angle view) and re deploy ROV C P RR2 0900 1200 3.00 3480.0m Disconnect Alpha plate with ROV Bleed down riser tensioners. Unlatch TRT. Remove riser tensioners and bullseye from riser. Lay down flow head and stiff joint C P RR2 1200 1300 1.0... [From:WELL_DAILY]
HDR A GEOGRAPHICALLY _VERY_ CLOSE WELL TO THIS WELL: WELL_NAME= BASKER-2 HDR A GEOGRAPHICALLY _VERY_ CLOSE WELL TO THIS WELL: WELL_NAME= BASKER-3 HDR A GEOGRAPHICALLY _VERY_ CLOSE WELL TO THIS WELL: WELL_NAME= BASKER-5 HDR A GEOGRAPHICALLY _VERY_ CLOSE WELL TO THIS WELL: WELL_NAME= BASKER-7
--- LISTING OF GEOGRAPHICALLY CLOSE WELLS TO THIS WELL ---
DISTANCE= 00.0 km (very approx) Onshore?=N WELL_NAME= BASKER-2 DISTANCE= 00.0 km (very approx) Onshore?=N WELL_NAME= BASKER-3 DISTANCE= 00.0 km (very approx) Onshore?=N WELL_NAME= BASKER-5 DISTANCE= 00.0 km (very approx) Onshore?=N WELL_NAME= BASKER-7 DISTANCE= 00.9 km (very approx) Onshore?=N WELL_NAME= BASKER-1 DISTANCE= 02.0 km (very approx) Onshore?=N WELL_NAME= MANTA-2 DISTANCE= 02.0 km (very approx) Onshore?=N WELL_NAME= MANTA-2A DISTANCE= 02.2 km (very approx) Onshore?=N WELL_NAME= BASKER SOUTH-1 DISTANCE= 02.5 km (very approx) Onshore?=N WELL_NAME= MANTA-1 DISTANCE= 02.7 km (very approx) Onshore?=N WELL_NAME= GUMMY-1 DISTANCE= 02.8 km (very approx) Onshore?=N WELL_NAME= BASKER-6 DISTANCE= 02.8 km (very approx) Onshore?=N WELL_NAME= BASKER-6 ST1 DISTANCE= 03.1 km (very approx) Onshore?=N WELL_NAME= CHIMAERA-1 DISTANCE= 03.2 km (very approx) Onshore?=N WELL_NAME= MANTA-3 DISTANCE= 09.5 km (very approx) Onshore?=N WELL_NAME= CULVERIN-1 DISTANCE= 09.8 km (very approx) Onshore?=N WELL_NAME= BIGNOSE-1 DISTANCE= 11.8 km (very approx) Onshore?=N WELL_NAME= KIPPER-2 DISTANCE= 11.9 km (very approx) Onshore?=N WELL_NAME= SCALLOP-1 DISTANCE= 12.8 km (very approx) Onshore?=N WELL_NAME= STONEFISH-1 DISTANCE= 13.0 km (very approx) Onshore?=N WELL_NAME= ADMIRAL-1 DISTANCE= 13.5 km (very approx) Onshore?=N WELL_NAME= KIPPER-A3 DISTANCE= 13.5 km (very approx) Onshore?=N WELL_NAME= KIPPER-A4 DISTANCE= 13.6 km (very approx) Onshore?=N WELL_NAME= KIPPER-1 DISTANCE= 13.6 km (very approx) Onshore?=N WELL_NAME= KIPPER-A1 DISTANCE= 13.6 km (very approx) Onshore?=N WELL_NAME= KIPPER-A2 DISTANCE= 14.2 km (very approx) Onshore?=N WELL_NAME= GREAT WHITE-1 DISTANCE= 14.6 km (very approx) Onshore?=N WELL_NAME= EAST PILCHARD-1 DISTANCE= 14.6 km (very approx) Onshore?=N WELL_NAME= HAMMERHEAD-1 DISTANCE= 15.9 km (very approx) Onshore?=N WELL_NAME= GRUNTER-1
SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = 082/03 SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = 68_12P1 SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = 68_12P2 SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = G88A-9170 SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = G92A-3044 SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = G94A-4083 SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = G94A-4097 SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = GNS07-10 SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = GS81A-36A SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = GS81A-69A SDO: HISTORICAL TITLES: 1. ENCLOSING BASKER-4 : TITLE_NAME=PEP38 SDO: HISTORICAL TITLES: 1. ENCLOSING BASKER-4 : TITLE_NAME=VIC/L26 SDO: HISTORICAL TITLES: 1. ENCLOSING BASKER-4 : TITLE_NAME=VIC/P1 SDO: HISTORICAL TITLES: 1. ENCLOSING BASKER-4 : TITLE_NAME=VIC/RL6 SDO: HISTORICAL TITLES: 2. NEAR BASKER-4 : TITLE_NAME=PEP38 : Distance=0 SDO: HISTORICAL TITLES: 2. NEAR BASKER-4 : TITLE_NAME=PEP57 : Distance=11.73 SDO: HISTORICAL TITLES: 2. NEAR BASKER-4 : TITLE_NAME=V11-5 : Distance=5.7 SDO: HISTORICAL TITLES: 2. NEAR BASKER-4 : TITLE_NAME=VIC/L11 : Distance=10.64 SDO: HISTORICAL TITLES: 2. NEAR BASKER-4 : TITLE_NAME=VIC/L25 : Distance=6.63 SDO: HISTORICAL TITLES: 2. NEAR BASKER-4 : TITLE_NAME=VIC/L26 : Distance=0 SDO: HISTORICAL TITLES: 2. NEAR BASKER-4 : TITLE_NAME=VIC/L27 : Distance=3.37 SDO: HISTORICAL TITLES: 2. NEAR BASKER-4 : TITLE_NAME=VIC/L28 : Distance=3.9 SDO: HISTORICAL TITLES: 2. NEAR BASKER-4 : TITLE_NAME=VIC/L9 : Distance=12.07 SDO: HISTORICAL TITLES: 2. NEAR BASKER-4 : TITLE_NAME=VIC/P1 : Distance=0 SDO: HISTORICAL TITLES: 2. NEAR BASKER-4 : TITLE_NAME=VIC/P1 : Distance=3.37 SDO: HISTORICAL TITLES: 2. NEAR BASKER-4 : TITLE_NAME=VIC/P19 : Distance=3.37 SDO: HISTORICAL TITLES: 2. NEAR BASKER-4 : TITLE_NAME=VIC/P22 : Distance=11.17 SDO: HISTORICAL TITLES: 2. NEAR BASKER-4 : TITLE_NAME=VIC/P24 : Distance=3.58 SDO: HISTORICAL TITLES: 2. NEAR BASKER-4 : TITLE_NAME=VIC/P3 : Distance=11.75 SDO: HISTORICAL TITLES: 2. NEAR BASKER-4 : TITLE_NAME=VIC/P41 : Distance=11.17 SDO: HISTORICAL TITLES: 2. NEAR BASKER-4 : TITLE_NAME=VIC/P41 : Distance=11.18 SDO: HISTORICAL TITLES: 2. NEAR BASKER-4 : TITLE_NAME=VIC/P49 : Distance=3.56 SDO: HISTORICAL TITLES: 2. NEAR BASKER-4 : TITLE_NAME=VIC/P55 : Distance=5.71 SDO: HISTORICAL TITLES: 2. NEAR BASKER-4 : TITLE_NAME=VIC/P56 : Distance=4.9 SDO: HISTORICAL TITLES: 2. NEAR BASKER-4 : TITLE_NAME=VIC/P9 : Distance=11.73 SDO: HISTORICAL TITLES: 2. NEAR BASKER-4 : TITLE_NAME=VIC/RL10 : Distance=3.9 SDO: HISTORICAL TITLES: 2. NEAR BASKER-4 : TITLE_NAME=VIC/RL2 : Distance=6.62 SDO: HISTORICAL TITLES: 2. NEAR BASKER-4 : TITLE_NAME=VIC/RL6 : Distance=0 SDO: HISTORICAL TITLES: 2. NEAR BASKER-4 : TITLE_NAME=VIC/RL9 : Distance=3.37
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE915209 a BASKER-4 Wireline Logs and Data [CD] PE915209__((_BASKER-4_WIRELINE_LOGS_AND_DATA_))_.TAR.GZ(477.2m)......... SAM2_167_PE915209__((_BASKER-4_WIRELINE_LOGS_AND_DATA_))__MEDIA_LABELLING.JPG(2.9m)......... PE915209__((_BASKER-4_WIRELINE_LOGS_AND_DATA_))__FILES_LISTING.TXT(0.0m)......... ASSETS (DETAIL) GENERAL DATA_CD_DVD PE915209 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes) ASSETS (DETAIL) GENERAL DATA_CD_DVD PE915209 c DESC=BASKER-4 Wireline Logs. Final Data. Schlumberger for Anzon Australia Ltd. 8-JUN-2006. PDF, PDS and DLIS format HRLA-PEX-HNGS-SP FMI-DSI-GR MDT-GR CBL-VDL-GR0CCL VSI-GR 4.5" HSD Perforation Record. Run 1-3/1-2/1-3 Suite 1/2/3 ASSETS (DETAIL) GENERAL DATA_CD_DVD PE915209 d WELL_NAME=BASKER-4 ASSETS (DETAIL) GENERAL ESUBS_CD_DVD PE911536 a DDRs, Well & Permit Data 2005 to 2007 [DVD] (3259 DIGITAL FILES) ASSETS (DETAIL) GENERAL ESUBS_CD_DVD PE911536 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes) ASSETS (DETAIL) GENERAL ESUBS_CD_DVD PE911536 c DESC=Daily Drilling reports, Well Data & Permit Data for the years 2005 to 2007. Reports submitted via email to DPI. Saved by Kourosh Mehin, Mary Jane, Hannah Wallace. NOTE! Some files corrupted. See Remarks. ASSETS (DETAIL) GENERAL FIELD_DEV PE805508 a Basker Manta Gummy Development Update [PAPER] ASSETS (DETAIL) GENERAL FIELD_DEV PE805508 b (located in::PE181944= Recent Fields Box 3 of 3 All Basins) ASSETS (DETAIL) GENERAL FIELD_DEV PE805508 c DESC=Basker Manta Gummy (BMG) Development Update Report. VIC/L26. 38p document from Powerpoint presentation at DPI Offices, Nov 2008. Roc Oil/AGR/Anzon. ASSETS (DETAIL) GENERAL FIELD_DEV PE805508 d WELL_NAME=BASKER-2 ASSETS (DETAIL) GENERAL FIELD_DEV PE805508 d WELL_NAME=BASKER-3 ASSETS (DETAIL) GENERAL FIELD_DEV PE805508 d WELL_NAME=BASKER-4 ASSETS (DETAIL) GENERAL FIELD_DEV PE805508 d WELL_NAME=BASKER-5 ASSETS (DETAIL) GENERAL FIELD_DEV PE805508 d WELL_NAME=BASKER-6 ASSETS (DETAIL) GENERAL FIELD_DEV PE805508 d WELL_NAME=BASKER-6 ST1 ASSETS (DETAIL) GENERAL FIELD_DEV PE805508 d WELL_NAME=MANTA-2A ASSETS (DETAIL) GENERAL REGISTRY_FILE F7718773 a PE/16/0546(Part-1} Registry File [PAPER] ASSETS (DETAIL) GENERAL REGISTRY_FILE F7718773 b (located in::COMPACTUS_1= COMPACTUS_1 55 Collins St) ASSETS (DETAIL) GENERAL REGISTRY_FILE F7718773 c DESC=PE/16/0546(Part-1) PETROLEUM EXPLORATION WELL W1462 - BASKER-4 - CORRESPONDENCE ASSETS (DETAIL) GENERAL REGISTRY_FILE F7718773 d WELL_NAME=BASKER-4 ASSETS (DETAIL) GENERAL REGISTRY_FILE F7718773 d WELL_NAME=BASKER-4 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) TITLE FIELD_RPT PE802638 a Basker Manta Update [PAPER] ASSETS (DETAIL) TITLE FIELD_RPT PE802638 b (located in::PE184842= Well Box - Recent Wells 1) ASSETS (DETAIL) TITLE FIELD_RPT PE802638 c DESC=Basker Manta Update: VicDPI/DITR/GA/NOPSA. Introduction; Safety & environment; Drilling, MDT & EPT results; Geological correlation; Field Development plan; FFD project update; Gas project. Anzon Australia Limited, 28 June 2006. Prints of 80 slides. ASSETS (DETAIL) TITLE FIELD_RPT PE802638 d WELL_NAME=BASKER-2 ASSETS (DETAIL) TITLE FIELD_RPT PE802638 d WELL_NAME=BASKER-3 ASSETS (DETAIL) TITLE FIELD_RPT PE802638 d WELL_NAME=BASKER-4 ASSETS (DETAIL) TITLE FIELD_RPT PE802638 d WELL_NAME=BASKER-5 ASSETS (DETAIL) TITLE FIELD_RPT PE802638 d WELL_NAME=MANTA-2A ASSETS (DETAIL) WELL DAILY_RPT PE909654 a BASKER-4 Daily Drilling & Workover Rpts [CD] (179 DIGITAL FILES) ASSETS (DETAIL) WELL DAILY_RPT PE909654 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes) ASSETS (DETAIL) WELL DAILY_RPT PE909654 c DESC=BASKER-4 Daily Drilling & Workover Reports. June 2006. Anzon Australia. ASSETS (DETAIL) WELL DAILY_RPT PE909654 d WELL_NAME=BASKER-4 ASSETS (DETAIL) WELL DAILY_RPT PE911536_5 a Daily Drilling, Geol, Workover, Mud Rpts [DVD] (3259 DIGITAL FILES) ASSETS (DETAIL) WELL DAILY_RPT PE911536_5 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007) ASSETS (DETAIL) WELL DAILY_RPT PE911536_5 c DESC=Daily Drilling, Geol, Workover, Mud Reports, 2005-2007. ASSETS (DETAIL) WELL DIRECTIONAL PE909778_195 a BASKER-4 deviation survey data [CD] PE909778__((_BASKER-4_WCR,_VOL1_))_.TAR.GZ(860.8m)......... SAM1_757_PE909778__((_BASKER-4_WCR,_VOL1_))_I_MEDIA_LABELLING.JPG(2.7m)......... PE909778__((_BASKER-4_WCR,_VOL1_))__FILES_LISTING.TXT(0.1m)......... PE909778__((_BASKER-4_WCR,_VOL1_))__MINUSLOGS.ZIP(393.3m)......... PE909778__((_BASKER-4_WCR,_VOL1_))__READ_ME.DOC(0.0m)......... ASSETS (DETAIL) WELL DIRECTIONAL PE909778_195 b (located in::PE909778= BASKER-4 WCR, Vol1) ASSETS (DETAIL) WELL DIRECTIONAL PE909778_195 c DESC=BASKER-4 deviation survey data. 4 pages, 116 rows of tabular data ASSETS (DETAIL) WELL DIRECTIONAL PE909778_195 d WELL_NAME=BASKER-4 ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 a Geodetic Survey Data [DVD] (3259 DIGITAL FILES) ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007) ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 c DESC=Geodetic Survey Data. ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=BASKER-2 ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=BASKER-4 ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=BASKER-5 ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=BREAM-A19A ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=BREAM-A6A ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=BREAM-A9B ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=GALLOWAY-1 ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=GLENAIRE-1 ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=GLENAIRE-1 ST1 ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=HAZELWOOD-1 ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=LONGTOM-3 ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=LONGTOM-3 ST1 ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=LONGTOM-3H ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=LONGTOM-3P ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=MANTA-2A ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=WEST KINGFISH-W18A ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=WEST KINGFISH-W19A ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=WEST KINGFISH-W20A ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=WEST KINGFISH-W21A ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=WEST KINGFISH-W23A ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=WEST KINGFISH-W31A ASSETS (DETAIL) WELL DIRECTIONAL PE911536_8 d WELL_NAME=WEST KINGFISH-W6A ASSETS (DETAIL) WELL DRILL_RPT PE911536_9 a Drilling Data, Logs, TD Curves & Reports [DVD] (3259 DIGITAL FILES) ASSETS (DETAIL) WELL DRILL_RPT PE911536_9 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007) ASSETS (DETAIL) WELL DRILL_RPT PE911536_9 c DESC=Drilling Data, Logs, TD Curves & Reports. ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 a Various Data and Reports [DVD] (3259 DIGITAL FILES) ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007) ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 c DESC=Various Data and Reports, including mud/drilling fluids reports, rig logistics and lookahead reports, personnel data, drill completion, time estimates & cleanup. ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=BASKER-2 ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=BASKER-3 ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=BASKER-4 ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=BASKER-5 ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=CULVERIN-1 ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=GLENAIRE-1 ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=GLENAIRE-1 ST1 ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=LONGTOM-3 ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=LONGTOM-3H ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=LONGTOM-3P ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=LOY YANG-2 ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=MANTA-2 ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=MANTA-2A ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=MEGASCOLIDES-1 RE ST1 ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=PETERBOROUGH-1 ST1 ASSETS (DETAIL) WELL FWR_RPT_AND_ASSOC PE911536_15 d WELL_NAME=PRITCHARD-1 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE915209_2 a BASKER-4 Wireline Log Data [CD] PE915209__((_BASKER-4_WIRELINE_LOGS_AND_DATA_))_.TAR.GZ(477.2m)......... SAM2_167_PE915209__((_BASKER-4_WIRELINE_LOGS_AND_DATA_))__MEDIA_LABELLING.JPG(2.9m)......... PE915209__((_BASKER-4_WIRELINE_LOGS_AND_DATA_))__FILES_LISTING.TXT(0.0m)......... ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE915209_2 b (located in::PE915209= BASKER-4 Wireline Logs and Data) ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE915209_2 c DESC=BASKER-4 Wireline Log Data. Schlumberger for Anzon Australia Ltd. 8-JUN-2006. DLIS and LAS format. Within file named 'Data'. ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE915209_2 d WELL_NAME=BASKER-4 ASSETS (DETAIL) WELL MUD_LOG PE911536_6 a Mudlogs [DVD] (3259 DIGITAL FILES) ASSETS (DETAIL) WELL MUD_LOG PE911536_6 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007) ASSETS (DETAIL) WELL MUD_LOG PE911536_6 c DESC=Mudlogs. ASSETS (DETAIL) WELL PROD_RPT PE911536_10 a Basker-Manta-Gummy Reserves Review [DVD] (3259 DIGITAL FILES) ASSETS (DETAIL) WELL PROD_RPT PE911536_10 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007) ASSETS (DETAIL) WELL PROD_RPT PE911536_10 c DESC=Basker-Manta-Gummy Reserves Review. There is also a 'Hydrocarbon Reserves and Resources Certificate'. ASSETS (DETAIL) WELL PROD_RPT PE911536_10 d WELL_NAME=BASKER-2 ASSETS (DETAIL) WELL PROD_RPT PE911536_10 d WELL_NAME=BASKER-3 ASSETS (DETAIL) WELL PROD_RPT PE911536_10 d WELL_NAME=BASKER-4 ASSETS (DETAIL) WELL PROD_RPT PE911536_10 d WELL_NAME=GUMMY-1 ASSETS (DETAIL) WELL PROD_RPT PE911536_10 d WELL_NAME=MANTA-1 ASSETS (DETAIL) WELL PROD_RPT PE911536_10 d WELL_NAME=MANTA-2A ASSETS (DETAIL) WELL RPT PE911536_12 a Basker-Manta-Gummy Intgtd Field Dev Plan [DVD] (3259 DIGITAL FILES) ASSETS (DETAIL) WELL RPT PE911536_12 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007) ASSETS (DETAIL) WELL RPT PE911536_12 c DESC=Basker-Manta-Gummy Integrated Field Development Plan. Anzon/Beach. ASSETS (DETAIL) WELL RPT PE911536_12 d WELL_NAME=BASKER-1 ASSETS (DETAIL) WELL RPT PE911536_12 d WELL_NAME=BASKER-2 ASSETS (DETAIL) WELL RPT PE911536_12 d WELL_NAME=BASKER-3 ASSETS (DETAIL) WELL RPT PE911536_12 d WELL_NAME=BASKER-4 ASSETS (DETAIL) WELL RPT PE911536_12 d WELL_NAME=BASKER-5 ASSETS (DETAIL) WELL RPT PE911536_12 d WELL_NAME=GUMMY-1 ASSETS (DETAIL) WELL RPT PE911536_12 d WELL_NAME=MANTA-1 ASSETS (DETAIL) WELL RPT PE911536_12 d WELL_NAME=MANTA-2A ASSETS (DETAIL) WELL VELOCITY_RPT PE915209_3 a BASKER-4 Check Shot Survey Report [CD] PE915209__((_BASKER-4_WIRELINE_LOGS_AND_DATA_))_.TAR.GZ(477.2m)......... SAM2_167_PE915209__((_BASKER-4_WIRELINE_LOGS_AND_DATA_))__MEDIA_LABELLING.JPG(2.9m)......... PE915209__((_BASKER-4_WIRELINE_LOGS_AND_DATA_))__FILES_LISTING.TXT(0.0m)......... ASSETS (DETAIL) WELL VELOCITY_RPT PE915209_3 b (located in::PE915209= BASKER-4 Wireline Logs and Data) ASSETS (DETAIL) WELL VELOCITY_RPT PE915209_3 c DESC=BASKER-4 Check Shot Survey Report. Schlumberger for Anzon Australia Ltd. 25-MAY-2006. PDF format. Suite 2 Run 2. ASSETS (DETAIL) WELL VELOCITY_RPT PE915209_3 d WELL_NAME=BASKER-4 ASSETS (DETAIL) WELL WCR_RPT PE909778 a BASKER-4 WCR, Vol1 [CD] PE909778__((_BASKER-4_WCR,_VOL1_))_.TAR.GZ(860.8m)......... SAM1_757_PE909778__((_BASKER-4_WCR,_VOL1_))_I_MEDIA_LABELLING.JPG(2.7m)......... PE909778__((_BASKER-4_WCR,_VOL1_))__FILES_LISTING.TXT(0.1m)......... PE909778__((_BASKER-4_WCR,_VOL1_))__MINUSLOGS.ZIP(393.3m)......... PE909778__((_BASKER-4_WCR,_VOL1_))__READ_ME.DOC(0.0m)......... ASSETS (DETAIL) WELL WCR_RPT PE909778 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes) ASSETS (DETAIL) WELL WCR_RPT PE909778 c DESC=BASKER-4 Well Completion Report, Volume 1 Basic data, December 2006. Anzon Australia. PDF Report, LAS files, logs, DLIS, PDS and PDF files, ASCII Data. ASSETS (DETAIL) WELL WCR_RPT PE909778 d WELL_NAME=BASKER-4 ASSETS (DETAIL) WELL WCR_RPT PE913222 a BASKER-4 WCR Vol.2 Interpretation [CD] PE913222__((_BASKER-4_WCR_VOL.2_INTERPRETATION_))_.TAR.GZ(9.9m)......... SAM3_270_PE913222__((_BASKER-4_WCR_VOL.2_INTERPRETATION_))_I_MEDIA_LABELLING.JPG(2.6m)......... PE913222__((_BASKER-4_WCR_VOL.2_INTERPRETATION_))__FILES_LISTING.TXT(0.0m)......... ASSETS (DETAIL) WELL WCR_RPT PE913222 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes) ASSETS (DETAIL) WELL WCR_RPT PE913222 c DESC=BASKER-4 WCR Vol 2 Interpretation Data. Anzon Australia Limited ASSETS (DETAIL) WELL WCR_RPT PE913222 d WELL_NAME=BASKER-4 ASSETS (DETAIL) WELL WELL_LOG PE911536_14 a Well Log Images [DVD] (3259 DIGITAL FILES) ASSETS (DETAIL) WELL WELL_LOG PE911536_14 b (located in::PE911536= DDRs, Well & Permit Data 2005 to 2007) ASSETS (DETAIL) WELL WELL_LOG PE911536_14 c DESC=Well Log Images. ASSETS (DETAIL) WELL WELL_LOG PE915209_1 a BASKER-4 Wireline Logs [CD] PE915209__((_BASKER-4_WIRELINE_LOGS_AND_DATA_))_.TAR.GZ(477.2m)......... SAM2_167_PE915209__((_BASKER-4_WIRELINE_LOGS_AND_DATA_))__MEDIA_LABELLING.JPG(2.9m)......... PE915209__((_BASKER-4_WIRELINE_LOGS_AND_DATA_))__FILES_LISTING.TXT(0.0m)......... ASSETS (DETAIL) WELL WELL_LOG PE915209_1 b (located in::PE915209= BASKER-4 Wireline Logs and Data) ASSETS (DETAIL) WELL WELL_LOG PE915209_1 c DESC=BASKER-4 Wireline Logs. Schlumberger for Anzon Australia Ltd. 8-Jun-2006. PDF and PDS Format. Headers and Logs for three run in three suites. Verification Listings also included (PDS). ASSETS (DETAIL) WELL WELL_LOG PE915209_1 d WELL_NAME=BASKER-4
93 1 CHECKSHOT: 200017315893 Schlumberger AH10_TW Conventional 93 2 CHECKSHOT: 200017315893 01 SOURCE =AH10_TW 93 2 CHECKSHOT: 200017315893 02 SURVEY_COMPANY =Schlumberger 93 2 CHECKSHOT: 200017315893 03 SURVEY_DATE =25-MAY-06 93 2 CHECKSHOT: 200017315893 03 SURVEY_ID =200017315893 93 2 CHECKSHOT: 200017315893 03 SURVEY_TYPE =CONV 93 2 CHECKSHOT: 200017315893 05 TOP_DEPTH =2175 93 2 CHECKSHOT: 200017315893 06 BASE_DEPTH =3414.9 93 2 CHECKSHOT: 200017315893 07 ENERGY_SOURCE =AIRGUN 93 2 CHECKSHOT: 200017315893 08 SOURCE_DEPTH =4.5 93 2 CHECKSHOT: 200017315893 08 SOURCE_OFFSET =24.277 93 2 CHECKSHOT: 200017315893 10 GUN_PRESS =1800 93 2 CHECKSHOT: 200017315893 12 DATUM_ELEV =21.5 93 2 CHECKSHOT: 200017315893 13 CHECKSHOT_VELOCITY =1524 93 2 CHECKSHOT: 200017315893 14 CHECKSHOT_TRAVEL_PATH =OWT 93 2 CHECKSHOT: 200017315893 15 MONITOR_DEPTH =9.5 93 2 CHECKSHOT: 200017315893 16 SAMPLE_RATE =1 93 2 CHECKSHOT: 200017315893 18 PETROSYS_SRD_TIME =0 93 2 CHECKSHOT: 200017315893 19 PETROSYS_SRD_ELEV =0 93 2 CHECKSHOT: 200017315893 25 REMARK =Time-Depth points sourced from page 20 of PE915209 (Check Shot Survey). Company is Anzon Australia. (checked AH10, Dec 2007) 93 2 CHECKSHOT: 200017315893 29 POINT COUNT =19 93 3 CHECKSHOT: 200017315893 93 4 CHECKSHOT: 200017315893 :2175 SHOT:1 MD:2175 VERT DEPTH:2051.482 OBS_TIME:792.8 Type:CONV Rmk:(VERT_DEPTH: 2051.4m, CORR_TIME: 795.7ms); 93 4 CHECKSHOT: 200017315893 :2190 SHOT:2 MD:2190.1 VERT DEPTH:2065.283 OBS_TIME:797.5 Type:CONV Rmk:(VERT_DEPTH: 2065.3m, CORR_TIME: 800.5ms); 93 4 CHECKSHOT: 200017315893 :2205 SHOT:3 MD:2205.2 VERT DEPTH:2079.06 OBS_TIME:801.7 Type:CONV Rmk:(VERT_DEPTH: 2079.1m, CORR_TIME: 804.6ms); 93 4 CHECKSHOT: 200017315893 :2220 SHOT:4 MD:2220.3 VERT DEPTH:2092.807 OBS_TIME:805.6 Type:CONV Rmk:(VERT_DEPTH: 2092.8m, CORR_TIME: 808.6ms); 93 4 CHECKSHOT: 200017315893 :2659 SHOT:5 MD:2659 VERT DEPTH:2483.65 OBS_TIME:911.9 Type:CONV Rmk:(VERT_DEPTH: 2483.6m, CORR_TIME: 914.8ms); 93 4 CHECKSHOT: 200017315893 :2674 SHOT:6 MD:2674.1 VERT DEPTH:2497.083 OBS_TIME:915.7 Type:CONV Rmk:(VERT_DEPTH: 2497.1m, CORR_TIME: 918.7ms); 93 4 CHECKSHOT: 200017315893 :2689 SHOT:7 MD:2689.2 VERT DEPTH:2510.635 OBS_TIME:919.5 Type:CONV Rmk:(VERT_DEPTH: 2510.7m, CORR_TIME: 922.5ms); 93 4 CHECKSHOT: 200017315893 :2704 SHOT:8 MD:2704.3 VERT DEPTH:2524.327 OBS_TIME:923.5 Type:CONV Rmk:(VERT_DEPTH: 2524.4m, CORR_TIME: 926.4ms); 93 4 CHECKSHOT: 200017315893 :3228 SHOT:9 MD:3227.8 VERT DEPTH:3028.062 OBS_TIME:1063.8 Type:CONV Rmk:(VERT_DEPTH: 3028.1m, CORR_TIME: 1066.8ms); 93 4 CHECKSHOT: 200017315893 :3243 SHOT:10 MD:3243 VERT DEPTH:3043.198 OBS_TIME:1068 Type:CONV Rmk:(VERT_DEPTH: 3043.1m, CORR_TIME: 1071ms); 93 4 CHECKSHOT: 200017315893 :3258 SHOT:11 MD:3258.1 VERT DEPTH:3058.239 OBS_TIME:1072.4 Type:CONV Rmk:(VERT_DEPTH: 3058.2m, CORR_TIME: 1075.4ms); 93 4 CHECKSHOT: 200017315893 :3273 SHOT:12 MD:3273.2 VERT DEPTH:3073.284 OBS_TIME:1077.2 Type:CONV Rmk:(VERT_DEPTH: 3073.3m, CORR_TIME: 1080.1ms); 93 4 CHECKSHOT: 200017315893 :3324 SHOT:13 MD:3324.2 VERT DEPTH:3124.159 OBS_TIME:1090 Type:CONV Rmk:(VERT_DEPTH: 3124.1m, CORR_TIME: 1093ms); 93 4 CHECKSHOT: 200017315893 :3339 SHOT:14 MD:3339.3 VERT DEPTH:3139.231 OBS_TIME:1094.1 Type:CONV Rmk:(VERT_DEPTH: 3139.2m, CORR_TIME: 1097.1ms); 93 4 CHECKSHOT: 200017315893 :3354 SHOT:15 MD:3354.4 VERT DEPTH:3154.308 OBS_TIME:1098.3 Type:CONV Rmk:(VERT_DEPTH: 3154.3m, CORR_TIME: 1101.2ms); 93 4 CHECKSHOT: 200017315893 :3370 SHOT:16 MD:3369.5 VERT DEPTH:3169.387 OBS_TIME:1102.3 Type:CONV Rmk:(VERT_DEPTH: 3169.4m, CORR_TIME: 1105.2ms); 93 4 CHECKSHOT: 200017315893 :3385 SHOT:17 MD:3384.6 VERT DEPTH:3184.469 OBS_TIME:1107.9 Type:CONV Rmk:(VERT_DEPTH: 3184.5m, CORR_TIME: 1110.8ms); 93 4 CHECKSHOT: 200017315893 :3400 SHOT:18 MD:3399.8 VERT DEPTH:3199.652 OBS_TIME:1111.8 Type:CONV Rmk:(VERT_DEPTH: 3199.6m, CORR_TIME: 1114.7ms); 93 4 CHECKSHOT: 200017315893 :3415 SHOT:19 MD:3414.9 VERT DEPTH:3214.736 OBS_TIME:1115.4 Type:CONV Rmk:(VERT_DEPTH: 3214.7m, CORR_TIME: 1118.4ms);
BASKER_4_DIR OIL_CO_DATA:1: DEVIATION SRVY 01 SURVEY_ID =BASKER_4_DIR BASKER_4_DIR OIL_CO_DATA:1: DEVIATION SRVY 02 SURVEY_COMPANY =Halliburton BASKER_4_DIR OIL_CO_DATA:1: DEVIATION SRVY 03 SURVEY_DATE =22-FEB-06 BASKER_4_DIR OIL_CO_DATA:1: DEVIATION SRVY 05 SURVEY_TYPE =DIR BASKER_4_DIR OIL_CO_DATA:1: DEVIATION SRVY 06 STORAGE_UNIT =Metres BASKER_4_DIR OIL_CO_DATA:1: DEVIATION SRVY 09 COMPUTE_METHOD =MC BASKER_4_DIR OIL_CO_DATA:1: DEVIATION SRVY 10 EW_MAGNETIC_DECLINATION =U BASKER_4_DIR OIL_CO_DATA:1: DEVIATION SRVY 11 MAGNETIC_DECLINATION =13.38 BASKER_4_DIR OIL_CO_DATA:1: DEVIATION SRVY 13 AZIMUTH_NORTH_TYPE =G BASKER_4_DIR OIL_CO_DATA:1: DEVIATION SRVY 14 TOP_DEPTH =175.1 BASKER_4_DIR OIL_CO_DATA:1: DEVIATION SRVY 16 BASE_DEPTH =3480 BASKER_4_DIR OIL_CO_DATA:1: DEVIATION SRVY 18 SOURCE =OIL_CO_DATA BASKER_4_DIR OIL_CO_DATA:1: DEVIATION SRVY 20 REMARK =Data Source PE909778 page 195, 196 and 197. 116 Points. BASKER_4_DIR OIL_CO_DATA:1: DEVIATION SRVY 21 POINT COUNT = 116 BASKER_4_DIR OIL_CO_DATA:2: DEVIATION SRVY STATION_MD INCLINATION AZIMUTH STATION_ID STATION_TVD X_OFFSET Y_OFFSET VERTICAL_SECTION NS_DIRECTION EW_DIRECTION DOG_LEG_SEVERITY REMARK BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 0175 175.1 0 0 175.1 0 0 N E BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 0224 224.3 .17 263.11 224.33993 .07 .01 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 0253 252.8 .24 141.85 252.84983 .08 .06 S W Correct MD is 252.83 whereas it was entered as 252.85 BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 0282 281.5 .68 251.68 281.49916 .2 .16 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 0310 310.1 .57 182.42 310.10781 .37 .36 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 0339 338.8 .62 202.07 338.87629 .43 .64 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 0368 367.5 .26 36.68 367.58586 .45 .74 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 0396 396.2 .24 140.18 396.2457 .38 .73 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 0425 425.0 .25 223.74 425.06551 .38 .82 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 0454 453.8 .43 165.28 453.86507 .4 .97 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 0483 482.7 .56 82.01 482.7243 .23 1.06 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 0511 511.4 .39 79.68 511.4533 .01 1.02 S E BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 0540 540.0 .47 24.97 540.01261 .15 .9 S E BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 0569 568.6 .22 142.01 568.64228 .23 .83 S E BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 0597 596.8 1.34 247.04 596.83975 .04 1 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 0626 625.5 6.54 249.39 625.41224 1.87 1.71 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 0654 654.0 7.66 257.17 653.78322 5.25 2.71 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 0683 682.7 8.24 265.12 682.16852 9.16 3.3 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 0712 711.7 8.55 270.76 710.82857 13.39 3.45 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 0741 740.7 11.2 268.1 739.40636 18.36 3.52 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 0770 769.6 12.68 264.8 767.67087 24.32 3.9 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 0798 798.3 12.7 267.68 795.71888 30.62 4.31 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 0827 826.9 14.94 264.68 823.45068 37.42 4.78 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 0856 855.6 17.23 267.77 851.07384 45.37 5.29 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 0884 884.2 17.03 267.08 878.34779 53.77 5.67 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 0913 912.7 18.43 263.44 905.47523 62.41 6.39 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 0942 941.5 18.44 263.17 932.86371 71.47 7.46 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 0971 970.5 18.49 263.81 960.31383 80.58 8.5 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1006 1006.0 18.22 263.21 994.0267 91.69 9.76 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1029 1029.0 18.47 263.91 1015.86731 98.89 10.57 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1060 1059.6 20.13 264.08 1044.74661 108.95 11.63 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1092 1091.7 21.19 264.12 1074.82863 120.23 12.8 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1120 1120.2 22.06 264.4 1101.32243 130.68 13.85 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1149 1148.7 23.53 265.09 1127.54973 141.66 14.85 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1166 1166.4 24.41 265.1 1143.75964 148.84 15.47 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1177 1176.9 24.84 265.08 1153.25924 153.18 15.84 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1206 1205.7 25.45 266.48 1179.33013 165.38 16.74 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1234 1234.4 25.51 265.74 1205.29287 177.72 17.58 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1263 1263.2 25.87 267.1 1231.16515 190.14 18.36 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1292 1291.7 26 266.25 1256.83998 202.61 19.08 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1320 1320.1 23.84 267.67 1282.55829 214.54 19.72 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1349 1348.6 23.46 267.58 1308.65546 225.96 20.2 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1377 1377.1 23.23 267.54 1334.88657 237.27 20.68 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1406 1405.8 22.71 267.15 1361.28323 248.45 21.19 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1434 1434.4 21.97 267.39 1387.73647 259.31 21.71 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1463 1463.1 22.01 267.1 1414.33925 270.04 22.23 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1492 1491.8 21.79 268.7 1440.96838 280.73 22.62 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1521 1520.5 21.61 266.95 1467.63476 291.34 23.02 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1549 1549.3 22.21 263.87 1494.35534 302.04 23.89 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1578 1578.0 21.41 264.26 1521.00082 312.65 24.99 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1607 1606.7 20.45 263.34 1547.86292 322.86 26.1 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1635 1635.2 20.73 263.47 1574.54234 332.82 27.25 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1664 1663.9 20.52 262.36 1601.34678 342.83 28.49 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1692 1692.3 21.37 263.53 1627.90745 352.92 29.74 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1721 1721.2 21.83 262.07 1654.76882 363.47 31.07 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1750 1750.0 22.56 260.84 1681.46258 374.24 32.69 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1779 1779.1 22.33 263.23 1708.33098 385.23 34.23 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1808 1807.9 23.57 265.88 1734.80549 396.39 35.29 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1832 1832.2 23.47 265.58 1757.0775 406.05 36.01 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1865 1865.3 23.22 265.42 1787.52285 419.15 37.04 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1894 1894.0 23.12 265.71 1813.93554 430.42 37.92 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1923 1922.6 22.73 265.42 1840.20286 441.5 38.78 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1951 1951.1 22.39 266.14 1866.54047 452.41 39.58 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 1980 1979.6 22.07 265.65 1892.9499 463.18 40.35 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2008 2008.1 22.1 266.23 1919.331 473.85 41.11 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2037 2036.7 22.65 265.9 1945.74994 484.7 41.86 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2065 2065.3 22.69 266 1972.2049 495.73 42.64 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2094 2094.1 23.82 265.25 1998.61878 507.04 43.51 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2123 2122.9 22.88 264.88 2025.05063 518.41 44.49 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2152 2151.7 22.84 266.31 2051.62565 529.58 45.35 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2181 2180.5 23.94 267.75 2078.07715 541.01 45.94 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2209 2209.3 24.32 268.28 2104.35147 552.77 46.34 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2238 2238.1 25.23 268.19 2130.46414 564.81 46.72 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2267 2266.7 25.65 268.18 2156.32702 577.11 47.11 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2295 2295.2 26.09 267.23 2181.94398 589.52 47.6 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2324 2323.8 26.23 267.68 2207.64133 602.13 48.16 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2353 2352.6 26.53 267.73 2233.39747 614.9 48.68 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2382 2381.6 26.79 267.15 2259.30542 627.89 49.26 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2411 2410.6 26.7 266.45 2285.23873 640.94 49.99 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2439 2439.3 26.9 266.47 2310.85593 653.86 50.79 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2468 2467.8 27.11 266.39 2336.29302 666.79 51.59 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2497 2496.6 27.6 266.02 2361.82804 679.98 52.47 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2525 2525.1 27.72 265.68 2387.08873 693.18 53.43 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2554 2553.5 28.03 265.54 2412.20228 706.42 54.44 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2582 2582.4 28.18 266.17 2437.67697 719.99 55.43 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2612 2611.7 28.71 266.08 2463.4748 733.94 56.37 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2641 2640.9 27.83 265.83 2489.1477 747.71 57.34 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2669 2669.2 27.16 265.59 2514.25998 760.74 58.32 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2698 2697.8 24.86 266.02 2539.98856 773.26 59.24 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2727 2727.1 22.34 267.37 2566.79937 784.95 59.92 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2755 2755.4 20.81 268.4 2593.088 795.34 60.31 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2784 2784.0 20.58 267.75 2619.91744 805.47 60.65 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2813 2813.4 20.73 265.54 2647.37192 815.8 61.26 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2842 2841.6 20.35 264.62 2673.82602 825.68 62.11 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2870 2869.8 19.14 264.86 2700.37694 835.17 62.98 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2899 2898.5 18.93 265.94 2727.50768 844.5 63.73 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2928 2927.6 17.73 265.97 2755.07371 853.61 64.38 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2957 2956.7 16.24 266.55 2782.9419 862.1 64.93 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 2985 2984.8 15.17 265.41 2809.93478 869.67 65.46 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 3014 3013.5 13.08 266.7 2837.79468 876.66 65.95 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 3042 3042.4 11.59 267.5 2866.0756 882.84 66.27 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 3070 3070.2 10.14 268.21 2893.32744 888.07 66.46 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 3099 3099.4 8.9 269.44 2922.15435 892.9 66.57 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 3127 3126.9 7.62 272.84 2949.31919 896.84 66.5 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 3154 3154.3 6.95 271.52 2976.55739 900.32 66.36 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 3185 3184.6 6.18 274.43 3006.65856 903.78 66.19 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 3212 3212.1 5.61 271.92 3033.97328 906.59 66.03 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 3242 3241.9 5.14 272.66 3063.65212 909.38 65.92 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 3270 3270.1 4.86 277.14 3091.72497 911.83 65.71 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 3297 3297.4 3.88 281.92 3118.93539 913.88 65.38 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 3327 3327.0 3.55 281.91 3148.53303 915.76 64.98 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 3355 3355.1 3.03 283.24 3176.56665 917.33 64.63 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 3413 3412.7 2.54 279.42 3234.06853 920.07 64.07 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 3441 3440.9 2.44 280.54 3262.29186 921.28 63.86 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 3472 3471.9 2.68 285.72 3293.22098 922.63 63.54 S W BASKER_4_DIR OIL_CO_DATA:3: DEVIATION SRVY 3480 3480.0 2.68 285.72 3301.27216 922.99 63.44 S W BASKER_4_MASTER MASTER:1: DEVIATION SRVY 01 SURVEY_ID =BASKER_4_MASTER BASKER_4_MASTER MASTER:1: DEVIATION SRVY 02 SURVEY_COMPANY =Halliburton BASKER_4_MASTER MASTER:1: DEVIATION SRVY 03 SURVEY_DATE =22-FEB-06 BASKER_4_MASTER MASTER:1: DEVIATION SRVY 05 SURVEY_TYPE =DIR BASKER_4_MASTER MASTER:1: DEVIATION SRVY 06 STORAGE_UNIT =Metres BASKER_4_MASTER MASTER:1: DEVIATION SRVY 09 COMPUTE_METHOD =MC BASKER_4_MASTER MASTER:1: DEVIATION SRVY 10 EW_MAGNETIC_DECLINATION =U BASKER_4_MASTER MASTER:1: DEVIATION SRVY 11 MAGNETIC_DECLINATION =13.38 BASKER_4_MASTER MASTER:1: DEVIATION SRVY 13 AZIMUTH_NORTH_TYPE =G BASKER_4_MASTER MASTER:1: DEVIATION SRVY 14 TOP_DEPTH =175.1 BASKER_4_MASTER MASTER:1: DEVIATION SRVY 16 BASE_DEPTH =3480 BASKER_4_MASTER MASTER:1: DEVIATION SRVY 18 SOURCE =MASTER BASKER_4_MASTER MASTER:1: DEVIATION SRVY 18 SOURCE =MASTER [Note: surveys with a SOURCE of MASTER should usually be just a copy of one of the original surveys run in the well. The MASTER survey is used by the database to display/calculate well paths etc] BASKER_4_MASTER MASTER:1: DEVIATION SRVY 20 REMARK =Data Source PE909778 page 195, 196 and 197. 116 Points. BASKER_4_MASTER MASTER:1: DEVIATION SRVY 21 POINT COUNT = 116 BASKER_4_MASTER MASTER:2: DEVIATION SRVY STATION_MD INCLINATION AZIMUTH STATION_ID STATION_TVD X_OFFSET Y_OFFSET VERTICAL_SECTION NS_DIRECTION EW_DIRECTION DOG_LEG_SEVERITY REMARK BASKER_4_MASTER MASTER:3: DEVIATION SRVY 0175 175.1 0 0 175.1 0 0 N E BASKER_4_MASTER MASTER:3: DEVIATION SRVY 0224 224.3 .17 263.11 224.33993 .07 .01 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 0253 252.8 .24 141.85 252.82983 .08 .06 S W Correct MD is 252.83 whereas it was entered as 252.85 BASKER_4_MASTER MASTER:3: DEVIATION SRVY 0282 281.5 .68 251.68 281.49916 .2 .16 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 0310 310.1 .57 182.42 310.10781 .37 .36 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 0339 338.8 .62 202.07 338.87629 .43 .64 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 0368 367.5 .26 36.68 367.58586 .45 .74 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 0396 396.2 .24 140.18 396.2457 .38 .73 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 0425 425.0 .25 223.74 425.06551 .38 .82 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 0454 453.8 .43 165.28 453.86507 .4 .97 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 0483 482.7 .56 82.01 482.7243 .23 1.06 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 0511 511.4 .39 79.68 511.4533 .01 1.02 S E BASKER_4_MASTER MASTER:3: DEVIATION SRVY 0540 540.0 .47 24.97 540.01261 .15 .9 S E BASKER_4_MASTER MASTER:3: DEVIATION SRVY 0569 568.6 .22 142.01 568.64228 .23 .83 S E BASKER_4_MASTER MASTER:3: DEVIATION SRVY 0597 596.8 1.34 247.04 596.83975 .04 1 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 0626 625.5 6.54 249.39 625.41224 1.87 1.71 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 0654 654.0 7.66 257.17 653.78322 5.25 2.71 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 0683 682.7 8.24 265.12 682.16852 9.16 3.3 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 0712 711.7 8.55 270.76 710.82857 13.39 3.45 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 0741 740.7 11.2 268.1 739.40636 18.36 3.52 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 0770 769.6 12.68 264.8 767.67087 24.32 3.9 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 0798 798.3 12.7 267.68 795.71888 30.62 4.31 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 0827 826.9 14.94 264.68 823.45068 37.42 4.78 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 0856 855.6 17.23 267.77 851.07384 45.37 5.29 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 0884 884.2 17.03 267.08 878.34779 53.77 5.67 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 0913 912.7 18.43 263.44 905.47523 62.41 6.39 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 0942 941.5 18.44 263.17 932.86371 71.47 7.46 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 0971 970.5 18.49 263.81 960.31383 80.58 8.5 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1006 1006.0 18.22 263.21 994.0267 91.69 9.76 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1029 1029.0 18.47 263.91 1015.86731 98.89 10.57 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1060 1059.6 20.13 264.08 1044.74661 108.95 11.63 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1092 1091.7 21.19 264.12 1074.82863 120.23 12.8 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1120 1120.2 22.06 264.4 1101.32243 130.68 13.85 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1149 1148.7 23.53 265.09 1127.54973 141.66 14.85 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1166 1166.4 24.41 265.1 1143.75964 148.84 15.47 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1177 1176.9 24.84 265.08 1153.25924 153.18 15.84 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1206 1205.7 25.45 266.48 1179.33013 165.38 16.74 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1234 1234.4 25.51 265.74 1205.29287 177.72 17.58 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1263 1263.2 25.87 267.1 1231.16515 190.14 18.36 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1292 1291.7 26 266.25 1256.83998 202.61 19.08 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1320 1320.1 23.84 267.67 1282.55829 214.54 19.72 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1349 1348.6 23.46 267.58 1308.65546 225.96 20.2 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1377 1377.1 23.23 267.54 1334.88657 237.27 20.68 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1406 1405.8 22.71 267.15 1361.28323 248.45 21.19 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1434 1434.4 21.97 267.39 1387.73647 259.31 21.71 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1463 1463.1 22.01 267.1 1414.33925 270.04 22.23 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1492 1491.8 21.79 268.7 1440.96838 280.73 22.62 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1521 1520.5 21.61 266.95 1467.63476 291.34 23.02 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1549 1549.3 22.21 263.87 1494.35534 302.04 23.89 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1578 1578.0 21.41 264.26 1521.00082 312.65 24.99 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1607 1606.7 20.45 263.34 1547.86292 322.86 26.1 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1635 1635.2 20.73 263.47 1574.54234 332.82 27.25 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1664 1663.9 20.52 262.36 1601.34678 342.83 28.49 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1692 1692.3 21.37 263.53 1627.90745 352.92 29.74 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1721 1721.2 21.83 262.07 1654.76882 363.47 31.07 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1750 1750.0 22.56 260.84 1681.46258 374.24 32.69 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1779 1779.1 22.33 263.23 1708.33098 385.23 34.23 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1808 1807.9 23.57 265.88 1734.80549 396.39 35.29 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1832 1832.2 23.47 265.58 1757.0775 406.05 36.01 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1865 1865.3 23.22 265.42 1787.52285 419.15 37.04 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1894 1894.0 23.12 265.71 1813.93553 430.42 37.92 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1923 1922.6 22.73 265.42 1840.20286 441.5 38.78 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1951 1951.1 22.39 266.14 1866.54047 452.41 39.58 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 1980 1979.6 22.07 265.65 1892.9499 463.18 40.35 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2008 2008.1 22.1 266.23 1919.331 473.85 41.11 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2037 2036.7 22.65 265.9 1945.74994 484.7 41.86 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2065 2065.3 22.69 266 1972.2049 495.73 42.64 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2094 2094.1 23.82 265.25 1998.61878 507.04 43.51 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2123 2122.9 22.88 264.88 2025.05063 518.41 44.49 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2152 2151.7 22.84 266.31 2051.62565 529.58 45.35 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2181 2180.5 23.94 267.75 2078.07715 541.01 45.94 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2209 2209.3 24.32 268.28 2104.35147 552.77 46.34 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2238 2238.1 25.23 268.19 2130.46414 564.81 46.72 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2267 2266.7 25.65 268.18 2156.32702 577.11 47.11 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2295 2295.2 26.09 267.23 2181.94398 589.52 47.6 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2324 2323.8 26.23 267.68 2207.64133 602.13 48.16 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2353 2352.6 26.53 267.73 2233.39747 614.9 48.68 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2382 2381.6 26.79 267.15 2259.30542 627.89 49.26 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2411 2410.6 26.7 266.45 2285.23873 640.94 49.99 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2439 2439.3 26.9 266.47 2310.85593 653.86 50.79 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2468 2467.8 27.11 266.39 2336.29302 666.79 51.59 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2497 2496.6 27.6 266.02 2361.82804 679.98 52.47 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2525 2525.1 27.72 265.68 2387.08873 693.18 53.43 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2554 2553.5 28.03 265.54 2412.20228 706.42 54.44 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2582 2582.4 28.18 266.17 2437.67696 719.99 55.43 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2612 2611.7 28.71 266.08 2463.47479 733.94 56.37 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2641 2640.9 27.83 265.83 2489.1477 747.71 57.34 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2669 2669.2 27.16 265.59 2514.25998 760.74 58.32 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2698 2697.8 24.86 266.02 2539.98856 773.26 59.24 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2727 2727.1 22.34 267.37 2566.79937 784.95 59.92 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2755 2755.4 20.81 268.4 2593.088 795.34 60.31 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2784 2784.0 20.58 267.75 2619.91744 805.47 60.65 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2813 2813.4 20.73 265.54 2647.37192 815.8 61.26 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2842 2841.6 20.35 264.62 2673.82602 825.68 62.11 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2870 2869.8 19.14 264.86 2700.37694 835.17 62.98 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2899 2898.5 18.93 265.94 2727.50768 844.5 63.73 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2928 2927.6 17.73 265.97 2755.07371 853.61 64.38 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2957 2956.7 16.24 266.55 2782.9419 862.1 64.93 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 2985 2984.8 15.17 265.41 2809.93478 869.67 65.46 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 3014 3013.5 13.08 266.7 2837.79468 876.66 65.95 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 3042 3042.4 11.59 267.5 2866.0756 882.84 66.27 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 3070 3070.2 10.14 268.21 2893.32744 888.07 66.46 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 3099 3099.4 8.9 269.44 2922.15435 892.9 66.57 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 3127 3126.9 7.62 272.84 2949.31919 896.84 66.5 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 3154 3154.3 6.95 271.52 2976.55739 900.32 66.36 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 3185 3184.6 6.18 274.43 3006.65856 903.78 66.19 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 3212 3212.1 5.61 271.92 3033.97328 906.59 66.03 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 3242 3241.9 5.14 272.66 3063.65212 909.38 65.92 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 3270 3270.1 4.86 277.14 3091.72497 911.83 65.71 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 3297 3297.4 3.88 281.92 3118.93539 913.88 65.38 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 3327 3327.0 3.55 281.91 3148.53302 915.76 64.98 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 3355 3355.1 3.03 283.24 3176.56665 917.33 64.63 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 3413 3412.7 2.54 279.42 3234.06853 920.07 64.07 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 3441 3440.9 2.44 280.54 3262.29186 921.28 63.86 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 3472 3471.9 2.68 285.72 3293.22098 922.63 63.54 S W BASKER_4_MASTER MASTER:3: DEVIATION SRVY 3480 3480.0 2.68 285.72 3301.27216 922.99 63.44 S W
PPDM_AUDIT_HISTORY: WELL_NAME=HISTWELL200006781942