GSV: Geological Survey of Victoria   Geological Survey of Victoria

NETHERBY1




*** NETHERBY1 ***

netherby1 000 LINKS HYPERLINKAGES OTWAY_WELLS OTWAY_ON_SHORE_WELLS OTWAY_OFFSHORE_WELLS
HDR WELL_NAME = NETHERBY-1
HDR A GEOGRAPHICALLY VERY CLOSE WELL TO THIS WELL: WELL_NAME= NETHERBY-1 DW1
HDR DATE 1: SPUD_DATE = 15-JUL-08 HDR DATE 3: RIG_RELEASE_DATE = 02-AUG-08 HDR DATE 4: DB_ENTRY_BY = EF03_TW (database header data entry) HDR DATE 4: DB_ENTRY_DATE = 24-APR-08 (database header data entry date) HDR DATE 5: DB_ROW_UPDATER = EF03_TW (database header data entry last updated by) HDR DATE 5: DB_ROW_UPDATE_DATE = 18-MAR-09 (database header data entry last update date) HDR DATE 6: THEORETICAL OPENFILE BASIC DATE= 03-AUG-10 HDR DATE 6: THEORETICAL OPENFILE INTERPRETIVE DATE= 02-SEP-13
HDR DEVIATION_IND = Y (i.e. has this hole been deviated?) HDR LOC: BASIN DESCRIPTION= Otway Basin HDR LOC: BASIN_CODE = OTWAY HDR LOC: COUNTRY = AUSTRALIA HDR LOC: FIELD_NAME = FIELD HDR LOC: ONSHORE_IND = N HDR LOC: PROVINCE_STATE = VIC HDR LOC: TITLE_NAME = VIC/P44 HDR LOC: TITLE_NAME: SDO: CURRENT TITLE (Current as at 23-FEB-12) BY LOCATION: ENCLOSING NETHERBY-1 : TITLE_NAME=VIC/L30 HDR LOC: TITLE_NAME: SDO: CURRENT TITLE (Current as at 23-FEB-12) BY LOCATION: ENCLOSING NETHERBY-1 : TITLE_NAME=VIC/P44 HDR OPERATOR = SANTOS Limited ACN007550923 HDR PLATFORM_IND = N (i.e. is this hole off a platform?) HDR SIDETRACK_IND = N (i.e. is this hole a sidetrack?)
HDR DPH GREATEST OF DEPTHS = 1875 HDR DPH: DRILL_TD = 1875 HDR DPH: DRILL_TD = DRILLERS TOTAL DEPTH: Total or maximum depth of the well as reported by the operator/driller (PPDM definition). HDR DPH: FINAL_TD = 1875 HDR DPH: FINAL_TD = FINAL TOTAL DEPTH: The actual measurement along the well path from the reference datum to the bottom of the well (PPDM definition). HDR DPH: MAX_TVD = 1668 HDR DPH: MAX_TVD = MAXIMUM TRUE VERTICAL DEPTH: The maximum true vertical depth from the surface datum reference to the final total depth or deepest point, measured on a straight line (PPDM definition). HDR ELEV: DEPTH_DATUM = RT HDR ELEV: DEPTH_DATUM LONGNM= Rotary Table HDR ELEV: DEPTH_DATUM_ELEV = 20.8 HDR ELEV: ELEVATION_REF = RT HDR ELEV: ELEVATION_REF LN = Rotary Table HDR ELEV: REF_ELEV = 20.8 HDR ELEV: RT_ELEV = 20.8 HDR ELEV: WATER_DEPTH = -66.1 HDR STORAGE_UNIT = Metres
HDR CURRENT_CLASS = E_WILDCAT HDR CURRENT_CLASS LONG_NAME = Exploration Wildcat HDR CURRENT_STATUS = P&S HDR CURRENT_STATUS LONG_NAME= Plugged and Suspended HDR INITIAL_CLASS = E_WILDCAT HDR INITIAL_CLASS LONG_NAME = Exploration Wildcat HDR PLOT SYMBOL DESCRIPTION = Gas well/discovery HDR PLOT_SYMBOL = 109
WELL_ALIAS BOREHOLE_SITE_ID=SIT962920 : equivalent BOREHOLE_NAME=UNKNOWN PARISH 0 WELL_ALIAS PLOT_NAME= NETHERBY-1 WELL_ALIAS UWI= 200018512463 WELL_ALIAS WELL_NAME= 962920 : [WELL_SITE_ID] WELL_SITE_ID -- GEDIS Boreholes Database SITE ID WELL_ALIAS WELL_NAME= NETHERBY-1 : [WELL_TRUE_NM] WELL_TRUE_NM: the true (actual) name of the well WELL_ALIAS WELL_NAME= W1447 : [WELL_BOX_NO] WELL_BOX_NO: the W Number (Well Box No) of the well
NODE_COORD BOTTOM HOLE LAT & LONG = -38.680161 142.640486 NODE_COORD SURFACE LAT & LONG = -38.6801611 142.6404861 NODE_COORD DATUM = COORD_SYSTEM_ID=4283 GEODETIC_DATUM_ID=4283
GENERAL REMARKS 001 RMK_TYPE= TVD_DEPTH RMK= The TVD value (0) was calculated from the directional survey data in the dbMap database as at 20-FEB-2009, using the ps_well_path_tvd_m function, using the greatest depth value found in the well header. Caution: THIS TVD IS FAKE. GENERAL REMARKS 002 RMK_TYPE= SIDETRACK RMK= Netherby 1DW1 sidetracked from the Netherby 1 wellbore from 1505m at 21:00 hours on 2nd August 2008.Source: page 1 of "Netherby 1_DGR19_0308.pdf" within PE915098 (3331 digital files) GENERAL REMARKS 003 RMK_TYPE= FAKE_DIRSRVY RMK= Fake directional survey data was put into the database for this well. The survey data could not be found for this well as at 29-JAN-2009.
ASSETS (BRIEF) DATA_TYPE DATA_SUB_TYPE BARCODE ITEM_NAME [MEDIA_TYPE] SCANNED_OR_DIGITAL_FILES
ASSETS (BRIEF) GENERAL DATA_CD_DVD PE913157 NETHERBY-1 WCR CD [CD] 2009 PE913157__((_NETHERBY-1_WCR_CD_))_.TAR.GZ(91.7m)......... PE913157__((_NETHERBY-1_WCR_CD_))_.TAR.GZ(91.7m)......... SAM3_245_PE913157__((_NETHERBY-1_WCR_CD_))_I_MEDIA_LABELLING.JPG(2.6m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes ASSETS (BRIEF) GENERAL DATA_CD_DVD PE913158 NETHERBY-1 DW1 WCR CD [CD] 2009 PE913158__((_NETHERBY-1_DW1_WCR_CD_))_.TAR.GZ(76.9m)......... PE913158__((_NETHERBY-1_DW1_WCR_CD_))_.TAR.GZ(76.9m)......... SAM3_246_PE913158__((_NETHERBY-1_DW1_WCR_CD_))__MEDIA_LABELLING.JPG(2.6m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes ASSETS (BRIEF) WELL LOG_TAPE_OR_DISK PE619581 NETHERBY-1 MWD/LWD [CD] 2008 PE619581__((_NETHERBY-1_MWD_LWD_))_.TAR.GZ(11.8m)......... PE619581__((_NETHERBY-1_MWD_LWD_))_.TAR.GZ(11.8m)......... SAM1_277_PE619581__((_NETHERBY-1_MWD_LWD_))_I_MEDIA_LABELLING.JPG(3.1m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes ASSETS (BRIEF) WELL LOG_TAPE_OR_DISK PE619582 NETHERBY-1 Wireline products [CD] 2008 PE619582__((_NETHERBY-1_WIRELINE_PRODUCTS_))_.TAR.GZ(11.8m)......... PE619582__((_NETHERBY-1_WIRELINE_PRODUCTS_))_.TAR.GZ(11.8m)......... SAM1_278_PE619582__((_NETHERBY-1_WIRELINE_PRODUCTS_))_I_MEDIA_LABELLING.JPG(3.0m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes ASSETS (BRIEF) WELL WCR_RPT PE911566 NETHERBY-1 WCR (Interpreted Well Data) [CD] 2009 in: COMPACTUS Bay of COMPACTUS_1 used to store tapes ASSETS (BRIEF) WELL WCR_RPT PE913137 NETHERBY-1 WCR Basic [CD] 2009 PE913137__((_NETHERBY-1_WCR_BASIC_))_.TAR.GZ(91.6m)......... PE913137__((_NETHERBY-1_WCR_BASIC_))_.TAR.GZ(91.6m)......... SAM2_493_PE913137__((_NETHERBY-1_WCR_BASIC_))__MEDIA_LABELLING.JPG(2.6m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) SEISMIC HRZN_CONTR_MAP PE911563_4 Champion South 3D K76 Waarre A Depth Map [CD] 2009 in: CD NETHERBY-1 DW1 WCR (Interpretive) & Logs ASSETS (BRIEF) SEISMIC HRZN_CONTR_MAP PE911566_3 NETHERBY-1 Depth Structure Map [CD] 2009 in: WCR_RPT NETHERBY-1 WCR (Interpreted Well Data) ASSETS (BRIEF) WELL BIOSTRAT PE911566_4 NETHERBY-1 Palynology Range Chart, 2009 [CD] 2009 in: WCR_RPT NETHERBY-1 WCR (Interpreted Well Data) ASSETS (BRIEF) WELL BIOSTRAT PE913157_5 NETHERBY-1 Palynology range chart [CD] 2009 PE913157__((_NETHERBY-1_WCR_CD_))_.TAR.GZ(91.7m)......... PE913157__((_NETHERBY-1_WCR_CD_))_.TAR.GZ(91.7m)......... SAM3_245_PE913157__((_NETHERBY-1_WCR_CD_))_I_MEDIA_LABELLING.JPG(2.6m)......... in: CD NETHERBY-1 WCR CD ASSETS (BRIEF) WELL COMPOSITE_LOG PE911563_2 NETHERBY-1 DW1 Composite Well Log [CD] 2009 in: CD NETHERBY-1 DW1 WCR (Interpretive) & Logs ASSETS (BRIEF) WELL COMPOSITE_LOG PE911566_2 NETHERBY-1 Composite Log (Interpreted) [CD] 2009 in: WCR_RPT NETHERBY-1 WCR (Interpreted Well Data) ASSETS (BRIEF) WELL CROSS_SECTION PE911566_5 NETHERBY-1 Stratigraphic Cross Section [CD] 2009 in: WCR_RPT NETHERBY-1 WCR (Interpreted Well Data) ASSETS (BRIEF) WELL DAILY_RPT PE915098_01 Well Daily Reports: DDRs, WOs, DGRs 2008 [CD] 2008 (2291 DIGITAL FILES) in: DVD Well Data - Electronic Submissions 2008 ASSETS (BRIEF) WELL DRILL_RPT PE915098_08 Well Drill Repts, Logs & T-D Curves 2008 [CD] 2008 (2291 DIGITAL FILES) in: DVD Well Data - Electronic Submissions 2008 ASSETS (BRIEF) WELL LITHOLOGY_LOG PE915098_09 Well Lithology Logs 2008 [CD] 2008 (2291 DIGITAL FILES) in: DVD Well Data - Electronic Submissions 2008 ASSETS (BRIEF) WELL LOG_TAPE_OR_DISK PE913137_1 NETHERBY-1 Digital Well HRLT Logs [CD] 2009 PE913137__((_NETHERBY-1_WCR_BASIC_))_.TAR.GZ(91.6m)......... PE913137__((_NETHERBY-1_WCR_BASIC_))_.TAR.GZ(91.6m)......... SAM2_493_PE913137__((_NETHERBY-1_WCR_BASIC_))__MEDIA_LABELLING.JPG(2.6m)......... in: CD NETHERBY-1 WCR Basic ASSETS (BRIEF) WELL LOG_TAPE_OR_DISK PE913157_2 NETHERBY-1 Dlis Well logs [CD] 2009 PE913157__((_NETHERBY-1_WCR_CD_))_.TAR.GZ(91.7m)......... PE913157__((_NETHERBY-1_WCR_CD_))_.TAR.GZ(91.7m)......... SAM3_245_PE913157__((_NETHERBY-1_WCR_CD_))_I_MEDIA_LABELLING.JPG(2.6m)......... in: CD NETHERBY-1 WCR CD ASSETS (BRIEF) WELL LOG_TAPE_OR_DISK PE913157_3 NETHERBY-1 LAS Well logs [CD] 2009 PE913157__((_NETHERBY-1_WCR_CD_))_.TAR.GZ(91.7m)......... PE913157__((_NETHERBY-1_WCR_CD_))_.TAR.GZ(91.7m)......... SAM3_245_PE913157__((_NETHERBY-1_WCR_CD_))_I_MEDIA_LABELLING.JPG(2.6m)......... in: CD NETHERBY-1 WCR CD ASSETS (BRIEF) WELL MONTAGE_LOG PE911563_3 NETHERBY-1 DW1 WES Plot [CD] 2009 in: CD NETHERBY-1 DW1 WCR (Interpretive) & Logs ASSETS (BRIEF) WELL MUD_LOG PE913137_3 NETHERBY-1 Mudlog, Gasratio and Pressure [CD] 2009 PE913137__((_NETHERBY-1_WCR_BASIC_))_.TAR.GZ(91.6m)......... PE913137__((_NETHERBY-1_WCR_BASIC_))_.TAR.GZ(91.6m)......... SAM2_493_PE913137__((_NETHERBY-1_WCR_BASIC_))__MEDIA_LABELLING.JPG(2.6m)......... in: CD NETHERBY-1 WCR Basic ASSETS (BRIEF) WELL MUD_LOG PE915098_02 Well Mud Logs 2008 [CD] 2008 (2291 DIGITAL FILES) in: DVD Well Data - Electronic Submissions 2008 ASSETS (BRIEF) WELL SRVY_RPT PE915098_07 Well Geodetic Survey Data, Reports 2008 [CD] 2008 (2291 DIGITAL FILES) in: DVD Well Data - Electronic Submissions 2008 ASSETS (BRIEF) WELL WCR_RPT PE911563_1 NETHERBY-1 DW1 WCR (Interpretive) [CD] 2009 in: CD NETHERBY-1 DW1 WCR (Interpretive) & Logs ASSETS (BRIEF) WELL WCR_RPT PE911566_1 NETHERBY-1 WCR (Interpreted Well Data) [CD] 2009 in: WCR_RPT NETHERBY-1 WCR (Interpreted Well Data) ASSETS (BRIEF) WELL WCR_RPT PE913157_1 NETHERBY-1 WCR [CD] 2008 PE913157__((_NETHERBY-1_WCR_CD_))_.TAR.GZ(91.7m)......... PE913157__((_NETHERBY-1_WCR_CD_))_.TAR.GZ(91.7m)......... SAM3_245_PE913157__((_NETHERBY-1_WCR_CD_))_I_MEDIA_LABELLING.JPG(2.6m)......... in: CD NETHERBY-1 WCR CD ASSETS (BRIEF) WELL WCR_RPT PE913158_1 NETHERBY-1 DW1 WCR [CD] 2008 PE913158__((_NETHERBY-1_DW1_WCR_CD_))_.TAR.GZ(76.9m)......... PE913158__((_NETHERBY-1_DW1_WCR_CD_))_.TAR.GZ(76.9m)......... SAM3_246_PE913158__((_NETHERBY-1_DW1_WCR_CD_))__MEDIA_LABELLING.JPG(2.6m)......... in: CD NETHERBY-1 DW1 WCR CD ASSETS (BRIEF) WELL WELL_CORRELATION PE911563_5 NETHERBY-1 DW1 Stratigraphic Cross Sectn [CD] 2009 in: CD NETHERBY-1 DW1 WCR (Interpretive) & Logs ASSETS (BRIEF) WELL WELL_LOG PE911566_6 NETHERBY-1 Well Evaluation Summary (WES) [CD] 2009 in: WCR_RPT NETHERBY-1 WCR (Interpreted Well Data) ASSETS (BRIEF) WELL WELL_LOG PE913137_2 NETHERBY-1 Well Log Displays (HRLT) [CD] 2009 PE913137__((_NETHERBY-1_WCR_BASIC_))_.TAR.GZ(91.6m)......... PE913137__((_NETHERBY-1_WCR_BASIC_))_.TAR.GZ(91.6m)......... SAM2_493_PE913137__((_NETHERBY-1_WCR_BASIC_))__MEDIA_LABELLING.JPG(2.6m)......... in: CD NETHERBY-1 WCR Basic ASSETS (BRIEF) WELL WELL_LOG PE913157_4 NETHERBY-1 PDF Well logs [CD] 2009 PE913157__((_NETHERBY-1_WCR_CD_))_.TAR.GZ(91.7m)......... PE913157__((_NETHERBY-1_WCR_CD_))_.TAR.GZ(91.7m)......... SAM3_245_PE913157__((_NETHERBY-1_WCR_CD_))_I_MEDIA_LABELLING.JPG(2.6m)......... in: CD NETHERBY-1 WCR CD ASSETS (BRIEF) WELL WELL_LOG PE915098_04 Well Logs: MWD/LWD 2008 [CD] 2008 (2291 DIGITAL FILES) in: DVD Well Data - Electronic Submissions 2008
ASSETS (BRIEF) WELL APPLICATION_RPT PE907852 NETHERBY-1 DW1 Drilling Programme [PAPER] 2008 in:WELL_BOX Well Box - Recent Wells 2 ASSETS (BRIEF) WELL APPLICATION_RPT PE911527 Sorrell & Otway Basins 2008 WOMP [PAPER] 2008 in:WELL_BOX Well Box - Recent Wells 2 ASSETS (BRIEF) WELL GEOL_RPT PE907851 NETHERBY-1 Geological Prognosis [PAPER] 2008 in:WELL_BOX Well Box - Recent Wells 2
ASSETS (BRIEF) GENERAL REGISTRY_FILE F7737415 VIC/P44/2/A-C 1 Registry File [PAPER] 2009 in:[ADMIN] SEE RECFIND DATABASE ASSETS (BRIEF) GENERAL REGISTRY_FILE F7743129 IR/04/0299 Registry File [PAPER] 2009 in:COMPACTUS COMPACTUS_1 55 Collins St
ASSETS (viaENC)GENERAL DATA_CD_DVD PE911563 NETHERBY-1 DW1 WCR (Interpretive) & Logs [CD] (?2009) (this is a report with at least one enclosure related to NETHERBY-1) ASSETS (viaENC)WELL DATA_CD_DVD PE915098 Well Data - Electronic Submissions 2008 [DVD] (?2008) (2291 DIGITAL FILES) (this is a report with at least one enclosure related to NETHERBY-1)
LINKS HYPERLINKAGES COPYRIGHT_DISCLAIMER ABOUT_DBMAP HOW_TO_GET_OR_SUBMIT_DATA This data has been dumped from Victorian Govt (http://www.dpi.vic.gov.au) dbMap database on 23-FEB-12
CORE/CUTTINGS Netherby 1 : SAMPLE_TYPE=CUTT 00660 DEPTH_RANGE= 660.000 TO 1875.000M STORAGE_BAY=233 ROW=R TO R #TRAYS=6 [ <--this shows the actual cores and cuttings that DPI has stored in the DPI Werribee core shed ]
ASSET Counts Summary: GENERAL DATA_CD_DVD [CD] 2 ASSET Counts Summary: GENERAL REGISTRY_FILE [PAPER] 2 ASSET Counts Summary: SEISMIC HRZN_CONTR_MAP [CD] 2 ASSET Counts Summary: WELL APPLICATION_RPT [PAPER] 2 ASSET Counts Summary: WELL BIOSTRAT [CD] 2 ASSET Counts Summary: WELL COMPOSITE_LOG [CD] 2 ASSET Counts Summary: WELL CROSS_SECTION [CD] 1 ASSET Counts Summary: WELL DAILY_RPT [CD] 1 ASSET Counts Summary: WELL DRILL_RPT [CD] 1 ASSET Counts Summary: WELL GEOL_RPT [PAPER] 1 ASSET Counts Summary: WELL LITHOLOGY_LOG [CD] 1 ASSET Counts Summary: WELL LOG_TAPE_OR_DISK [CD] 5 ASSET Counts Summary: WELL MONTAGE_LOG [CD] 1 ASSET Counts Summary: WELL MUD_LOG [CD] 2 ASSET Counts Summary: WELL SRVY_RPT [CD] 1 ASSET Counts Summary: WELL WCR_RPT [CD] 6 ASSET Counts Summary: WELL WELL_CORRELATION [CD] 1 ASSET Counts Summary: WELL WELL_LOG [CD] 4
A WELL_DRILL_HISTORY: DRILL_OBS_NO DRILL_DATE DEPTH DEPTH_TVD HOLE_IND MUD_WT REMARK source B WELL_DRILL_HISTORY:002 03-AUG-08 492.0 9999.99 Drilled 311 mm (12 1/4") hole from 1544 m to 1934 m. Control drilled for evaluation from 1915 m, circulating bottoms up for samples every 5 m from 1927 m. Drilled 311 mm (12 1/4") hole from 1544 m to 1934 m. Control drilled for evaluation from 1915 m, circulating bottoms up for samples every 5 m from 1927 m. Formations Name Top (MD) Top (TVD) Comment K85 Unconformity 1783.0m 1673.6m 38.6m low Waarre A 1792.0m 1683.1m 48.1m low Operations For Period 0000 Hrs to 2400 Hrs on 03 Aug 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description PH P DA 0000 0230 2.50 1608.0m Continued to drill production hole from 1544 m to 1608 m MD. PH TP (DFC) RO 0230 0330 1.00 1608.0m Observed 4.1 MPa (600 psi) pressure drop, then 3.4 MPa (500 psi) pressure drop. Shut down pumps and flow checked well, ok. Tested surface equipment and MWD tools, ok. Pressure normal with pumps #2 and #1 running. Trouble shoot pump #3 and continued to drill ahead. PH P DA 0330 1930 16.00 1915.0m Drilled ahead production hole from 1608 m to 1915 m MD with 3527 l/min (932 gpm), 160 RPM and 6.7-51.7 kdaN (15-23 klbs) WOB. Back reamed as required and took surveys every connection. PH P CS 1930 2000 0.50 1915.0m Circulated bottoms up for samples, 100 % siltstone, 0 units gas count PH P CDE 2000 2130 1.50 1927.0m Continued to control drill ahead at 10 m/hr from 1915 m to 1927 m MD PH P CS 2130 2200 0.50 1927.0m Circulated bottoms up for samples, 100 % siltstone, 4 units gas count PH P CDE 2200 2300 1.00 1932.0m Continued to control drill ahead at 10 m/hr from 1927 m to 1932 m MD (1680 m TVD RT LAT). PH P CS 2300 2400 1.00 1932.0m Circulated bottoms up for samples, 10 % sand / 90 % siltstone, 16 units gas count Operations For Period 0000 Hrs to 0600 Hrs on 04 Aug 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description PH P CDE 0000 0045 0.75 1937.0m Continued to control drill at... [From:WELL_DAILY] B WELL_DRILL_HISTORY:003 16-JUL-08 177.0 177.00 Mixed and pumped 30.8 m� (194bbl), class G, 1.89 sg (15.8ppg) cement slurry and displaced with 5.7 m� (36bbls) of sea water. WOC to set. POH running tool. Made up 445mm (17-1/2") BHA. Drilled from 128m to 177 mRT, [From:WELL_DAILY] B WELL_DRILL_HISTORY:004 05-AUG-08 492.0 9999.99 POOH from 1520 m to 1135 m, back reaming and pumping out of hole continually. Pumped hi-vis sweep and circulated hole clean. RIH for wiper trip to TD and pumped hi-vis sweep and circulated hole clean. POOH from 1944 m to 1625 m working pipe as required. POOH from 1520 m to 1135 m, back reaming and pumping out of hole continually. Pumped hi-vis sweep and circulated hole clean. RIH for wiper trip to TD and pumped hi-vis sweep and circulated hole clean. POOH from 1944 m to 1625 m working pipe as required. Formations Name Top (MD) Top (TVD) Comment K85 Unconformity 1783.0m 1673.6m 38.6m low Waarre A 1792.0m 1683.1m 48.1m low Operations For Period 0000 Hrs to 2400 Hrs on 05 Aug 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description PH P RW 0000 0830 8.50 1944.0m Continued to backream and pump out of hole from 1520 m to 1135 m working a stand each connection. PH P CHC 0830 0930 1.00 1944.0m Pumped 15.9 m3 (100 bbl) hi-vis sweep and circulated hole clean PH U WT 0930 1000 0.50 1944.0m RIH for wiper trip from 1135 m to 1337 m. PH U WT 1000 1200 2.00 1944.0m String held up 13 t (30 klbs), made up TDS and washed in hole from 1337 m to 1539 m. PH U WT 1200 1600 4.00 1944.0m String held up 13 t (30 klbs), commenced reaming and washing in hole from 1539 m to 1944 m. PH U WT 1600 1830 2.50 1944.0m Pumped 15.9 m3 (100 bbl) hi-vis sweep and circulated hole clean with 3236 l/min (855 gpm) and 190 rpm. PH U WT 1830 1845 0.25 1944.0m Flow checked well on trip tank PH U WT 1845 2130 2.75 1944.0m POOH from 1942 m to 1798 m working pipe as required and at each connection, max O/P 31 t (70 klbs), minimal resistance seen on second run. PH U WT 2130 2300 1.50 1944.0m Made up TDS to DP and pumped out of hole with 757 l/min (200gpm) from 1798 m to 1740 m, max O/P 31 t (70 klbs). Worked pipe as required and at each connection, minimal resistance seen on second run. PH U WT... [From:WELL_DAILY] B WELL_DRILL_HISTORY:005 06-AUG-08 492.0 9999.99 POOH from 1625 m and racked back BHA. Made up cement head and racked back same. Made up CSHART stand to hanger pup joint and racked back same. Retrieved wear bushing. Rigged up to and run casing as per tally to 642 m. POOH from 1625 m and racked back BHA. Made up cement head and racked back same. Made up CSHART stand to hanger pup joint and racked back same. Retrieved wear bushing. Rigged up to and run casing as per tally to 642 m. Formations Name Top (MD) Top (TVD) Comment K85 Unconformity 1783.0m 1673.6m Waarre A 1792.0m 1683.1m Operations For Period 0000 Hrs to 2400 Hrs on 06 Aug 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description PH P TO 0000 0330 3.50 1944.0m Continued to POOH from 1625 m to 183 m, flow checking at 1308 m, 615 m and 183 m. PH P HBHA 0330 0530 2.00 1944.0m POOH and racked back BHA, downloaded MWD tools and broke off bit. IC P HT 0530 0600 0.50 1944.0m Made up pup joint to TIW valve and cement head on catwalk. Picked up and made up to 2 joints HWDP in slips, racked back same. IC TP (VE) HT 0600 0830 2.50 1944.0m Landed casing hanger pup joint in slips and made up CSHART stand to hanger. Attempted to install shear pins in CSHART and prepare for running, unsuccessful. Racked back stand in derrick. IC P WH 0830 1200 3.50 1944.0m Picked up and made up wear bushing tool. RIH and jetted wellhead, latched wear bushing and closed LPR for indication marks to confirm space out. Retrieved wear bushing with 4.4 t (10 klbs) over pull. POOH and laid out same. Index line reset at 85.4 m. IC P SM 1200 1215 0.25 1944.0m Held pre job safety meeting with drill crew, deck crew and casing running hands. IC P RRC 1215 1430 2.25 1944.0m Rigged up to run 244 mm (9 5/8") casing. IC TP (VE) RRC 1430 1530 1.00 1944.0m Troubleshoot and repaired 500 T slip type elevators. IC P CRN 1530 2200 6.50 1944.0m Ran 244 mm (9 5/8") casing as per casing tally to ... [From:WELL_DAILY] B WELL_DRILL_HISTORY:006 07-AUG-08 492.0 9999.99 Ran 244 mm (9 5/8") by 273 mm (10 3/4") casing from 642 m to 1936 m and cemented same. Ran 244 mm (9 5/8") by 273 mm (10 3/4") casing from 642 m to 1936 m and cemented same. Formations Name Top (MD) Top (TVD) Comment K85 Unconformity 1783.0m 1673.6m Waarre A 1792.0m 1683.1m Operations For Period 0000 Hrs to 2400 Hrs on 07 Aug 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IC P CRN 0000 0730 7.50 1944.0m Continued to run 244 mm (9 5/8") casing from 642 m to 1434 m, filling every joint and breaking circulation after every 10. IC P CIC 0730 0745 0.25 1944.0m Worked casing and circulated clean. IC P RRC 0745 0930 1.75 1944.0m Changed out casing handling gear from 244 mm (9 5/8") to 273 mm (10 3/4"). IC P CRN 0930 1600 6.50 1944.0m Continued to run 273 mm (10 3/4") casing from 1434 m to 1849 m. Washed down casing from 1528 m to 1540 m and 1770 m to 1795 m with TAM Packer at 1100 l/min (290gpm). IC P RRC 1600 1630 0.50 1944.0m Rigged down casing handling gear and rigged up to run drill pipe. IC P HT 1630 1700 0.50 1944.0m Landed out plug basket and SST tool in casing stump and make up to CSHART stand. Made up casing hanger on CSHART tool to casing. IC P CRN 1700 2000 3.00 1944.0m Washed down casing on drill pipe from 1849 m to 1936 m at 1100 l/min (290gpm). IC P RUC 2000 2030 0.50 1944.0m Made up cement lines to cement head IC P CRN 2030 2100 0.50 1944.0m Landed out casing hanger in wellhead with 630 t (280 klbs). Confirmed with index line, ok. IC P CIC 2100 2200 1.00 1944.0m Circulated bottoms up and hole clean with 1100 l/min (290gpm). Held pre job safety meeting with crew and third party on cementing operations and P/Testing. IC P CMC 2200 2400 2.00 1944.0m Lined up cement unit and pumped 0.5 m3 (3 bbls) of sea water. Closed low torque valve and p/t surface lines to 27.6 MPa (4000 psi) for 10 min, ok. Pumped 5.5 m3 (35 bbls) o... [From:WELL_DAILY] B WELL_DRILL_HISTORY:007 08-AUG-08 492.0 9999.99 Cemented casing and p/t same. Set 273 mm (10 3/4") casing hanger seal assembly and completed p/t on BOP's. Unlatched CHSART tool from casing hanger and POOH. Laid out CHSART stand, cement head stand and 311 mm (12 1/4") BHA. Picked up and commenced running BHA. Cemented casing and p/t same. Set 273 mm (10 3/4") casing hanger seal assembly and completed p/t on BOP's. Unlatched CHSART tool from casing hanger and POOH. Laid out CHSART stand, cement head stand and 311 mm (12 1/4") BHA. Picked up and commenced running BHA. Formations Name Top (MD) Top (TVD) Comment K85 Unconformity 1783.0m 1673.6m Waarre A 1792.0m 1683.1m Operations For Period 0000 Hrs to 2400 Hrs on 08 Aug 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IC P CMC 0000 0100 1.00 1944.0m Continued to displace casing, pumped total 712 m3 (448 bbls) of 1.3 sg (11.1 ppg) mud, bumped plug with 6.9 MPa (1000 psi). Changed over to cement unit and p/t casing to 27.6 MPa (4000 psi) for 10 min, ok. Bled back 0.3 m3 (1.75 bbls) of mud, floats holding. IC P WH 0100 0300 2.00 1944.0m Set 273 mm (10 3/4") casing hanger seal assembly. Close LPR's and p/t to 34.5 MPa (5000 psi) down kill line to confirm seat, ok. IC P BOP 0300 0730 4.50 1944.0m P/t BOPs and function tested both pods as below: Test #1 - LPR, seal ass, CMV #8, 15, 16 for 5/10 min to 1.4/27.6 MPa (200/4000 psi) Test #2 - UPR, OC, CMV #7, 19, 20 for 5/10 min to 1.4/27.6 MPa (200/4000 psi) Test #3 - UPR, IC, CMV # 14, 27, 28 for 5/10 min to 1.4/27.6 MPa (200/4000 psi) Test #4 - UPR, CMV #1, CMV #31, 32 for 5/10 min to 1.4/27.6 MPa (200/4000 psi) Test #5 - UPR, CMV #3 for 5/10 min to 1.4/27.6 MPa (200/4000 psi) Test #6 - UPR, LIK, CMV # 5, 7, 11, 12 for 5/10 min to 1.4/27.6 MPa (200/4000 psi) Test #7 - UPR, CMV #2, 6, 8, 17, 18 for 5/10 min to 1.4/27.6 MPa (200/4000 psi) Test #8 - UPR, CMV #4, 25, 26 for 5/10 min to 1.4/27.6 MPa (200/4000 psi) Test #9 - UPR, LIK, CMV# 29, 30 for 5/... [From:WELL_DAILY] B WELL_DRILL_HISTORY:008 09-AUG-08 492.0 9999.99 Made up and RIH 216 mm (8 1/2") BHA to 1910 m and drilled out cement, plugs and float collar. Drilled cement shoe track to 1933 m and displaced KCL mud to DIF. Drilled float shoe and new formation to 1960 m. Made up and RIH 216 mm (8 1/2") BHA to 1910 m and drilled out cement, plugs and float collar. Drilled cement shoe track to 1933 m and displaced KCL mud to DIF. Drilled float shoe and new formation to 1960 m. Formations Name Top (MD) Top (TVD) Comment K85 Unconformity 1783.0m 1673.6m Waarre A 1792.0m 1683.1m Operations For Period 0000 Hrs to 2400 Hrs on 09 Aug 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description PH P HBHA 0000 0330 3.50 1944.0m Continued to pick up and make up 216 mm (8 1/2") BHA from 25 m to 183 m. Conducted shallow hole test on HWDP, pulled back to LWD tools and loaded source. RIH and performed shallow hole test at HWDP, ok. PH P TI 0330 0430 1.00 1944.0m Continued to RIH from 183 m to 529 m. PH P RS 0430 0500 0.50 1944.0m Serviced TDS, blocks and dolly. PH P TI 0500 1300 8.00 1944.0m Continued to RIH from 529 m to 1830 m. Broke each joint and cleaned out cement contamination. Broke circulation every 10 joints to confirm MWD tool signal and serviceability. Cement contamination on tool joints from 847 m to 1482 m. PH P TI 1300 1330 0.50 1944.0m Made up TDS and washed in from 1830 m to 1900 m. Tagged TOC at 1900 m with 4.4 t (10 klbs) WOB. PH P SM 1330 1400 0.50 1944.0m Performed well control drill, spaced out and shut in well. Conducted choke manifold drill by circulating through manifold while maintaining back pressure with chokes. PH P DFS 1400 1430 0.50 1944.0m Drilled out cement from 1900 m to 1911 m, tagged plugs and drilled out same. PH TP (JNK) DFS 1430 1630 2.00 1944.0m Experienced high torque and circulating pressures due to rubber from plugs and plastic from Shark Bite sleeve packing off around stabilisers. Worked BHA with... [From:WELL_DAILY] B WELL_DRILL_HISTORY:009 10-AUG-08 492.0 9999.99 Drilled 216 mm (8 1/2") hole from 1960 m to 2215 m, as per directional plan. Drilled 216 mm (8 1/2") hole from 1960 m to 2215 m, as per directional plan. Formations Name Top (MD) Top (TVD) Comment K85 Unconformity 1783.0m 1673.6m Waarre A 1792.0m 1683.1m Operations For Period 0000 Hrs to 2400 Hrs on 10 Aug 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description PH P DA 0000 0230 2.50 1998.0m Continued to drill ahead from 1960 m to 1998 m. PH P FC 0230 0300 0.50 1998.0m Flow checked well, ok. Calibrated mud loggers gas instrumentation. PH P DA 0300 1300 10.00 2144.0m Continued to drill ahead from 1998 m to 2144 m MD, average gas 69 units (1.38%). Changed TDS from high gear to low gear due to 33 kN-m (25kf-lbs) torque. PH TP (RE) RR 1300 1430 1.50 2144.0m Saver sub on TDS broke out when backing out connection. Torque gauge showed expected torque when drilling and 40.68 kNm (30 kft.lbs) on connections. Troubleshoot high torque, broke and laid out single with saver sub. Made up new saver sub to TDS and prepared to drill ahead. PH P DA 1430 1530 1.00 2164.0m Continued to drill ahead from 2144 m to 2164 m. PH TP (RE) RR 1530 1700 1.50 2164.0m Saver sub on TDS broke out when backing out connection due to being over torqued. Gauges showed expected torque readings when drilling and on connections. Troubleshoot, broke off and laid out two joints drill pipe, re-torqued saver sub to TDS. Changed from low gear to high gear on TDS and prepared to drill ahead. PH P DA 1700 1900 2.00 2182.0m Continued drilling from 2164 m to 2182 m. PH TP (VE) RO 1900 1930 0.50 2182.0m Geolograph line on TDS broke due to high winds. Both MWD and mud logging units were running off the same line. Racked back 1 stand DP, made up new geolograph line and calibrated same. PH P DA 1930 2400 4.50 2215.0m Continued drilling from 2182 m to 2215 m MD, 1683.21 m TVD. Max gas 897 units (17.94%... [From:WELL_DAILY] B WELL_DRILL_HISTORY:010 11-AUG-08 492.0 9999.99 Drilled 216 mm (8 1/2") production hole from 2215 m to 2488 m. Drilled 216 mm (8 1/2") production hole from 2215 m to 2488 m. Formations Name Top (MD) Top (TVD) Comment K85 Unconformity 1783.0m 1673.6m Waarre A 1792.0m 1683.1m Operations For Period 0000 Hrs to 2400 Hrs on 11 Aug 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description PH P DA 0000 0300 3.00 2258.0m Continued to drill 216 mm (8 1/2") hole from 2215 m to 2258 m. PH TP (VE) RR 0300 0500 2.00 2258.0m Upper racking arm hydraulic hose burst while moving stand prior to making connection. Removed hose and replaced same. PH P DA 0500 0730 2.50 2287.0m Continued to drill ahead from 2258 m to 2287 m. PH P SCR 0730 0800 0.50 2287.0m Upper racking arm hydraulic hose failed again due to fitting not being clamped correctly. Repaired and refitted same. During repair, recorded SCR's, CLF rates and flushed booster, choke and kill lines. PH P DA 0800 2400 16.00 2488.0m Continued to drill ahead from 2287 m to 2488 m MD, 1660 m TVD. Max gas 26 units (0.52%) at 2390 m, average gas reading 12 units, (0.24%). Operations For Period 0000 Hrs to 0600 Hrs on 12 Aug 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description PH P DA 0000 0130 1.50 2517.0m Continued to drill 216 mm (8 1/2") production hole from 2488 m to TD at 2517 m MD, 1655 m TVD. PH P CHC 0130 0430 3.00 2517.0m Pumped 11.1 m3 (70 bbl) hi-vis sweep at TD and circulated hole clean with 4 by bottoms up. Ran booster pumps for the last circulation to clean riser. PH P FC 0430 0445 0.25 2517.0m Flow checked well for 15 min, ok PH P TO 0445 0600 1.25 2517.0m Pulled out of hole from 2517 m to 2317 m. Max overpull 4.4 t (10 klbs). Pick up weight 111 t (250 klbs), slack off weight 89 t (200 klbs), string weight 97.8 t (220 klbs). WBM Data Cost Today $ 3550 Mud Type: ! WFW Sample-From: FL Time: 22:00 Weight: 1.15sg Temp: 12... [From:WELL_DAILY] B WELL_DRILL_HISTORY:011 24-JUL-08 1870.0 1744.60 Drilled 311mm (12-1/4") hole from 1474m to total depth 1870m RT (1744.6 mTVD). Circulated until shakers clear. [From:WELL_DAILY] B WELL_DRILL_HISTORY:012 25-JUL-08 1870.0 1744.60 Circulated 3 x bottoms up volumes until the shakers were clean. POH to tight hole at 1575m. Back reamed to the shoe at 642m. Circulated until shakers clean. POH and laid out FEWD. Rigged up wireline. Run logging tool run #1 down to 1365m. [From:WELL_DAILY] B WELL_DRILL_HISTORY:013 26-JUL-08 1870.0 1744.60 POH logging tools run #1, unable to pass 1365m. washed and reamed across 1237m to 1400m section until slick. Continued running wiper to bottom on elevators to 1556m. Washed and reamed down to TD at 1870m. [From:WELL_DAILY] B WELL_DRILL_HISTORY:014 27-JUL-08 1870.0 1744.60 POH logging tools and rigged down wireline equipment. Picked up Wiper BHA and ran in hole to tight hole section at 1783m on elevators. Washed and reamed from 1783m to 1870m until slick. Circulated bottoms up. POH. [From:WELL_DAILY] B WELL_DRILL_HISTORY:015 28-JUL-08 1870.0 1744.60 Pulled logging tools run #1 to surface. Reconfigured the toolstring and rerun the tools. Still unable to pass the obstruction at 1792.5m. POH and reconfigured the tools to run them on TCL and drill pipe. [From:WELL_DAILY] B WELL_DRILL_HISTORY:016 29-JUL-08 1870.0 1744.60 Pulled the TCL tools from 1764m to 1735m. Broke out the SE sub, shear released the Latching tools from the TCL tools. Pulled the wireline out of the drill pipe. Worked tight hole section from 1760m to 1835m. Circulated on bottom 1870m. [From:WELL_DAILY] B WELL_DRILL_HISTORY:017 30-JUL-08 1870.0 1744.60 POH wiper trip. Picked up 48 Jts of drill pipe while awaiting for FEWD tools and for personnel to rest. Picked up FEWD BHA, TIH and reamed through from 1760m to 1870m. Drilled a further 5m of rathole [From:WELL_DAILY] B WELL_DRILL_HISTORY:018 31-JUL-08 1875.0 1748.30 Continued taking pressure probe tests in the reservoir. wiped the hole to bottom, circulated a Hi-Vis pill to balance on bottom. POH and laid out BHA. [From:WELL_DAILY] B WELL_DRILL_HISTORY:019 01-AUG-08 1875.0 1748.30 Picked up cement stinger and RIH on drill pipe to 614 m, Continued to RIH cement stinger to 1870 m and circulated hole clean. Mixed and pumped cement plug #1 from 1870 m to 1720 m. POOH to 1720 m and circulated bottoms up. [From:WELL_DAILY] B WELL_DRILL_HISTORY:020 02-AUG-08 1875.0 1748.30 RIH with 311 mm (12 1/4") BHA and tagged cement at 1421 m. Kicked off with 100 % new formation at 1505 m. Commenced Netherby-1DW at 21:00 hrs. [From:WELL_DAILY] B WELL_DRILL_HISTORY:100 04-AUG-08 492.0 9999.99 Drilled 311 mm (12 1/4") production hole from 1934 m to 1944 m, circulated hole clean. Flow checked well and POOH from 1944 m to 1520 m back reaming and pumping continually. Drilled 311 mm (12 1/4") production hole from 1934 m to 1944 m, circulated hole clean. Flow checked well and POOH from 1944 m to 1520 m back reaming and pumping continually. Formations Name Top (MD) Top (TVD) Comment K85 Unconformity 1783.0m 1673.6m 38.6m low Waarre A 1792.0m 1683.1m 48.1m low Operations For Period 0000 Hrs to 2400 Hrs on 04 Aug 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description PH P CDE 0000 0045 0.75 1937.0m Continued to control drill at 10 m/hr from 1934 m to 1937 m MD (1680.7 m TVD LAT) PH P CS 0045 0130 0.75 1937.0m Circulated bottoms up for geology samples, 60% poor quality sand / 40% siltstone, 24 units gas count. PH P CDE 0130 0230 1.00 1944.0m Continued to control drill at 10 m/hr from 1937 m to 1944 m MD (1681.8 m TVD LAT) PH P CHC 0230 0530 3.00 1944.0m Circulated bottoms up for geology samples, 80% poor quality sand / 20% siltstone, 29 units gas count. Continued to circulate hole clean with 4.5 times bottoms up. PH P FC 0530 0545 0.25 1944.0m Flow check well, ok. PH P TO 0545 0630 0.75 1944.0m POOH from 1944 m to 1904 m. PH P RW 0630 2400 17.50 1944.0m Experienced tight hole at 1904 m with max overpull 22 t (50 klbs). Commenced back reaming and pumping out of hole from 1904 m to 1520 m, working each stand before connections. Pumped a 15.9 m3 (100 bbl) hi-vis sweep at 1620 m when working stand. Operations For Period 0000 Hrs to 0600 Hrs on 05 Aug 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description PH P RW 0000 0600 6.00 1944.0m Continued to backream and pump out of hole from 1520 m to 1420 m working a stand each connection. WBM Data Cost Today $ 22895 Mud Type: ! 8KCL Sample-From: Pit Time: 22:30 Weight: 1.32sg Temp:... [From:WELL_DAILY] B WELL_DRILL_HISTORY:101 12-AUG-08 492.0 9999.99 Drilled 216 mm (8 1/2") production hole from 2488 m to TD at 2517 m. Circulated and conditioned mud, POOH to 1923 m and RIH for check trip to TD. Circulated and conditioned mud with 325 mesh screens and POOH, laid out BHA. Picked up and made up casing scraper assembly and RIH to 236 m. Drilled 216 mm (8 1/2") production hole from 2488 m to TD at 2517 m. Circulated and conditioned mud, POOH to 1923 m and RIH for check trip to TD. Circulated and conditioned mud with 325 mesh screens and POOH, laid out BHA. Picked up and made up casing scraper assembly and RIH to 236 m. Formations Name Top (MD) Top (TVD) Comment K85 Unconformity 1783.0m 1673.6m Waarre A 1792.0m 1683.1m Operations For Period 0000 Hrs to 2400 Hrs on 12 Aug 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description PH P DA 0000 0130 1.50 2517.0m Continued to drill 216 mm (8 1/2") production hole from 2488 m to TD at 2517 m MD, 1655 m TVD. Samples at TD showed 5% siltstone. PH P CHC 0130 0430 3.00 2517.0m Pumped 11.1 m3 (70 bbl) hi-vis sweep at TD and circulated hole clean with 4 by bottoms up. Ran booster pumps for the last circulation to clean riser. Simultaneous Operations: Mud Test Carried out 12 sec for 1L Flow with 175mm Screens. PH P FC 0430 0445 0.25 2517.0m Flow checked well for 15 min, ok PH P TO 0445 0800 3.25 2517.0m Pulled out of hole from 2517 m to 1923 m. Max overpull 4.4 t (10 klbs). Pick up weight 115 t (260 klbs), slack off weight 84 t (190 klbs), string weight 97.8 t (220 klbs). PH P TI 0800 1000 2.00 2517.0m RIH from 1923 m to 2517 m on check trip for sand screen run, ok. Max drag 13.6 t (30 kips) PH P CMD 1000 1200 2.00 2517.0m Circulated and conditioned mud. Screened up to 325 mesh shaker screens and circulated 3 by bottoms up, minimal returns observed at shakers by end of circulation. PH P FC 1200 1215 0.25 2517.0m Conducted flow check prior to POOH and held pre job safety meeting. P... [From:WELL_DAILY] B WELL_DRILL_HISTORY:101 13-AUG-08 492.0 9999.99 RIH with casing scraper assembly and scraped casing over packer setting depths. Dropped CCV opening ball and jetted BOP''s. Dropped closing CCV ball and circulated through bit to clean up well. POOH and laid out cleanout assembly. Rigged up completion and umbilical sheaves in derrick. Installed co-flexip hose and secured same. RIH with casing scraper assembly and scraped casing over packer setting depths. Dropped CCV opening ball and jetted BOP''s. Dropped closing CCV ball and circulated through bit to clean up well. POOH and laid out cleanout assembly. Rigged up completion and umbilical sheaves in derrick. Installed co-flexip hose and secured same. Formations Name Top (MD) Top (TVD) Comment K85 Unconformity 1783.0m 1673.6m Waarre A 1792.0m 1683.1m Operations For Period 0000 Hrs to 2400 Hrs on 13 Aug 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description CTB P TI 0000 0245 2.75 2517.0m Continued to RIH from 236 m to 1476 m. Filled pipe and broke circulation. CTB P SM 0245 0300 0.25 2517.0m Held pre job safety meeting with rig crew, deck crew and third party on handling, making up and running 273 mm (10 3/4") Well Patroller tool. CTB P HT 0300 0315 0.25 2517.0m Picked up and made up 273 mm (10 3/4") Well Patroller tool. CTB P TI 0315 0330 0.25 2517.0m Continued to RIH on drillpipe from 1480 m to 1625 m. CTB P HT 0330 0345 0.25 2517.0m Picked up and made up CCV tool and Ball Catcher. CTB P TI 0345 0415 0.50 2517.0m Continued to RIH from 1629 m to 1745 m on drillpipe. CTB P HT 0415 0430 0.25 2517.0m Picked up and made up 476 mm (18 3/4") Riser Brush to drillpipe. CTB P WCU 0430 0600 1.50 2517.0m Commenced casing scraper run from 1746 m to 1804 m with 3218 l/min (850 gpm) flow rate, 15.2 MPa (2 200 psi). Total volume pumped 237 m3 (1495 bbls). Simultaneous Operations: Changed out shaker screens for 230 mesh. Off loaded completion equipment from NOR Captain to... [From:WELL_DAILY] B WELL_DRILL_HISTORY:101 14-AUG-08 492.0 9999.99 Rigged up and ran lower completion assembly and sand screens on drill pipe to 1382 m. Rigged up and ran lower completion assembly and sand screens on drill pipe to 1382 m. Formations Name Top (MD) Top (TVD) Comment K85 Unconformity 1783.0m 1673.6m Waarre A 1792.0m 1683.1m Operations For Period 0000 Hrs to 2400 Hrs on 14 Aug 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description CTB P RCM 0000 0100 1.00 2517.0m Rigged up to run 168 mm (6 5/8") sand screens. CTB P RCM 0100 0200 1.00 2517.0m Held pre job safety meeting, picked up and made up bull nose to single joint of 168 mm (6 5/8") sand screen and landed out in rotary. CTB TP (OTH) RIC 0200 0400 2.00 2517.0m Unable to set slips due to insufficent pipe between screens and collar to fit slip type elevators and hand slips. Troubleshoot, layout single joint and shoe. Rig up to RIH with 168 mm (6 5/8") by 114 mm (4 1/2") IF xover made up to pick up sub on drill pipe elevators. CTB P SM 0400 0415 0.25 2517.0m Held pre job safety meeting for new running procedure. CTB P RIC 0415 0545 1.50 2517.0m RIH bull nose shoe joint and 168 mm (6 5/8") sand screens to 70 m. CTB TP (OTH) RIC 0545 0600 0.25 2517.0m High shoulder torque experienced when making up joint #98. Backed out and attempted to re-torque to manufacture''s spec, unsuccessful. Backed out and observed pin and box damaged. CTB TP (OTH) RIC 0600 0630 0.50 2517.0m Laid out joint #98 CTB TP (OTH) RIC 0630 0700 0.50 2517.0m Attempted to back out collar on joint #99, unsuccessful due to insufficient neck room between collar and screens. Laid out same. CTB P RIC 0700 0845 1.75 2517.0m Picked up and made up joint #97, continued to RIH from 59 m to 127 m. CTB TP (VE) RIC 0845 0900 0.25 2517.0m Split ring broke on dog collar slip element. Picked up spares from deck and repaired same. CTB P RIC 0900 1130 2.50 2517.0m Continued to RIH sand scre... [From:WELL_DAILY] B WELL_DRILL_HISTORY:101 15-AUG-08 492.0 9999.99 Ran lower completion on drill pipe from 1382 m to setting depth. Set packer, pressure test same and dropped ball to open circulating sub. Displaced well to brine and POOH, laid out running tools. Made up and ran XT bore protector retrieval tool and RIH to 91 m. Ran lower completion on drill pipe from 1382 m to setting depth. Set packer, pressure test same and dropped ball to open circulating sub. Displaced well to brine and POOH, laid out running tools. Made up and ran XT bore protector retrieval tool and RIH to 91 m. Formations Name Top (MD) Top (TVD) Comment K85 Unconformity 1783.0m 1673.6m Waarre A 1792.0m 1683.1m Operations For Period 0000 Hrs to 2400 Hrs on 15 Aug 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description CTB P RIC 0000 0345 3.75 2517.0m Continued to RIH sand screens on drill pipe from 1382 m to setting depth at 2506 m CTB P RIC 0345 0415 0.50 2517.0m Made up single joint of drill pipe for space out. Weights on final stand: Pick up 115 t (260 klbs), slack off 80 t (180 klbs), string weight 106 t (240 klbs) CTB P RIC 0415 0430 0.25 2517.0m Held pre job safety meeting for setting packer. CTB TP (RE) RIC 0430 0530 1.00 2517.0m Attempted to break circulation with cement unit via cement line. High and inconsistent pressures observed due to potential cement blockage in line. Lined up cement unit to test line and broke circulation, ok. CTB P RIC 0530 0545 0.25 2517.0m Dropped SC-1R setting ball CTB P RIC 0545 0600 0.25 2517.0m Spaced out to packer setting depth compensating TDS. String weight of 106 t (240 klbs). CTB P RIC 0600 0630 0.50 2517.0m Commenced circulating with cement unit at 318 l/min (2 bpm) with 1.7 MPa (240 psi). CTB TP (OTH) RIC 0630 0730 1.00 2517.0m Unable to seat ball. Attempted to pick up and drop Bakelite ball, unsuccessful with 17.8 t (40 klbs) overpull. Set back down to neutral and attempted to work string free, unsuccess... [From:WELL_DAILY] B WELL_DRILL_HISTORY:101 16-AUG-08 492.0 9999.99 Jetted XT bore protector recess and BOP''s, recovered bore protector and laid out same. Rigged up and ran upper completion to TRSV and p/t same. Jetted XT bore protector recess and BOP''s, recovered bore protector and laid out same. Rigged up and ran upper completion to TRSV and p/t same. Formations Name Top (MD) Top (TVD) Comment K85 Unconformity 1783.0m 1673.6m Waarre A 1792.0m 1683.1m Operations For Period 0000 Hrs to 2400 Hrs on 16 Aug 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description CTB P WCU 0000 0015 0.25 2517.0m Dropped 63.5 mm (2.5") DABS open activation ball, CTB P WCU 0015 0045 0.50 2517.0m Made up TDS and pumped ball to seat, sheared at 16.5 MPa (2400 psi). CTB P WCU 0045 0100 0.25 2517.0m Commenced jetting bore protector with 1590 l/min (10 bpm). CTB P HT 0100 0115 0.25 2517.0m Land out bore protector. Set down with 4.5 t (10 klbs) and marked index line on pipe. CTB P HT 0115 0130 0.25 2517.0m Picked up 4.5 t (10 klbs) increments to 71 t (160 klbs). Bore protector released with 11 t (25 klbs) overpull. CTB P WCU 0130 0145 0.25 2517.0m Commenced jetting XT hanger seating profile and stack at 1271 l/min (8 bpm). CTB P RRC 0145 0230 0.75 2517.0m POOH XT bore protector retrieval string CTB P RCM 0230 0245 0.25 2517.0m Broke and laid out XT bore protector, running tool and DABS tool. CTB P RCM 0245 0315 0.50 2517.0m Pull Expro umbilical down to deck and connect to LLSA. CTB P RS 0315 0345 0.50 2517.0m Serviced TDS and blocks. CTB P RCM 0345 0415 0.50 2517.0m Rigged up to run upper completion assembly. CTB P SM 0415 0515 1.00 2517.0m Held pre job safety meeting prior running completions. CTB P RIC 0515 0530 0.25 2517.0m Picked up and made up mule shoe in rotary. CTB TP (VE) TI 0530 0730 2.00 2517.0m Picked up and made up 178 mm (7") JFE to mule shoe. Tongs slipped, minimum torque on shoulder not... [From:WELL_DAILY] B WELL_DRILL_HISTORY:101 17-AUG-08 492.0 9999.99 'P/t TRSV and continued to RIH to tubing hanger. Made up tubing hanger to tubing and installed TRSV, PDHG cable. Made up LLSA and continued to RIH to lubricator valve. P/t TRSV and continued to RIH to tubing hanger. Made up tubing hanger to tubing and installed TRSV, PDHG cable. Made up LLSA and continued to RIH to lubricator valve. Formations Name Top (MD) Top (TVD) Comment K85 Unconformity 1783.0m 1673.6m Waarre A 1792.0m 1683.1m Operations For Period 0000 Hrs to 2400 Hrs on 17 Aug 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description CTB P PT 0000 0130 1.50 2517.0m Continued to pressure test TRSV to 8000 psi (15 min test). Chart behaved erratically. Troubleshoot and changed out chart paper, good test obtained. TRSV cycle pressure for 3 by tests: Opening pressure: 16.1 MPa (2300 psi). Closing pressure: 11.9 MPa (1700 psi). CTB P RTB 0130 0415 2.75 2517.0m Continued to RIH upper completion on 178mm (7") 13Cr80 JFE Bear. CTB TP (OTH) RTB 0415 0515 1.00 2517.0m Laid out joint #117 - high shoulder. CTB P RTB 0515 0700 1.75 2517.0m Continued to RIH to tubing hanger. PQ Gauge Readings: Pressure 16.2 MPa (2316 psi), Temp 65.13 deg C, 17.98 VDC, 15.8 mA CTB P SM 0700 0730 0.50 2517.0m Held pre job safety meeting prior to picking up tubing hanger. CTB P HT 0730 0830 1.00 2517.0m Picked up and made up tubing hanger. Connected TRSV control line. CTB P PT 0830 0930 1.00 2517.0m Pressure test gauge to 52 MPa (7500 psi). TRSV chart recorder not working, changed out to PDHG unit, and continued to pressure test. TRSV cycle pressure for 3 by tests: Opening pressure: 15.4 MPa (2200 psi) Closing pressure: 11.2 MPa (1600 psi) P/t to 52.5 MPa (7500 psi) for 15 min (250 mL fluid returns) CTB P HT 0930 1100 1.50 2517.0m Connected down hole gauge cable. CTB TP (OTH) PT 1100 1200 1.00 2517.0m Attempted to p/t to 35 MPa (5000 psi), unsuccessful, leak in surface test li... [From:WELL_DAILY] B WELL_DRILL_HISTORY:101 18-AUG-08 492.0 9999.99 Made up and ran LV on landing string, picked up flow head and installed same. Rigged up PCE and tested same. Made up and ran LV on landing string, picked up flow head and installed same. Rigged up PCE and tested same. Formations Name Top (MD) Top (TVD) Comment K85 Unconformity 1783.0m 1673.6m Waarre A 1792.0m 1683.1m Operations For Period 0000 Hrs to 2400 Hrs on 18 Aug 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description CTB P HT 0000 0100 1.00 2517.0m Removed BJ350 slips and master bushings to run LV assembly through RT. Note: Slight damage to outer encapsulation of LLSA umbilical due to rubbing on slotted bowl, starboard side of rotary. CTB P PT 0100 0115 0.25 2517.0m Function tested LV with HPU: Close - 4.14 L with 21 MPa (3000 psi) for 5 min, 52 strokes. Open - 3.40 L with 21 MPa (3000 psi) for 5 min, 46 strokes. CTB P RIC 0115 0130 0.25 2517.0m Ran LV through rotary table. Note: Ballast rig port side. CTB P HT 0130 0200 0.50 2517.0m Re-installed master bushings and BJ350 slips. CTB P RIC 0200 0230 0.50 2517.0m Made up pup joint B to tubing. Note: Ballast rig to port/aft. CTB P RIC 0230 0245 0.25 2517.0m Made up pup joint C. CTB P SM 0245 0300 0.25 2517.0m Held pre job safety meeting prior to positioning Co-Flexip hose onto drill floor. CTB P HT 0300 0500 2.00 2517.0m Positioned Co-Flexip hose ready for make up and rigged up 13.7 m (45'') bails. CTB P SM 0500 0515 0.25 2517.0m Held pre job safety meeting for making up flow head. CTB P HT 0515 0830 3.25 2517.0m Picked up and made up flow head. CTB P HT 0830 0930 1.00 2517.0m Made up surface flowhead connection, Co-flexip hose, kill hose, ESD lines and air lines. CTB P SLK 0930 1015 0.75 2517.0m Rigged up slickline xover and double blind ram BOP to flowhead. CTB P XT 1015 1245 2.50 2517.0m Landed and locked tubing hanger. Bled down soft land, 3 L returned at pa... [From:WELL_DAILY] B WELL_DRILL_HISTORY:101 20-AUG-08 492.0 9999.99 Pumped glycol into upper completion tubing, set crown plug and pressure tested same. Laid out PCE, flowhead, landing string and LLSA. Flushed XT profile and RIH internal tree cap on DP. Pumped glycol into upper completion tubing, set crown plug and pressure tested same. Laid out PCE, flowhead, landing string and LLSA. Flushed XT profile and RIH internal tree cap on DP. Formations Name Top (MD) Top (TVD) Comment K85 Unconformity 1783.0m 1673.6m Waarre A 1792.0m 1683.1m Operations For Period 0000 Hrs to 2400 Hrs on 20 Aug 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description CTB P RIC 0000 0200 2.00 2517.0m Continued to pump glycol, 8 m3 (50 bbls) total. Displaced lines and pumped 4 m3 (25 bbls) drill water. CTB P SLK 0200 0245 0.75 2517.0m Closed swab valve, broke PCE and made up crown plug to slickline. CTB P PT 0245 0300 0.25 2517.0m Opened swab valve and closed master valve. Pressure tested PCE to 33.7 MPa (5000 psi) for 10 min, ok. CTB P SLK 0300 0330 0.50 2517.0m Opened master valve and RIH crown plug on slick line to tubing hanger. CTB P XT 0330 0415 0.75 2517.0m Landed out crown plug, applied 1.3 MPa (200 psi) above and held for 10 min while jarring with slickline to seat. CTB P PT 0415 0430 0.25 2517.0m Pressure tested above crown plug to 33.7 MPa (5000 psi) for 10 min, ok. CTB P SLK 0430 0500 0.50 2517.0m Un-latched running tool from crown plug and recovered same, 4.4 mm (0.173") on indicator pin. CTB P WCU 0500 0545 0.75 2517.0m Lined up cement unit to flow head and flushed lines with 5.5 m3 (35 bbls) of drill water to well test package. Lined up to kill line and flushed 244 mm (9 5/8") rams and tubing hanger with drill water. CTB P PT 0545 0615 0.50 2517.0m Lined up and pressure tested below crown plug to 6.7 MPa (1000 psi ) for 10 min, ok. APT reading : 7.6 MPa (1127 psi). CTB P SM 0615 0630 0.25 2517.0m Held pre job safety mee... [From:WELL_DAILY] B WELL_DRILL_HISTORY:102 21-AUG-08 492.0 9999.99 RIH, seated internal tree cap and pressure tested same. Rigged down completions equipment from derrick and on decks. Made up floor to recover riser. Pulled and laid out diverter and slip joint. Removed and laid out IWOC umbilical. Waited on weather before pulling BOP's through splash zone. RIH, seated internal tree cap and pressure tested same. Rigged down completions equipment from derrick and on decks. Made up floor to recover riser. Pulled and laid out diverter and slip joint. Removed and laid out IWOC umbilical. Waited on weather before pulling BOP's through splash zone. Formations Name Top (MD) Top (TVD) Comment K85 Unconformity 1783.0m 1673.6m Waarre A 1792.0m 1683.1m Operations For Period 0000 Hrs to 2400 Hrs on 21 Aug 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description SUS P TI 0000 0115 1.25 2517.0m RIH internal tree cap and landed out same in XT profile. SUS P HT 0115 0230 1.25 2517.0m Closed lower annular preventer and applied 27 MPa (4000 psi) with cement unit down kill line to lock internal tree cap. Total pumped 0.1 m3 (0.4 bbls). Observed returns from drill pipe indicating internal tree cap seated. SUS P HT 0230 0300 0.50 2517.0m Opened BOP annular preventer, slacked off DP to neutral weight and rotated 5 3/4 turns to right with chain tongs to release running tool from internal tree cap. POOH running tool and laid out same. Simultaneous Operations: Tested internal tree cap from below with 33.7 MPa (5000 psi) for 10 min through TCT line, ok. Closed AAV, ROV confirmed. SUS P HT 0300 0600 3.00 2517.0m Disconnected umbilical line from LLSA and removed from derrick with starboard side crane. Rigged down sheave and laid out same. SUS P RR2 0600 1000 4.00 2517.0m Rigged up diverter handling tool, de-energised packer and removed same. Picked up and made up landing joint. Simultaneous Operations: Disconnected tronic electrical connector from PC/B on XT with ROV Disconne... [From:WELL_DAILY] B WELL_DRILL_HISTORY:102 22-AUG-08 492.0 9999.99 Waited on weather(15hrs). Pulled the BOPs to surface and secured same.Laid out the double of riser and rigged down riser handling equipment. Waited on the ROV umbilical repairs to be completed. Waited on weather(15hrs). Pulled the BOPs to surface and secured same.Laid out the double of riser and rigged down riser handling equipment. Waited on the ROV umbilical repairs to be completed. Formations Name Top (MD) Top (TVD) Comment K85 Unconformity 1783.0m 1673.6m Waarre A 1792.0m 1683.1m Operations For Period 0000 Hrs to 2400 Hrs on 22 Aug 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description SUS U (WOW) WOW 0000 0600 6.00 2517.0m Continued to wait on weather. Simultaneous Operations: Cleaned out mud tanks for next operations. Installed new flood light in derrick. Installed third pad eye in derrick for next completions operations. SUS U (WOW) WOW 0600 1500 9.00 2517.0m Continued to wait on weather. ROV clump weight cable parted which caused it to surface uncontrolled. This action also caused the umbilical to twist resulting in damage. Recovered the ROV to the rig and inspected the umbilical. The umbilical required resplicing. SUS P RR2 1500 1630 1.50 2517.0m Pulled BOPs to surface, landed and secured onto the Normar carrier. Made running repairs to the drive motor of the Normar carrier. SUS P RR2 1630 1900 2.50 2517.0m Rigged down guide lines & pod lines. Secured the pod hose to the BOPs. Broke out the termination joint from the BOP and moved the BOP to the starboard side. SUS P RR2 1900 2100 2.00 2517.0m Laid out the double of riser and the termination joint. Rigged down riser handling equipment. SUS TP (VE) RO 2100 2400 3.00 2517.0m Continued resplicing the ROV umbilical. Concurrent Ops: Changed out the TDS gear box oil, serviced same. Searched the flowline for debris which had been causing a slight blockage - found the Hole Finder from wireline logging tool string. Opera... [From:WELL_DAILY] B WELL_DRILL_HISTORY:202 24-AUG-08 492.0 9999.99 Completed pulling anchors. END OF NETHERBY-1 DW @ 10:00hrs 24th August 2008. Completed pulling anchors. END OF NETHERBY-1 DW @ 10:00hrs 24th August 2008. Formations Name Top (MD) Top (TVD) Comment K85 Unconformity 1783.0m 1673.6m Waarre A 1792.0m 1683.1m Operations For Period 0000 Hrs to 2400 Hrs on 24 Aug 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description RM P AH 0000 0600 6.00 2517.0m 01:01 - PCC #3 passed back to the rig. 01:25 - PCC #7 passed back to the rig. 01:38 - PCC #8 passed to the Far Grip 02:02 - Tow Bridle PCC passed to the Nor Captain 02:20 - Nor Captain on static tow. 02:51 - #8 anchor off bottom. 04:10 - #8 PCC passed back to rig. 04:38 - #4 PCC passed to Far Grip 04:58 - #4 anchor off bottom. RM P RM 0600 1000 4.00 2517.0m 06:26 - #4 PCC passed back to the rig 06:41 - #1 PCC passed to the Far Grip 07:09 - #1 anchor off bottom. 08:26 - #1 PCC passed back to the rig. 08:39 - #5 PCC passed to the Far Grip 10:00 - #5 anchor off bottom. RM P RM 1000 1000 0.00 0.0m END OF NETHERBY-1 DW (last anchor off bottom) Ocean Patriot on tight tow at drilling draft with the Nor Captain. Far Grip following with the #5 anchor on deck. STATEMENT OF FACTS: Ocean Patriot: Fuel - 342 m� Drill Water - 480 m� Pot Water - 350 m� Barite - 84 mt G Cement - 70 mt Gel - 86 mt Far Grip: Fuel - 350 m� Drill Water - 451 m� Pot Water - 462 m� Barite - 84 mt G Cement - 44 mt Gel - 59 mt Brine - 866 m� Comp Brine - 48 m� DIF - 117 m� Nor Captain: Fuel - 525.7 m� Drill Water - 470.0 m� Pot Water - 363.0 m� Barite - 70 mt Cement - 38 mt WBM - 226 m� Santos Offshore... Santos Offshore... DRILLING MORNING REPORT # 23 Netherby-1 Netherby-1DW ( 24 Aug 2008 ) 'Copyright IDS 2006',AT 20060707, SANTOS_OFFSHORE_drllg Page 1 Printed on 25 Aug 2008 Bulk Stocks Name Unit In Used Adjust Balance Comment Barite mT 0 0 0 84.0 Gel mT 0 0 0 86.0 Cement mT 0 0 0 70.0 F... [From:WELL_DAILY]
HDR A GEOGRAPHICALLY _VERY_ CLOSE WELL TO THIS WELL: WELL_NAME= NETHERBY-1 DW1
--- LISTING OF GEOGRAPHICALLY CLOSE WELLS TO THIS WELL ---
DISTANCE= 00.0 km (very approx) Onshore?=N WELL_NAME= NETHERBY-1 DW1 DISTANCE= 02.1 km (very approx) Onshore?=N WELL_NAME= PECTEN-1 DISTANCE= 02.1 km (very approx) Onshore?=N WELL_NAME= PECTEN-1A DISTANCE= 02.6 km (very approx) Onshore?=N WELL_NAME= HENRY-2 DISTANCE= 02.6 km (very approx) Onshore?=N WELL_NAME= HENRY-2 DW1 DISTANCE= 02.6 km (very approx) Onshore?=N WELL_NAME= HENRY-2 DW1 ST1 DISTANCE= 03.7 km (very approx) Onshore?=N WELL_NAME= HENRY-1 DISTANCE= 03.7 km (very approx) Onshore?=N WELL_NAME= HENRY-1 ST1 DISTANCE= 06.6 km (very approx) Onshore?=N WELL_NAME= PECTEN EAST-1 DISTANCE= 06.9 km (very approx) Onshore?=N WELL_NAME= MARTHA-1 DISTANCE= 10.0 km (very approx) Onshore?=N WELL_NAME= CASINO-4 DISTANCE= 10.0 km (very approx) Onshore?=N WELL_NAME= CASINO-4 DW1 DISTANCE= 10.0 km (very approx) Onshore?=N WELL_NAME= CASINO-4 DW2 DISTANCE= 10.2 km (very approx) Onshore?=N WELL_NAME= CASINO-1 DISTANCE= 11.1 km (very approx) Onshore?=N WELL_NAME= CASINO-3 DISTANCE= 11.2 km (very approx) Onshore?=N WELL_NAME= HALLADALE-1 DW1 DISTANCE= 11.2 km (very approx) Onshore?=N WELL_NAME= HALLADALE-1 DW2 DISTANCE= 11.2 km (very approx) Onshore?=N WELL_NAME= HALLADALE-1 DW3 DISTANCE= 12.9 km (very approx) Onshore?=N WELL_NAME= CASINO-5 DISTANCE= 13.0 km (very approx) Onshore?=N WELL_NAME= CASINO-2 DISTANCE= 14.6 km (very approx) Onshore?=Y WELL_NAME= FLAXMANS-1 DISTANCE= 15.0 km (very approx) Onshore?=Y WELL_NAME= HOWMAINS-1 DISTANCE= 15.7 km (very approx) Onshore?=Y WELL_NAME= CURDIEVALE-1 DISTANCE= 16.1 km (very approx) Onshore?=Y WELL_NAME= CROFT-1
DISTANCE to non-petroleum deep borehole= 16.0 km (very approx) BOREHOLE_SITE_ID=SIT78540 : BOREHOLE_NAME=MEPUNGA 9 (Depth=993.04) DISTANCE to non-petroleum deep borehole= 16.0 km (very approx) BOREHOLE_SITE_ID=SIT78541 : BOREHOLE_NAME=MEPUNGA 10 (Depth=1829.41) DISTANCE to non-petroleum deep borehole= 16.0 km (very approx) BOREHOLE_SITE_ID=SIT85942 : BOREHOLE_NAME=NIRRANDA 8 (Depth=1281.3)
SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = OE81A-2014 SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = OH91-123 SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = OH91-139 SDO: HISTORICAL TITLES: 1. ENCLOSING NETHERBY-1 : TITLE_NAME=PEP22 SDO: HISTORICAL TITLES: 1. ENCLOSING NETHERBY-1 : TITLE_NAME=VIC/L30 SDO: HISTORICAL TITLES: 1. ENCLOSING NETHERBY-1 : TITLE_NAME=VIC/P10 SDO: HISTORICAL TITLES: 1. ENCLOSING NETHERBY-1 : TITLE_NAME=VIC/P15 SDO: HISTORICAL TITLES: 1. ENCLOSING NETHERBY-1 : TITLE_NAME=VIC/P30 SDO: HISTORICAL TITLES: 1. ENCLOSING NETHERBY-1 : TITLE_NAME=VIC/P44 SDO: HISTORICAL TITLES: 2. NEAR NETHERBY-1 : TITLE_NAME=PEP22 : Distance=0 SDO: HISTORICAL TITLES: 2. NEAR NETHERBY-1 : TITLE_NAME=PEP40 : Distance=5.76 SDO: HISTORICAL TITLES: 2. NEAR NETHERBY-1 : TITLE_NAME=V11-2 : Distance=12.08 SDO: HISTORICAL TITLES: 2. NEAR NETHERBY-1 : TITLE_NAME=VIC/L24 : Distance=7.59 SDO: HISTORICAL TITLES: 2. NEAR NETHERBY-1 : TITLE_NAME=VIC/L30 : Distance=0 SDO: HISTORICAL TITLES: 2. NEAR NETHERBY-1 : TITLE_NAME=VIC/P10 : Distance=0 SDO: HISTORICAL TITLES: 2. NEAR NETHERBY-1 : TITLE_NAME=VIC/P15 : Distance=0 SDO: HISTORICAL TITLES: 2. NEAR NETHERBY-1 : TITLE_NAME=VIC/P30 : Distance=0 SDO: HISTORICAL TITLES: 2. NEAR NETHERBY-1 : TITLE_NAME=VIC/P31 : Distance=9.62 SDO: HISTORICAL TITLES: 2. NEAR NETHERBY-1 : TITLE_NAME=VIC/P37(V) : Distance=11.9 SDO: HISTORICAL TITLES: 2. NEAR NETHERBY-1 : TITLE_NAME=VIC/P44 : Distance=0 SDO: HISTORICAL TITLES: 2. NEAR NETHERBY-1 : TITLE_NAME=VIC/P6 : Distance=6.11 SDO: HISTORICAL TITLES: 2. NEAR NETHERBY-1 : TITLE_NAME=VIC/RL2(v) : Distance=11.9
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913157 a NETHERBY-1 WCR CD [CD] PE913157__((_NETHERBY-1_WCR_CD_))_.TAR.GZ(91.7m)......... PE913157__((_NETHERBY-1_WCR_CD_))_.TAR.GZ(91.7m)......... SAM3_245_PE913157__((_NETHERBY-1_WCR_CD_))_I_MEDIA_LABELLING.JPG(2.6m)......... ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913157 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes) ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913157 c DESC=NETHERBY-1 (incorporates some NETHERBY-1 DW1 data). Well Completion Report Basic Well Data CD. VIC/P44. Includes WCR report; Mudlogging, MWD, wireline data; palynological data. Santos Limited, 18 March 2009. Replaces PE913137. ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913157 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913157 d WELL_NAME=NETHERBY-1 DW1 ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913157 d WELL_NAME=NETHERBY-1 DW1 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913157 d WELL_NAME=NETHERBY-1 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913158 a NETHERBY-1 DW1 WCR CD [CD] PE913158__((_NETHERBY-1_DW1_WCR_CD_))_.TAR.GZ(76.9m)......... PE913158__((_NETHERBY-1_DW1_WCR_CD_))_.TAR.GZ(76.9m)......... SAM3_246_PE913158__((_NETHERBY-1_DW1_WCR_CD_))__MEDIA_LABELLING.JPG(2.6m)......... ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913158 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes) ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913158 c DESC=NETHERBY-1 DW1 (incorporates some NETHERBY-1 data). Well Completion Report Basic Well Data CD. VIC/P44. Includes WCR report; Mudlogging, MWD data; well survey data. Santos Limited, 29 January 2009. ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913158 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913158 d WELL_NAME=NETHERBY-1 DW1 ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913158 d WELL_NAME=NETHERBY-1 DW1 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913158 d WELL_NAME=NETHERBY-1 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) GENERAL REGISTRY_FILE F7737415 a VIC/P44/2/A-C 1 Registry File [PAPER] ASSETS (DETAIL) GENERAL REGISTRY_FILE F7737415 b (located in::RECFINDD= SEE RECFIND DATABASE) ASSETS (DETAIL) GENERAL REGISTRY_FILE F7737415 c DESC=VIC/P44/2/A-C 1 OFFSHORE EXPLORATION PERMIT YEAR 2 WELL A-C SANTOS LTD NETHERBY-1, HENRY-2, PECTEN EAST-1 ASSETS (DETAIL) GENERAL REGISTRY_FILE F7737415 d WELL_NAME=HENRY-2 ASSETS (DETAIL) GENERAL REGISTRY_FILE F7737415 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) GENERAL REGISTRY_FILE F7737415 d WELL_NAME=PECTEN EAST-1 ASSETS (DETAIL) GENERAL REGISTRY_FILE F7743129 a IR/04/0299 Registry File [PAPER] ASSETS (DETAIL) GENERAL REGISTRY_FILE F7743129 b (located in::COMPACTUS_1= COMPACTUS_1 55 Collins St) ASSETS (DETAIL) GENERAL REGISTRY_FILE F7743129 c DESC=IR/04/0299 Registry File: INDUSTRY REGULATION LICENSING, LEASING AND PERMITS PETROLEUM EXPLORATION WELL VIC/P44 NETHERBY-1 (W1447) ASSETS (DETAIL) GENERAL REGISTRY_FILE F7743129 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) SEISMIC HRZN_CONTR_MAP PE911563_4 a Champion South 3D K76 Waarre A Depth Map [CD] ASSETS (DETAIL) SEISMIC HRZN_CONTR_MAP PE911563_4 b (located in::PE911563= NETHERBY-1 DW1 WCR (Interpretive) & Logs) ASSETS (DETAIL) SEISMIC HRZN_CONTR_MAP PE911563_4 c DESC=Champion South 3D (OS07A) K76 Waarre A Depth Structure Map in PDF format. Santos Limited. Jul 2009. An enclosure in NETHERBY-1 Interp WCR. ASSETS (DETAIL) SEISMIC HRZN_CONTR_MAP PE911563_4 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) SEISMIC HRZN_CONTR_MAP PE911563_4 d WELL_NAME=NETHERBY-1 DW1 ASSETS (DETAIL) SEISMIC HRZN_CONTR_MAP PE911566_3 a NETHERBY-1 Depth Structure Map [CD] ASSETS (DETAIL) SEISMIC HRZN_CONTR_MAP PE911566_3 b (located in::PE911566= NETHERBY-1 WCR (Interpreted Well Data)) ASSETS (DETAIL) SEISMIC HRZN_CONTR_MAP PE911566_3 c DESC=NETHERBY-1 K76 Waarre A Depth Structure Map, contained within the Well Completion Report (Interpretive) for Santos Ltd, July 2009 ASSETS (DETAIL) SEISMIC HRZN_CONTR_MAP PE911566_3 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL APPLICATION_RPT PE907852 a NETHERBY-1 DW1 Drilling Programme [PAPER] ASSETS (DETAIL) WELL APPLICATION_RPT PE907852 b (located in::PE184843= Well Box - Recent Wells 2) ASSETS (DETAIL) WELL APPLICATION_RPT PE907852 c DESC=NETHERBY-1 DW1 Drilling Programme, VIC/P44, Approval. Doc. No. OA-5000-W04-D007. (33 pp). Santos Limited, 30 May 2008. ASSETS (DETAIL) WELL APPLICATION_RPT PE907852 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL APPLICATION_RPT PE907852 d WELL_NAME=NETHERBY-1 DW1 ASSETS (DETAIL) WELL APPLICATION_RPT PE911527 a Sorrell & Otway Basins 2008 WOMP [PAPER] ASSETS (DETAIL) WELL APPLICATION_RPT PE911527 b (located in::PE184843= Well Box - Recent Wells 2) ASSETS (DETAIL) WELL APPLICATION_RPT PE911527 c DESC=Sorrell and Otway Basins 2008 Well Operations Management Plan. Document Number OA-5000-A02-D016. By Santos Limited, February 2008. ASSETS (DETAIL) WELL APPLICATION_RPT PE911527 d WELL_NAME=HENRY-2 DW1 ASSETS (DETAIL) WELL APPLICATION_RPT PE911527 d WELL_NAME=HENRY-2 DW1 ST1 ASSETS (DETAIL) WELL APPLICATION_RPT PE911527 d WELL_NAME=JARVER-1 ASSETS (DETAIL) WELL APPLICATION_RPT PE911527 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL APPLICATION_RPT PE911527 d WELL_NAME=NETHERBY-1 DW1 ASSETS (DETAIL) WELL APPLICATION_RPT PE911527 d WELL_NAME=PECTEN EAST-1 ASSETS (DETAIL) WELL BIOSTRAT PE911566_4 a NETHERBY-1 Palynology Range Chart, 2009 [CD] ASSETS (DETAIL) WELL BIOSTRAT PE911566_4 b (located in::PE911566= NETHERBY-1 WCR (Interpreted Well Data)) ASSETS (DETAIL) WELL BIOSTRAT PE911566_4 c DESC=NETHERBY-1 Palynology Range Chart contained within the Well Completion Report (Interpreted Well Data CD). Santos Ltd, July 2009 ASSETS (DETAIL) WELL BIOSTRAT PE911566_4 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL BIOSTRAT PE913157_5 a NETHERBY-1 Palynology range chart [CD] PE913157__((_NETHERBY-1_WCR_CD_))_.TAR.GZ(91.7m)......... PE913157__((_NETHERBY-1_WCR_CD_))_.TAR.GZ(91.7m)......... SAM3_245_PE913157__((_NETHERBY-1_WCR_CD_))_I_MEDIA_LABELLING.JPG(2.6m)......... ASSETS (DETAIL) WELL BIOSTRAT PE913157_5 b (located in::PE913157= NETHERBY-1 WCR CD) ASSETS (DETAIL) WELL BIOSTRAT PE913157_5 c DESC=NETHERBY-1. Palynology range chart. 1760-1870 m; Scale 1:760. Windows metafile format. Geoff Wood, Santos Limited, 13 March 2009. ASSETS (DETAIL) WELL BIOSTRAT PE913157_5 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL BIOSTRAT PE913157_5 d WELL_NAME=NETHERBY-1 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL COMPOSITE_LOG PE911563_2 a NETHERBY-1 DW1 Composite Well Log [CD] ASSETS (DETAIL) WELL COMPOSITE_LOG PE911563_2 b (located in::PE911563= NETHERBY-1 DW1 WCR (Interpretive) & Logs) ASSETS (DETAIL) WELL COMPOSITE_LOG PE911563_2 c DESC=NETHERBY-1 DW1 Composite Well Log in TIF & CGM formats. Santos Limited. Jul 2009. ASSETS (DETAIL) WELL COMPOSITE_LOG PE911563_2 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL COMPOSITE_LOG PE911563_2 d WELL_NAME=NETHERBY-1 DW1 ASSETS (DETAIL) WELL COMPOSITE_LOG PE911566_2 a NETHERBY-1 Composite Log (Interpreted) [CD] ASSETS (DETAIL) WELL COMPOSITE_LOG PE911566_2 b (located in::PE911566= NETHERBY-1 WCR (Interpreted Well Data)) ASSETS (DETAIL) WELL COMPOSITE_LOG PE911566_2 c DESC=NETHERBY-1 Composite Log in CGM and TIF formats within the Well Completion Report (Interpreted Well Data CD) for Santos Ltd, July 2009 ASSETS (DETAIL) WELL COMPOSITE_LOG PE911566_2 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL CROSS_SECTION PE911566_5 a NETHERBY-1 Stratigraphic Cross Section [CD] ASSETS (DETAIL) WELL CROSS_SECTION PE911566_5 b (located in::PE911566= NETHERBY-1 WCR (Interpreted Well Data)) ASSETS (DETAIL) WELL CROSS_SECTION PE911566_5 c DESC=NETHERBY-1 Stratigraphic Cross Section contained within the Well Completion Report (Interpreted Well Data CD). Santos Ltd, July 2009 ASSETS (DETAIL) WELL CROSS_SECTION PE911566_5 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL DAILY_RPT PE915098_01 a Well Daily Reports: DDRs, WOs, DGRs 2008 [CD] (2291 DIGITAL FILES) ASSETS (DETAIL) WELL DAILY_RPT PE915098_01 b (located in::PE915098= Well Data - Electronic Submissions 2008) ASSETS (DETAIL) WELL DAILY_RPT PE915098_01 c DESC=Well Daily Reports - Electronic Submissions 2008. Contains well d.drill/geol/workover/ops/daily litho rpts catalogued in 2008. For well/company/rpt details see Remarks/Ancillary Data. ASSETS (DETAIL) WELL DAILY_RPT PE915098_01 d (more than 25 wells for this asset item) ASSETS (DETAIL) WELL DRILL_RPT PE915098_08 a Well Drill Repts, Logs & T-D Curves 2008 [CD] (2291 DIGITAL FILES) ASSETS (DETAIL) WELL DRILL_RPT PE915098_08 b (located in::PE915098= Well Data - Electronic Submissions 2008) ASSETS (DETAIL) WELL DRILL_RPT PE915098_08 c DESC=Well Drilling Reports, Logs & Time-Depth Curves - Electronic Submissions 2008. Contains drilling reports, and digital & image files of drill logs and time depth curves. ASSETS (DETAIL) WELL DRILL_RPT PE915098_08 d (more than 25 wells for this asset item) ASSETS (DETAIL) WELL GEOL_RPT PE907851 a NETHERBY-1 Geological Prognosis [PAPER] ASSETS (DETAIL) WELL GEOL_RPT PE907851 b (located in::PE184843= Well Box - Recent Wells 2) ASSETS (DETAIL) WELL GEOL_RPT PE907851 c DESC=NETHERBY-1, NETHERBY-1 DW1, Geological Prognosis. (13 pp). Santos Limited. ASSETS (DETAIL) WELL GEOL_RPT PE907851 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL GEOL_RPT PE907851 d WELL_NAME=NETHERBY-1 DW1 ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 a Well Lithology Logs 2008 [CD] (2291 DIGITAL FILES) ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 b (located in::PE915098= Well Data - Electronic Submissions 2008) ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 c DESC=Well Lithology Logs - Electronic Submissions 2008. Contains core, cuttings & SWC descriptions/logs. ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 d WELL_NAME=ALBERTON-1 ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 d WELL_NAME=BOOLA BOOLA-2 ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 d WELL_NAME=COELACANTH-1 ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 d WELL_NAME=HAZELWOOD-1 ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 d WELL_NAME=HENRY-2 ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 d WELL_NAME=HENRY-2 DW1 ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 d WELL_NAME=LONGTOM-4 ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 d WELL_NAME=LONGTOM-4P ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 d WELL_NAME=MADFISH-1 ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 d WELL_NAME=NAPIER HIGH-1 ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 d WELL_NAME=PEEJAY-1 ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 d WELL_NAME=SPEKE SOUTH-1 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE619581 a NETHERBY-1 MWD/LWD [CD] PE619581__((_NETHERBY-1_MWD_LWD_))_.TAR.GZ(11.8m)......... PE619581__((_NETHERBY-1_MWD_LWD_))_.TAR.GZ(11.8m)......... SAM1_277_PE619581__((_NETHERBY-1_MWD_LWD_))_I_MEDIA_LABELLING.JPG(3.1m)......... ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE619581 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes) ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE619581 c DESC=NETHERBY-1 MWD/LWD By Schlumberger for Santos 29-Aug-08 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE619581 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE619582 a NETHERBY-1 Wireline products [CD] PE619582__((_NETHERBY-1_WIRELINE_PRODUCTS_))_.TAR.GZ(11.8m)......... PE619582__((_NETHERBY-1_WIRELINE_PRODUCTS_))_.TAR.GZ(11.8m)......... SAM1_278_PE619582__((_NETHERBY-1_WIRELINE_PRODUCTS_))_I_MEDIA_LABELLING.JPG(3.0m)......... ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE619582 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes) ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE619582 c DESC=NETHERBY-1 Wireline; HRLT-PEX-HNGS-MSIP By Schlumberger for Santos SLB Client CD 27-jul-08 Run 1 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE619582 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE913137_1 a NETHERBY-1 Digital Well HRLT Logs [CD] PE913137__((_NETHERBY-1_WCR_BASIC_))_.TAR.GZ(91.6m)......... PE913137__((_NETHERBY-1_WCR_BASIC_))_.TAR.GZ(91.6m)......... SAM2_493_PE913137__((_NETHERBY-1_WCR_BASIC_))__MEDIA_LABELLING.JPG(2.6m)......... ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE913137_1 b (located in::PE913137= NETHERBY-1 WCR Basic) ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE913137_1 c DESC=NETHERBY-1 Digital Well Logs. Shear Slowness, Gamma-Ray, Density, Neutron /Porosity, Resistivity, Dt(compressional) and Poissons Ratio. 29 January 2009 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE913137_1 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE913157_2 a NETHERBY-1 Dlis Well logs [CD] PE913157__((_NETHERBY-1_WCR_CD_))_.TAR.GZ(91.7m)......... PE913157__((_NETHERBY-1_WCR_CD_))_.TAR.GZ(91.7m)......... SAM3_245_PE913157__((_NETHERBY-1_WCR_CD_))_I_MEDIA_LABELLING.JPG(2.6m)......... ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE913157_2 b (located in::PE913157= NETHERBY-1 WCR CD) ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE913157_2 c DESC=NETHERBY-1. Mudlogging, MWD and Wireline logs (Dlis and FMA formats). Santos Limited, 18 March 2009. Replaces PE913137. ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE913157_2 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE913157_2 d WELL_NAME=NETHERBY-1 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE913157_3 a NETHERBY-1 LAS Well logs [CD] PE913157__((_NETHERBY-1_WCR_CD_))_.TAR.GZ(91.7m)......... PE913157__((_NETHERBY-1_WCR_CD_))_.TAR.GZ(91.7m)......... SAM3_245_PE913157__((_NETHERBY-1_WCR_CD_))_I_MEDIA_LABELLING.JPG(2.6m)......... ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE913157_3 b (located in::PE913157= NETHERBY-1 WCR CD) ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE913157_3 c DESC=NETHERBY-1. Mudlogging, MWD and Wireline logs (LAS format). Santos Limited, 18 March 2009. Replaces PE913137. ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE913157_3 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE913157_3 d WELL_NAME=NETHERBY-1 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL MONTAGE_LOG PE911563_3 a NETHERBY-1 DW1 WES Plot [CD] ASSETS (DETAIL) WELL MONTAGE_LOG PE911563_3 b (located in::PE911563= NETHERBY-1 DW1 WCR (Interpretive) & Logs) ASSETS (DETAIL) WELL MONTAGE_LOG PE911563_3 c DESC=NETHERBY-1 DW1 WES (Well Evaluation Summary) Plot in PDF & CGM formats. Santos Limited. Jul 2009. A combined mudlog/composite log. ASSETS (DETAIL) WELL MONTAGE_LOG PE911563_3 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL MONTAGE_LOG PE911563_3 d WELL_NAME=NETHERBY-1 DW1 ASSETS (DETAIL) WELL MUD_LOG PE913137_3 a NETHERBY-1 Mudlog, Gasratio and Pressure [CD] PE913137__((_NETHERBY-1_WCR_BASIC_))_.TAR.GZ(91.6m)......... PE913137__((_NETHERBY-1_WCR_BASIC_))_.TAR.GZ(91.6m)......... SAM2_493_PE913137__((_NETHERBY-1_WCR_BASIC_))__MEDIA_LABELLING.JPG(2.6m)......... ASSETS (DETAIL) WELL MUD_LOG PE913137_3 b (located in::PE913137= NETHERBY-1 WCR Basic) ASSETS (DETAIL) WELL MUD_LOG PE913137_3 c DESC=NETHERBY-1 Mudlog, Gasratio and Pressure logs. 29 January 2009 ASSETS (DETAIL) WELL MUD_LOG PE913137_3 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL MUD_LOG PE915098_02 a Well Mud Logs 2008 [CD] (2291 DIGITAL FILES) ASSETS (DETAIL) WELL MUD_LOG PE915098_02 b (located in::PE915098= Well Data - Electronic Submissions 2008) ASSETS (DETAIL) WELL MUD_LOG PE915098_02 c DESC=Well Mud Logs - Electronic Submissions 2008. Contains Mudlogs only, images and digital. ASSETS (DETAIL) WELL MUD_LOG PE915098_02 d (more than 25 wells for this asset item) ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 a Well Geodetic Survey Data, Reports 2008 [CD] (2291 DIGITAL FILES) ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 b (located in::PE915098= Well Data - Electronic Submissions 2008) ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 c DESC=Well Geodetic Survey Data, Reports - Electronic Submissions 2008. Contains geodetic surveys and other positioning, downhole surveys and nav reports. Also rotary table heighting data. ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=COELACANTH-1 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=DORY-1 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=FERMAT-1 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=HAZELWOOD-1 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=HENRY-2 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=HENRY-2 DW1 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=HENRY-2 DW1 ST1 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=HENRY-2 DW1 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=HENRY-2 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=LONGTOM-4 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=LONGTOM-4H ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=MADFISH-1 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=PEEJAY-1 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=SNAPPER-A11A ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=SNAPPER-A1A ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=SNAPPER-A1A WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=SNAPPER-A21A ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=SNAPPER-M33A ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=SNAPPER-M33A WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=SPEKE SOUTH-1 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=WARDIE-1 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=WASABI-1 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=WEST SEAHORSE-3 ASSETS (DETAIL) WELL WCR_RPT PE911563_1 a NETHERBY-1 DW1 WCR (Interpretive) [CD] ASSETS (DETAIL) WELL WCR_RPT PE911563_1 b (located in::PE911563= NETHERBY-1 DW1 WCR (Interpretive) & Logs) ASSETS (DETAIL) WELL WCR_RPT PE911563_1 c DESC=NETHERBY-1 DW1, contains WCR (Interpreted Data Report) in PDF format. Santos Limited. Jul 2009. ASSETS (DETAIL) WELL WCR_RPT PE911563_1 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL WCR_RPT PE911563_1 d WELL_NAME=NETHERBY-1 DW1 ASSETS (DETAIL) WELL WCR_RPT PE911566 a NETHERBY-1 WCR (Interpreted Well Data) [CD] ASSETS (DETAIL) WELL WCR_RPT PE911566 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes) ASSETS (DETAIL) WELL WCR_RPT PE911566 c DESC=NETHERBY-1 Well Completion Report (Interpreted Well Data CD). Contains WCR, and enclosures: composite log, depth map, palynology range chart, stratigraphic cross section, and WES plot for Santos Ltd, July 2009 ASSETS (DETAIL) WELL WCR_RPT PE911566 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL WCR_RPT PE911566_1 a NETHERBY-1 WCR (Interpreted Well Data) [CD] ASSETS (DETAIL) WELL WCR_RPT PE911566_1 b (located in::PE911566= NETHERBY-1 WCR (Interpreted Well Data)) ASSETS (DETAIL) WELL WCR_RPT PE911566_1 c DESC=NETHERBY-1 Well Completion Report (Interpreted Well Data CD). Contains WCR, electric log evaluation, MDT pressure report, hydrocarbon show report, geothermal gradient, petrology report and palynology report for Santos Ltd, July 2009 ASSETS (DETAIL) WELL WCR_RPT PE911566_1 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL WCR_RPT PE913137 a NETHERBY-1 WCR Basic [CD] PE913137__((_NETHERBY-1_WCR_BASIC_))_.TAR.GZ(91.6m)......... PE913137__((_NETHERBY-1_WCR_BASIC_))_.TAR.GZ(91.6m)......... SAM2_493_PE913137__((_NETHERBY-1_WCR_BASIC_))__MEDIA_LABELLING.JPG(2.6m)......... ASSETS (DETAIL) WELL WCR_RPT PE913137 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes) ASSETS (DETAIL) WELL WCR_RPT PE913137 c DESC=NETHERBY-1 Well Completion Report, Basic Well Data. Santos. . 29 January 2009 ASSETS (DETAIL) WELL WCR_RPT PE913137 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL WCR_RPT PE913157_1 a NETHERBY-1 WCR [CD] PE913157__((_NETHERBY-1_WCR_CD_))_.TAR.GZ(91.7m)......... PE913157__((_NETHERBY-1_WCR_CD_))_.TAR.GZ(91.7m)......... SAM3_245_PE913157__((_NETHERBY-1_WCR_CD_))_I_MEDIA_LABELLING.JPG(2.6m)......... ASSETS (DETAIL) WELL WCR_RPT PE913157_1 b (located in::PE913157= NETHERBY-1 WCR CD) ASSETS (DETAIL) WELL WCR_RPT PE913157_1 c DESC=NETHERBY-1 (incorporates some NETHERBY-1 DW1 data), Well Completion Report Basic Well Data (654 pp). VIC/P44. Includes Daily reports; End of well reports; Deviation data; Preliminary palynological report. Santos Limited, 31 August 2008. Replaces PE913137. ASSETS (DETAIL) WELL WCR_RPT PE913157_1 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL WCR_RPT PE913157_1 d WELL_NAME=NETHERBY-1 DW1 ASSETS (DETAIL) WELL WCR_RPT PE913157_1 d WELL_NAME=NETHERBY-1 DW1 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL WCR_RPT PE913157_1 d WELL_NAME=NETHERBY-1 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL WCR_RPT PE913158_1 a NETHERBY-1 DW1 WCR [CD] PE913158__((_NETHERBY-1_DW1_WCR_CD_))_.TAR.GZ(76.9m)......... PE913158__((_NETHERBY-1_DW1_WCR_CD_))_.TAR.GZ(76.9m)......... SAM3_246_PE913158__((_NETHERBY-1_DW1_WCR_CD_))__MEDIA_LABELLING.JPG(2.6m)......... ASSETS (DETAIL) WELL WCR_RPT PE913158_1 b (located in::PE913158= NETHERBY-1 DW1 WCR CD) ASSETS (DETAIL) WELL WCR_RPT PE913158_1 c DESC=NETHERBY-1 DW1 (incorporates some Netherby-1 data). Well Completion Report Basic Well Data (678 pp). VIC/P44. Includes Daily reports; End of well reports; Deviation data. Santos Limited, 30 Sept. 2008. ASSETS (DETAIL) WELL WCR_RPT PE913158_1 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL WCR_RPT PE913158_1 d WELL_NAME=NETHERBY-1 DW1 ASSETS (DETAIL) WELL WCR_RPT PE913158_1 d WELL_NAME=NETHERBY-1 DW1 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL WCR_RPT PE913158_1 d WELL_NAME=NETHERBY-1 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL WELL_CORRELATION PE911563_5 a NETHERBY-1 DW1 Stratigraphic Cross Sectn [CD] ASSETS (DETAIL) WELL WELL_CORRELATION PE911563_5 b (located in::PE911563= NETHERBY-1 DW1 WCR (Interpretive) & Logs) ASSETS (DETAIL) WELL WELL_CORRELATION PE911563_5 c DESC=NETHERBY-1 DW1 Stratigraphic Cross (Well Correlation) Section. In PDF format. Santos Limited. Jul 2009. MARTHA-1 to CASINO-1. ASSETS (DETAIL) WELL WELL_CORRELATION PE911563_5 d WELL_NAME=CASINO-1 ASSETS (DETAIL) WELL WELL_CORRELATION PE911563_5 d WELL_NAME=HENRY-1 ST1 ASSETS (DETAIL) WELL WELL_CORRELATION PE911563_5 d WELL_NAME=MARTHA-1 ASSETS (DETAIL) WELL WELL_CORRELATION PE911563_5 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL WELL_CORRELATION PE911563_5 d WELL_NAME=NETHERBY-1 DW1 ASSETS (DETAIL) WELL WELL_CORRELATION PE911563_5 d WELL_NAME=PECTEN EAST-1 ASSETS (DETAIL) WELL WELL_CORRELATION PE911563_5 d WELL_NAME=PECTEN-1A ASSETS (DETAIL) WELL WELL_LOG PE911566_6 a NETHERBY-1 Well Evaluation Summary (WES) [CD] ASSETS (DETAIL) WELL WELL_LOG PE911566_6 b (located in::PE911566= NETHERBY-1 WCR (Interpreted Well Data)) ASSETS (DETAIL) WELL WELL_LOG PE911566_6 c DESC=NETHERBY-1 Well Evaluation Summary (WES) in PDF and CGM format, contained within the Well Completion Report (Interpreted Well Data CD). Santos Ltd, July 2009 ASSETS (DETAIL) WELL WELL_LOG PE911566_6 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL WELL_LOG PE913137_2 a NETHERBY-1 Well Log Displays (HRLT) [CD] PE913137__((_NETHERBY-1_WCR_BASIC_))_.TAR.GZ(91.6m)......... PE913137__((_NETHERBY-1_WCR_BASIC_))_.TAR.GZ(91.6m)......... SAM2_493_PE913137__((_NETHERBY-1_WCR_BASIC_))__MEDIA_LABELLING.JPG(2.6m)......... ASSETS (DETAIL) WELL WELL_LOG PE913137_2 b (located in::PE913137= NETHERBY-1 WCR Basic) ASSETS (DETAIL) WELL WELL_LOG PE913137_2 c DESC=NETHERBY-1 Well Log Displays. Shear Slowness, Gamma-Ray, Density, Neutron /Porosity, Resistivity, Dt(compressional) and Poissons Ratio from HRLT run. 29 January 2009 ASSETS (DETAIL) WELL WELL_LOG PE913137_2 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL WELL_LOG PE913157_4 a NETHERBY-1 PDF Well logs [CD] PE913157__((_NETHERBY-1_WCR_CD_))_.TAR.GZ(91.7m)......... PE913157__((_NETHERBY-1_WCR_CD_))_.TAR.GZ(91.7m)......... SAM3_245_PE913157__((_NETHERBY-1_WCR_CD_))_I_MEDIA_LABELLING.JPG(2.6m)......... ASSETS (DETAIL) WELL WELL_LOG PE913157_4 b (located in::PE913157= NETHERBY-1 WCR CD) ASSETS (DETAIL) WELL WELL_LOG PE913157_4 c DESC=NETHERBY-1. Mudlogging, MWD and Wireline logs (PDF, PDS, TIF formats). Santos Limited, 18 March 2009. Replaces PE913137. ASSETS (DETAIL) WELL WELL_LOG PE913157_4 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL WELL_LOG PE913157_4 d WELL_NAME=NETHERBY-1 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 a Well Logs: MWD/LWD 2008 [CD] (2291 DIGITAL FILES) ASSETS (DETAIL) WELL WELL_LOG PE915098_04 b (located in::PE915098= Well Data - Electronic Submissions 2008) ASSETS (DETAIL) WELL WELL_LOG PE915098_04 c DESC=Well Logs - Electronic Submissions 2008. Contains MWD/LWD Logs. Images and digital. ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=BAZZARD-1 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=BAZZARD-1 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=COELACANTH-1 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=DORY-1 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=HENRY-2 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=HENRY-2 DW1 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=HENRY-2 DW1 ST1 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=HENRY-2 DW1 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=HENRY-2 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=MADFISH-1 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=PEEJAY-1 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=SNAPPER-A11A ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=SNAPPER-A21A ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=SNAPPER-M33A ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=SNAPPER-M33A WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=SPEKE SOUTH-1 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=WASABI-1 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=WEST SEAHORSE-3
NETHERBY_1 OIL_CO_ESSO:1: DEVIATION SRVY 01 SURVEY_ID =NETHERBY_1 NETHERBY_1 OIL_CO_ESSO:1: DEVIATION SRVY 02 SURVEY_COMPANY =Schlumberger NETHERBY_1 OIL_CO_ESSO:1: DEVIATION SRVY 03 SURVEY_DATE =21-AUG-08 NETHERBY_1 OIL_CO_ESSO:1: DEVIATION SRVY 05 SURVEY_TYPE =DIR NETHERBY_1 OIL_CO_ESSO:1: DEVIATION SRVY 06 STORAGE_UNIT =Metres NETHERBY_1 OIL_CO_ESSO:1: DEVIATION SRVY 09 COMPUTE_METHOD =MC NETHERBY_1 OIL_CO_ESSO:1: DEVIATION SRVY 11 MAGNETIC_DECLINATION =-1.03 NETHERBY_1 OIL_CO_ESSO:1: DEVIATION SRVY 13 AZIMUTH_NORTH_TYPE =G NETHERBY_1 OIL_CO_ESSO:1: DEVIATION SRVY 14 TOP_DEPTH =0 NETHERBY_1 OIL_CO_ESSO:1: DEVIATION SRVY 16 BASE_DEPTH =1870 NETHERBY_1 OIL_CO_ESSO:1: DEVIATION SRVY 18 SOURCE =OIL_CO_ESSO NETHERBY_1 OIL_CO_ESSO:1: DEVIATION SRVY 20 REMARK =from PE913137, Netherby 1 Geodetic Survey.xls. NETHERBY_1 OIL_CO_ESSO:1: DEVIATION SRVY 21 POINT COUNT = 63 NETHERBY_1 OIL_CO_ESSO:2: DEVIATION SRVY STATION_MD INCLINATION AZIMUTH STATION_ID STATION_TVD X_OFFSET Y_OFFSET VERTICAL_SECTION NS_DIRECTION EW_DIRECTION DOG_LEG_SEVERITY REMARK NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0000 .0 0 0 0 0 0 N E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0087 87.0 0 0 87 0 0 N E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0110 110.2 .34 228.85 110.28986 .05 .05 S W NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0139 139.3 .48 70.38 139.30958 0 .06 S W NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0169 168.5 .56 302.02 168.49902 .01 .06 N W NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0197 196.5 .62 250.43 196.57772 .27 .08 N W NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0225 224.6 .7 303.64 224.6561 .55 .12 N W NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0253 252.7 .64 294.72 252.73419 .84 .28 N W NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0281 280.8 .72 298.73 280.79221 1.14 .43 N W NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0310 309.5 .65 287.17 309.50017 1.45 .57 N W NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0338 337.9 .69 292.15 337.96822 1.76 .68 N W NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0367 366.8 .7 359.25 366.87653 1.93 .92 N W NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0396 395.8 .92 12.26 395.78365 1.88 1.32 N W NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0425 424.7 .87 19.3 424.73012 1.76 1.76 N W NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0454 453.6 .56 88.31 453.6583 1.54 1.97 N W NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0482 482.4 .59 96.35 482.46685 1.26 1.96 N W NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0511 511.3 .65 96.56 511.33516 .94 1.92 N W NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0540 540.2 .7 100.87 540.24315 .61 1.87 N W NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0569 569.0 .71 112.99 569.02099 .27 1.77 N W NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0598 597.9 .69 128.34 597.86886 .03 1.59 N E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0617 617.1 .84 123.17 617.11714 .24 1.44 N E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0634 634.4 .94 124.68 634.42505 .46 1.29 N E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0660 660.0 .52 130.06 659.99292 .72 1.1 N E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0745 745.2 2.31 160.81 745.16421 1.58 .77 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0774 773.5 4.27 158.54 773.38625 2.16 2.29 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0801 801.2 5.89 157.85 801.00641 3.07 4.57 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0831 831.4 7.57 152.25 831.01742 4.58 7.77 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0860 859.9 9.31 137.33 859.20117 7.02 11.12 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0890 889.7 11.19 126.87 888.48746 10.96 14.63 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0919 919.1 12.15 123.94 917.36779 15.82 18.08 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0949 948.9 12.93 122.08 946.36894 21.23 21.59 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 0979 979.4 13.44 120.85 976.07462 27.17 25.22 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1008 1007.5 14.16 120.45 1003.36332 32.94 28.63 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1036 1036.1 14.55 118.54 1031.09954 39.12 32.13 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1065 1065.2 14.6 118.24 1059.22437 45.55 35.6 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1096 1096.0 14.09 118.27 1089.14147 52.29 39.23 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1125 1124.6 14.01 116.68 1116.86658 58.44 42.43 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1154 1153.5 15.82 116.95 1144.73377 65.07 45.78 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1182 1182.0 19.92 117.65 1171.8911 72.84 49.8 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1210 1210.1 23.56 117.6 1197.95093 82.05 54.62 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1239 1239.3 25.76 114.79 1224.5417 93.01 59.99 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1267 1267.3 29.36 115.62 1249.38705 104.74 65.52 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1294 1294.2 33.74 116.12 1272.28822 117.39 71.66 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1322 1322.4 33.97 116.49 1295.6654 131.45 78.61 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1350 1350.1 34.69 115.42 1318.54846 145.5 85.45 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1380 1379.9 34.59 115.6 1343.08256 160.79 92.75 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1408 1408.2 35.05 116.5 1366.33196 175.32 99.85 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1436 1436.1 34.88 116.15 1389.18789 189.65 106.94 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1466 1465.6 35.16 116.1 1413.32238 204.83 114.38 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1494 1494.2 35.09 116.37 1436.74701 219.61 121.67 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1523 1523.4 35.39 116.22 1460.59586 234.72 129.13 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1553 1552.9 35.14 115.95 1484.65783 250 136.61 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1582 1581.5 35.1 115.95 1508.05935 264.8 143.81 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1611 1610.8 35.09 116.84 1532.03277 279.89 151.3 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1639 1639.1 35.01 117.96 1555.18446 294.31 158.78 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1668 1668.0 34.91 118.18 1578.91051 308.94 166.58 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1696 1695.8 34.89 119.39 1601.67 322.86 174.23 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1725 1725.2 34.9 120.32 1625.82512 337.47 182.61 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1754 1753.7 34.99 120.9 1649.14571 351.49 190.91 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1782 1781.6 35.06 120.66 1671.98489 365.25 199.1 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1811 1811.0 35.22 120.21 1696.05125 379.85 207.68 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1839 1838.5 35.18 119.41 1718.55554 393.63 215.57 S E NETHERBY_1 OIL_CO_ESSO:3: DEVIATION SRVY 1870 1870.0 35.38 119.23 1744.19675 409.44 224.46 S E NETHERBY_1_MSTR MASTER:1: DEVIATION SRVY 01 SURVEY_ID =NETHERBY_1_MSTR NETHERBY_1_MSTR MASTER:1: DEVIATION SRVY 02 SURVEY_COMPANY =Schlumberger NETHERBY_1_MSTR MASTER:1: DEVIATION SRVY 03 SURVEY_DATE =18-JUL-08 NETHERBY_1_MSTR MASTER:1: DEVIATION SRVY 05 SURVEY_TYPE =DIR NETHERBY_1_MSTR MASTER:1: DEVIATION SRVY 06 STORAGE_UNIT =Metres NETHERBY_1_MSTR MASTER:1: DEVIATION SRVY 09 COMPUTE_METHOD =MC NETHERBY_1_MSTR MASTER:1: DEVIATION SRVY 11 MAGNETIC_DECLINATION =-1.03 NETHERBY_1_MSTR MASTER:1: DEVIATION SRVY 13 AZIMUTH_NORTH_TYPE =G NETHERBY_1_MSTR MASTER:1: DEVIATION SRVY 14 TOP_DEPTH =0 NETHERBY_1_MSTR MASTER:1: DEVIATION SRVY 16 BASE_DEPTH =1870 NETHERBY_1_MSTR MASTER:1: DEVIATION SRVY 18 SOURCE =MASTER NETHERBY_1_MSTR MASTER:1: DEVIATION SRVY 18 SOURCE =MASTER [Note: surveys with a SOURCE of MASTER should usually be just a copy of one of the original surveys run in the well. The MASTER survey is used by the database to display/calculate well paths etc] NETHERBY_1_MSTR MASTER:1: DEVIATION SRVY 20 REMARK =from PE913137, Netherby 1 Geodetic Survey.xls. NETHERBY_1_MSTR MASTER:1: DEVIATION SRVY 21 POINT COUNT = 63 NETHERBY_1_MSTR MASTER:2: DEVIATION SRVY STATION_MD INCLINATION AZIMUTH STATION_ID STATION_TVD X_OFFSET Y_OFFSET VERTICAL_SECTION NS_DIRECTION EW_DIRECTION DOG_LEG_SEVERITY REMARK NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0000 .0 0 0 0 0 0 N E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0087 87.0 0 0 87 0 0 N E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0110 110.2 .34 228.85 110.28986 .05 .05 S W NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0139 139.3 .48 70.38 139.30958 0 .06 S W NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0169 168.5 .56 302.02 168.49902 .01 .06 N W NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0197 196.5 .62 250.43 196.57772 .27 .08 N W NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0225 224.6 .7 303.64 224.6561 .55 .12 N W NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0253 252.7 .64 294.72 252.73419 .84 .28 N W NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0281 280.8 .72 298.73 280.79221 1.14 .43 N W NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0310 309.5 .65 287.17 309.50017 1.45 .57 N W NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0338 337.9 .69 292.15 337.96822 1.76 .68 N W NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0367 366.8 .7 359.25 366.87653 1.93 .92 N W NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0396 395.8 .92 12.26 395.78365 1.88 1.32 N W NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0425 424.7 .87 19.3 424.73012 1.76 1.76 N W NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0454 453.6 .56 88.31 453.6583 1.54 1.97 N W NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0482 482.4 .59 96.35 482.46685 1.26 1.96 N W NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0511 511.3 .65 96.56 511.33516 .94 1.92 N W NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0540 540.2 .7 100.87 540.24315 .61 1.87 N W NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0569 569.0 .71 112.99 569.02099 .27 1.77 N W NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0598 597.9 .69 128.34 597.86886 .03 1.59 N E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0617 617.1 .84 123.17 617.11714 .24 1.44 N E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0634 634.4 .94 124.68 634.42505 .46 1.29 N E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0660 660.0 .52 130.06 659.99292 .72 1.1 N E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0745 745.2 2.31 160.81 745.16421 1.58 .77 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0774 773.5 4.27 158.54 773.38625 2.16 2.29 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0801 801.2 5.89 157.85 801.00641 3.07 4.57 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0831 831.4 7.57 152.25 831.01742 4.58 7.77 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0860 859.9 9.31 137.33 859.20117 7.02 11.12 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0890 889.7 11.19 126.87 888.48746 10.96 14.63 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0919 919.1 12.15 123.94 917.36779 15.82 18.08 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0949 948.9 12.93 122.08 946.36894 21.23 21.59 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 0979 979.4 13.44 120.85 976.07462 27.17 25.22 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1008 1007.5 14.16 120.45 1003.36332 32.94 28.63 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1036 1036.1 14.55 118.54 1031.09954 39.12 32.13 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1065 1065.2 14.6 118.24 1059.22437 45.55 35.6 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1096 1096.0 14.09 118.27 1089.14147 52.29 39.23 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1125 1124.6 14.01 116.68 1116.86658 58.44 42.43 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1154 1153.5 15.82 116.95 1144.73377 65.07 45.78 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1182 1182.0 19.92 117.65 1171.8911 72.84 49.8 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1210 1210.1 23.56 117.6 1197.95093 82.05 54.62 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1239 1239.3 25.76 114.79 1224.5417 93.01 59.99 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1267 1267.3 29.36 115.62 1249.38705 104.74 65.52 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1294 1294.2 33.74 116.12 1272.28822 117.39 71.66 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1322 1322.4 33.97 116.49 1295.6654 131.45 78.61 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1350 1350.1 34.69 115.42 1318.54846 145.5 85.45 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1380 1379.9 34.59 115.6 1343.08256 160.79 92.75 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1408 1408.2 35.05 116.5 1366.33196 175.32 99.85 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1436 1436.1 34.88 116.15 1389.18789 189.65 106.94 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1466 1465.6 35.16 116.1 1413.32238 204.83 114.38 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1494 1494.2 35.09 116.37 1436.74701 219.61 121.67 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1523 1523.4 35.39 116.22 1460.59586 234.72 129.13 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1553 1552.9 35.14 115.95 1484.65783 250 136.61 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1582 1581.5 35.1 115.95 1508.05935 264.8 143.81 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1611 1610.8 35.09 116.84 1532.03277 279.89 151.3 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1639 1639.1 35.01 117.96 1555.18446 294.31 158.78 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1668 1668.0 34.91 118.18 1578.91051 308.94 166.58 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1696 1695.8 34.89 119.39 1601.67 322.86 174.23 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1725 1725.2 34.9 120.32 1625.82512 337.47 182.61 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1754 1753.7 34.99 120.9 1649.14571 351.49 190.91 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1782 1781.6 35.06 120.66 1671.98489 365.25 199.1 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1811 1811.0 35.22 120.21 1696.05125 379.85 207.68 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1839 1838.5 35.18 119.41 1718.55554 393.63 215.57 S E NETHERBY_1_MSTR MASTER:3: DEVIATION SRVY 1870 1870.0 35.38 119.23 1744.19675 409.44 224.46 S E
PPDM_AUDIT_HISTORY: WELL_NAME=HISTWELL200018512463