HDR WELL_NAME = HENRY-2
HDR A GEOGRAPHICALLY VERY CLOSE WELL TO THIS WELL: WELL_NAME= HENRY-2 DW1 HDR A GEOGRAPHICALLY VERY CLOSE WELL TO THIS WELL: WELL_NAME= HENRY-2 DW1 ST1
HDR DATE 1: SPUD_DATE = 25-AUG-08 HDR DATE 3: RIG_RELEASE_DATE = 16-SEP-08 HDR DATE 4: DB_ENTRY_BY = EF03_TW (database header data entry) HDR DATE 4: DB_ENTRY_DATE = 20-JUL-09 (database header data entry date) HDR DATE 5: DB_ROW_UPDATER = EF03_TW (database header data entry last updated by) HDR DATE 5: DB_ROW_UPDATE_DATE = 20-JUL-09 (database header data entry last update date) HDR DATE 6: THEORETICAL OPENFILE BASIC DATE= 17-SEP-10 HDR DATE 6: THEORETICAL OPENFILE INTERPRETIVE DATE= 17-OCT-13
HDR DEVIATION_IND = Y (i.e. has this hole been deviated?) HDR LOC: BASIN DESCRIPTION= Otway Basin HDR LOC: BASIN_CODE = OTWAY HDR LOC: COUNTRY = AUSTRALIA HDR LOC: FIELD_NAME = HENRY FIELD HDR LOC: ONSHORE_IND = N HDR LOC: PROVINCE_STATE = VIC HDR LOC: TITLE_NAME = VIC/P44 HDR LOC: TITLE_NAME: SDO: CURRENT TITLE (Current as at 23-FEB-12) BY LOCATION: ENCLOSING HENRY-2 : TITLE_NAME=VIC/L30 HDR LOC: TITLE_NAME: SDO: CURRENT TITLE (Current as at 23-FEB-12) BY LOCATION: ENCLOSING HENRY-2 : TITLE_NAME=VIC/P44 HDR OPERATOR = SANTOS Limited ACN007550923 HDR PLATFORM_IND = N (i.e. is this hole off a platform?) HDR SIDETRACK_IND = N (i.e. is this hole a sidetrack?)
HDR DPH GREATEST OF DEPTHS = 2042 HDR DPH: DRILL_TD = 2042 HDR DPH: DRILL_TD = DRILLERS TOTAL DEPTH: Total or maximum depth of the well as reported by the operator/driller (PPDM definition). HDR DPH: FINAL_TD = 2042 HDR DPH: FINAL_TD = FINAL TOTAL DEPTH: The actual measurement along the well path from the reference datum to the bottom of the well (PPDM definition). HDR DPH: MAX_TVD = 1757 HDR DPH: MAX_TVD = MAXIMUM TRUE VERTICAL DEPTH: The maximum true vertical depth from the surface datum reference to the final total depth or deepest point, measured on a straight line (PPDM definition). HDR ELEV: DEPTH_DATUM = RT HDR ELEV: DEPTH_DATUM LONGNM= Rotary Table HDR ELEV: DEPTH_DATUM_ELEV = 20.8 HDR ELEV: ELEVATION_REF = RT HDR ELEV: ELEVATION_REF LN = Rotary Table HDR ELEV: REF_ELEV = 20.8 HDR ELEV: RT_ELEV = 20.8 HDR ELEV: WATER_DEPTH = -67 HDR STORAGE_UNIT = Metres
HDR CURRENT_CLASS = D_HC_PROD HDR CURRENT_CLASS LONG_NAME = Development Well --Hydrocarbon PRODUCTION Well HDR CURRENT_STATUS = SIDETRACKED HDR CURRENT_STATUS LONG_NAME= Original well has been cased and sidetracked HDR CURRENT_STATUS REMARK = I have created this well status to identify wells which were drilled and then sidetracked (tb09). HDR INITIAL_CLASS = D_HC_PROD HDR INITIAL_CLASS LONG_NAME = Development Well --Hydrocarbon PRODUCTION Well HDR PLOT SYMBOL DESCRIPTION = Plugged and Abandoned --- DRY HOLE HDR PLOT_SYMBOL = 104
WELL_ALIAS BOREHOLE_SITE_ID=SIT965216 : equivalent BOREHOLE_NAME=UNKNOWN PARISH 0 WELL_ALIAS PLOT_NAME= HENRY-2 WELL_ALIAS UWI= 200019770162 WELL_ALIAS WELL_NAME= 965216 : [WELL_SITE_ID] WELL_SITE_ID -- GEDIS Boreholes Database SITE ID
NODE_COORD BOTTOM HOLE LAT & LONG = -38.704046 142.620296 NODE_COORD SURFACE LAT & LONG = -38.7040463 142.6202958 NODE_COORD DATUM = COORD_SYSTEM_ID=4283 GEODETIC_DATUM_ID=4283
GENERAL REMARKS 001 RMK_TYPE= SIDETRACK RMK= Henry-2 was a pilot hole for Hnery-2 DW1. Henry 2 was plugged back and sidetracked as Henry 2DW1. Due to hole problems whilerunning 244mm (9 5/8") casing Henry 2DW1 was sidetracked as Henry 2DW1 ST1.
ASSETS (BRIEF) DATA_TYPE DATA_SUB_TYPE BARCODE ITEM_NAME [MEDIA_TYPE] SCANNED_OR_DIGITAL_FILES
ASSETS (BRIEF) GENERAL DATA_CD_DVD PE913159 HENRY-2 DW1 & -2 WCR CD [CD] 2009 PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_.TAR.GZ(141.3m)......... PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_.TAR.GZ(141.3m)......... SAM3_247_PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_I_MEDIA_LABELLING.JPG(2.6m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes ASSETS (BRIEF) GENERAL DATA_CD_DVD PE913160 HENRY-2 DW1, HENRY-2 DW1 ST1, WCR CD [CD] 2009 PE913160__((_HENRY-2_DW1,_HENRY-2_DW1_ST1,_WCR_CD_))_.TAR.GZ(161.7m)......... PE913160__((_HENRY-2_DW1,_HENRY-2_DW1_ST1,_WCR_CD_))_.TAR.GZ(161.7m)......... SAM3_248_PE913160__((_HENRY-2_DW1,_HENRY-2_DW1_ST1,_WCR_CD_))_I_MEDIA_LABELLING.JPG(2.6m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes ASSETS (BRIEF) WELL WCR_RPT PE911567 HENRY-2 WCR (Interpreted Well Data) [CD] 2009 in: COMPACTUS Bay of COMPACTUS_1 used to store tapes ASSETS (BRIEF) WELL WELL_LOG PE610438 HENRY-2 MWD/LWD VISION Service [DVD] 2008 PE610438__((_HENRY-2_MWD_LWD_VISION_SERVICE_))_.TAR.GZ(73.4m)......... PE610438__((_HENRY-2_MWD_LWD_VISION_SERVICE_))_.TAR.GZ(73.4m)......... SAM0_849_PE610438__((_HENRY-2_MWD_LWD_VISION_SERVICE_))_I_MEDIA_LABELLING.JPG(3.0m)......... in: COMPACTUS Bay of COMPACTUS_1 used to store tapes
ASSETS (BRIEF) SEISMIC HRZN_CONTR_MAP PE911567_3 HENRY-2 Depth Structure Map [CD] 2009 in: WCR_RPT HENRY-2 WCR (Interpreted Well Data) ASSETS (BRIEF) WELL BIOSTRAT PE911567_4 HENRY-2 Palynology Range Chart, 2009 [CD] 2009 in: WCR_RPT HENRY-2 WCR (Interpreted Well Data) ASSETS (BRIEF) WELL COMPOSITE_LOG PE911567_2 HENRY-2 Composite Log (Interp.) [CD] 2009 in: WCR_RPT HENRY-2 WCR (Interpreted Well Data) ASSETS (BRIEF) WELL CROSS_SECTION PE911567_5 HENRY-2 Stratigraphic Cross Section [CD] 2009 in: WCR_RPT HENRY-2 WCR (Interpreted Well Data) ASSETS (BRIEF) WELL DAILY_RPT PE915098_01 Well Daily Reports: DDRs, WOs, DGRs 2008 [CD] 2008 (2291 DIGITAL FILES) in: DVD Well Data - Electronic Submissions 2008 ASSETS (BRIEF) WELL DIRECTIONAL PE610438_1 HENRY-2 MWD/LWD VISION Service [DVD] 2008 PE610438__((_HENRY-2_MWD_LWD_VISION_SERVICE_))_.TAR.GZ(73.4m)......... PE610438__((_HENRY-2_MWD_LWD_VISION_SERVICE_))_.TAR.GZ(73.4m)......... SAM0_849_PE610438__((_HENRY-2_MWD_LWD_VISION_SERVICE_))_I_MEDIA_LABELLING.JPG(3.0m)......... in: DVD HENRY-2 MWD/LWD VISION Service ASSETS (BRIEF) WELL DIRECTIONAL PE610439_1 HENRY-2 DW1 MWD/LWD VISION Service [DVD] 2008 PE610439__((_HENRY-2_DW1_MWD_LWD_VISION_SERVICE_))_.TAR.GZ(4.3m)......... PE610439__((_HENRY-2_DW1_MWD_LWD_VISION_SERVICE_))_.TAR.GZ(4.3m)......... SAM0_850_PE610439__((_HENRY-2_DW1_MWD_LWD_VISION_SERVICE_))_I_MEDIA_LABELLING.JPG(3.0m)......... in: DVD HENRY-2 DW1 MWD/LWD VISION Service ASSETS (BRIEF) WELL DRILL_RPT PE915098_08 Well Drill Repts, Logs & T-D Curves 2008 [CD] 2008 (2291 DIGITAL FILES) in: DVD Well Data - Electronic Submissions 2008 ASSETS (BRIEF) WELL LITHOLOGY_LOG PE915098_09 Well Lithology Logs 2008 [CD] 2008 (2291 DIGITAL FILES) in: DVD Well Data - Electronic Submissions 2008 ASSETS (BRIEF) WELL LOG_TAPE_OR_DISK PE913159_2 HENRY-2 Dlis Well logs [CD] 2009 PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_.TAR.GZ(141.3m)......... PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_.TAR.GZ(141.3m)......... SAM3_247_PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_I_MEDIA_LABELLING.JPG(2.6m)......... in: CD HENRY-2 DW1 & -2 WCR CD ASSETS (BRIEF) WELL LOG_TAPE_OR_DISK PE913159_3 HENRY-2 LAS Well logs [CD] 2009 PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_.TAR.GZ(141.3m)......... PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_.TAR.GZ(141.3m)......... SAM3_247_PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_I_MEDIA_LABELLING.JPG(2.6m)......... in: CD HENRY-2 DW1 & -2 WCR CD ASSETS (BRIEF) WELL LOG_TAPE_OR_DISK PE915098_06 Well Logs: Digital 2008 [CD] 2008 (2291 DIGITAL FILES) in: DVD Well Data - Electronic Submissions 2008 ASSETS (BRIEF) WELL MUD_LOG PE915098_02 Well Mud Logs 2008 [CD] 2008 (2291 DIGITAL FILES) in: DVD Well Data - Electronic Submissions 2008 ASSETS (BRIEF) WELL SRVY_RPT PE915098_07 Well Geodetic Survey Data, Reports 2008 [CD] 2008 (2291 DIGITAL FILES) in: DVD Well Data - Electronic Submissions 2008 ASSETS (BRIEF) WELL WCR_RPT PE911567_1 HENRY-2 WCR (Interpreted Well Data) [CD] 2009 in: WCR_RPT HENRY-2 WCR (Interpreted Well Data) ASSETS (BRIEF) WELL WCR_RPT PE913159_1 HENRY-2 WCR [CD] 2008 PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_.TAR.GZ(141.3m)......... PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_.TAR.GZ(141.3m)......... SAM3_247_PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_I_MEDIA_LABELLING.JPG(2.6m)......... in: CD HENRY-2 DW1 & -2 WCR CD ASSETS (BRIEF) WELL WCR_RPT PE913160_1 HENRY-2 DW1, HENRY-2 DW1 ST1, WCR [CD] 2008 PE913160__((_HENRY-2_DW1,_HENRY-2_DW1_ST1,_WCR_CD_))_.TAR.GZ(161.7m)......... PE913160__((_HENRY-2_DW1,_HENRY-2_DW1_ST1,_WCR_CD_))_.TAR.GZ(161.7m)......... SAM3_248_PE913160__((_HENRY-2_DW1,_HENRY-2_DW1_ST1,_WCR_CD_))_I_MEDIA_LABELLING.JPG(2.6m)......... in: CD HENRY-2 DW1, Henry-2 DW1 ST1, WCR CD ASSETS (BRIEF) WELL WELL_LOG PE911567_6 HENRY-2 Well Evaluation Summary (WES) [CD] 2009 in: WCR_RPT HENRY-2 WCR (Interpreted Well Data) ASSETS (BRIEF) WELL WELL_LOG PE913159_4 HENRY-2 PDF Well logs [CD] 2009 PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_.TAR.GZ(141.3m)......... PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_.TAR.GZ(141.3m)......... SAM3_247_PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_I_MEDIA_LABELLING.JPG(2.6m)......... in: CD HENRY-2 DW1 & -2 WCR CD ASSETS (BRIEF) WELL WELL_LOG PE915098_04 Well Logs: MWD/LWD 2008 [CD] 2008 (2291 DIGITAL FILES) in: DVD Well Data - Electronic Submissions 2008 ASSETS (BRIEF) WELL WELL_LOG PE915098_05 Well Logs: Images 2008 [CD] 2008 (2291 DIGITAL FILES) in: DVD Well Data - Electronic Submissions 2008
ASSETS (BRIEF) GENERAL REGISTRY_FILE F7737415 VIC/P44/2/A-C 1 Registry File [PAPER] 2009 in:[ADMIN] SEE RECFIND DATABASE ASSETS (BRIEF) GENERAL REGISTRY_FILE F7743651 IR/04/0314 Registry File [PAPER] 2009 in:COMPACTUS COMPACTUS_1 55 Collins St
ASSETS (viaENC)WELL DATA_CD_DVD PE915098 Well Data - Electronic Submissions 2008 [DVD] (?2008) (2291 DIGITAL FILES) (this is a report with at least one enclosure related to HENRY-2) ASSETS (viaENC)WELL WELL_LOG PE610439 HENRY-2 DW1 MWD/LWD VISION Service [DVD] (?2008) PE610439__((_HENRY-2_DW1_MWD_LWD_VISION_SERVICE_))_.TAR.GZ(4.3m)......... PE610439__((_HENRY-2_DW1_MWD_LWD_VISION_SERVICE_))_.TAR.GZ(4.3m)......... SAM0_850_PE610439__((_HENRY-2_DW1_MWD_LWD_VISION_SERVICE_))_I_MEDIA_LABELLING.JPG(3.0m)......... (this is a report with at least one enclosure related to HENRY-2)
LINKS HYPERLINKAGES COPYRIGHT_DISCLAIMER ABOUT_DBMAP HOW_TO_GET_OR_SUBMIT_DATA This data has been dumped from Victorian Govt (http://www.dpi.vic.gov.au) dbMap database on 23-FEB-12
CORE/CUTTINGS Henry 2 : SAMPLE_TYPE=CUTT 00660 DEPTH_RANGE= 660.000 TO 2042.000M STORAGE_BAY=233 ROW=Q TO Q #TRAYS=6 [ <--this shows the actual cores and cuttings that DPI has stored in the DPI Werribee core shed ]
ASSET Counts Summary: GENERAL DATA_CD_DVD [CD] 2 ASSET Counts Summary: GENERAL REGISTRY_FILE [PAPER] 2 ASSET Counts Summary: SEISMIC HRZN_CONTR_MAP [CD] 1 ASSET Counts Summary: WELL BIOSTRAT [CD] 1 ASSET Counts Summary: WELL COMPOSITE_LOG [CD] 1 ASSET Counts Summary: WELL CROSS_SECTION [CD] 1 ASSET Counts Summary: WELL DAILY_RPT [CD] 1 ASSET Counts Summary: WELL DIRECTIONAL [DVD] 2 ASSET Counts Summary: WELL DRILL_RPT [CD] 1 ASSET Counts Summary: WELL LITHOLOGY_LOG [CD] 1 ASSET Counts Summary: WELL LOG_TAPE_OR_DISK [CD] 3 ASSET Counts Summary: WELL MUD_LOG [CD] 1 ASSET Counts Summary: WELL SRVY_RPT [CD] 1 ASSET Counts Summary: WELL WCR_RPT [CD] 4 ASSET Counts Summary: WELL WELL_LOG [CD] 4 ASSET Counts Summary: WELL WELL_LOG [DVD] 1
A WELL_DRILL_HISTORY: DRILL_OBS_NO DRILL_DATE DEPTH DEPTH_TVD HOLE_IND MUD_WT REMARK source B WELL_DRILL_HISTORY:001 24-AUG-08 .0 .00 Heading of this DDR is Henry 2 DW1 however the costs and dates line up with Henry-2, NOT the sidetrack DW1. As there is an existing Report# 1 for the DW1 well, I have added this report#1 into the Henry-2 daily history. [From:WELL_DAILY] B WELL_DRILL_HISTORY:002 25-AUG-08 131.7 131.70 Spud the well and drilled from 87.8m (mudline) to 131.7m RT. Displaced to PHG mud and POH. Run and cemented the 762mm (30") casing. WOC. [From:WELL_DAILY] B WELL_DRILL_HISTORY:003 26-AUG-08 396.0 396.00 Waited on cement. Backed out R/Tool from the wellhead and POH. Installed guide wires and cleared the wellhead base of cuttings. Tagged TOC at 129m, drilled out the cement and float shoe. Drilled ahead to 396m RT (LAT). [From:WELL_DAILY] B WELL_DRILL_HISTORY:004 27-AUG-08 657.0 657.00 Drilled 445mm (17.5") hole to casing point at 657m. Dropped EMS survey on bottom and POH. Retreived the EMS survey on wireline from 29m [From:WELL_DAILY] B WELL_DRILL_HISTORY:005 28-AUG-08 657.0 657.00 Completed running 340mm (13.375") casing. Made up 18-3/4' wellhead to drill pipe and landed and latched the wellhead. Circulated the casing volume. [From:WELL_DAILY] B WELL_DRILL_HISTORY:006 29-AUG-08 657.0 657.00 Picked up 36m of Riser. ROV became entangled in the guidelines. Attempted to free ROV, lost communication with ROV. Wait on equipment. [From:WELL_DAILY] B WELL_DRILL_HISTORY:007 30-AUG-08 657.0 657.00 Standby waiting on recovery ROV equipment. Offloaded ROV equipment off the supply vessel, rigged up to run the recovery ROV. [From:WELL_DAILY] B WELL_DRILL_HISTORY:008 31-AUG-08 657.0 657.00 Continued troubleshooting electronics with the Sea Eye ROV [From:WELL_DAILY] B WELL_DRILL_HISTORY:009 01-SEP-08 657.0 657.00 Waited on Nomad#3 recovery ROV being shipped to the field. Offloaded the supply vessel and installed the Nomad#3 recovery ROV into the existing Nomad#6 deployment frame. [From:WELL_DAILY] B WELL_DRILL_HISTORY:010 02-SEP-08 657.0 657.00 Continued re-terminating the recovery ROV. Completed final checks. Deployed ROV to bottom, visual siting of the XT showed guidelines across the XT. Problems encountered with the ROV camera, pulled the ROV to surface. [From:WELL_DAILY] B WELL_DRILL_HISTORY:011 03-SEP-08 657.0 657.00 Continued to function test ROV sonar. Deployed ROV, waited on visibility to improve. Manuerved ROV and untangled the guidelines from XT. Tensioned up the guidelines [From:WELL_DAILY] B WELL_DRILL_HISTORY:012 04-SEP-08 657.0 657.00 Function tested BOPs on the Normar carrier prior to running. Moved the BOP over to hole center and made up to the riser. Run BOPs to bottom, landed and latched same. [From:WELL_DAILY] B WELL_DRILL_HISTORY:013 05-SEP-08 657.0 657.00 Laid out 445mm (17.5") BHA. RIH and set the wear bushing. Picked up 311mm (12.25") BHA and RIH. Picked up the weight set test tool and continued RIH to land test tool. Pressure tested the BOPs, [From:WELL_DAILY] B WELL_DRILL_HISTORY:014 06-SEP-08 932.0 931.00 Completed repairs to the choke and kill manifold valve. Pressure tested the repaired valve. Pulled the weight set test tool to surface and laid out. Completed pressure testing surface equipment. Drilled ahead from 660m to 932m (272m). [From:WELL_DAILY] B WELL_DRILL_HISTORY:015 07-SEP-08 1329.0 1292.00 Continued to drill ahead from 932m to 1329m RT. [From:WELL_DAILY] B WELL_DRILL_HISTORY:016 08-SEP-08 1560.0 1471.00 Continued drillling 311mm (12.25") hole to 1560 mRT. Circulated 6 x BU until shakers were clean. Flushed choke and kill lines, conducted SCR's. Flow checked the well. POH from 1560m to 1368m. [From:WELL_DAILY] B WELL_DRILL_HISTORY:017 09-SEP-08 1560.0 1471.00 POH from 1368m to the shoe at 652m. Flow checked the well and pumped a slug. Continued to POH laying out FEWD tools. Picked up new bit and FEWD tools. RIH and tagged up in the wellhead at 93m (casing XO). [From:WELL_DAILY] B WELL_DRILL_HISTORY:018 10-SEP-08 1685.0 1564.00 Picked up new bit and RIH to 918m. Washed and reamed from 918m to bottom 1560m. Drilled ahead from 1560m to 1685 mRT. [From:WELL_DAILY] B WELL_DRILL_HISTORY:019 11-SEP-08 1904.0 1689.00 Drilled 311mm (12.25") hole from 1685m to 1904m (219m). [From:WELL_DAILY] B WELL_DRILL_HISTORY:020 12-SEP-08 2042.0 1757.00 Drilled 311 mm (12.25") hole from 1904 m to TD at 2042 m. Circulated hole clean, flow checked well and back reamed to 1745 m. [From:WELL_DAILY] B WELL_DRILL_HISTORY:021 13-SEP-08 2042.0 1757.00 POOH 311 mm (12.25") BHA from 764 m and laid out same. Made up CSHART to pup joint and laid out same. Made up 89 mm (3 1/2") cement stinger and RIH to 1360 m. [From:WELL_DAILY] B WELL_DRILL_HISTORY:022 14-SEP-08 2042.0 1757.00 RIH 89 mm (3 1/2") cement stinger from 1360 m to TD at 2042 m and completed 3 by cement plugs from 2042 m to 1600 m. POOH and laid out cement stinger. Made up 311 mm (12 1/4") BHA and RIH to 1220 m. [From:WELL_DAILY] B WELL_DRILL_HISTORY:023 15-SEP-08 1645.0 1539.00 RIH 311 mm (12 1/4") BHA from 1220 m to 1611 m and commenced sidetrack from 1628 m to 1645 m. [From:WELL_DAILY] B WELL_DRILL_HISTORY:024 16-SEP-08 1652.0 9999.99 Time drilled off cement plug from 1645 m and drilled ahead to 1652 m. Commenced Henry-2DW1 sidetrack. [From:WELL_DAILY] B WELL_DRILL_HISTORY:100 17-SEP-08 90.0 9999.99 Continued to RIH BHA from 93 m to 1709 m and drilled ahead to 1998 m MD. Circulated bottoms up for geological samples and prepared to control drill ahead. Continued to RIH BHA from 93 m to 1709 m and drilled ahead to 1998 m MD. Circulated bottoms up for geological samples and prepared to control drill ahead. Formations Name Top (MD) Top (TVD) Comment Massacre Shale 1207.0m 1189.1m 33.3m Low Timboon Fm 1222.0m 1202.2m 36.4m Low Paarratte Fm 1443.0m 1382.3m 28.5m Low Skull Creek Mudstone 1682.0m 1564.0m 19.7m Low Operations For Period 0000 Hrs to 2400 Hrs on 17 Sep 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IH P HBHA 0000 0030 0.50 1709.0m Continued to RIH BHA to 90 m and made up TDS. Worked through 340 mm (13 3/8") casing swage at 93 m with max slack off weight 0.9-1.8 t (2-4 klbs). Pulled back through to confirm free and worked back through same. IH P TI 0030 0230 2.00 1709.0m Continued to RIH from 95 m to 616 m. IH P SC 0230 0500 2.50 1709.0m Held pre job safety meeting and slipped and cut drill line. IH P RS 0500 0530 0.50 1709.0m Serviced block and TDS IH P TI 0530 0800 2.50 1709.0m Continued to RIH from 616 m to 1628 m. Made up TDS, washed and reamed tight spots at 1308 m, 1335 m. IH P WIN 0800 1000 2.00 1709.0m Made up TDS and washed in from 1628 m to 1709 m. IH P DA 1000 2300 13.00 1998.0m Drilled ahead intermediate hole from 1709 m to 1998 m MD, 1710 m TVD. Back reamed each stand at connections. IH P CS 2300 2400 1.00 1998.0m Circulated bottoms up at 1998 m MD, 1710 m TVD for geological samples. Operations For Period 0000 Hrs to 0600 Hrs on 18 Sep 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IH P DA 0000 0200 2.00 2039.0m Drilled ahead from 1998 m MD, 1710 m TVD to 2039 m MD, (1715 m TVD). Formation resistivity marker observed at 1707.5 m TVD. IH P CS 0200 0300 1.00 2039.0m Circulat... [From:WELL_DAILY] B WELL_DRILL_HISTORY:100 19-SEP-08 90.0 9999.99 Reamed in hole on wiper trip from 1940 m to 2047 m. Circulated hole clean and POOH. Laid out LWD/MWD/DD BHA. Picked up and racked back cement head and CHSART stand in aft finger board. Recovered wear bushing and jetted BOP's and wellhead. Rigged up to and ran 9 5/8" csg to 60 m. Reamed in hole on wiper trip from 1940 m to 2047 m. Circulated hole clean and POOH. Laid out LWD/MWD/DD BHA. Picked up and racked back cement head and CHSART stand in aft finger board. Recovered wear bushing and jetted BOP's and wellhead. Rigged up to and ran 9 5/8" csg to 60 m. Formations Name Top (MD) Top (TVD) Comment Massacre Shale 1207.0m 1189.1m 33.3m Low Timboon Fm 1222.0m 1202.2m 36.4m Low Paarratte Fm 1443.0m 1382.3m 28.5m Low Skull Creek Mudstone 1682.0m 1564.0m 19.7m Low Operations For Period 0000 Hrs to 2400 Hrs on 19 Sep 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IH P RW 0000 0100 1.00 2047.0m Continued to ream in hole from 1940 m to 2047 m. IH P CHC 0100 0200 1.00 2047.0m Circulated 1.5 times bottoms up, shakers clean. IH P TO 0200 1030 8.50 2047.0m Flow checked well and POOH conventionally from 2047 m to BHA at 42 m. Worked tight hole at: 1950 m, 1890 m, 1850 m, 1770 m, 1700 m, 1680 m, 1650 m, 1630 m, 1590 m. IH P HBHA 1030 1400 3.50 2047.0m Laid out 311 mm (12 1/4") BHA. IH P WH 1400 1800 4.00 2047.0m RIH with jet sub and wear bushing retrieval tool. Jetted well head, XT and BOP's with 1033 L/min (273 GPM), 10 RPM. Latched wear bushing and pulled free with 0.9 t (2 klbs). Jetted wellhead on trip out with same parameters. POOH and laid out retrieval tool. Wear bushing showed no signs of wear. IC P HT 1800 1830 0.50 2047.0m Picked up and made up cement head and racked back with a double of HWDP in aft finger board. IC P HT 1830 1930 1.00 2047.0m Picked up and made up CHSART and racked back on stand of DP in aft finger board. IC P SM 1930 1945 0.25 2... [From:WELL_DAILY] B WELL_DRILL_HISTORY:100 20-SEP-08 30.0 9999.99 RIH casing from 97 m as per tally to 1940 m. RIH casing from 97 m as per tally to 1940 m. Formations Name Top (MD) Top (TVD) Comment Massacre Shale 1207.0m 1189.1m 33.3m Low Timboon Fm 1222.0m 1202.2m 36.4m Low Paarratte Fm 1443.0m 1382.3m 28.5m Low Skull Creek Mudstone 1682.0m 1564.0m 19.7m Low Operations For Period 0000 Hrs to 2400 Hrs on 20 Sep 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IC P TI 0000 0330 3.50 2047.0m Continued to run 244 mm (9 5/8") casing from 60 m to 421 m. Filled each joint and broke circulation every 10 jts. IC TP (OTH) TI 0330 0500 1.50 2047.0m Cross threaded jt#19, torque levelled out prematurely. When laying out, TDS came into contact with stabbing arm due to stabbing arm not being racked back completely. Damage was caused to a hydraulic hose on the stabbing arm. Hydraulic system was disabled with minimal loss of fluid, no dropped objects. Hose not required for operations and was blanked off at both ends. Continued to layout casing joint #19 and #18. IC P TI 0500 1630 11.50 2047.0m Continued to run 244 mm (9 5/8") casing from 409 m to 1521 m. Filled each joint and broke circulation every 10 jts. Laid out jt # 20 and # 21 due to galling. IC P TI 1630 1830 2.00 2047.0m Changed out casing handling gear from 244 mm (9 5/8") to 273 mm (10 3/4") and made up xover. IC P TI 1830 2245 4.25 2047.0m Continued to RIH 273 mm (10 3/4") casing from 1535 m to 1927 m. Casing hung up at 1600 m and 1785 m. Washed through tight spots with minimal resistance. IC TP (OTH) WTH 2245 2315 0.50 2047.0m Continued to RIH casing, hung up at 1934 m. Attempted to work through, unsuccessful. Pulled back 10 m and broke circulation. Increased pump rate to 890 L/min (235 GPM) and washed down casing to 1940 m. Worked single clean. Filter cake observed at shakers after bottoms up. Unable to wash casing to tool joint due to FAC tool. IC TP (OTH) WTH 2315 240... [From:WELL_DAILY] B WELL_DRILL_HISTORY:100 21-SEP-08 30.0 9999.99 Attempted to work casing past 1927 m, unsuccessful. Changed out handling gear and POOH casing from 1927 m to 1006 m. Attempted to work casing past 1927 m, unsuccessful. Changed out handling gear and POOH casing from 1927 m to 1006 m. Formations Name Top (MD) Top (TVD) Comment Massacre Shale 1207.0m 1189.1m 33.3m Low Timboon Fm 1222.0m 1202.2m 36.4m Low Paarratte Fm 1443.0m 1382.3m 28.5m Low Skull Creek Mudstone 1682.0m 1564.0m 19.7m Low Operations For Period 0000 Hrs to 2400 Hrs on 21 Sep 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IC TP (OTH) WTH 0000 0200 2.00 2047.0m Worked casing free from 1927 m to 1940 m with 890 L/min (235 GPM). Unable to wash casing down to connection due to FAC tool packer space out. Attempted to work down without pumps unsuccessful. IC TP (OTH) WTH 0200 0300 1.00 2047.0m Held pre job safety meeting, laid out single joint of casing and made up 273 mm (10 3/4") by NC50 water bushing. Changed out handling gear for DP and made up a stand of DP to water bushing. IC TP (OTH) WTH 0300 0800 5.00 2047.0m Worked casing on DP from 1920 m to 1927 m with 850 - 1053 L/min (235 - 278 GPM). No drag observed. Minimal debris returned at shakers, mostly fine sand with some filter cake. Unable to work past 1927 m, taking weight and starting to pack off. Rotated pipe with torque limit set to 20.3 kNm (15 kft.lbs) at 15 RPM. Casing rotated free from 1920 to 1927 m with 13.6-20.3 kNm (10-15 kft.lbs) torque. Unable to work past 1927 m, TDS stalling out on torque limit cut off. IC U (HC) HT 0800 0900 1.00 2047.0m Removed water bushing and racked back stand of drill pipe. Changed out handling gear for 273 mm (10 3/4") casing. IC U (HC) TO 0900 1500 6.00 2047.0m POOH and laid out 273 mm (10 3/4") casing from 1927 m to 1535 m. Collar backed off joint #20, attempted to work casing while rigged up back-up tongs, unsuccessful. Unable to go down past 1778 m. Made up... [From:WELL_DAILY] B WELL_DRILL_HISTORY:100 22-SEP-08 80.0 9999.99 POOH 244 mm (9 5/8") casing, RIH and set wear bushing in wellhead, made up BHA for wiper trip and RIH to 951 m. POOH 244 mm (9 5/8") casing, RIH and set wear bushing in wellhead, made up BHA for wiper trip and RIH to 951 m. Formations Name Top (MD) Top (TVD) Comment Massacre Shale 1207.0m 1189.1m 33.3m Low Timboon Fm 1222.0m 1202.2m 36.4m Low Paarratte Fm 1443.0m 1382.3m 28.5m Low Skull Creek Mudstone 1682.0m 1564.0m 19.7m Low Operations For Period 0000 Hrs to 2400 Hrs on 22 Sep 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IC U (HC) TO 0000 1115 11.25 2047.0m Continued to POOH 244 mm (9 5/8") casing from 1006 m to 140 m. IC U (HC) TO 1115 1145 0.50 2047.0m Shut down cranes due to helicopter on deck. Serviced casing tong and cleaned rig floor. IC U (HC) TO 1145 1330 1.75 2047.0m Continued to POOH 244 mm (9 5/8") casing from 140 m to 37 m. IC U (HC) TO 1330 1500 1.50 2047.0m Broke out shoe track Baker-loked joints with rig tongs 61 - 72 kNm (45 - 53 kft.lbs) torque and laid out same. IC U (HC) HT 1500 1600 1.00 2047.0m Rigged down 244 mm (9 5/8") casing handling gear and rigged up to run DP. Cleaned up drill floor. IC U (HC) WH 1600 1900 3.00 2047.0m Picked up and RIH wear bushing, set down 4.4 t (10 klbs), backed out running tool and POOH. IC U (HC) WT 1900 2100 2.00 2047.0m Picked up and made up 311 mm (BHA) to 201 m. IC U (HC) WT 2100 2200 1.00 2047.0m Continued to RIH from 201 m to 640 m. IC P RS 2200 2300 1.00 2047.0m Serviced TDS and blocks. Tested TDS torque settings from SCR room. IC U (HC) WT 2300 2400 1.00 2047.0m Continued to RIH from 640 m to 951 m. Operations For Period 0000 Hrs to 0600 Hrs on 23 Sep 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IC U (HC) WT 0000 0130 1.50 2047.0m Continued to RIH from 951 m to 1481 m. IC U (HC) WT 0130 0600 4.50 2047.0m Unable to p... [From:WELL_DAILY] B WELL_DRILL_HISTORY:100 23-SEP-08 30.0 9999.99 RIH wiper trip from 951 m to TD at 2047 m, back reaming from 1481 m. RIH wiper trip from 951 m to TD at 2047 m, back reaming from 1481 m. Formations Name Top (MD) Top (TVD) Comment Massacre Shale 1207.0m 1189.1m 33.3m Low Timboon Fm 1222.0m 1202.2m 36.4m Low Paarratte Fm 1443.0m 1382.3m 28.5m Low Skull Creek Mudstone 1682.0m 1564.0m 19.7m Low Operations For Period 0000 Hrs to 2400 Hrs on 23 Sep 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IC U (HC) WT 0000 0130 1.50 2047.0m Continued to RIH from 951 m to 1481 m. IC U (HC) WT 0130 1930 18.00 2047.0m Unable to pass bridge at 1481 m. Made up TDS, washed and reamed in hole from 1481 m to 2030 m. Hole packing off and string stalling out continuously. Unable to establish movement up or down without pumps. Worked each stand clean until minimal torque and drag encountered. Heavy returns observed at shakers at times with some fine sand and filter cake initially. Simultaneous Operations: Increased mud weight to 1.38 sg (11.5 ppg). IC U (HC) WT 1930 2000 0.50 2047.0m Saver sub broke out from TDS at connection. Laid out single and made up new. IC U (HC) WT 2000 2100 1.00 2047.0m Continued to ream in from 2030 m to TD at 2047 m. Hole starting to improve with no packing off and cleaning up after first run. IC U (HC) WT 2100 2400 3.00 2047.0m At TD staged pumps up from 2461 L/min (650 GPM) to 3785 L/min (1000 GPM) while working stand with 160 RPM. No pack off, hole cleaning up. Simultaneous Operations: Offloaded KCL bulk bags from Far Grip and commenced adding to active to increase KCL concentration from 8% to 10% bt wt. Operations For Period 0000 Hrs to 0600 Hrs on 24 Sep 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IC U (HC) WT 0000 0245 2.75 2047.0m Continued to circulate hole clean and condition mud. Laid out stand and worked from 2028 m to 2000 m. RIH to 2043 m and circulated Hi-vis... [From:WELL_DAILY] B WELL_DRILL_HISTORY:100 24-SEP-08 50.0 9999.99 Circulated and conditioned mud at TD, flow checked well and back reamed out of hole from 2047 m to 1400 m. Circulated clean and reamed in hole to TD. Circulated clean and POOH conventionally to 201 m. Racked back BHA, RIH and recovered wear bushing. Circulated and conditioned mud at TD, flow checked well and back reamed out of hole from 2047 m to 1400 m. Circulated clean and reamed in hole to TD. Circulated clean and POOH conventionally to 201 m. Racked back BHA, RIH and recovered wear bushing. Formations Name Top (MD) Top (TVD) Comment Massacre Shale 1207.0m 1189.1m 33.3m Low Timboon Fm 1222.0m 1202.2m 36.4m Low Paarratte Fm 1443.0m 1382.3m 28.5m Low Skull Creek Mudstone 1682.0m 1564.0m 19.7m Low Operations For Period 0000 Hrs to 2400 Hrs on 24 Sep 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IC U (HC) WT 0000 0245 2.75 2047.0m Continued to circulate hole clean and condition mud. Laid out stand and worked from 2028 m to 2000 m. RIH to 2043 m and circulated Hi-vis sweep. Simultaneous Operations: Added KCL to active to increase to 10% by wt. Prepared 11.1 m3 (70 bbl) Hi vis sweep and pumped same. IC U (HC) WT 0245 0300 0.25 2047.0m Flow checked well, ok. IC U (HC) WT 0300 0330 0.50 2047.0m POOH conventionally from 2047 m to 1951 m. IC U (HC) WT 0330 0800 4.50 2047.0m Unable to work past 1951 m with 31 t (71 klbs) overpull. Broke circulation and back reamed out of hole from 1951 m to 1400 m with 2461 L/min (650) GPM and 170 RPM. IC U (HC) WT 0800 0900 1.00 2047.0m At 1400 m continued to circulate until shakers clean at 3786 L/min (1000 GPM), 170 RPM. Prepared drill floor to RIH for wiper trip. IC U (HC) WT 0900 1000 1.00 2047.0m Attempted to trip in hole conventionally, unsuccessful. Could not pass 1420 m. IC U (HC) WT 1000 1430 4.50 2047.0m Made up TDS and reamed in hole from 1420 m to TD at 2047 m. IC U (HC) WT 1430 1600 1.50 2047.0m Cont... [From:WELL_DAILY] B WELL_DRILL_HISTORY:101 25-SEP-08 30.0 9999.99 POOH wear bushing from 85 m. Rigged up and RIH 244 mm (9 5/8") by 273 mm (10 3/4") casing as per programme to 1808 m. POOH wear bushing from 85 m. Rigged up and RIH 244 mm (9 5/8") by 273 mm (10 3/4") casing as per programme to 1808 m. Formations Name Top (MD) Top (TVD) Comment Massacre Shale 1207.0m 1189.1m 33.3m Low Timboon Fm 1222.0m 1202.2m 36.4m Low Paarratte Fm 1443.0m 1382.3m 28.5m Low Skull Creek Mudstone 1682.0m 1564.0m 19.7m Low Operations For Period 0000 Hrs to 2400 Hrs on 25 Sep 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IC P WT 0000 0130 1.50 2047.0m POOH wear bushing to slip joint. Made up TDS and rotated wear bushing retrieval tool past slip joint. Continued to pull wear bushing and jet sub, laid out same. Minimal wear on wear bushing. Cleaned up floor and rigged down DP handling gear. IC P SM 0130 0145 0.25 2047.0m Held pre job safety meeting, reviewed Drill Crew and Casing Running Crew JSA's. Discussed previous incidents and controls. IC P RRC 0145 0330 1.75 2047.0m Rigged up to run 244 mm (9 5/8") casing. IC P CRN 0330 0415 0.75 2047.0m Made up shoe track with Baker-Lok and tested floats, ok. IC P CRN 0415 1730 13.25 2047.0m Continued to RIH 244 mm (9 5/8") casing to 1451 m. Filled pipe every broke circulation every 10 jts. IC P CRN 1730 1830 1.00 2047.0m Changed out casing handling equipment from 244 mm (9 5/8") to 273 mm (10 3/4"). IC P CRN 1830 2130 3.00 2047.0m Continued to RIH 273 mm (10 3/4") casing from 1451 m to 1700 m. IC TP (VE) OA 2130 2230 1.00 2047.0m Picked up joint #22 with 500 t slip type elevators 2 m below collar to allow FAC tool to fill casing. Casing slipped quickly through elevators to catch up on collar. Landed out casing in FMS and cleaned elevator dies with a brush and detergent, removed with a pressure cleaner. Picked up joint #23, casing slipped 2 m again. Rigged down 500 t slip type elevator... [From:WELL_DAILY] B WELL_DRILL_HISTORY:101 26-SEP-08 50.0 9999.99 RIH 273 mm (10 3/4") casing from 1808 m to 1913 m. Casing became stuck at 1913 m. Lowered mud weight and continued attempts to work casing free. RIH 273 mm (10 3/4") casing from 1808 m to 1913 m. Casing became stuck at 1913 m. Lowered mud weight and continued attempts to work casing free. Formations Name Top (MD) Top (TVD) Comment Massacre Shale 1207.0m 1189.1m 33.3m Low Timboon Fm 1222.0m 1202.2m 36.4m Low Paarratte Fm 1443.0m 1382.3m 28.5m Low Skull Creek Mudstone 1682.0m 1564.0m 19.7m Low Operations For Period 0000 Hrs to 2400 Hrs on 26 Sep 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IC P CRN 0000 0100 1.00 2047.0m Continued to RIH 273 mm (10 3/4") casing from 1808 m to 1868 m. Casing continued to drag 8.9-22 t (20 - 50 klbs) below average running weight, 133 t (300 klbs inc blocks). IC P CRN 0100 0230 1.50 2047.0m Made up 273 mm (10 3/4") by (4 1/2") IF water bushing to casing joint on drill floor. Made up casing joint to casing string and TDS to water bushing. Washed casing in from 1868 m to 1913 m with 484 L/min (128 GPM). IC TP (SP) CRN 0230 0600 3.50 2047.0m Attempted to run joint #39 273 mm (10 3/4") casing, unsuccessful. Casing stuck, no up/down movement no rotation, full circulation. Varied parameters from 67-289 t (150 - 650 klbs), 0-27.1 kNm (0-20 kft.lbs) torque, 0-969 L/min (0-256 GPM) flow rate. Pipe rotated 1/4 turn with 27.1 kNm (20 kft.lbs) Performed pull test to calculate stuck point: Test #1: Starting weight 156 t (350 klbs), final weight 178 t (400 klbs), distance travelled 178 mm (7"). Test #2: Starting weight 156 t (350 klbs), final weight 200 t (450 klbs), distance travelled 241 mm (9.5"). IC TP (SP) CRN 0600 2400 18.00 2047.0m Made up 15.9 m3 (100 bbl) of 1.14 sg (9.5 ppg) citric acid/SAPP pill and displaced into annulus from 1850 m to 1300 m circulating through choke and holding back pressure on annulus to avoid u-tubing, shut in pressure on ... [From:WELL_DAILY] B WELL_DRILL_HISTORY:101 27-SEP-08 50.0 9999.99 Attempted to work stuck casing free by reducing MW, unsuccessful. Set cement plug over shoe to isolate Waarre A sands and backed off casing above 340 mm (13 3/8") casing shoe. POOH 8 joints 273 mm (10 3/4") casing and laid out same. Attempted to work stuck casing free by reducing MW, unsuccessful. Set cement plug over shoe to isolate Waarre A sands and backed off casing above 340 mm (13 3/8") casing shoe. POOH 8 joints 273 mm (10 3/4") casing and laid out same. Formations Name Top (MD) Top (TVD) Comment Massacre Shale 1207.0m 1189.1m 33.3m Low Timboon Fm 1222.0m 1202.2m 36.4m Low Paarratte Fm 1443.0m 1382.3m 28.5m Low Skull Creek Mudstone 1682.0m 1564.0m 19.7m Low Operations For Period 0000 Hrs to 2400 Hrs on 27 Sep 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IC TP (SP) CRN 0000 1330 13.50 2047.0m Continued attempting to work casing free while reducing mud weight to 1.2 sg, (10 ppg). IC TP (SP) HT 1330 1500 1.50 2047.0m Set slips with casing in neutral weight. Broke and laid out single of 273 mm (10 3/4") casing joint, water bushing and TIW valve. Made up water bushing to 273 mm (10 3/4") casing, installed cementing sub and made up cement hose. Latched casing with 350 t elevators, picked up string weight and compensated string. IC TP (SP) CMP 1500 1700 2.00 2047.0m Lined up cement unit and pumped 0.8 m3 (5 bbls) of sea water. Closed low torque vavle on cementing sub and p/t surface lines to 3.4 MPa (500 psi). Pumped 0.8 m3 (5 bbls) of sea water, mixed and pumped 6.4 m3 (40 bbls) of 1.9 sg 15.8 ppg at 636 L/min (4 bpm), pumped 7.9 m3 (50 bbls) of Hi-vis mud and displaced with 68 m3 (428 bbls) of 1.2 sg (10 ppg) mud at 954 L/min (6 bpm). Bled off pressure and confirmed floats holding. ok. IC TP (SP) HT 1700 1800 1.00 2047.0m Broke off cement circulating sub, changed out elevators for DP and made up 4.5 m pup joint to water bushing. Marked all connections above rotary wit... [From:WELL_DAILY] B WELL_DRILL_HISTORY:101 28-SEP-08 50.0 9999.99 POOH casing, changed out handling gear and RIH casing cutting assembly. Cut casing @ 1300 m POOH lcasing cutting assembly laid out same. Made up and RIH to 147 m w/fishing assembly. POOH casing, changed out handling gear and RIH casing cutting assembly. Cut casing @ 1300 m POOH lcasing cutting assembly laid out same. Made up and RIH to 147 m w/fishing assembly. Formations Name Top (MD) Top (TVD) Comment Massacre Shale 1207.0m 1189.1m 33.3m Low Timboon Fm 1222.0m 1202.2m 36.4m Low Paarratte Fm 1443.0m 1382.3m 28.5m Low Skull Creek Mudstone 1682.0m 1564.0m 19.7m Low Operations For Period 0000 Hrs to 2400 Hrs on 28 Sep 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IC TP (SCS) CPL 0000 0530 5.50 2047.0m Continued to POOH 273 mm (10 3/4") casing. Pulled 37 joints of 273 mm (10 3/4") and 244 mm (9 5/8") 273 mm (10 3/4") x/over box down. Casing connections broke on average with 50 kNm (37 kft.lbs) Top of fish at 455 m with pin up on a 244 mm (9 5/8") 2.3 m casing pup joint. IC TP (SCS) HT 0530 0630 1.00 2047.0m Rigged down casing handling equipment and rigged up to handle DP. IC TP (SCS) WH 0630 0830 2.00 2047.0m Picked up and made up wear bushing running tool with wear bushing installed. RIH and landed out, released wear bushing and POOH. IC TP (SCS) CCT 0830 0900 0.50 2047.0m Picked up casing cutter tool and function tested in rotary with 323 L/min (85gpm), 0.7 MPa (100 psi). IC TP (SCS) CCT 0900 1200 3.00 2047.0m RIH cutting assembly to top of fish (TOF) at 451 m. Entered fish with minimal loss of weight. Continued to RIH to 838 m. IC TP (SCS) SM 1200 1230 0.50 2047.0m Held pre job safety meeting prior to handling fishing assembly and changed out automatic DP elevators for manual. IC TP (SCS) OA 1230 1400 1.50 2047.0m Made up marine swivel assembly and attempted to run through rotary, unsuccessful. 244 mm (9 5/8") casing stop on travelling sleeve hung... [From:WELL_DAILY] B WELL_DRILL_HISTORY:101 29-SEP-08 80.0 9999.99 RIH fishing assembly and attempted to jar casing free, unsuccessful. POOH fishing assembly and RIH casing cutter assembly. Cut casing at 1050 m and POOH. RIH fishing assembly and pulled casing free. POOH w/fish and laid out 16 joints of casing. RIH fishing assembly and attempted to jar casing free, unsuccessful. POOH fishing assembly and RIH casing cutter assembly. Cut casing at 1050 m and POOH. RIH fishing assembly and pulled casing free. POOH w/fish and laid out 16 joints of casing. Formations Name Top (MD) Top (TVD) Comment Massacre Shale 1207.0m 1189.1m 33.3m Low Timboon Fm 1222.0m 1202.2m 36.4m Low Paarratte Fm 1443.0m 1382.3m 28.5m Low Skull Creek Mudstone 1682.0m 1564.0m 19.7m Low Operations For Period 0000 Hrs to 2400 Hrs on 29 Sep 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IC TP (SCS) FSH 0000 0030 0.50 2047.0m Continued to RIH fishing assembly to top of fish (TOF) at 451 m. IC TP (SCS) FSH 0030 0100 0.50 2047.0m Serviced TDS and blocks. Completed pre-jar inspection of TDS. IC TP (SCS) FSH 0100 0130 0.50 2047.0m Held pre job safety meeting prior to engaging fish and jarring free. Set casing spear grapple and picked up to confirm same. IC TP (SCS) FSH 0130 0400 2.50 2047.0m Attempted to jar casing free with 45-54 t (100-120 klbs) overpull, unsuccessful. Pulled casing to 113 t (250 klbs) overpull and allowed rig heave to work same unsuccessful. Continued to jar and work pipe as above, unsuccessful. IC TP (SCS) FSH 0400 0600 2.00 2047.0m Slacked off weight and released grapple. POOH, racked back HWDP and laid out Itco spear fishing assembly. IC TP (SCS) FSH 0600 0630 0.50 2047.0m Picked up casing cutter assembly and tested same with 321 L/min (85 GPM), 0.7 MPa (100 psi). IC TP (SCS) FSH 0630 0900 2.50 2047.0m Run casing cutter assembly to 600 m. IC TP (SCS) FSH 0900 0930 0.50 2047.0m Picked up marine swivel assembly with x/over an... [From:WELL_DAILY] B WELL_DRILL_HISTORY:101 30-SEP-08 70.0 9999.99 POOH casing, RIH and set cement plugs from 1050 m to 800 m. POOH, laid out fishing assembly from derrick and RIH weight set test tool. Tested choke manifold and commenced p/t BOP's. POOH casing, RIH and set cement plugs from 1050 m to 800 m. POOH, laid out fishing assembly from derrick and RIH weight set test tool. Tested choke manifold and commenced p/t BOP's. Formations Name Top (MD) Top (TVD) Comment Massacre Shale 1207.0m 1189.1m 33.3m Low Timboon Fm 1222.0m 1202.2m 36.4m Low Paarratte Fm 1443.0m 1382.3m 28.5m Low Skull Creek Mudstone 1682.0m 1564.0m 19.7m Low Operations For Period 0000 Hrs to 2400 Hrs on 30 Sep 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IC TP (SP) FSH 0000 0430 4.50 2047.0m Continued to POOH casing. 35 joints laid out with final joint showing clean casing cut 1.2 m down from box. IC TP (SCS) HT 0430 0530 1.00 2047.0m Rigged down casing handling equipment and rigged up to run 89 mm (3 1/2") DP. IC TP (SCS) CMP 0530 0600 0.50 2047.0m Made up mule shoe and RIH 89 mm (3 1/2") cement stinger to 50 m. IC TP (RE) RR 0600 0630 0.50 2047.0m On routine derrick inspection, noticed wire wrap secondary retention on bolts for compensator top hat covers broken. Removed covers from compensator. IC TP (SCS) CMP 0630 0800 1.50 2047.0m Continued to pick up 89 mm (3 1/2") cement stinger from 50 m and RIH to 206 m. IC TP (SCS) CMP 0800 0930 1.50 2047.0m Change over to DP handling gear and RIH cement stinger on DP to 1050 m. IC TP (SCS) CMP 0930 1000 0.50 2047.0m Circulated bottoms up and held pre job safety meeting prior to cementing operations. IC TP (SCS) CMP 1000 1100 1.00 2047.0m Made up cementing sub onto DP with low torque valve and lined up cement unit. Pumped 0.8 m3 (5 bbls) of drill water, p/t surface hose to 10.3 MPa (1500 psi) for 5 min ok. Pumped 5.7 m3 (35 bbls) of drill water spacer, mixed and pumped 13.6 m3 (86 bbls) of ... [From:WELL_DAILY] B WELL_DRILL_HISTORY:200 04-OCT-08 94.0 9999.99 Unable to pass swage at 93 m with RS assembly. POOH and RIH with milling assembly. Milled casing swage at 93 m and POOH, laid out same. Operations For Period 0000 Hrs to 2400 Hrs on 04 Oct 2008 Unable to pass swage at 93 m with RS assembly. POOH and RIH with milling assembly. Milled casing swage at 93 m and POOH, laid out same. Operations For Period 0000 Hrs to 2400 Hrs on 04 Oct 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IC TP (SCS) HBHA 0000 0330 3.50 1050.0m Continued to pick up and make BHA#10 311 mm (12 1/4") Powerdrive X5 assembly with Bit#10 ReedHycalog RSX616M-A16 PDC bit, RIH to 93 m. Powerdrive X5 directional tool was hot shot to rig and required special make up on drill floor due to being delivered in separate segments. Reprogrammed LWD/MWD assembly for new DD tools. IC TU (MIS) OA 0330 0430 1.00 1050.0m Attempted to pass swage at 93 m, unsuccessful. Continued to vary parameters, attempted to work past with left hand rotation and engaged DD tool pads, unable to pass obstruction. POOH to change assembly, hung up on wellhead. Passed wellhead after 5 min with slight rotation and low flow rate. IC TU (MIS) HBHA 0430 0530 1.00 1050.0m POOH to change bit. IC TU (MIS) HBHA 0530 0630 1.00 1050.0m Made up BHA#11 with Bit#11 Reed T11C (115) rock bit and RIH to 93 m. IC TU (MIS) TI 0630 0700 0.50 1050.0m Attempted to pass casing swage restriction at 93 m, unsuccessful. IC U (MIS) HBHA 0700 0900 2.00 1050.0m POOH, worked DD tool and bit past wellhead at 86.5 m with low flow rate and 10 RPM. Continued to POOH and rack back BHA, flushed directional assembly with sea water when pulled through rotary. IC TU (MIS) HBHA 0900 1000 1.00 1050.0m Picked up a stand of 203 mm (8 ") DC, made up used 117 rock bit and attempted to work past swage, unsuccessful. Simultaneous Operations: Mobilised milling assembly to rig via Portland. IC TU (MIS) HBHA 1000 1130 1.50 1050.0m POOH and... [From:WELL_DAILY] B WELL_DRILL_HISTORY:200 05-OCT-08 94.0 9999.99 Milled casing swage and RIH check trip to confirm free passage. Made up 311 mm (12 1/4") BHA and RIH to 1050 m. Drilled ahead to 1224 m MD. Milled casing swage and RIH check trip to confirm free passage. Made up 311 mm (12 1/4") BHA and RIH to 1050 m. Drilled ahead to 1224 m MD. Formations Name Top (MD) Top (TVD) Comment Pember Mudstone 1092.5m 1086.4m 0.5 H Pebble Point Fm 1131.0m 1123.2m 1.3 L Massacre Shale 1201.0m 1189.5m 0.4 L Timboon Fm 1214.5m 1202.4m 0.2 L Operations For Period 0000 Hrs to 2400 Hrs on 05 Oct 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IC TU (MIS) HBHA 0000 0400 4.00 1050.0m Picked up BHA#13 with Bit#10RR 311 mm (12 1/4") ReedHycalog RSX616M-A16 PDC, 308 mm (12 1/8") near bit stabiliser and 203 mm (8") DC assembly and RIH to 93 m. Attempted to work past swage, unsuccessful. Attempted to POOH, unsuccessful, hung up on bottom of wellhead at 86.5 m. RIH and commenced reaming on swage for 20 min. Worked past swage with low flow rate and 20 RPM, continued to POOH and rack back assembly. IC TU (MIS) HBHA 0400 0530 1.50 1050.0m Picked up and made up BHA#14 milling assembly: Milling assembly (inc 311 mm (12 1/4") Mill tapered entry shoe and 2 x 311 mm (12 1/4") melon mills at 0.5 m and 3.4 m behind shoe), 308 mm (12 1/8") near bit stabiliser, 2 x 203 mm (8") DC, 308 mm (12 1/8" IBSS), 1 x 203 mm (8") DC and HWDP to surface. IC TU (MIS) M 0530 0700 1.50 1050.0m Commenced milling swage from 93 m. Worked past with mill shoe and 2 x mills, picked up above swage and attempted to ream down, unsuccessful. Hung up at 93 m with the mill shoe. Continued to mill from 93 m with 3236 L/min (855 GPM), 130 RPM, 4.1-6.8 kNm (3-5 kft.lbs). Once through swage with mill assembly, worked several times until assembly passed with minimal resistance. Pumped Hi-vis sweep, fine swarf returned on ditch magnet. Attempted to POOH, unsuccessful. Hung up on the bottom of the wellhead, attem... [From:WELL_DAILY] B WELL_DRILL_HISTORY:200 06-OCT-08 88.0 9999.99 Drilled 311 mm (12 1/4") hole from 1224 m to 1625 m. Drilled 311 mm (12 1/4") hole from 1224 m to 1625 m. Formations Name Top (MD) Top (TVD) Comment Pebble Point Fm 1131.0m 1123.2m 1.3 L Massacre Shale 1201.0m 1189.5m 0.4 L Timboon Fm 1214.5m 1202.4m 0.2 L Paaratte Fm 1413.0m 1380.0m 2.3 m H Operations For Period 0000 Hrs to 2400 Hrs on 06 Oct 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IH U (SCS) DA 0000 1600 16.00 1413.0m Drilled ahead Timboon Fm from 1224 m to 1413 m MD, (1380 m TVD) with 4.5-11.3 t (10-25 klbs) WOB, 160 RPM, 3710 L/min (980 GPM) flow rate and 6.8-27.1 kNm (5-20 kft.lbs) torque. Correlated pyrite stringers off pilot hole mud log and drilled with 100 RPM and 3.6-4.5 t (8-10 klbs) WOB. IH U (SCS) DA 1600 2400 8.00 1625.0m Drilled ahead Paaratte Fm from 1413 m to 1625 m MD, (1534 m TVD) with 9-11.3 t (20-25 klbs) WOB, 160 RPM, 3710 L/min (980 GPM) flow rate and 6.8-27.1 kNm (5-20 kft.lbs) torque. Operations For Period 0000 Hrs to 0600 Hrs on 07 Oct 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IH U (SCS) DA 0000 0600 6.00 1760.0m Drilled ahead Paaratte Fm from 1625 m to 1760 m MD with 9-11.3 t (20-25 klbs) WOB, 160 RPM, 3710 L/min (980 GPM) flow rate and 6.8-27.1 kNm (5-20 kft.lbs) torque. WBM Data Cost Today $ 13909 Mud Type: ! KCL/GLY Sample-From: Pit Time: 20:00 Weight: 1.38sg Temp: 142.0C� API FL: 4cm�/30m Filter-Cake: HTHP-FL: HTHP-Cake: 0mm KCl: 10% Hard/Ca: 600 MBT: 5 PM: 0.1 PF: 0.02 Solids: 12.37 H2O: 88% Oil: Sand: 1 pH: 8.4 PHPA: 2ppb Viscosity: 0sec/L PV: 0.039Pa/s YP: 0.278MPa Gels 10s: 0.057 Gels 10m: 0.120 Fann 003: 12 Fann 006: 15 Fann 100: 58 Fann 200: 82 Fann 300: 97 Fann 600: 136 Comment Continued to add 6 sx calcium carbonate / std drilled. Added PHPA and KCL as required to maintain specs. Weighted up active to 11.5 ppg prior to 1400 m with additions we... [From:WELL_DAILY] B WELL_DRILL_HISTORY:200 07-OCT-08 88.0 9999.99 Drilled 311 mm (12 1/4") intermediate hole from 1625 m to 2037 m. Drilled 311 mm (12 1/4") intermediate hole from 1625 m to 2037 m. Formations Name Top (MD) Top (TVD) Comment Massacre Shale 1201.0m 1189.5m 0.4 L Timboon Fm 1214.5m 1202.4m 0.2 L Paaratte Fm 1413.0m 1380.0m 2.3 H Skull Ck 1665.0m 1558.6m 5.4 H Operations For Period 0000 Hrs to 2400 Hrs on 07 Oct 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IH U (SCS) DA 0000 0130 1.50 1665.0m Drilled ahead Paaratte Fm from 1625 m to 1665 m MD with 9-11.3 t (20-25 klbs) WOB, 160 RPM, 3710 L/min (980 GPM) flow rate and 6.8-27.1 kNm (5-20 kft.lbs) torque. IH U (SCS) DA 0130 2400 22.50 2037.0m Drilled ahead Skull Ck Fm from 1665 m to 2037 m MD with 9-14.5 t (20-32 klbs) WOB, 160 RPM, 3710 L/min (980 GPM) flow rate and 6.8-27.1 kNm (5-20 kft.lbs) torque. Operations For Period 0000 Hrs to 0600 Hrs on 08 Oct 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IH U (SCS) DA 0000 0030 0.50 2050.0m Continued to drill Skull Ck Fm from 2037 m to section TD at 2050 m MD (1711.4 m) IH U (SCS) CHC 0030 0300 2.50 2050.0m Circulated 3 x bottoms up, worked double with 160 RPM and 3709 L/min (980 GPM). Racked back stand and continued to work next with same parameters. Shakers clean. IH U (SCS) FC 0300 0315 0.25 2050.0m Conducted flow check, static. IC U (SCS) RW 0315 0600 2.75 2050.0m POOH to 1961 m on elevators, started to pull 31.7 t (70 klbs) over, attempted to work through unsuccessful. Made up TDS and attempted to pump out of hole, unsuccessful, started to pack off. Commenced back reaming from 1961 m to 1600 m with 150 RPM and 3406 L/min (900 GPM). Minimal overpull observed, no pack off and fluctuating torque without stalling. WBM Data Cost Today $ 36406 Mud Type: ! KCL/GLY Sample-From: Pit Time: 20:00 Weight: 1.38sg Temp: 140.0C� API FL: 3cm�/30m Filter-Cake: HTHP-FL: HTHP-Cake: 1... [From:WELL_DAILY] B WELL_DRILL_HISTORY:200 08-OCT-08 88.0 9999.99 Continued drilling 311 mm (12 1/4") hole from 2,037 m to 2,050 m. Circulated hole clean and pumped out of hole from 2,050 m to 1,945 m. Back reamed out of the hole to the 340 mm (13 3/8") casing shoe at 650 m. Replaced darts in cement head and racked back in derrick. Slipped and cut drill line. Commenced running back in the hole to conduct a wiper trip. Continued drilling 311 mm (12 1/4") hole from 2,037 m to 2,050 m. Circulated hole clean and pumped out of hole from 2,050 m to 1,945 m. Back reamed out of the hole to the 340 mm (13 3/8") casing shoe at 650 m. Replaced darts in cement head and racked back in derrick. Slipped and cut drill line. Commenced running back in the hole to conduct a wiper trip. Formations Name Top (MD) Top (TVD) Comment Massacre Shale 1201.0m 1189.5m 0.4 L Timboon 1214.5m 1202.4m 0.2 L Paaratte 1413.0m 1380.0m 2.3 H Skull Creek 1665.0m 1558.6m 5.4 H Operations For Period 0000 Hrs to 2400 Hrs on 08 Oct 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IH U (SCS) DA 0000 0030 0.50 2050.0m Continued drilling Skull Creek formation from 2,037 m to section TD at 2,050 m MD (1,711.4 m) TVD. IH U (SCS) CHC 0030 0300 2.50 2050.0m Circulated 3 x bottoms up, worked double with 160 RPM and 3709 L/min (980 GPM). Racked back stand and continued to work next with same parameters. Shakers clean. IH U (SCS) FC 0300 0315 0.25 2050.0m Conducted flow check, well static. IC U (SCS) RW 0315 1430 11.25 2050.0m POOH from 2,050 m to 1,961 m on elevators. Took 31.7 mt (70 klbs) overpull. Attempted to work through tight spot, unsuccessful. Made up TDS and attempted to pump out of hole, unsuccessful. Started packing off . Commenced back reaming from 1,961 m to 1,105 m with 150 rpm and 3406 l/min (900 gpm). Minimal overpull observed, no pack off and fluctuating torque without stalling. IC U (SCS) CHC 1430 1500 0.50 2050.0m Circulated bottoms up with: 3,236 l/min, (855 gp... [From:WELL_DAILY] B WELL_DRILL_HISTORY:201 01-OCT-08 70.0 9999.99 P/t BOP's and POOH weight set test tool. Made up 311 mm (12 1/4") BHA, RIH and performed shallow hole test at first HWDP, unsuccessful. POOH and serviced tools. RIH and became wedged between casing swedge and wellheand. P/t BOP's and POOH weight set test tool. Made up 311 mm (12 1/4") BHA, RIH and performed shallow hole test at first HWDP, unsuccessful. POOH and serviced tools. RIH and became wedged between casing swedge and wellheand. Formations Name Top (MD) Top (TVD) Comment Massacre Shale 1207.0m 1189.1m 33.3m Low Timboon Fm 1222.0m 1202.2m 36.4m Low Paarratte Fm 1443.0m 1382.3m 28.5m Low Skull Creek Mudstone 1682.0m 1564.0m 19.7m Low Operations For Period 0000 Hrs to 2400 Hrs on 01 Oct 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IC P BOP 0000 0500 5.00 2047.0m Continued to p/t BOP's and function test both pods, one from drillers console and one from the rig office remote station. IC P BOP 0500 0600 1.00 2047.0m POOH and laid out weight set test tool. IC P BOP 0600 0830 2.50 2047.0m Rigged up and tested TDS, standpipe valves, IBOP and floor safety valves. IC P HBHA 0830 1130 3.00 2047.0m Picked up 311 mm (12 1/4") BHA and RIH to first HWDP. Note: Hung up at 93 m, rotated 1/4 turn and continued to RIH BHA. IC TP (VE) TI 1130 1200 0.50 2047.0m Attempted to shallow test MWD tools, unsuccessful. No signal from tools to surface. IC TP (VE) TO 1200 1300 1.00 2047.0m POOH from 125 m to LWD/MWD/DD tools. Tested connections on drill floor unsuccessful. Unable to get signal through tool string. IC TP (VE) HBHA 1300 1430 1.50 2047.0m Laid out LWD/MWD/DD tools and serviced same on deck. Simultaneous Operations: Completed rig service on TDS. IC TP (VE) HBHA 1430 1600 1.50 2047.0m Picked up 311 mm (12 1/4") BHA and RIH to 70 m. IC TP (VE) TI 1600 1630 0.50 2047.0m Attempted to shallow test MWD tools, unsuccessful. Replacement tools on rout... [From:WELL_DAILY] B WELL_DRILL_HISTORY:201 02-OCT-08 88.0 9999.99 Worked free of casing swage and POOH to change BHA. RIH and commenced sidetrack from 815 m to 826 m. Operations For Period 0000 Hrs to 2400 Hrs on 02 Oct 2008 Worked free of casing swage and POOH to change BHA. RIH and commenced sidetrack from 815 m to 826 m. Operations For Period 0000 Hrs to 2400 Hrs on 02 Oct 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IC TP (SP) TI 0000 0630 6.50 802.0m Sat down on swage with 9-11.6 t (20-25 klbs) WOB, 100 RPM and 4164 L/min (1100 GPM) and attempted to ream obstruction. Monitored ditch magnet for debris and attempted to POOH every 30 min with 2.3 t (5 klbs). Worked down to swage and varied parameters attempting to work past obstruction including changing DD tool settings, unsuccessful. Continued to ream obstruction. Started to return 50 g of 30-40 mm metal cuttings on ditch magnet and torque fluctuated from 6.8-10.8 kNm (5-8 kft.lbs). Stopped reaming and attempted to work free of obstruction varying parameters. IC TP (SP) HBHA 0630 0930 3.00 802.0m BHA pulled free from wellhead with no overpull. Continued to POOH and laid out same. Observed wear on gauge of PDC bit, back reaming and gauge cutters broken and chipped. No wear on stabiliser blades. IC TP (SP) HBHA 0930 1245 3.25 802.0m Picked up and made up new BHA, shallow hole tested same prior to running through wellhead, ok. IC TP (SP) WH 1245 1300 0.25 802.0m Bit hung up in swage, attempted to work through by applying 1.4-2.3 t (3-5 klbs) down and rotated slowly, unsuccessful. Increased set down weight to 4.5-6.8 t (10-15 klbs) and rotated at 7 rpm, bit past obstruction after 5 min. Second stabiliser on the Exceed directional tool hung up on casing swage. Rotated and worked through, past obstruction after several minutes. IC TP (SP) TI 1300 1400 1.00 802.0m Continued to RIH on DP to 700 m. IC TP (SP) WIN 1400 1500 1.00 802.0m Made up TDS, washed/reamed in hole from 700 to 802 m. IC TP (SP) ... [From:WELL_DAILY] B WELL_DRILL_HISTORY:201 03-OCT-08 88.0 9999.99 Drilled from 826 m to 847 m MD. 100 % new formation observed in cuttings. Commenced Henry-2DW1ST1 at 03:00 hrs, 03/10/08. Operations For Period 0000 Hrs to 2400 Hrs on 03 Oct 2008 Drilled from 826 m to 847 m MD. 100 % new formation observed in cuttings. Commenced Henry-2DW1ST1 at 03:00 hrs, 03/10/08. Operations For Period 0000 Hrs to 2400 Hrs on 03 Oct 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IC TP (SCS) ST 0000 0300 3.00 847.0m Continued to side track well with 311 mm (12 1/4") Powerdrive Exceed drilling assembly, time drill at 8 m/hr from 826 m to 847 m. 100% new cuttings observed at shakers from 847 m, commenced Henry-2DW1ST1 at 03:00 hrs, 847 m. WBM Data Cost Today $ 23144 Mud Type: ! KCL/GLY Sample-From: Pit Time: 21:30 Weight: 1.25sg Temp: API FL: 4cm�/30m Filter-Cake: HTHP-FL: HTHP-Cake: 1mm KCl: 11% Hard/Ca: 520 MBT: 5.6 PM: 0.2 PF: 0.15 Solids: 7.65 H2O: 92% Oil: Sand: 0.9 pH: 1 PHPA: 2ppb Viscosity: 0sec/L PV: 0.029Pa/s YP: 0.230MPa Gels 10s: 0.053 Gels 10m: 0.110 Fann 003: 10 Fann 006: 14 Fann 100: 45 Fann 200: 63 Fann 300: 77 Fann 600: 106 Comment Bled in premix as required to maintain active volume. Commenced 5 ppb treatment of omnicarb20 at 850 m and maintained additions to active of 6 scks per stand while drilling ahead. Added drispac, KCL and PHPA to active. Bit # 9 Wear I O1 D L B G O2 R w 0 1 WT G E 1 NO PR Size: 311mm IADC# 115 Nozzles Drilled over last 24 hrs Calculated over Bit Run Mfr: REED WOB(avg) 8.62mt No. Size 3 20/32nd" Progress 223.0m Cum. Progress 247.0m Type: Rock RPM(avg) 129 On Bottom Hrs 14.28h Cum. On Btm Hrs 22.73h Serial No.: CL4832 F.Rate 3441lpm IADC Drill Hrs 17.50h Cum IADC Drill Hrs 26.50h Bit Model T11C SPP 16678kPa Total Revs Cum Total Revs 0 Depth In 802.0m TFA 0.920 ROP(avg) 15.62 m/hr ROP(avg) 10.87 m/hr Depth Out 1050.0m . . . . BHA # ... [From:WELL_DAILY] B WELL_DRILL_HISTORY:300 10-OCT-08 88.0 9999.99 POOH with the 311 mm (12 1/4") BHA from2,050 m to 652 m backreaming tight spots as required. RIH from 652 m to 1,853 m reaming tight spots as required. POOH with the 311 mm (12 1/4") BHA from2,050 m to 652 m backreaming tight spots as required. RIH from 652 m to 1,853 m reaming tight spots as required. Formations Name Top (MD) Top (TVD) Comment Massacre Shale 1201.0m 1189.5m 0.4 L Timboon 1214.5m 1202.4m 0.2 L Paaratte 1413.0m 1380.0m 2.3 H Skull Creek 1665.0m 1558.6m 5.4 H Operations For Period 0000 Hrs to 2400 Hrs on 10 Oct 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IC U (SCS) TO 0000 0030 0.50 2050.0m Pulled 5 stands with no overpull encountered. IC U (SCS) TI 0030 0100 0.50 2050.0m Ran 5 stands back to bottom without any problems. IC U (SCS) CMD 0100 0345 2.75 2050.0m Added 40 drums of Starglide to circulating system to achieve a concentration of +/- 3.0 ppb IC U (SCS) TO 0345 0530 1.75 2050.0m POOH from 2,050 m to 1,633 m. No hole problems observed. IC U (SCS) WTH 0530 0600 0.50 2050.0m Observed 44.5 kdaN,(100 klbs) drag at 1,633 m over string weight. Made up top drive and established circulation. No signs of pack off. Jarred string down to free, rotated and reciprocated string while circulating. Worked stand fully, no idications of any cuttings at shale shakers on bottoms up. Continued to ream stand and worked through to 1,625 m. IC U (SCS) WTH 0600 1230 6.50 2050.0m Backreamed from 1,633 m to 1,045 m with the following average parameters: Made several attempts to pull without pumps and rotatation. Unsuccsessful due to hole drag trending to 31.1 kdaN, (70 klbs) overpull. Flow Rate: 3,312 l/min, (875 gpm). SPP: 22.7 MPa, (3,300 psi). Torque: 5.4 kNm, (4 klbs). RPM: 140. IC U (SCS) WTH 1230 1400 1.50 2050.0m BHA packed off at 1,045 m. Worked drill string to regain movement with the following parameters: Flow Rate: 3,312 l/min, (875 gpm). SP... [From:WELL_DAILY] B WELL_DRILL_HISTORY:300 11-OCT-08 88.0 9999.99 Cont RIH with 311 mm (12 1/4") BHA to 2,050 m. Circulated clean and POOH to surface racking back 311 mm (12 1/4") BHA in derrick. P/U and M/U jetting and WBRT assembly. Jetted wellhead and BOP's. Latched onto WB and retrieved same, damage observed. Held JSA, R/U 245 mm (9 5/8") casing handling equipment and commenced running 245 mm (9 5/8") casing as per running list. Cont RIH with 311 mm (12 1/4") BHA to 2,050 m. Circulated clean and POOH to surface racking back 311 mm (12 1/4") BHA in derrick. P/U and M/U jetting and WBRT assembly. Jetted wellhead and BOP's. Latched onto WB and retrieved same, damage observed. Held JSA, R/U 245 mm (9 5/8") casing handling equipment and commenced running 245 mm (9 5/8") casing as per running list. Formations Name Top (MD) Top (TVD) Comment Timboon 1214.5m 1202.4m 0.2 L Paaratte 1413.0m 1380.0m 2.3 H Skull Creek 1665.0m 1558.6m 5.4 H Waarre A 2040.0m 1709.5m 5.0 H Operations For Period 0000 Hrs to 2400 Hrs on 11 Oct 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IC U (SCS) TI 0000 0030 0.50 2050.0m Cont RIH from 1,853 m to 2,050 m. IC U (SCS) CHC 0030 0145 1.25 2050.0m Pumped a 4.8 m3, (30 bbl) sweep weighing 1.62 SG, (13.5 ppg) and circulated until clean at the shale shakers. Increase in cuttings seen when weighted sweep returned to surface. IC U (SCS) FC 0145 0200 0.25 2050.0m Conducted flow check, well static. IC U (SCS) TO 0200 0630 4.50 2050.0m POOH wet with the 311 mm (12 1/4") BHA from 2,050 m to 650 m with no hole problems being encountered. IC U (SCS) TO 0630 0830 2.00 2050.0m Conducted flow check and continued POOH with 31 mm (12 1/4") BHA from 650 m to 164 m. Rig tongs were used to break drill pipe from 441 m due to excessive torque. IC U (SCS) HBHA 0830 0930 1.00 2050.0m Broke out and racked back 127 mm (5") HWDP and (12 1/4") BHA. IC U (SCS) HBHA 0930 1000 0.50 2050.0m Downloaded MWD tool in rotary. Br... [From:WELL_DAILY] B WELL_DRILL_HISTORY:301 12-OCT-08 88.0 9999.99 Completed running 245 mm (9 5/8") and 274 mm (10 3/4") casing and landed out in wellhead. Cemented casing as per programme. Commenced setting (10 3/4") casing seal assembly as directed by Cameron. Completed running 245 mm (9 5/8") and 274 mm (10 3/4") casing and landed out in wellhead. Cemented casing as per programme. Commenced setting (10 3/4") casing seal assembly as directed by Cameron. Formations Name Top (MD) Top (TVD) Comment Timboon 1214.5m 1202.4m 0.2 L Paaratte 1413.0m 1380.0m 2.3 H Skull Creek 1665.0m 1558.6m 5.4 H Waarre A 2040.0m 1709.5m 5.0 H Operations For Period 0000 Hrs to 2400 Hrs on 12 Oct 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IC U (SCS) CRN 0000 0930 9.50 2050.0m Continued running 245 mm (9 5/8") casing from 182 m to 1,541 m. IC U (SCS) HT 0930 1100 1.50 2050.0m Changed out handling equipment from 245 mm, (9 5/8) to 274 mm, (10 3/4"). IC U (SCS) CRN 1100 1130 0.50 2050.0m Commenced running 274 mm (10 3/4") from 1,541 m to 1,635 m. IC TU (VE) CRN 1130 1400 2.50 2050.0m While coming off casing slips the blocks came in to contact with the casing stabbing arm. Stopped operations to inspect damage and to conduct visual inspection of blocks and travelling equipment. IC U (SCS) CRN 1400 1800 4.00 2050.0m Continued running 274 mm (10 3/4") from 1,635 m to 1,944.53 m. IC P HT 1800 1900 1.00 2050.0m Changed out handling equipment from 274 mm, (10 3/4") casing to 127 mm (5") drill pipe. RIH with landing string. Work string as required. 26.7 kdaN (60 klbs) intermittent drag observed. IC P CIC 1900 2015 1.25 2050.0m Rigged up cement hose to cement head and circulated hole with mud at 1,272 l/min, (336 gpm). SIMOPS: Held JSA with all crew members involved in the casing cement job. IC P CMC 2015 2300 2.75 2050.0m Conducted the casing cementing programme as follows: 20:30: Lined up cement unit and pumped 0.5 m3, (3 bbl) of sea ... [From:WELL_DAILY] B WELL_DRILL_HISTORY:301 13-OCT-08 80.0 9999.99 Set 274 mm (10 3/4") seal assembly. Final setting verification spike not observed. Released CHSART from seal assembly and POOH. Broke down deep sea express cement plug launcher, 311 mm (12 1/4") BHA and laid out same. Conducted drop survey in derrick and inspected blocks and TDS for damage. Serviced TDS and repaired oul leak. Re-dressed CHSART and RIH to confirm 274 mm (10 3/4") seal assembly had set. Unable to confirm lock ring engagement pressure spike as previously observed. Cameron in Aberdeen confirmed that with current indications that the seal had been set and the lock ring engaged. Unlatched CHSART and POOH with same. Rigged up to pressure test mud hose, upper and lower IBOP. Set 274 mm (10 3/4") seal assembly. Final setting verification spike not observed. Released CHSART from seal assembly and POOH. Broke down deep sea express cement plug launcher, 311 mm (12 1/4") BHA and laid out same. Conducted drop survey in derrick and inspected blocks and TDS for damage. Serviced TDS and repaired oul leak. Re-dressed CHSART and RIH to confirm 274 mm (10 3/4") seal assembly had set. Unable to confirm lock ring engagement pressure spike as previously observed. Cameron in Aberdeen confirmed that with current indications that the seal had been set and the lock ring engaged. Unlatched CHSART and POOH with same. Rigged up to pressure test mud hose, upper and lower IBOP. Formations Name Top (MD) Top (TVD) Comment Timboon 1214.5m 1202.4m 0.2 L Paaratte 1413.0m 1380.0m 2.3 H Skull Creek 1665.0m 1558.6m 5.4 H Waarre A 2040.0m 1709.5m 5.0 H Operations For Period 0000 Hrs to 2400 Hrs on 13 Oct 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IC P WH 0000 0300 3.00 2050.0m Applied 34.5 MPa, (5,000 psi) with cement unit down through the127 mm (5") drill pipe to observe indication that the retaining pins had sheared. No indication of shearing observed. Bled pressure off. Closed rams and pressured up annulus throu... [From:WELL_DAILY] B WELL_DRILL_HISTORY:301 14-OCT-08 80.0 9999.99 Completed pressure tests on remaining surface equipment. Aligned motor trunion on TDS. Picked up 216 mm (8 1/2") BHA and made up as directed by Anadrill. RIH with 216 mm (8 1/2") BHA and tagged cement at 2,020 m. Conducted MPI and visual inspection of TDS and travelling equipment and tracks for dolly rollers. Completed pressure tests on remaining surface equipment. Aligned motor trunion on TDS. Picked up 216 mm (8 1/2") BHA and made up as directed by Anadrill. RIH with 216 mm (8 1/2") BHA and tagged cement at 2,020 m. Conducted MPI and visual inspection of TDS and travelling equipment and tracks for dolly rollers. Formations Name Top (MD) Top (TVD) Comment Timboon 1214.5m 1202.4m 0.2 L Paaratte 1413.0m 1380.0m 2.3 H Skull Creek 1665.0m 1558.6m 5.4 H Waarre A 2040.0m 1709.5m 5.0 H Operations For Period 0000 Hrs to 2400 Hrs on 14 Oct 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description IC P PT 0000 0030 0.50 2050.0m Continued rigging up to pressure test surface equipment. IC P PT 0030 0200 1.50 2050.0m Conducted pressure tests on mud hose, lower IBOP to 1.7 MPa, (250 psi) for 5 min and 34.5 MPa, (5,000 psi) for 10 min. PH TP (RE) PT 0200 0330 1.50 2050.0m Unable to obtain test on upper IBOP. Filled with grease. Tested again with mud (250 psi) for 5 min and 34.5 MPa, (5,000 psi) for 10 min. IC TP (OTH) CRN 0330 0400 0.50 2050.0m Align motor trunion on TDS with enerpac jack as remedial work following TDS/Stabbing Arm incident. IC P PT 0400 0430 0.50 2050.0m Rigged down pressure testing equipment. SIMOPS: Pressure tested C and K manifold valves to 1.7 MPa, (250 psi) and 34.5 MPa, (5,000 psi) for 10 min. PH P HBHA 0430 1000 5.50 2050.0m Commenced picking up 216 mm (8 1/2") BHA from deck and made up as directed by directional driller. Shallow tested MWD at 33 m with 2,271 l/min, (600 gpm) and 7.6 MPa, (1,100 psi). Loaded radio active source. SIMOPS: Continued Pressure ... [From:WELL_DAILY] B WELL_DRILL_HISTORY:301 15-OCT-08 80.0 9999.99 Drilled 216 mm (8 1/2") hole as per directional drillers instructions taking surveys as required with an average ROP including connections of 20.41 m/hr. Conducted visual inspection of TDS and dolly roller carriage. Maintained exclusion zone around rig floor until TD has been reached. Drilled 216 mm (8 1/2") hole as per directional drillers instructions taking surveys as required with an average ROP including connections of 20.41 m/hr. Conducted visual inspection of TDS and dolly roller carriage. Maintained exclusion zone around rig floor until TD has been reached. Formations Name Top (MD) Top (TVD) Comment Timboon 1214.5m 1202.4m 0.2 L Paaratte 1413.0m 1380.0m 2.3 H Skull Creek 1665.0m 1558.6m 5.4 H Waarre A 2040.0m 1709.5m 5.0 H Operations For Period 0000 Hrs to 2400 Hrs on 15 Oct 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description PH P SM 0000 0030 0.50 2050.0m Held JSA on rig floor with all involved in the displacement from KCL/Polymer mud to DIF. Conducted drops survey on TDS and barriered off area around drill floor as an exclusion zone while drilling the 216 mm (8 1/2") section. PH P DA 0030 0345 3.25 2050.0m Commenced drilling through cement plugs, float and casing shoe with the following parameters: Flow Rate: 2,271 l/min, (600 gpm). WOB: 4 t, (9 klbs). Torque: 9.5 kNm, (7 kft-lbs). RPM: 70. (Confirmed 244 mm (9 5/8") casing shoe depth at 2,045.7 m with gamma ray, LWD.) PH P DIS 0345 0430 0.75 2050.0m Displaced mud system to DIF with 2,271 l/min, (600 gpm) and 13.1 MPa, (1,900 psi). Discarded 311 mm (12 1/4") mud at the shale shakers while displacing. PH P DA 0430 1430 10.00 2345.0m Took SCR's and drilled 311 mm (12 1/4") hole from 2,050 m to 2,345 m with the following parameters: Flow Rate: 2,460 l/min, (650 gpm). WOB: 6.7 t, (15 klbs). Torque: 9.5 kNm, (10 kft-lbs). RPM: 140. Average ROP including connections: 29.5 m/hr. PH P SVY 1430 1500 0.50 2345.0m Condu... [From:WELL_DAILY] B WELL_DRILL_HISTORY:301 16-OCT-08 80.0 9999.99 Continued drilling 216 mm (8 1/2") hole from 2,448 m to 2,648 m taking surveys as required. Circulated hole clean and POOH from 2,648 m to 1,999 m. RIH from 1,999 m to 2,648 m. Circulated 2 x bottoms up while Weatherford sampled DIF to ensure that it meets the correct criteria for leaving in the open hole section. POOH from 2,648 m to 1,999 m at midnight. Continued drilling 216 mm (8 1/2") hole from 2,448 m to 2,648 m taking surveys as required. Circulated hole clean and POOH from 2,648 m to 1,999 m. RIH from 1,999 m to 2,648 m. Circulated 2 x bottoms up while Weatherford sampled DIF to ensure that it meets the correct criteria for leaving in the open hole section. POOH from 2,648 m to 1,999 m at midnight. Formations Name Top (MD) Top (TVD) Comment Timboon 1214.5m 1202.4m 0.2 L Paaratte 1413.0m 1380.0m 2.3 H Skull Creek 1665.0m 1558.6m 5.4 H Waarre A 2040.0m 1709.5m 5.0 H Operations For Period 0000 Hrs to 2400 Hrs on 16 Oct 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description PH P DA 0000 0600 6.00 2521.0m Continued drilling 311 mm (12 1/4") hole from 2,448 m to 2,521 m with the following parameters: Flow Rate: 2,631 l/min, (695 gpm) SPP: 17.9 MPa, (2,600 psi). WOB: 10.2 mt, (23 klbs). Torque: 16.3 kNm, (12 kft-lbs). RPM: 155 Average ROP including connections: 12.16 m/hr. PH P DA 0600 1000 4.00 2633.0m Continued drilling 311 mm (12 1/4") hole from 2,521 m to 2,633 m with the following parameters: Flow Rate: 2,650 l/min, (700 gpm) SPP: 18.9 MPa, (2,740 psi). WOB: 10.2 mt. (23 klbs). Torque: 16.3 kNm, (10 kft-lbs). RPM: 150 Average ROP including connections: 28 m/hr. PH P CS 1000 1100 1.00 2633.0m Racked back 1 stand of 127 mm, (5") drill pipe and circulated bottoms up with 2,589 l/min, (684 gpm) and 19.3 MPa, (2,800 psi) for cuttings sample as requested by Geologist. PH P DA 1100 1130 0.50 2648.0m Continued drilling 216 mm (8 1/2") hole from 2,633 m to 2,648 m backreaming each s... [From:WELL_DAILY] B WELL_DRILL_HISTORY:301 17-OCT-08 83.0 9999.99 POOH with 216 mm (8 1/2") BHA and laid out same. Picked up scraper clean out assembly, RIH and commenced scraper run from 1,762 m to 1,693 m while cleaning riser with brush assembly. Functioned BOP's to remove debris from cavities. POOH from 1,793 m to 351 m. POOH with 216 mm (8 1/2") BHA and laid out same. Picked up scraper clean out assembly, RIH and commenced scraper run from 1,762 m to 1,693 m while cleaning riser with brush assembly. Functioned BOP's to remove debris from cavities. POOH from 1,793 m to 351 m. Formations Name Top (MD) Top (TVD) Comment Timboon 1214.5m 1202.4m 0.2 L Paaratte 1413.0m 1380.0m 2.3 H Skull Creek 1665.0m 1558.6m 5.4 H Waarre A 2040.0m 1709.5m 5.0 H Operations For Period 0000 Hrs to 2400 Hrs on 17 Oct 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description PH P TO 0000 0300 3.00 2648.0m Continued POOH with 216 mm (8 1/2") BHA from 1,999 m to 182 m. PH P HBHA 0300 0445 1.75 2648.0m Broke off and racked back 4 stands of 127 mm (5") HWDP and 1 stand with jars. PH P HBHA 0445 0545 1.00 2648.0m Removed source from MWD. Broke down 216 mm (8 1/2") BHA components and laid out same. PH P OA 0545 0600 0.25 2648.0m Pulled master bushings and diverter. Flushed out housing of any debris. SIMOPS: Functioned BOP rams to remove any debris lodged in cavities. PH P HBHA 0600 0630 0.50 2648.0m Picked up and made up casing scraper assembly. PH P TI 0630 0930 3.00 2648.0m Held JSA and RIH with scraper assembly on 127 mm (5") drill pipe from surface to 1,073 m drifting stands from monkey board level. PH P HT 0930 1130 2.00 2648.0m Removed Schlumberger DD/LWD spool piece and cables from standpipe in derrick PH P TI 1130 1500 3.50 2648.0m Continued RIH from 1,073 m to 1,881 m picking up 274 mm (10 3/4") well patroller, ball catcher and CCU. PH P CIC 1500 1630 1.50 2648.0m Commenced scraping 245 mm (9 5/8") casing from 1,762 m to 1,697... [From:WELL_DAILY] B WELL_DRILL_HISTORY:301 18-OCT-08 2058.0 9999.99 POH well patroller/casing srapper assembly. Picked up and ran the 168mm (6-5/8") Sand screen and tubing joint assembly c/w SCR-1 Packer on 127mm (5") drill pipe to bottom. Set and tested the Packer assembly. Lined up to circulate to completion brine. Continued mixing/diluting completions brine. POH well patroller/casing srapper assembly. Picked up and ran the 168mm (6-5/8") Sand screen and tubing joint assembly c/w SCR-1 Packer on 127mm (5") drill pipe to bottom. Set and tested the Packer assembly. Lined up to circulate to completion brine. Continued mixing/diluting completions brine. Formations Name Top (MD) Top (TVD) Comment Timboon 1214.5m 1202.4m 0.2 L Paaratte 1413.0m 1380.0m 2.3 H Skull Creek 1665.0m 1558.6m 5.4 H Waarre A 2040.0m 1709.5m 5.0 H Operations For Period 0000 Hrs to 2400 Hrs on 18 Oct 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description PH P HBHA 0000 0115 1.25 2648.0m Continued POOH with scraper/cleanout BHA, broke down and laid out same. Functioned BOP's to remove debris from cavities. Circulated through the choke and kill lines to displace the slug out of the riser. PH P RCM 0115 0215 1.00 2648.0m Cleared rig floor and rigged up handling equipment for running lower completion. PH P SM 0215 0230 0.25 2648.0m Conducted JSA for running lower completion, sand screens and tubing. PH P RIC 0230 0315 0.75 2648.0m Lifted screen bull nose sub assembly LC01-03 to rig floor. Picked up assembly and set in PCS 6-5/8" DC slips with PCS dog collar. Tailed in first sand screen joint to rig floor. PH P RIC 0315 0600 2.75 2648.0m Commenced running lower completion as programmed from surface to 255 m, Joint No #23. PH P RIC 0600 1130 5.50 2648.0m Continued picking up 168mm (6-5/8") WFT Super Flo 24ppf Sand Screen joints (total 50) followed by 26 x 168mm (6-5/8") 24ppf 13Cr Tubing Jts. Concurrent Ops: Started cleaning out the mud pits for brine from the boat. S... [From:WELL_DAILY] B WELL_DRILL_HISTORY:301 19-OCT-08 1740.0 9999.99 Cleaned out the mud pits and diluted the brine down from 1.29sg (10.8ppg) to 1.19sg (10.0ppg). Flushed out the surface lines, choke and kill lines, booster lines with uninhibited brine. Pumped a Hi-Vis pill followed by Dirt magnet slurry down drill pipe. Chased with 1.19sg (10.0ppg) inhibited brine, dumped DIF returns and pill train. Stopped pumping when brine at surface. Mixed 41 m� (260bbls) of brine and filtered same. Circulated system to inhibited filtered brine. Pull out of hole from 1740m to 1278m laying out drill pipe. Cleaned out the mud pits and diluted the brine down from 1.29sg (10.8ppg) to 1.19sg (10.0ppg). Flushed out the surface lines, choke and kill lines, booster lines with uninhibited brine. Pumped a Hi-Vis pill followed by Dirt magnet slurry down drill pipe. Chased with 1.19sg (10.0ppg) inhibited brine, dumped DIF returns and pill train. Stopped pumping when brine at surface. Mixed 41 m� (260bbls) of brine and filtered same. Circulated system to inhibited filtered brine. Pull out of hole from 1740m to 1278m laying out drill pipe. Formations Name Top (MD) Top (TVD) Comment Timboon 1214.5m 1202.4m 0.2 L Paaratte 1413.0m 1380.0m 2.3 H Skull Creek 1665.0m 1558.6m 5.4 H Waarre A 2040.0m 1709.5m 5.0 H Operations For Period 0000 Hrs to 2400 Hrs on 19 Oct 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description PH TP (WOE) RIC 0000 0300 3.00 2648.0m Standby waiting on pit space to dilute brine. Continued cleaning pit #4. PH P RIC 0300 0330 0.50 2648.0m Lined up mud pumps down the drill pipe and circulated 4.8 m� (30bbls) His Vis, 14.3 m� (90bbls) Dirt Magnet and another 4.8 m� (30bbls) Hi Vis pill. Lined up and circulated the surface lines, booster line and choke and kill lines to Dirt Magnet brine (slug and pit#1 empty). Cleaned and flushed out pit #1. PH TP (WOE) RIC 0330 0500 1.50 2648.0m Standby waiting on brine to be diluted down from 1.29sg (10.8ppg) to 1.19sg (10ppg). PH ... [From:WELL_DAILY] B WELL_DRILL_HISTORY:301 20-OCT-08 1278.0 9999.99 POH laying out drill pipe. Laid out the SABs sub and packer running tool. Picked up the Well Patroller and Bore Protector pulling tool. RIH and jetted across the XT/Wellhead. Landed and latched the XT Bore Protector, overpulled 11.4 mt (25klbs) and pulled the Bore Protector. Jetted again across the XT/wellhead and continued to POH. Laid out the Bore Protector assembly and 2 x stds of HWDP. Prepared the floor for running the final completion. Picked up the WEG / Packer and PDHG assembly. Inserted and tested the electrical cable into the PDHG, confirmed communication with the PDHG. RIH on 178mm, 43.2 kg/m (7" 29ppf) 13Cr80 JFE Bear tubing joints to 663m. POH laying out drill pipe. Laid out the SABs sub and packer running tool. Picked up the Well Patroller and Bore Protector pulling tool. RIH and jetted across the XT/Wellhead. Landed and latched the XT Bore Protector, overpulled 11.4 mt (25klbs) and pulled the Bore Protector. Jetted again across the XT/wellhead and continued to POH. Laid out the Bore Protector assembly and 2 x stds of HWDP. Prepared the floor for running the final completion. Picked up the WEG / Packer and PDHG assembly. Inserted and tested the electrical cable into the PDHG, confirmed communication with the PDHG. RIH on 178mm, 43.2 kg/m (7" 29ppf) 13Cr80 JFE Bear tubing joints to 663m. Formations Name Top (MD) Top (TVD) Comment Timboon 1214.5m 1202.4m 0.2 L Paaratte 1413.0m 1380.0m 2.3 H Skull Creek 1665.0m 1558.6m 5.4 H Waarre A 2040.0m 1709.5m 5.0 H Operations For Period 0000 Hrs to 2400 Hrs on 20 Oct 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description PH P RIC 0000 0630 6.50 2648.0m Continued POH laying down drill pipe from 1278m to surface. Note: Manual tongs were required to break 25% of the connections. Laid out SAB's circulating sub and the SCR-1 packer running tool. PH P RIC 0630 0700 0.50 2648.0m Pulled the diverter packer. PH P RIC 0700 0800 1.00 0.0m Picked u... [From:WELL_DAILY] B WELL_DRILL_HISTORY:301 21-OCT-08 1246.0 9999.99 Continued running the Packer assembly on 178mm (7") tubing down to 1246m. Picked up and installed the TRSV. Connected the control line and pressure tested the connection. Continued running the completion, installing control line clamps across each tubing joint collar. Picked up and installed the Tubing Hanger, terminated both the PDHG and TRSV control lines to the TH. Cleared the rig floor of 178mm (7") running equipment. Picked up the LLSA and made up to the TH. Conducted communication checks through the LLSA/TH. Picked up 1st joint of 245mm (9-5/8") landing string. Continued running the Packer assembly on 178mm (7") tubing down to 1246m. Picked up and installed the TRSV. Connected the control line and pressure tested the connection. Continued running the completion, installing control line clamps across each tubing joint collar. Picked up and installed the Tubing Hanger, terminated both the PDHG and TRSV control lines to the TH. Cleared the rig floor of 178mm (7") running equipment. Picked up the LLSA and made up to the TH. Conducted communication checks through the LLSA/TH. Picked up 1st joint of 245mm (9-5/8") landing string. Formations Name Top (MD) Top (TVD) Comment Timboon 1214.5m 1202.4m 0.2 L Paaratte 1413.0m 1380.0m 2.3 H Skull Creek 1665.0m 1558.6m 5.4 H Waarre A 2040.0m 1709.5m 5.0 H Operations For Period 0000 Hrs to 2400 Hrs on 21 Oct 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description PH P RIC 0000 0530 5.50 2648.0m Continued running the completion on 178mm, 43.2 kg/m (7" 29ppf) 13Cr80 JFE Bear tubing joints from 663m to 1246m (Jts #55 to #103). Installed control line clamps over the collar of each joint. PH P RIC 0530 0600 0.50 2648.0m MU joint#3 and TRSV assembly (UC-04-03), made up cross coupling clamp. Secured PDHG cable in TRSC cable protector. Made up 3 m space out pump and secured cross coupling clamp. Pulled back TRSV above RT. Checked position of cross coupling clamp be... [From:WELL_DAILY] B WELL_DRILL_HISTORY:302 22-OCT-08 15.0 9999.99 Completed running the 244mm (9-5/8") landing string. Picked up and made up the Flowhead and slickline PCE. Lifted Flowhead assembly onto the landing string. Landed the Tubing Hanger and completed communication checks and an overpull. Function tested ESD system. Complete pressure tests on TRSV and PDHG. Flushed across the surface lines from the cement unit to the well test separator. Completed running the 244mm (9-5/8") landing string. Picked up and made up the Flowhead and slickline PCE. Lifted Flowhead assembly onto the landing string. Landed the Tubing Hanger and completed communication checks and an overpull. Function tested ESD system. Complete pressure tests on TRSV and PDHG. Flushed across the surface lines from the cement unit to the well test separator. Formations Name Top (MD) Top (TVD) Comment Timboon 1214.5m 1202.4m 0.2 L Paaratte 1413.0m 1380.0m 2.3 H Skull Creek 1665.0m 1558.6m 5.4 H Waarre A 2040.0m 1709.5m 5.0 H Operations For Period 0000 Hrs to 2400 Hrs on 22 Oct 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description PH P RIC 0000 0115 1.25 2648.0m Held JSA with rig crew for RIH landing string. Chain on drive for Expro umbilical reel broke - pin sheared. Shutdown to replace sheared pin. Drive functioned briefly before a second pin sheared. Spooling out by hand. PH P RIC 0115 0215 1.00 2648.0m Continued running the 244mm (9-5/8") landing string. Taped the umbilical to the LS. SIMOPs: Check rig positioning prior to running through flex joint: Flex jt 0.25 deg Fwd-Stbd @ 230 deg. LRMP & BOP both 0 deg. PH P RIC 0215 0300 0.75 2648.0m MU lubricator valve (LV) to landing string. Secured umbilical and MU hydraulic lines to the LV. PH P RIC 0300 0400 1.00 2648.0m Pressure tested LV hydraulic line. Pulled master bushings and RIH LV. MU pup joint #3 as per tally. Set in slips. PH P RIC 0400 0530 1.50 2648.0m Held JSA for rigging up bails and lifting Flowhead. Remov... [From:WELL_DAILY] B WELL_DRILL_HISTORY:302 23-OCT-08 80.0 9999.99 Pressure tested the slickline lubricator. Pulled the Isolation sleeve from the Tubing Hanger. Displaced the tubing to diesel. Set the Packer and pressure cycled the Flapper valve to open. Pressure tested the Annulus. Open the choke and flowed the well. Pressure tested the slickline lubricator. Pulled the Isolation sleeve from the Tubing Hanger. Displaced the tubing to diesel. Set the Packer and pressure cycled the Flapper valve to open. Pressure tested the Annulus. Open the choke and flowed the well. Formations Name Top (MD) Top (TVD) Comment Timboon 1214.5m 1202.4m 0.2 L Paaratte 1413.0m 1380.0m 2.3 H Skull Creek 1665.0m 1558.6m 5.4 H Waarre A 2040.0m 1709.5m 5.0 H Operations For Period 0000 Hrs to 2400 Hrs on 23 Oct 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description PH P RIC 0000 0100 1.00 2648.0m Closed KWV, closed kill line valves. Crew change. Waited to conduct JSA for RIH slickline with new crew. Could not maintain 20.6MPa (3000 psi) line pressure on LV open line after opening LV. Trouble shoot leak. Could not find leak at surface. Confirmed valve was cycling fully opened and fully closed. Proceeded with operations. SIMOPs: rigged up hydraulic lines for slickline PCE PH P RIC 0100 0300 2.00 2648.0m Conducted JSA for RIH slickline. RU sheave. B/out sub above BOPs, MU TH isolation sleeve retrieval tool to toolstring and PU into lubricator. MU lubricator. Closed well test choke manifold, closed MV, opened SV and lubricator needle valves, opened KWV. Flushed through from cement unit until returns seen through lubricator needle valve. Pressure tested lubricator against MV and choke manifold to 1.3MPa (200 psi) 5 mins, 34.8MPa (5000 psi) 5mins - good test. Bled off pressure. PH P RIC 0300 0400 1.00 2648.0m Opened MV. RIH with TH isolation sleeve retrieval tool on slickline. Latched TH Iso sleeve and jarred out. POH. Closed the MV and disconnnected slickline lubricaor. Lait out the GS... [From:WELL_DAILY] B WELL_DRILL_HISTORY:402 26-OCT-08 50.0 9999.99 Broke out Termination joint from the BOPs. Stowed BOPs to starboard. Laid out the remaining riser joints. Rigged down riser handling equipment. Picked up and set the Debris cap on the XT. ROV conducted final site survey. Laid out remaining tubulars from the derrick. Removed the PCS stabbing arm from the derrick. Offloaded Apache equipment and backloaded remaining Santos equipment. Broke out Termination joint from the BOPs. Stowed BOPs to starboard. Laid out the remaining riser joints. Rigged down riser handling equipment. Picked up and set the Debris cap on the XT. ROV conducted final site survey. Laid out remaining tubulars from the derrick. Removed the PCS stabbing arm from the derrick. Offloaded Apache equipment and backloaded remaining Santos equipment. Formations Name Top (MD) Top (TVD) Comment Timboon 1214.5m 1202.4m 0.2 L Paaratte 1413.0m 1380.0m 2.3 H Skull Creek 1665.0m 1558.6m 5.4 H Waarre A 2040.0m 1709.5m 5.0 H Operations For Period 0000 Hrs to 2400 Hrs on 26 Oct 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description PH TP (CJ) RR2 0000 0300 3.00 2648.0m Continued trying to breakout termination joint bolts. Changed out three torque wrenches and increased hydraulic pressure from 6.1MPa to 16.5MPa (890psi to 2400psi). PH P RR2 0300 0430 1.50 2648.0m Laid out the double of riser and the termination joint. PH P RR2 0430 0500 0.50 2648.0m Rigged down riser handling equipment. Moved the rig back over location. PH P XT 0500 0600 1.00 2648.0m Picked up the Debris cap and J-Latch R/Tool and made up to 127mm (5") drill pipe. Installed guide ropes to the drill pipe. RIH and land the Debris cap. Observed with ROV. Prepare to unlatch Keeper pin from the R/Tool. PH P XT 0600 0800 2.00 2648.0m ROV pulled the Keeper pin from the J-Tool R/Tool. Unjayed the R/tool and pulled out laying down the drill pipe landing string. Laid out the J-Tool. PH P XT 0800 0900 1.00 2648.0... [From:WELL_DAILY] B WELL_DRILL_HISTORY:402 27-OCT-08 50.0 9999.99 Formations Name Top (MD) Top (TVD) Comment Timboon 1214.5m 1202.4m 0.2 L Paaratte 1413.0m 1380.0m 2.3 H Skull Creek 1665.0m 1558.6m 5.4 H Waarre A 2040.0m 1709.5m 5.0 H Operations For Period 0000 Hrs to 2400 Hrs on 27 Oct 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description RM P RM 0000 0900 9.00 2648.0m De-ballasted rig to transit draft. Pulled anchor #3 to commence #3 bolster repairs. 06:52 #3 PCC passed to Far Sky 07:06 #3 PCC connected to Far Sky work wire 07:09 Far Sky chasing out to anchor #3 07:30 Far Sky paid out and re-spooled work wire 08:37 Anchor #3 off bottom 08:43 Heaving in on Anchor #3 SIMOPS Held pre-job safety meeting. Continued with removal and repair of DSC forward piston. Commenced change out of choke manifold valve #2. RM TP (RE) RR 0900 1130 2.50 0.0m 10:04 Anchor #3 on deck. Commenced removing anchor from chain. 11:30 Anchor #3 removed from chain. Made up PCC #3 to chain. RM P RM 1130 1230 1.00 0.0m 12:15 Passed PCC #3 back to rig. RM P RM 1230 1315 0.75 2648.0m Held pre-job safety meeting for rigging up scaffolding on bolster #3. RM TP (RE) RR 1315 2000 6.75 2648.0m Rigged up scaffolding on bolster #3. SIMOPS Continued with repair of DSC forward piston. Continued with change out of choke manifold valve #2. Continued with shimming of upper inner TDS dolly brackets Continued with PM's on seawater pumps, firewater pumps & fuel purifiers RM TP (RE) RR 2000 2400 4.00 2648.0m Scaffolding rigged up on bolster #3. Commenced welding work removing worn patch on bolster. SIMOPS Continued with repair of DSC forward piston. Continued with change out of choke manifold valve #2. Continued with shimming of upper inner TDS dolly brackets Continued with PM's on seawater pumps, firewater pumps & fuel purifiers Operations For Period 0000 Hrs to 0600 Hrs on 28 Oct 2008 Phse Cls (RC) Op From To Hrs Depth Activity Description RM TP RR 0000 0600 6.00... [From:WELL_DAILY]
A WELL_LOG_CURVE_INT: B.SOURCE B.CURVE_ID C.DESCRIPTION B.JOB_ID B.LOG_RUN B.PASS_NO B.TOP_DEPTH B.BASE_DEPTH B.DEPTH_UNIT B.QUALITY B.REMARK B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:A16H DESC:A16H JOB:01--HENRY-2 RUN:999 PASS:99 TOP:645 BASE:2032.1 Metres Units=OHMM; ARC Attenuation Resistivity 16-in. at 2 MHz; ; SRVC=Schlumberger D&M; COMP=Santos; START=645; STOP=2043.3; minv=0.1; maxv=200; average=4.5592; metadata from DPI Geolog (mostly Occam); B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:A22H DESC:A22H JOB:02--HENRY-2 RUN:999 PASS:99 TOP:645 BASE:2032.1 Metres Units=OHMM; ARC Attenuation Resistivity 22-in. at 2 MHz; ; SRVC=Schlumberger D&M; COMP=Santos; START=645; STOP=2043.3; minv=0.1; maxv=300; average=5.2347; metadata from DPI Geolog (mostly Occam); B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:A28H DESC:A28H JOB:03--HENRY-2 RUN:999 PASS:99 TOP:645 BASE:2032.1 Metres Units=OHMM; ARC Attenuation Resistivity 28-in. at 2 MHz; ; SRVC=Schlumberger D&M; COMP=Santos; START=645; STOP=2043.3; minv=0.1; maxv=500; average=6.1139; metadata from DPI Geolog (mostly Occam); B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:A34H DESC:A34H JOB:04--HENRY-2 RUN:999 PASS:99 TOP:645 BASE:2032.1 Metres Units=OHMM; ARC Attenuation Resistivity 34-in. at 2 MHz; ; SRVC=Schlumberger D&M; COMP=Santos; START=645; STOP=2043.3; minv=0.1; maxv=500; average=5.9155; metadata from DPI Geolog (mostly Occam); B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:A40H DESC:A40H JOB:05--HENRY-2 RUN:999 PASS:99 TOP:645 BASE:2032.1 Metres Units=OHMM; ARC Attenuation Resistivity 40-in. at 2 MHz; ; SRVC=Schlumberger D&M; COMP=Santos; START=645; STOP=2043.3; minv=0.1; maxv=700; average=5.687; metadata from DPI Geolog (mostly Occam); B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:DEPTH DESC:DEPTH JOB:00--HENRY-2 RUN:999 PASS:99 TOP:645 BASE:2043.3 Metres Units=M; Bit Depth 2hz; ; SRVC=Schlumberger D&M; COMP=Santos; START=645; STOP=2043.3; minv=645; maxv=2043.3; average=1344.15; metadata from DPI Geolog (mostly Occam); B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:DRHB DESC:DRHB JOB:06--HENRY-2 RUN:999 PASS:99 TOP:645 BASE:2008 Metres Units=G/C3; Bulk Density Correction Bottom; ; SRVC=Schlumberger D&M; COMP=Santos; START=645; STOP=2043.3; minv=-0.06; maxv=0.47; average=0.1276; metadata from DPI Geolog (mostly Occam); B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:GR DESC:Gamma ray JOB:07--HENRY-2 RUN:999 PASS:99 TOP:645 BASE:2031.9 Metres Units=GAPI; ARC Gamma Ray; ; SRVC=Schlumberger D&M; COMP=Santos; START=645; STOP=2043.3; minv=9.69; maxv=140.91; average=74.3575; metadata from DPI Geolog (mostly Occam); B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:P16H DESC:P16H JOB:08--HENRY-2 RUN:999 PASS:99 TOP:645 BASE:2032.1 Metres Units=OHMM; ARC Phase-Shift Resistivity 16-in. at 2 MHz; ; SRVC=Schlumberger D&M; COMP=Santos; START=645; STOP=2043.3; minv=0.27; maxv=1000; average=3.6759; metadata from DPI Geolog (mostly Occam); B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:P22H DESC:P22H JOB:09--HENRY-2 RUN:999 PASS:99 TOP:645 BASE:2032.1 Metres Units=OHMM; ARC Phase-Shift Resistivity 22-in. at 2 MHz; ; SRVC=Schlumberger D&M; COMP=Santos; START=645; STOP=2043.3; minv=0.29; maxv=1000; average=3.8406; metadata from DPI Geolog (mostly Occam); B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:P28H DESC:P28H JOB:10--HENRY-2 RUN:999 PASS:99 TOP:645 BASE:2032.1 Metres Units=OHMM; ARC Phase-Shift Resistivity 28-in. at 2 MHz; ; SRVC=Schlumberger D&M; COMP=Santos; START=645; STOP=2043.3; minv=0.1; maxv=1000; average=4.0211; metadata from DPI Geolog (mostly Occam); B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:P34H DESC:P34H JOB:11--HENRY-2 RUN:999 PASS:99 TOP:645 BASE:2032.1 Metres Units=OHMM; ARC Phase-Shift Resistivity 34-in. at 2 MHz; ; SRVC=Schlumberger D&M; COMP=Santos; START=645; STOP=2043.3; minv=0.1; maxv=1000; average=4.5233; metadata from DPI Geolog (mostly Occam); B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:P40H DESC:P40H JOB:12--HENRY-2 RUN:999 PASS:99 TOP:645 BASE:2032.1 Metres Units=OHMM; ARC Phase-Shift Resistivity 40-in. at 2 MHz; ; SRVC=Schlumberger D&M; COMP=Santos; START=645; STOP=2043.3; minv=0.1; maxv=1000; average=4.9595; metadata from DPI Geolog (mostly Occam); B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:PEB DESC:PEB JOB:13--HENRY-2 RUN:999 PASS:99 TOP:645 BASE:2008 Metres Units=----; Photoelectric Factor Bottom; ; SRVC=Schlumberger D&M; COMP=Santos; START=645; STOP=2043.3; minv=0.37; maxv=15.2; average=3.3603; metadata from DPI Geolog (mostly Occam); B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:ROBB DESC:ROBB JOB:14--HENRY-2 RUN:999 PASS:99 TOP:645 BASE:2008 Metres Units=G/C3; Bulk Density Bottom; ; SRVC=Schlumberger D&M; COMP=Santos; START=645; STOP=2043.3; minv=1.11; maxv=2.86; average=2.2033; metadata from DPI Geolog (mostly Occam); B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:ROP5 DESC:ROP5 JOB:15--HENRY-2 RUN:999 PASS:99 TOP:645 BASE:2043.3 Metres Units=M/HR; Rate of Penetration Averaged over Last 5ft; ; SRVC=Schlumberger D&M; COMP=Santos; START=645; STOP=2043.3; minv=1.21; maxv=286.3; average=40.6689; metadata from DPI Geolog (mostly Occam); B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:TAB DESC:TAB JOB:16--HENRY-2 RUN:999 PASS:99 TOP:645 BASE:2032.1 Metres Units=HR; ARC Resistivity Time After Bit; ; SRVC=Schlumberger D&M; COMP=Santos; START=645; STOP=2043.3; minv=0.05; maxv=3.05; average=0.8593; metadata from DPI Geolog (mostly Occam); B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:TAB DESC:TAB JOB:17--HENRY-2 RUN:999 PASS:99 TOP:645 BASE:2008 Metres Units=HR; Density Time After Bit; ; SRVC=Schlumberger D&M; COMP=Santos; START=645; STOP=2043.3; minv=0.42; maxv=6.34; average=2.562; metadata from DPI Geolog (mostly Occam); B WELL_LOG_CURVE_INT:DNRE_GEOLOG CURVE:TNPH DESC:TNPH JOB:18--HENRY-2 RUN:999 PASS:99 TOP:645 BASE:2006.8 Metres Units=PU; Thermal Neutron Porosity (Ratio Method) in Selected Lithology; ; SRVC=Schlumberger D&M; COMP=Santos; START=645; STOP=2043.3; minv=3.3; maxv=223.39; average=32.5857; metadata from DPI Geolog (mostly Occam);
HDR A GEOGRAPHICALLY _VERY_ CLOSE WELL TO THIS WELL: WELL_NAME= HENRY-2 DW1 HDR A GEOGRAPHICALLY _VERY_ CLOSE WELL TO THIS WELL: WELL_NAME= HENRY-2 DW1 ST1
--- LISTING OF GEOGRAPHICALLY CLOSE WELLS TO THIS WELL ---
DISTANCE= 00.0 km (very approx) Onshore?=N WELL_NAME= HENRY-2 DW1 DISTANCE= 00.0 km (very approx) Onshore?=N WELL_NAME= HENRY-2 DW1 ST1 DISTANCE= 02.6 km (very approx) Onshore?=N WELL_NAME= NETHERBY-1 DISTANCE= 02.6 km (very approx) Onshore?=N WELL_NAME= NETHERBY-1 DW1 DISTANCE= 03.6 km (very approx) Onshore?=N WELL_NAME= HENRY-1 DISTANCE= 03.6 km (very approx) Onshore?=N WELL_NAME= HENRY-1 ST1 DISTANCE= 04.3 km (very approx) Onshore?=N WELL_NAME= PECTEN-1 DISTANCE= 04.3 km (very approx) Onshore?=N WELL_NAME= PECTEN-1A DISTANCE= 09.0 km (very approx) Onshore?=N WELL_NAME= PECTEN EAST-1 DISTANCE= 09.4 km (very approx) Onshore?=N WELL_NAME= CASINO-4 DISTANCE= 09.4 km (very approx) Onshore?=N WELL_NAME= CASINO-4 DW1 DISTANCE= 09.4 km (very approx) Onshore?=N WELL_NAME= CASINO-4 DW2 DISTANCE= 09.4 km (very approx) Onshore?=N WELL_NAME= MARTHA-1 DISTANCE= 09.6 km (very approx) Onshore?=N WELL_NAME= CASINO-1 DISTANCE= 11.2 km (very approx) Onshore?=N WELL_NAME= CASINO-3 DISTANCE= 12.8 km (very approx) Onshore?=N WELL_NAME= CASINO-5 DISTANCE= 12.9 km (very approx) Onshore?=N WELL_NAME= CASINO-2 DISTANCE= 13.8 km (very approx) Onshore?=N WELL_NAME= HALLADALE-1 DW1 DISTANCE= 13.8 km (very approx) Onshore?=N WELL_NAME= HALLADALE-1 DW2 DISTANCE= 13.8 km (very approx) Onshore?=N WELL_NAME= HALLADALE-1 DW3
SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = OH91-124 SDO: CLOSE/INTERSECTING 2D SEISMIC LINES: SEIS_LINE_NAME = OH91-141 SDO: HISTORICAL TITLES: 1. ENCLOSING HENRY-2 : TITLE_NAME=PEP22 SDO: HISTORICAL TITLES: 1. ENCLOSING HENRY-2 : TITLE_NAME=VIC/L30 SDO: HISTORICAL TITLES: 1. ENCLOSING HENRY-2 : TITLE_NAME=VIC/P10 SDO: HISTORICAL TITLES: 1. ENCLOSING HENRY-2 : TITLE_NAME=VIC/P15 SDO: HISTORICAL TITLES: 1. ENCLOSING HENRY-2 : TITLE_NAME=VIC/P30 SDO: HISTORICAL TITLES: 1. ENCLOSING HENRY-2 : TITLE_NAME=VIC/P44 SDO: HISTORICAL TITLES: 2. NEAR HENRY-2 : TITLE_NAME=PEP22 : Distance=0 SDO: HISTORICAL TITLES: 2. NEAR HENRY-2 : TITLE_NAME=PEP40 : Distance=2.76 SDO: HISTORICAL TITLES: 2. NEAR HENRY-2 : TITLE_NAME=V11-2 : Distance=10.32 SDO: HISTORICAL TITLES: 2. NEAR HENRY-2 : TITLE_NAME=VIC/L24 : Distance=4.94 SDO: HISTORICAL TITLES: 2. NEAR HENRY-2 : TITLE_NAME=VIC/L30 : Distance=0 SDO: HISTORICAL TITLES: 2. NEAR HENRY-2 : TITLE_NAME=VIC/P10 : Distance=0 SDO: HISTORICAL TITLES: 2. NEAR HENRY-2 : TITLE_NAME=VIC/P15 : Distance=0 SDO: HISTORICAL TITLES: 2. NEAR HENRY-2 : TITLE_NAME=VIC/P30 : Distance=0 SDO: HISTORICAL TITLES: 2. NEAR HENRY-2 : TITLE_NAME=VIC/P31 : Distance=11.37 SDO: HISTORICAL TITLES: 2. NEAR HENRY-2 : TITLE_NAME=VIC/P44 : Distance=0 SDO: HISTORICAL TITLES: 2. NEAR HENRY-2 : TITLE_NAME=VIC/P6 : Distance=2.95
ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913159 a HENRY-2 DW1 & -2 WCR CD [CD] PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_.TAR.GZ(141.3m)......... PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_.TAR.GZ(141.3m)......... SAM3_247_PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_I_MEDIA_LABELLING.JPG(2.6m)......... ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913159 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes) ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913159 c DESC=HENRY-2 (incorporates some HENRY-2 DW1 & HENRY-2 DW1 ST1 data). Well Completion Report Basic Well Data CD. VIC/P44. Includes WCR report; Mudlogging and MWD data. Santos Limited, 27 April 2009. ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913159 d WELL_NAME=HENRY-2 ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913159 d WELL_NAME=HENRY-2 DW1 ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913159 d WELL_NAME=HENRY-2 DW1 ST1 ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913159 d WELL_NAME=HENRY-2 DW1 ST1 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913159 d WELL_NAME=HENRY-2 DW1 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913159 d WELL_NAME=HENRY-2 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913160 a HENRY-2 DW1, HENRY-2 DW1 ST1, WCR CD [CD] PE913160__((_HENRY-2_DW1,_HENRY-2_DW1_ST1,_WCR_CD_))_.TAR.GZ(161.7m)......... PE913160__((_HENRY-2_DW1,_HENRY-2_DW1_ST1,_WCR_CD_))_.TAR.GZ(161.7m)......... SAM3_248_PE913160__((_HENRY-2_DW1,_HENRY-2_DW1_ST1,_WCR_CD_))_I_MEDIA_LABELLING.JPG(2.6m)......... ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913160 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes) ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913160 c DESC=HENRY-2 DW1, HENRY-2 DW1 ST1 (incorporates some HENRY-2 data). Well Completion Report Basic Well Data CD. VIC/P44. Includes WCR report; Mudlogging and MWD data. Santos Limited, 27 April 2009. ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913160 d WELL_NAME=HENRY-2 ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913160 d WELL_NAME=HENRY-2 DW1 ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913160 d WELL_NAME=HENRY-2 DW1 ST1 ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913160 d WELL_NAME=HENRY-2 DW1 ST1 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913160 d WELL_NAME=HENRY-2 DW1 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) GENERAL DATA_CD_DVD PE913160 d WELL_NAME=HENRY-2 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) GENERAL REGISTRY_FILE F7737415 a VIC/P44/2/A-C 1 Registry File [PAPER] ASSETS (DETAIL) GENERAL REGISTRY_FILE F7737415 b (located in::RECFINDD= SEE RECFIND DATABASE) ASSETS (DETAIL) GENERAL REGISTRY_FILE F7737415 c DESC=VIC/P44/2/A-C 1 OFFSHORE EXPLORATION PERMIT YEAR 2 WELL A-C SANTOS LTD NETHERBY-1, HENRY-2, PECTEN EAST-1 ASSETS (DETAIL) GENERAL REGISTRY_FILE F7737415 d WELL_NAME=HENRY-2 ASSETS (DETAIL) GENERAL REGISTRY_FILE F7737415 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) GENERAL REGISTRY_FILE F7737415 d WELL_NAME=PECTEN EAST-1 ASSETS (DETAIL) GENERAL REGISTRY_FILE F7743651 a IR/04/0314 Registry File [PAPER] ASSETS (DETAIL) GENERAL REGISTRY_FILE F7743651 b (located in::COMPACTUS_1= COMPACTUS_1 55 Collins St) ASSETS (DETAIL) GENERAL REGISTRY_FILE F7743651 c DESC=IR/04/0314 Registry File: INDUSTRY REGULATION LICENSING, LEASING AND PERMITS PETROLEUM WELL - PRODUCTION LICENCE FOR PETROLEUM VIC/L30 - HENRY-2 (W1449) ASSETS (DETAIL) GENERAL REGISTRY_FILE F7743651 d WELL_NAME=HENRY-2 ASSETS (DETAIL) GENERAL REGISTRY_FILE F7743651 d WELL_NAME=HENRY-2 DW1 ASSETS (DETAIL) GENERAL REGISTRY_FILE F7743651 d WELL_NAME=HENRY-2 DW1 ST1 ASSETS (DETAIL) SEISMIC HRZN_CONTR_MAP PE911567_3 a HENRY-2 Depth Structure Map [CD] ASSETS (DETAIL) SEISMIC HRZN_CONTR_MAP PE911567_3 b (located in::PE911567= HENRY-2 WCR (Interpreted Well Data)) ASSETS (DETAIL) SEISMIC HRZN_CONTR_MAP PE911567_3 c DESC=HENRY-2 K76 Waarre A Depth Structure Map, contained within the Well Completion Report (Interpretive) for Santos Ltd, Oct 2009 ASSETS (DETAIL) SEISMIC HRZN_CONTR_MAP PE911567_3 d WELL_NAME=HENRY-2 ASSETS (DETAIL) WELL BIOSTRAT PE911567_4 a HENRY-2 Palynology Range Chart, 2009 [CD] ASSETS (DETAIL) WELL BIOSTRAT PE911567_4 b (located in::PE911567= HENRY-2 WCR (Interpreted Well Data)) ASSETS (DETAIL) WELL BIOSTRAT PE911567_4 c DESC=HENRY-2 Palynology Range Chart contained within the Well Completion Report (Interpreted Well Data CD). Santos Ltd, Oct 2009 ASSETS (DETAIL) WELL BIOSTRAT PE911567_4 d WELL_NAME=HENRY-2 ASSETS (DETAIL) WELL COMPOSITE_LOG PE911567_2 a HENRY-2 Composite Log (Interp.) [CD] ASSETS (DETAIL) WELL COMPOSITE_LOG PE911567_2 b (located in::PE911567= HENRY-2 WCR (Interpreted Well Data)) ASSETS (DETAIL) WELL COMPOSITE_LOG PE911567_2 c DESC=HENRY-2 Composite Log in CGM and TIF formats within the Well Completion Report (Interpreted Well Data CD) for Santos Ltd, Oct 2009 ASSETS (DETAIL) WELL COMPOSITE_LOG PE911567_2 d WELL_NAME=HENRY-2 ASSETS (DETAIL) WELL CROSS_SECTION PE911567_5 a HENRY-2 Stratigraphic Cross Section [CD] ASSETS (DETAIL) WELL CROSS_SECTION PE911567_5 b (located in::PE911567= HENRY-2 WCR (Interpreted Well Data)) ASSETS (DETAIL) WELL CROSS_SECTION PE911567_5 c DESC=HENRY-2 Stratigraphic Cross Section contained within the Well Completion Report (Interpreted Well Data CD). Santos Ltd, Oct 2009 ASSETS (DETAIL) WELL CROSS_SECTION PE911567_5 d WELL_NAME=HENRY-2 ASSETS (DETAIL) WELL DAILY_RPT PE915098_01 a Well Daily Reports: DDRs, WOs, DGRs 2008 [CD] (2291 DIGITAL FILES) ASSETS (DETAIL) WELL DAILY_RPT PE915098_01 b (located in::PE915098= Well Data - Electronic Submissions 2008) ASSETS (DETAIL) WELL DAILY_RPT PE915098_01 c DESC=Well Daily Reports - Electronic Submissions 2008. Contains well d.drill/geol/workover/ops/daily litho rpts catalogued in 2008. For well/company/rpt details see Remarks/Ancillary Data. ASSETS (DETAIL) WELL DAILY_RPT PE915098_01 d (more than 25 wells for this asset item) ASSETS (DETAIL) WELL DIRECTIONAL PE610438_1 a HENRY-2 MWD/LWD VISION Service [DVD] PE610438__((_HENRY-2_MWD_LWD_VISION_SERVICE_))_.TAR.GZ(73.4m)......... PE610438__((_HENRY-2_MWD_LWD_VISION_SERVICE_))_.TAR.GZ(73.4m)......... SAM0_849_PE610438__((_HENRY-2_MWD_LWD_VISION_SERVICE_))_I_MEDIA_LABELLING.JPG(3.0m)......... ASSETS (DETAIL) WELL DIRECTIONAL PE610438_1 b (located in::PE610438= HENRY-2 MWD/LWD VISION Service) ASSETS (DETAIL) WELL DIRECTIONAL PE610438_1 c DESC=HENRY-2 Wellsite Product MWD/LWD VISION Service sonicVISIONC By Schlumberger for Santos Limited, 25-aug-08, Henry field. Otway Run 3-5, Reference 08ASO0011 ASSETS (DETAIL) WELL DIRECTIONAL PE610438_1 d WELL_NAME=HENRY-2 ASSETS (DETAIL) WELL DIRECTIONAL PE610439_1 a HENRY-2 DW1 MWD/LWD VISION Service [DVD] PE610439__((_HENRY-2_DW1_MWD_LWD_VISION_SERVICE_))_.TAR.GZ(4.3m)......... PE610439__((_HENRY-2_DW1_MWD_LWD_VISION_SERVICE_))_.TAR.GZ(4.3m)......... SAM0_850_PE610439__((_HENRY-2_DW1_MWD_LWD_VISION_SERVICE_))_I_MEDIA_LABELLING.JPG(3.0m)......... ASSETS (DETAIL) WELL DIRECTIONAL PE610439_1 b (located in::PE610439= HENRY-2 DW1 MWD/LWD VISION Service) ASSETS (DETAIL) WELL DIRECTIONAL PE610439_1 c DESC=HENRY-2 DW1 Wellsite Product MWD/LWD VISION Service arcVISIONC By Schlumberger for Santos Limited, 25-aug-08, Henry field. Otway Run 6-7, Reference 08ASO0011 ASSETS (DETAIL) WELL DIRECTIONAL PE610439_1 d WELL_NAME=HENRY-2 ASSETS (DETAIL) WELL DIRECTIONAL PE610439_1 d WELL_NAME=HENRY-2 DW1 ASSETS (DETAIL) WELL DRILL_RPT PE915098_08 a Well Drill Repts, Logs & T-D Curves 2008 [CD] (2291 DIGITAL FILES) ASSETS (DETAIL) WELL DRILL_RPT PE915098_08 b (located in::PE915098= Well Data - Electronic Submissions 2008) ASSETS (DETAIL) WELL DRILL_RPT PE915098_08 c DESC=Well Drilling Reports, Logs & Time-Depth Curves - Electronic Submissions 2008. Contains drilling reports, and digital & image files of drill logs and time depth curves. ASSETS (DETAIL) WELL DRILL_RPT PE915098_08 d (more than 25 wells for this asset item) ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 a Well Lithology Logs 2008 [CD] (2291 DIGITAL FILES) ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 b (located in::PE915098= Well Data - Electronic Submissions 2008) ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 c DESC=Well Lithology Logs - Electronic Submissions 2008. Contains core, cuttings & SWC descriptions/logs. ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 d WELL_NAME=ALBERTON-1 ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 d WELL_NAME=BOOLA BOOLA-2 ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 d WELL_NAME=COELACANTH-1 ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 d WELL_NAME=HAZELWOOD-1 ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 d WELL_NAME=HENRY-2 ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 d WELL_NAME=HENRY-2 DW1 ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 d WELL_NAME=LONGTOM-4 ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 d WELL_NAME=LONGTOM-4P ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 d WELL_NAME=MADFISH-1 ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 d WELL_NAME=NAPIER HIGH-1 ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 d WELL_NAME=PEEJAY-1 ASSETS (DETAIL) WELL LITHOLOGY_LOG PE915098_09 d WELL_NAME=SPEKE SOUTH-1 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE913159_2 a HENRY-2 Dlis Well logs [CD] PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_.TAR.GZ(141.3m)......... PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_.TAR.GZ(141.3m)......... SAM3_247_PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_I_MEDIA_LABELLING.JPG(2.6m)......... ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE913159_2 b (located in::PE913159= HENRY-2 DW1 & -2 WCR CD) ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE913159_2 c DESC=HENRY-2. Mudlogging and MWD logs (Dlis format). Santos Limited, 27 April 2009. ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE913159_2 d WELL_NAME=HENRY-2 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE913159_2 d WELL_NAME=HENRY-2 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE913159_3 a HENRY-2 LAS Well logs [CD] PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_.TAR.GZ(141.3m)......... PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_.TAR.GZ(141.3m)......... SAM3_247_PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_I_MEDIA_LABELLING.JPG(2.6m)......... ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE913159_3 b (located in::PE913159= HENRY-2 DW1 & -2 WCR CD) ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE913159_3 c DESC=HENRY-2. Mudlogging and MWD logs (LAS format). Santos Limited, 27 April 2009. ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE913159_3 d WELL_NAME=HENRY-2 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE913159_3 d WELL_NAME=HENRY-2 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE915098_06 a Well Logs: Digital 2008 [CD] (2291 DIGITAL FILES) ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE915098_06 b (located in::PE915098= Well Data - Electronic Submissions 2008) ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE915098_06 c DESC=Well Logs: Digital - Electronic Submissions 2008. Contains Digital Geophysical Logs. Also includes digital gas logs. ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE915098_06 d WELL_NAME=BAZZARD-1 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE915098_06 d WELL_NAME=COELACANTH-1 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE915098_06 d WELL_NAME=HAZELWOOD-1 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE915098_06 d WELL_NAME=HENRY-2 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE915098_06 d WELL_NAME=HENRY-2 DW1 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE915098_06 d WELL_NAME=HENRY-2 DW1 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE915098_06 d WELL_NAME=LONGTOM-4 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE915098_06 d WELL_NAME=LONGTOM-4H ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE915098_06 d WELL_NAME=LONGTOM-4P ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE915098_06 d WELL_NAME=MADFISH-1 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE915098_06 d WELL_NAME=PEEJAY-1 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE915098_06 d WELL_NAME=SPEKE SOUTH-1 ASSETS (DETAIL) WELL LOG_TAPE_OR_DISK PE915098_06 d WELL_NAME=WASABI-1 ASSETS (DETAIL) WELL MUD_LOG PE915098_02 a Well Mud Logs 2008 [CD] (2291 DIGITAL FILES) ASSETS (DETAIL) WELL MUD_LOG PE915098_02 b (located in::PE915098= Well Data - Electronic Submissions 2008) ASSETS (DETAIL) WELL MUD_LOG PE915098_02 c DESC=Well Mud Logs - Electronic Submissions 2008. Contains Mudlogs only, images and digital. ASSETS (DETAIL) WELL MUD_LOG PE915098_02 d (more than 25 wells for this asset item) ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 a Well Geodetic Survey Data, Reports 2008 [CD] (2291 DIGITAL FILES) ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 b (located in::PE915098= Well Data - Electronic Submissions 2008) ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 c DESC=Well Geodetic Survey Data, Reports - Electronic Submissions 2008. Contains geodetic surveys and other positioning, downhole surveys and nav reports. Also rotary table heighting data. ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=COELACANTH-1 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=DORY-1 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=FERMAT-1 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=HAZELWOOD-1 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=HENRY-2 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=HENRY-2 DW1 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=HENRY-2 DW1 ST1 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=HENRY-2 DW1 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=HENRY-2 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=LONGTOM-4 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=LONGTOM-4H ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=MADFISH-1 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=PEEJAY-1 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=SNAPPER-A11A ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=SNAPPER-A1A ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=SNAPPER-A1A WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=SNAPPER-A21A ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=SNAPPER-M33A ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=SNAPPER-M33A WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=SPEKE SOUTH-1 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=WARDIE-1 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=WASABI-1 ASSETS (DETAIL) WELL SRVY_RPT PE915098_07 d WELL_NAME=WEST SEAHORSE-3 ASSETS (DETAIL) WELL WCR_RPT PE911567 a HENRY-2 WCR (Interpreted Well Data) [CD] ASSETS (DETAIL) WELL WCR_RPT PE911567 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes) ASSETS (DETAIL) WELL WCR_RPT PE911567 c DESC=HENRY-2 Well Completion Report (Interpreted Well Data CD). Contains WCR, and enclosures: composite log, depth map, palynology range chart, stratigraphic cross section, and WES plot for Santos Ltd, Oct 2009 ASSETS (DETAIL) WELL WCR_RPT PE911567 d WELL_NAME=HENRY-2 ASSETS (DETAIL) WELL WCR_RPT PE911567_1 a HENRY-2 WCR (Interpreted Well Data) [CD] ASSETS (DETAIL) WELL WCR_RPT PE911567_1 b (located in::PE911567= HENRY-2 WCR (Interpreted Well Data)) ASSETS (DETAIL) WELL WCR_RPT PE911567_1 c DESC=HENRY-2 Well Completion Report (Interpreted Well Data CD). Contains WCR, electric log evaluation, MDT pressure report, hydrocarbon show report, geothermal gradient, petrology report and palynology report for Santos Ltd, Oct 2009 ASSETS (DETAIL) WELL WCR_RPT PE911567_1 d WELL_NAME=HENRY-2 ASSETS (DETAIL) WELL WCR_RPT PE913159_1 a HENRY-2 WCR [CD] PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_.TAR.GZ(141.3m)......... PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_.TAR.GZ(141.3m)......... SAM3_247_PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_I_MEDIA_LABELLING.JPG(2.6m)......... ASSETS (DETAIL) WELL WCR_RPT PE913159_1 b (located in::PE913159= HENRY-2 DW1 & -2 WCR CD) ASSETS (DETAIL) WELL WCR_RPT PE913159_1 c DESC=HENRY-2 (incorporates some HENRY-2 DW1 & HENRY-2 DW1 ST1 data). Well Completion Report Basic Well Data (850 pp). VIC/P44. Includes Daily reports; End of well reports; Deviation data. Santos Limited, 31 October 2008. ASSETS (DETAIL) WELL WCR_RPT PE913159_1 d WELL_NAME=HENRY-2 ASSETS (DETAIL) WELL WCR_RPT PE913159_1 d WELL_NAME=HENRY-2 DW1 ASSETS (DETAIL) WELL WCR_RPT PE913159_1 d WELL_NAME=HENRY-2 DW1 ST1 ASSETS (DETAIL) WELL WCR_RPT PE913159_1 d WELL_NAME=HENRY-2 DW1 ST1 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL WCR_RPT PE913159_1 d WELL_NAME=HENRY-2 DW1 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL WCR_RPT PE913159_1 d WELL_NAME=HENRY-2 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL WCR_RPT PE913160_1 a HENRY-2 DW1, HENRY-2 DW1 ST1, WCR [CD] PE913160__((_HENRY-2_DW1,_HENRY-2_DW1_ST1,_WCR_CD_))_.TAR.GZ(161.7m)......... PE913160__((_HENRY-2_DW1,_HENRY-2_DW1_ST1,_WCR_CD_))_.TAR.GZ(161.7m)......... SAM3_248_PE913160__((_HENRY-2_DW1,_HENRY-2_DW1_ST1,_WCR_CD_))_I_MEDIA_LABELLING.JPG(2.6m)......... ASSETS (DETAIL) WELL WCR_RPT PE913160_1 b (located in::PE913160= HENRY-2 DW1, Henry-2 DW1 ST1, WCR CD) ASSETS (DETAIL) WELL WCR_RPT PE913160_1 c DESC=HENRY-2 DW1, HENRY-2 DW1 ST1 (incorporates some Henry-2 data). Well Completion Report Basic Well Data (1131 pp). VIC/P44. Includes Daily reports; End of well reports; Deviation data. Santos Limited, November 2008. ASSETS (DETAIL) WELL WCR_RPT PE913160_1 d WELL_NAME=HENRY-2 ASSETS (DETAIL) WELL WCR_RPT PE913160_1 d WELL_NAME=HENRY-2 DW1 ASSETS (DETAIL) WELL WCR_RPT PE913160_1 d WELL_NAME=HENRY-2 DW1 ST1 ASSETS (DETAIL) WELL WCR_RPT PE913160_1 d WELL_NAME=HENRY-2 DW1 ST1 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL WCR_RPT PE913160_1 d WELL_NAME=HENRY-2 DW1 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL WCR_RPT PE913160_1 d WELL_NAME=HENRY-2 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL WELL_LOG PE610438 a HENRY-2 MWD/LWD VISION Service [DVD] PE610438__((_HENRY-2_MWD_LWD_VISION_SERVICE_))_.TAR.GZ(73.4m)......... PE610438__((_HENRY-2_MWD_LWD_VISION_SERVICE_))_.TAR.GZ(73.4m)......... SAM0_849_PE610438__((_HENRY-2_MWD_LWD_VISION_SERVICE_))_I_MEDIA_LABELLING.JPG(3.0m)......... ASSETS (DETAIL) WELL WELL_LOG PE610438 b (located in::TAPEBAY= Bay of COMPACTUS_1 used to store tapes) ASSETS (DETAIL) WELL WELL_LOG PE610438 c DESC=HENRY-2 Wellsite Product MWD/LWD VISION Service sonicVISIONC By Schlumberger for Santos Limited, 25-aug-08, Henry field. Otway Run 3-5, Reference 08ASO0011 ASSETS (DETAIL) WELL WELL_LOG PE610438 d WELL_NAME=HENRY-2 ASSETS (DETAIL) WELL WELL_LOG PE911567_6 a HENRY-2 Well Evaluation Summary (WES) [CD] ASSETS (DETAIL) WELL WELL_LOG PE911567_6 b (located in::PE911567= HENRY-2 WCR (Interpreted Well Data)) ASSETS (DETAIL) WELL WELL_LOG PE911567_6 c DESC=HENRY-2 Well Evaluation Summary (WES) in PDF and CGM format, contained within the Well Completion Report (Interpreted Well Data CD). Santos Ltd, Oct 2009 ASSETS (DETAIL) WELL WELL_LOG PE911567_6 d WELL_NAME=HENRY-2 ASSETS (DETAIL) WELL WELL_LOG PE913159_4 a HENRY-2 PDF Well logs [CD] PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_.TAR.GZ(141.3m)......... PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_.TAR.GZ(141.3m)......... SAM3_247_PE913159__((_HENRY-2_DW1___-2_WCR_CD_))_I_MEDIA_LABELLING.JPG(2.6m)......... ASSETS (DETAIL) WELL WELL_LOG PE913159_4 b (located in::PE913159= HENRY-2 DW1 & -2 WCR CD) ASSETS (DETAIL) WELL WELL_LOG PE913159_4 c DESC=HENRY-2. Mudlogging and MWD logs (PDF, PDS, TIF formats). Santos Limited, 27 April 2009. ASSETS (DETAIL) WELL WELL_LOG PE913159_4 d WELL_NAME=HENRY-2 ASSETS (DETAIL) WELL WELL_LOG PE913159_4 d WELL_NAME=HENRY-2 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 a Well Logs: MWD/LWD 2008 [CD] (2291 DIGITAL FILES) ASSETS (DETAIL) WELL WELL_LOG PE915098_04 b (located in::PE915098= Well Data - Electronic Submissions 2008) ASSETS (DETAIL) WELL WELL_LOG PE915098_04 c DESC=Well Logs - Electronic Submissions 2008. Contains MWD/LWD Logs. Images and digital. ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=BAZZARD-1 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=BAZZARD-1 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=COELACANTH-1 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=DORY-1 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=HENRY-2 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=HENRY-2 DW1 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=HENRY-2 DW1 ST1 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=HENRY-2 DW1 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=HENRY-2 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=MADFISH-1 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=NETHERBY-1 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=PEEJAY-1 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=SNAPPER-A11A ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=SNAPPER-A21A ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=SNAPPER-M33A ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=SNAPPER-M33A WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=SPEKE SOUTH-1 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=WASABI-1 ASSETS (DETAIL) WELL WELL_LOG PE915098_04 d WELL_NAME=WEST SEAHORSE-3 ASSETS (DETAIL) WELL WELL_LOG PE915098_05 a Well Logs: Images 2008 [CD] (2291 DIGITAL FILES) ASSETS (DETAIL) WELL WELL_LOG PE915098_05 b (located in::PE915098= Well Data - Electronic Submissions 2008) ASSETS (DETAIL) WELL WELL_LOG PE915098_05 c DESC=Well Logs: Images - Electronic Submissions 2008. Contains Geophysical well log images. Also includes gas log images. ASSETS (DETAIL) WELL WELL_LOG PE915098_05 d WELL_NAME=BAZZARD-1 ASSETS (DETAIL) WELL WELL_LOG PE915098_05 d WELL_NAME=COELACANTH-1 ASSETS (DETAIL) WELL WELL_LOG PE915098_05 d WELL_NAME=DORY-1 ASSETS (DETAIL) WELL WELL_LOG PE915098_05 d WELL_NAME=EAST WING-1 ASSETS (DETAIL) WELL WELL_LOG PE915098_05 d WELL_NAME=EAST WING-1 ST1 ASSETS (DETAIL) WELL WELL_LOG PE915098_05 d WELL_NAME=HENRY-2 ASSETS (DETAIL) WELL WELL_LOG PE915098_05 d WELL_NAME=HENRY-2 DW1 ST1 ASSETS (DETAIL) WELL WELL_LOG PE915098_05 d WELL_NAME=HENRY-2 WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL WELL_LOG PE915098_05 d WELL_NAME=LONGTOM-4 ASSETS (DETAIL) WELL WELL_LOG PE915098_05 d WELL_NAME=MADFISH-1 ASSETS (DETAIL) WELL WELL_LOG PE915098_05 d WELL_NAME=PEEJAY-1 ASSETS (DETAIL) WELL WELL_LOG PE915098_05 d WELL_NAME=SNAPPER-A19A ASSETS (DETAIL) WELL WELL_LOG PE915098_05 d WELL_NAME=SNAPPER-M33A ASSETS (DETAIL) WELL WELL_LOG PE915098_05 d WELL_NAME=SNAPPER-M33A WELL_ANC = POINT DEPTH=0 BOTTOM_DEPTH=0 TOP_DEPTH=0 ASSETS (DETAIL) WELL WELL_LOG PE915098_05 d WELL_NAME=SPEKE SOUTH-1 ASSETS (DETAIL) WELL WELL_LOG PE915098_05 d WELL_NAME=WARDIE-1 ASSETS (DETAIL) WELL WELL_LOG PE915098_05 d WELL_NAME=WASABI-1
HENRY_2 OIL_CO_DATA:1: DEVIATION SRVY 01 SURVEY_ID =HENRY_2 HENRY_2 OIL_CO_DATA:1: DEVIATION SRVY 02 SURVEY_COMPANY =Schlumberger HENRY_2 OIL_CO_DATA:1: DEVIATION SRVY 03 SURVEY_DATE =28-AUG-08 HENRY_2 OIL_CO_DATA:1: DEVIATION SRVY 05 SURVEY_TYPE =DIR HENRY_2 OIL_CO_DATA:1: DEVIATION SRVY 06 STORAGE_UNIT =Metres HENRY_2 OIL_CO_DATA:1: DEVIATION SRVY 09 COMPUTE_METHOD =MC HENRY_2 OIL_CO_DATA:1: DEVIATION SRVY 13 AZIMUTH_NORTH_TYPE =G HENRY_2 OIL_CO_DATA:1: DEVIATION SRVY 14 TOP_DEPTH =0 HENRY_2 OIL_CO_DATA:1: DEVIATION SRVY 16 BASE_DEPTH =2042 HENRY_2 OIL_CO_DATA:1: DEVIATION SRVY 18 SOURCE =OIL_CO_DATA HENRY_2 OIL_CO_DATA:1: DEVIATION SRVY 20 REMARK =Deviation survey data for HENRY-2 (from HENRY_2.dsrvy). Also from Basic Data Report PE913159 Section 14, page 1. HENRY_2 OIL_CO_DATA:1: DEVIATION SRVY 21 POINT COUNT = 72 HENRY_2 OIL_CO_DATA:2: DEVIATION SRVY STATION_MD INCLINATION AZIMUTH STATION_ID STATION_TVD X_OFFSET Y_OFFSET VERTICAL_SECTION NS_DIRECTION EW_DIRECTION DOG_LEG_SEVERITY REMARK HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0000 .0 0 0 0 0 0 N E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0087 87.0 0 0 87 0 0 N E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0101 100.5 .86 166.76 100.53949 .02 .1 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0121 121.2 .69 181.46 121.28761 .06 .38 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0139 139.0 .44 330.2 138.99724 .02 .42 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0168 168.1 .76 319.12 168.18561 .16 .18 S W HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0196 196.2 .86 317.61 196.2528 .43 .12 N W HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0224 224.3 .9 318.13 224.32949 .72 .44 N W HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0252 252.4 .82 320.95 252.40632 .99 .76 N W HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0280 280.4 .85 321.06 280.46334 1.25 1.07 N W HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0309 309.3 .9 321.89 309.33998 1.52 1.42 N W HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0338 338.1 .88 317.75 338.08651 1.81 1.76 N W HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0367 366.9 .91 337.6 366.94306 2.05 2.14 N W HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0396 395.7 .18 193.03 395.732 2.14 2.3 N W HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0425 424.6 .23 186.43 424.57181 2.16 2.2 N W HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0453 453.4 .22 174.07 453.37159 2.16 2.09 N W HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0482 482.2 .28 178.7 482.24131 2.15 1.96 N W HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0511 511.1 .3 175.17 511.12094 2.15 1.82 N W HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0540 540.1 .32 168.39 540.08052 2.12 1.66 N W HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0569 568.8 .41 174.22 568.85994 2.1 1.48 N W HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0598 597.8 .27 181.06 597.79942 2.09 1.31 N W HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0627 626.6 .41 176.71 626.59891 2.08 1.14 N W HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0634 634.0 .47 178.32 634.03869 2.08 1.08 N W HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0682 681.5 .29 157.36 681.54764 2.03 .78 N W HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0740 740.0 .45 140.43 740.02642 1.82 .46 N W HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0768 768.2 .83 157.79 768.24463 1.68 .19 N W HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0797 797.0 2.5 141.89 797.03157 1.21 .5 S W HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0826 826.1 3.39 139.33 826.0629 .26 1.65 S W HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0854 854.4 3.4 141.08 854.30326 .81 2.94 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0884 883.6 3.87 140.62 883.47437 1.98 4.37 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0912 912.3 4.77 142.55 912.05267 3.32 6.07 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0940 940.4 6.91 146.93 940.00534 4.95 8.41 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0969 969.3 10.03 149.1 968.63612 7.2 12.03 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 0998 998.2 13.64 148.11 996.87798 10.29 17.08 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1026 1026.4 16.66 146.7 1024.13343 14.27 23.29 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1056 1056.3 19.21 141.25 1052.58967 19.71 30.72 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1085 1084.9 21.95 138.51 1079.34384 26.19 38.39 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1113 1112.8 24.41 135.23 1104.93551 33.69 46.37 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1142 1141.9 25.91 132.79 1131.26554 42.59 54.95 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1170 1169.5 27.21 130.42 1155.99771 51.83 63.16 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1199 1198.9 28.27 128.23 1182.0102 62.42 71.82 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1228 1228.1 29.96 126.7 1207.50259 73.69 80.45 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1258 1257.9 31.15 125.3 1233.20754 85.97 89.37 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1287 1287.2 34 121.48 1257.88995 99.14 98.03 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1315 1315.3 36.85 115.74 1280.80015 113.44 105.79 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1345 1344.5 38.72 112.58 1303.88644 129.77 113.11 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1374 1374.0 39.86 112.3 1326.67119 147 120.22 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1402 1402.2 40.08 111.24 1348.26805 163.81 126.94 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1432 1431.6 39.39 110.89 1370.94602 181.4 133.71 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1460 1460.3 38.67 109.79 1393.17086 198.29 139.98 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1488 1488.2 37.49 109.07 1415.17143 214.55 145.71 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1520 1519.6 38.21 109.48 1439.93379 232.71 152.06 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1538 1537.8 38.05 110.01 1454.26589 243.3 155.86 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1549 1548.7 38.12 110.29 1462.89248 249.65 158.19 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1578 1577.8 39.48 111.06 1485.51626 266.66 164.62 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1607 1606.7 41.45 112.42 1507.5028 284.08 171.57 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1635 1634.9 43.8 113.39 1528.29533 301.71 179.02 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1664 1663.9 45.65 114.57 1548.89908 320.35 187.32 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1692 1692.2 47.2 115.52 1568.4129 338.93 196 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1721 1720.6 49.49 115.31 1587.26095 358.07 205.09 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1751 1751.1 52.16 116.21 1606.52603 379.36 215.37 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1779 1779.0 54.97 116.68 1623.09453 399.45 225.37 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1808 1807.6 57.42 116.67 1638.98875 420.67 236.02 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1837 1836.5 59.33 117.7 1654.16325 442.58 247.28 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1866 1865.8 59.29 117.83 1669.08714 464.83 259 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1896 1895.5 59.36 118.49 1684.25965 487.38 271.07 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1924 1924.2 60.08 118.95 1698.72587 509.11 282.97 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1953 1952.6 60.05 119.47 1712.91799 530.62 295 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 1980 1980.3 59.99 119.22 1726.75463 551.53 306.75 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 2008 2007.9 60.08 118.21 1740.54529 572.51 318.25 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 2022 2022.0 60.26 118.69 1747.55906 583.26 324.07 S E HENRY_2 OIL_CO_DATA:3: DEVIATION SRVY 2042 2042.0 60.35 118.42 1757.43205 598.47 332.35 S E HENRY_2_MSTR MASTER:1: DEVIATION SRVY 01 SURVEY_ID =HENRY_2_MSTR HENRY_2_MSTR MASTER:1: DEVIATION SRVY 02 SURVEY_COMPANY =Schlumberger HENRY_2_MSTR MASTER:1: DEVIATION SRVY 03 SURVEY_DATE =28-AUG-08 HENRY_2_MSTR MASTER:1: DEVIATION SRVY 05 SURVEY_TYPE =DIR HENRY_2_MSTR MASTER:1: DEVIATION SRVY 06 STORAGE_UNIT =Metres HENRY_2_MSTR MASTER:1: DEVIATION SRVY 09 COMPUTE_METHOD =MC HENRY_2_MSTR MASTER:1: DEVIATION SRVY 13 AZIMUTH_NORTH_TYPE =G HENRY_2_MSTR MASTER:1: DEVIATION SRVY 14 TOP_DEPTH =0 HENRY_2_MSTR MASTER:1: DEVIATION SRVY 16 BASE_DEPTH =2042 HENRY_2_MSTR MASTER:1: DEVIATION SRVY 18 SOURCE =MASTER HENRY_2_MSTR MASTER:1: DEVIATION SRVY 18 SOURCE =MASTER [Note: surveys with a SOURCE of MASTER should usually be just a copy of one of the original surveys run in the well. The MASTER survey is used by the database to display/calculate well paths etc] HENRY_2_MSTR MASTER:1: DEVIATION SRVY 20 REMARK =Deviation survey data for HENRY-2 (from HENRY_2.dsrvy). Also from WCR/Basic Data Report PE913159 Section 14, page 1. HENRY_2_MSTR MASTER:1: DEVIATION SRVY 21 POINT COUNT = 72 HENRY_2_MSTR MASTER:2: DEVIATION SRVY STATION_MD INCLINATION AZIMUTH STATION_ID STATION_TVD X_OFFSET Y_OFFSET VERTICAL_SECTION NS_DIRECTION EW_DIRECTION DOG_LEG_SEVERITY REMARK HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0000 .0 0 0 0 0 0 N E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0087 87.0 0 0 87 0 0 N E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0101 100.5 .86 166.76 100.53949 .02 .1 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0121 121.2 .69 181.46 121.28761 .06 .38 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0139 139.0 .44 330.2 138.99724 .02 .42 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0168 168.1 .76 319.12 168.18561 .16 .18 S W HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0196 196.2 .86 317.61 196.2528 .43 .12 N W HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0224 224.3 .9 318.13 224.32949 .72 .44 N W HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0252 252.4 .82 320.95 252.40632 .99 .76 N W HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0280 280.4 .85 321.06 280.46334 1.25 1.07 N W HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0309 309.3 .9 321.89 309.33998 1.52 1.42 N W HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0338 338.1 .88 317.75 338.08651 1.81 1.76 N W HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0367 366.9 .91 337.6 366.94306 2.05 2.14 N W HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0396 395.7 .18 193.03 395.732 2.14 2.3 N W HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0425 424.6 .23 186.43 424.57181 2.16 2.2 N W HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0453 453.4 .22 174.07 453.37159 2.16 2.09 N W HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0482 482.2 .28 178.7 482.24131 2.15 1.96 N W HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0511 511.1 .3 175.17 511.12094 2.15 1.82 N W HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0540 540.1 .32 168.39 540.08052 2.12 1.66 N W HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0569 568.8 .41 174.22 568.85994 2.1 1.48 N W HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0598 597.8 .27 181.06 597.79942 2.09 1.31 N W HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0627 626.6 .41 176.71 626.59891 2.08 1.14 N W HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0634 634.0 .47 178.32 634.03869 2.08 1.08 N W HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0682 681.5 .29 157.36 681.54764 2.03 .78 N W HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0740 740.0 .45 140.43 740.02642 1.82 .46 N W HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0768 768.2 .83 157.79 768.24463 1.68 .19 N W HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0797 797.0 2.5 141.89 797.03157 1.21 .5 S W HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0826 826.1 3.39 139.33 826.0629 .26 1.65 S W HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0854 854.4 3.4 141.08 854.30326 .81 2.94 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0884 883.6 3.87 140.62 883.47437 1.98 4.37 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0912 912.3 4.77 142.55 912.05267 3.32 6.07 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0940 940.4 6.91 146.93 940.00534 4.95 8.41 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0969 969.3 10.03 149.1 968.63612 7.2 12.03 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 0998 998.2 13.64 148.11 996.87798 10.29 17.08 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1026 1026.4 16.66 146.7 1024.13343 14.27 23.29 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1056 1056.3 19.21 141.25 1052.58967 19.71 30.72 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1085 1084.9 21.95 138.51 1079.34384 26.19 38.39 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1113 1112.8 24.41 135.23 1104.93551 33.69 46.37 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1142 1141.9 25.91 132.79 1131.26554 42.59 54.95 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1170 1169.5 27.21 130.42 1155.99771 51.83 63.16 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1199 1198.9 28.27 128.23 1182.0102 62.42 71.82 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1228 1228.1 29.96 126.7 1207.50259 73.69 80.45 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1258 1257.9 31.15 125.3 1233.20754 85.97 89.37 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1287 1287.2 34 121.48 1257.88995 99.14 98.03 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1315 1315.3 36.85 115.74 1280.80015 113.44 105.79 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1345 1344.5 38.72 112.58 1303.88644 129.77 113.11 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1374 1374.0 39.86 112.3 1326.67119 147 120.22 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1402 1402.2 40.08 111.24 1348.26805 163.81 126.94 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1432 1431.6 39.39 110.89 1370.94602 181.4 133.71 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1460 1460.3 38.67 109.79 1393.17086 198.29 139.98 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1488 1488.2 37.49 109.07 1415.17143 214.55 145.71 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1520 1519.6 38.21 109.48 1439.93379 232.71 152.06 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1538 1537.8 38.05 110.01 1454.26589 243.3 155.86 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1549 1548.7 38.12 110.29 1462.89248 249.65 158.19 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1578 1577.8 39.48 111.06 1485.51626 266.66 164.62 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1607 1606.7 41.45 112.42 1507.5028 284.08 171.57 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1635 1634.9 43.8 113.39 1528.29533 301.71 179.02 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1664 1663.9 45.65 114.57 1548.89908 320.35 187.32 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1692 1692.2 47.2 115.52 1568.4129 338.93 196 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1721 1720.6 49.49 115.31 1587.26095 358.07 205.09 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1751 1751.1 52.16 116.21 1606.52603 379.36 215.37 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1779 1779.0 54.97 116.68 1623.09453 399.45 225.37 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1808 1807.6 57.42 116.67 1638.98875 420.67 236.02 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1837 1836.5 59.33 117.7 1654.16325 442.58 247.28 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1866 1865.8 59.29 117.83 1669.08714 464.83 259 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1896 1895.5 59.36 118.49 1684.25965 487.38 271.07 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1924 1924.2 60.08 118.95 1698.72587 509.11 282.97 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1953 1952.6 60.05 119.47 1712.91799 530.62 295 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 1980 1980.3 59.99 119.22 1726.75463 551.53 306.75 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 2008 2007.9 60.08 118.21 1740.54529 572.51 318.25 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 2022 2022.0 60.26 118.69 1747.55906 583.26 324.07 S E HENRY_2_MSTR MASTER:3: DEVIATION SRVY 2042 2042.0 60.35 118.42 1757.43205 598.47 332.35 S E