Origin: 35
Well Data
|
|
ESSO AUSTRALIA LTD.
|
|
CN
|
|
|
WHITING A-5
|
|
WN
|
|
|
WHITING
|
|
FN
|
|
RIG
|
MAERSK GIANT
|
|
CLAB, COUN
|
|
STATE
|
VICTORIA
|
|
SLAB, STAT
|
|
|
AUSTRALIA
|
|
NATI
|
|
|
AUSTRALIA
|
|
CONT
|
|
|
BASS STRAIT
|
|
FL
|
|
|
MG-89-09-01
|
|
SON
|
|
|
45.5 (m)
|
|
EKB
|
|
|
-53.0 (m)
|
|
EGL
|
|
|
45.2 (m)
|
|
EDF
|
|
|
MSL
|
0.0 (m)
|
PDAT, EPD
|
|
|
K.B.
|
0.0 (m)
|
LMF, APD
|
|
|
K.B.
|
|
DMF
|
Job Data
|
|
3-SEPT-89
|
|
DATE
|
|
|
ONE
|
|
RUN
|
|
|
2732.0 (m)
|
|
TDD
|
|
|
2730.0 (m)
|
|
TDL
|
|
|
2724.0 (m)
|
|
BLI
|
|
|
2100.0 (m)
|
|
TLI
|
|
|
7.63 (in)
|
|
CSIZ
|
|
|
9.88 (in)
|
|
BS
|
|
|
21:45 3-SEP-89
|
|
TLAB
|
|
|
390
|
VEA
|
LUN, LUL
|
|
|
R. CRIST
|
|
ENGI
|
|
|
P. GLENTON
|
|
WITN
|
|
|
MG-89-09-01
|
|
SON
|
Mud Data
|
|
KCL-POLYMER
|
|
DFT
|
|
|
9.50 (lbm/gal)
|
40.0 (s)
|
DFD, DFV
|
|
|
6.00 (cm3)
|
9.10
|
DFL, DFPH
|
|
|
0.0 (ppm)
|
|
BSAL
|
|
|
FLOWLINE
|
|
MSS
|
|
|
1.14 (ohm.m)
|
29.0 (degC)
|
RMS, MST
|
|
|
0.975 (ohm.m)
|
19.0 (degC)
|
RMFS, MFST
|
|
|
1.59 (ohm.m)
|
19.0 (degC)
|
RMCS, MCST
|
|
|
88.0 (degC)
|
|
MRT
|
|
|
1:00 3/9/89
|
|
TCS
|
|
|
21:45 3-SEP-89
|
|
TLAB
|
PVT Data
Remarks
|
. BOTTOM OF TOOL STOPPED 2M ABOVE TD. |
R1
|
|
. ALL SCALES AND PRESENTATIONS AT CLIENTS REQUEST. |
R2
|
|
. TLC TOOL STRING: DLTE LDTD CNTG SGTL SRTC TCCB AMS |
R3
|
|
. ON DOWN PASS CNT HOLE CORRECTION (HC) SET TO BS |
R4
|
|
. ON UP PASS CNT HOLE CORRECTION (HC) SET TO CALI |
R5
|
|
. HEAD TENSION FROM AMS PRESENTED IN DEPTH TRACK |
R6
|
|
SCALE 5000 0 |
R7
|
|
. LOG STOPPED 50M ABOVE THE TOP OF LATROBE. |
R8
|
|
. GR SPIKES ON DOWN PASS ARE DUE TO SOURCES ACTIVATING |
R9
|
|
FORMATION DURING DRILL PIPE CONNECTIONS. |
R10
|
|
. UP PASS DEPTH OFFSET +1 M. |
R11
|
Other Services
|