Schlumberger Verification Listing

Listing Created: 28-JAN-2009 17:21:59
Version: 11C0-208

  
Input Source: PE010505.dlis
Format: DLIS
Storage Set ID: LIS to DLIS Conversion

Max Record Length: 8192
Storage Unit Sequence: 1

  
File Header  File: ISN .007 Sequence: 1  
  Defining Origin: 62
  File ID: ISN .007 File Type: PLAY
  Producer Name: Schlumberger Product/Version: DLIS/U 0.1 File Set: 10116 File Number: 1 28-JAN-2009 17:21:15
     
          Company Name: ESSO AUSTRALIA LTD.
          Well Name: MACKEREL A-9
          Field Name: MACKEREL
  
    Origin: 35
  File ID: ISN .007 File Type: PLAY
  Producer Code: 440 Product/Version: CSU 32.4 File Set: 0 File Number: 7 8-AUG-1991
     
            Tool String: TEMP, NSM, DTT, CALR, SGTE
  
Well Site Data  File: ISN .007 Sequence: 1  
  Origin: 35
    Well Data
  ESSO AUSTRALIA LTD. CN
  MACKEREL A-9 WN
  MACKEREL FN
  COUNTRY AUSTRALIA CLAB, COUN
  STATE VICTORIA SLAB, STAT
  GIPPSLAND BASIN. FL
  910803 SON
  148 20 45 E. LONG
  038 24 48 S. LATI
  62.0 (deg) MHD
  33.8 (m) EKB
  -92.7 (m) EGL
  33.6 (m) EDF
  MSL     0.0 (m) PDAT, EPD
  KB     33.8 (m) LMF, APD
  KB DMF
    Job Data
  04-AUG-91 DATE
  ONE RUN
  3006.0 (m) TDD
  2902.0 (m) TDL
  2902.0 (m) BLI
  2850.0 (m) TLI
  0.0 (in) CSIZ
  9.88 (in) BS
  21:45 04/AUG. TLAB
  93     VEA LUN, LUL
  A. RICHMOND G.WRIGHT ENGI
  H. WILLIAMS WITN
  910803 SON
    Mud Data
  PRODUCTION FLUIDS. DFT
  106.0 (degC) MRT
  21:45 04/AUG. TLAB
    Remarks
  WELL DATA: R1
  WEL HEAD PRESS. 0.23 mpa, BOTTOM HOLE TEMP. 102 degc. R2
  TUBING SHOE: 2854 mtr, TOOL HOLD UP DEPTH: 2897 mtr. R3
  WELL DEVIATION: 47 deg. (AVER), 62 deg. (MAX). R4
  R6
  WIRELINE DATA: R7
  + 2.8 mtr. STRETCH CORRECTION ADDED TO GYRO LOG AT WELLSITE. R8
  WHEEL CORRECTION: -7 PARTS PER 10,000. R9
  CABLE TYPE: 1-32-ZT (ENDS-FIXED STRETCH COEFF. 11.5 X 10-7) R10
  R11
  LOGGING DATA: R12
  NUMBER OF GYRO STATIONS = 9 IN, 92 OUT. R13
  TOOL ZERO (AT SURFACE RELATIVE TO K.B.):- R14
  BEFORE RUN IN = +5.2 mtr. AFTER RUN OUT = + 5.2 mtr. R15
  DIFF BETWEEN DEPTH-SYSTEMS:- R16
  RUN IN = + 0.28 mtr. RUN OUT = - 0.39 mtr. R17
  R22
  TOOL DATA: R23
  GYRO POSITION TAKEN AS TOOL REFERENCE POINT. R24
  (BOTTOM NOSE WAS 2.28m BELOW GYRO MEASURE POINT) R25
  CCL (SCHLUM. ) MEASURE POINT IS 5.33m ABOVE TOOL REFERENCE. R26
  CCL (GYRO/DATA) MEASURE POINT IS 4.16m ABOVE TOOL REFERENCE R27
  PRESENTATION: R28
  LOGS PLAYED-BACK TO CORRECT OFFSET FROM CCLS TO REF POINT. R29
  DIFF. BETWEEN DEPTH SYSTEMS SHOWN IN DEPTH TRACK.(0->1M) R30
    Other Services
  NONE OS1
Channels  File: ISN .007 Sequence: 1  
  Origin: 62
    System and Miscellaneous

      Spacing: -6.0 in            Number of Channels: 10
CS        DIFF      ETIM      GR        INDEX     MARK      RGR       TENS      TIME      TOD      

      Spacing: -1.0 in            Number of Channels: 3
CCL       INDEX;2    RCCL     
Frame Summary  File: ISN .007 Sequence: 1  
Origin: 62
  Index Type Start Stop Spacing Channels Index Channel Frame Name
  BOREHOLE-DEPTH

2903.22

2846.83 m

-60.0 (0.1 in) up

10

INDEX   

1   

 

9525.00

9340.00 ft

  BOREHOLE-DEPTH

2903.35

2846.83 m

-10.0 (0.1 in) up

3

INDEX;2

2   

 

9525.42

9340.00 ft

Error Summary  File: ISN .007 Sequence: 1  
        No errors detected in file.
File Header  File: ISN .008 Sequence: 2  
  Defining Origin: 90
  File ID: ISN .008 File Type: PLAY
  Producer Name: Schlumberger Product/Version: DLIS/U 0.1 File Set: 10116 File Number: 2 28-JAN-2009 17:21:15
     
          Company Name: ESSO AUSTRALIA LTD.
          Well Name: MACKEREL A-9
          Field Name: MACKEREL
  
    Origin: 31
  File ID: ISN .008 File Type: PLAY
  Producer Code: 440 Product/Version: CSU 32.4 File Set: 0 File Number: 8 8-AUG-1991
     
            Tool String: TEMP, NSM, DTT, CALR, SGTE
  
Well Site Data  File: ISN .008 Sequence: 2  
  Origin: 31
    Well Data
  ESSO AUSTRALIA LTD. CN
  MACKEREL A-9 WN
  MACKEREL FN
  COUNTRY AUSTRALIA CLAB, COUN
  STATE VICTORIA SLAB, STAT
  GIPPSLAND BASIN. FL
  910803 SON
  148 20 45 E. LONG
  038 24 48 S. LATI
  62.0 (deg) MHD
  33.8 (m) EKB
  -92.7 (m) EGL
  33.6 (m) EDF
  MSL     0.0 (m) PDAT, EPD
  KB     33.8 (m) LMF, APD
  KB DMF
    Job Data
  04-AUG-91 DATE
  ONE RUN
  3006.0 (m) TDD
  2902.0 (m) TDL
  2902.0 (m) BLI
  2850.0 (m) TLI
  0.0 (in) CSIZ
  9.88 (in) BS
  21:45 04/AUG. TLAB
  93     VEA LUN, LUL
  A. RICHMOND G.WRIGHT ENGI
  H. WILLIAMS WITN
  910803 SON
    Mud Data
  PRODUCTION FLUIDS. DFT
  106.0 (degC) MRT
  21:45 04/AUG. TLAB
    Remarks
  WELL DATA: R1
  WEL HEAD PRESS. 0.23 mpa, BOTTOM HOLE TEMP. 102 degc. R2
  TUBING SHOE: 2854 mtr, TOOL HOLD UP DEPTH: 2897 mtr. R3
  WELL DEVIATION: 47 deg. (AVER), 62 deg. (MAX). R4
  R6
  WIRELINE DATA: R7
  + 2.8 mtr. STRETCH CORRECTION ADDED TO GYRO LOG AT WELLSITE. R8
  WHEEL CORRECTION: -7 PARTS PER 10,000. R9
  CABLE TYPE: 1-32-ZT (ENDS-FIXED STRETCH COEFF. 11.5 X 10-7) R10
  R11
  LOGGING DATA: R12
  NUMBER OF GYRO STATIONS = 9 IN, 92 OUT. R13
  TOOL ZERO (AT SURFACE RELATIVE TO K.B.):- R14
  BEFORE RUN IN = +5.2 mtr. AFTER RUN OUT = + 5.2 mtr. R15
  DIFF BETWEEN DEPTH-SYSTEMS:- R16
  RUN IN = + 0.28 mtr. RUN OUT = - 0.39 mtr. R17
  R22
  TOOL DATA: R23
  GYRO POSITION TAKEN AS TOOL REFERENCE POINT. R24
  (BOTTOM NOSE WAS 2.28m BELOW GYRO MEASURE POINT) R25
  CCL (SCHLUM. ) MEASURE POINT IS 5.33m ABOVE TOOL REFERENCE. R26
  CCL (GYRO/DATA) MEASURE POINT IS 4.16m ABOVE TOOL REFERENCE R27
  PRESENTATION: R28
  LOGS PLAYED-BACK TO CORRECT OFFSET FROM CCLS TO REF POINT. R29
  DIFF. BETWEEN DEPTH SYSTEMS SHOWN IN DEPTH TRACK.(0->1M) R30
    Other Services
  NONE OS1
Channels  File: ISN .008 Sequence: 2  
  Origin: 90
    System and Miscellaneous

      Spacing: -6.0 in            Number of Channels: 10
CS        DIFF      ETIM      GR        INDEX     MARK      RGR       TENS      TIME      TOD      

      Spacing: -1.0 in            Number of Channels: 3
CCL       INDEX;2    RCCL     
Frame Summary  File: ISN .008 Sequence: 2  
Origin: 90
  Index Type Start Stop Spacing Channels Index Channel Frame Name
  BOREHOLE-DEPTH

2898.50

2834.18 m

-60.0 (0.1 in) up

10

INDEX   

1   

 

9509.50

9298.50 ft

  BOREHOLE-DEPTH

2898.62

2834.18 m

-10.0 (0.1 in) up

3

INDEX;2

2   

 

9509.92

9298.50 ft

Error Summary  File: ISN .008 Sequence: 2  
        No errors detected in file.
File Header  File: ISN .009 Sequence: 3  
  Defining Origin: 119
  File ID: ISN .009 File Type: PLAY
  Producer Name: Schlumberger Product/Version: DLIS/U 0.1 File Set: 10116 File Number: 3 28-JAN-2009 17:21:16
     
          Company Name: ESSO AUSTRALIA LTD.
          Well Name: MACKEREL A-9
          Field Name: MACKEREL
  
    Origin: 64
  File ID: ISN .009 File Type: PLAY
  Producer Code: 440 Product/Version: CSU 32.4 File Set: 0 File Number: 9 8-AUG-1991
     
            Tool String: TEMP, NSM, DTT, CALR, SGTE
  
Well Site Data  File: ISN .009 Sequence: 3  
  Origin: 64
    Well Data
  ESSO AUSTRALIA LTD. CN
  MACKEREL A-9 WN
  MACKEREL FN
  COUNTRY AUSTRALIA CLAB, COUN
  STATE VICTORIA SLAB, STAT
  GIPPSLAND BASIN. FL
  910803 SON
  148 20 45 E. LONG
  038 24 48 S. LATI
  62.0 (deg) MHD
  33.8 (m) EKB
  -92.7 (m) EGL
  33.6 (m) EDF
  MSL     0.0 (m) PDAT, EPD
  KB     33.8 (m) LMF, APD
  KB DMF
    Job Data
  04-AUG-91 DATE
  ONE RUN
  3006.0 (m) TDD
  2902.0 (m) TDL
  2902.0 (m) BLI
  2850.0 (m) TLI
  0.0 (in) CSIZ
  9.88 (in) BS
  21:45 04/AUG. TLAB
  93     VEA LUN, LUL
  A. RICHMOND G.WRIGHT ENGI
  H. WILLIAMS WITN
  910803 SON
    Mud Data
  PRODUCTION FLUIDS. DFT
  106.0 (degC) MRT
  21:45 04/AUG. TLAB
    Remarks
  WELL DATA: R1
  WEL HEAD PRESS. 0.23 mpa, BOTTOM HOLE TEMP. 102 degc. R2
  TUBING SHOE: 2854 mtr, TOOL HOLD UP DEPTH: 2897 mtr. R3
  WELL DEVIATION: 47 deg. (AVER), 62 deg. (MAX). R4
  R6
  WIRELINE DATA: R7
  + 2.8 mtr. STRETCH CORRECTION ADDED TO GYRO LOG AT WELLSITE. R8
  WHEEL CORRECTION: -7 PARTS PER 10,000. R9
  CABLE TYPE: 1-32-ZT (ENDS-FIXED STRETCH COEFF. 11.5 X 10-7) R10
  R11
  LOGGING DATA: R12
  NUMBER OF GYRO STATIONS = 9 IN, 92 OUT. R13
  TOOL ZERO (AT SURFACE RELATIVE TO K.B.):- R14
  BEFORE RUN IN = +5.2 mtr. AFTER RUN OUT = + 5.2 mtr. R15
  DIFF BETWEEN DEPTH-SYSTEMS:- R16
  RUN IN = + 0.28 mtr. RUN OUT = - 0.39 mtr. R17
  R22
  TOOL DATA: R23
  GYRO POSITION TAKEN AS TOOL REFERENCE POINT. R24
  (BOTTOM NOSE WAS 2.28m BELOW GYRO MEASURE POINT) R25
  CCL (SCHLUM. ) MEASURE POINT IS 5.33m ABOVE TOOL REFERENCE. R26
  CCL (GYRO/DATA) MEASURE POINT IS 4.16m ABOVE TOOL REFERENCE R27
  PRESENTATION: R28
  LOGS PLAYED-BACK TO CORRECT OFFSET FROM CCLS TO REF POINT. R29
  DIFF. BETWEEN DEPTH SYSTEMS SHOWN IN DEPTH TRACK.(0->1M) R30
    Other Services
  NONE OS1
Channels  File: ISN .009 Sequence: 3  
  Origin: 119
    System and Miscellaneous

      Spacing: -6.0 in            Number of Channels: 10
CS        DIFF      ETIM      GR        INDEX     MARK      RGR       TENS      TIME      TOD      

      Spacing: -1.0 in            Number of Channels: 3
CCL       INDEX;2    RCCL     
Frame Summary  File: ISN .009 Sequence: 3  
Origin: 119
  Index Type Start Stop Spacing Channels Index Channel Frame Name
  BOREHOLE-DEPTH

2905.96

2855.82 m

-60.0 (0.1 in) up

10

INDEX   

1   

 

9534.00

9369.50 ft

  BOREHOLE-DEPTH

2906.09

2855.82 m

-10.0 (0.1 in) up

3

INDEX;2

2   

 

9534.42

9369.50 ft

Error Summary  File: ISN .009 Sequence: 3  
        No errors detected in file.
Schlumberger Verification Listing

Listing Completed: 28-JAN-2009 17:21:59