Schlumberger Verification Listing

Listing Created: 28-JAN-2009 17:19:56
Version: 11C0-208

  
Input Source: PE010504.dlis
Format: DLIS
Storage Set ID: LIS to DLIS Conversion

Max Record Length: 8192
Storage Unit Sequence: 1

  
File Header  File: ISN .003 Sequence: 1  
  Defining Origin: 62
  File ID: ISN .003 File Type: PLAY
  Producer Name: Schlumberger Product/Version: DLIS/U 0.1 File Set: 10116 File Number: 1 28-JAN-2009 17:18:55
     
          Company Name: ESSO AUSTRALIA LTD.
          Well Name: MACKEREL A-13
          Field Name: MACKEREL
  
    Origin: 35
  File ID: ISN .003 File Type: PLAY
  Producer Code: 440 Product/Version: CSU 32.4 File Set: 0 File Number: 3 10-AUG-1991
     
            Tool String: TEMP, NSM, DTT, CALR, SGTE
  
Well Site Data  File: ISN .003 Sequence: 1  
  Origin: 35
    Well Data
  ESSO AUSTRALIA LTD. CN
  MACKEREL A-13 WN
  MACKEREL FN
  COUNTRY AUSTRALIA CLAB, COUN
  STATE VICTORIA SLAB, STAT
  GIPPSLAND BASIN. FL
  GYRO 910805 SON
  148 20 45"E. LONG
  038 24 48" S. LATI
  65.0 (deg) MHD
  33.8 (m) EKB
  -92.6 (m) EGL
  33.6 (m) EDF
  MSL     0.0 (m) PDAT, EPD
  KB     33.8 (m) LMF, APD
  KB DMF
    Job Data
  10-AUGUST-1991 DATE
  ONE RUN
  3955.0 (m) TDD
  3895.8 (m) TDL
  3896.0 (m) BLI
  3750.0 (m) TLI
  0.0 (in) CSIZ
  9.88 (in) BS
  16:45 10/AUGUST TLAB
  93     VEA LUN, LUL
  N. WOODS A. RICHMOND ENGI
  S.FELSTEAD WITN
  GYRO 910805 SON
    Mud Data
  PRODUCTION FLUIDS. DFT
  102.3 (degC) MRT
  16:45 10/AUGUST TLAB
    Remarks
  WELL DATA: R1
  WELLHEAD PRESS.4.0MPA., BOTTOM HOLE TEMP.102.3DEGC. R2
  TUBING SHOE: 3801M., TOOL HOLD-UP DEPTH: 3895.8M. R3
  WELL DEVIATION: 60DEG (AVER.) 65DEG.(MAX.) @2748M. R4
  R6
  WIRELINE DATA: R7
  ## +6.5M. STRETCH CORR. APPLIED TO GYRO LOG AT WELLSITE. ## R8
  WHEEL CORRECTION: -7 PARTS PER 10,000. R9
  CABLE TYPE: 1-32-ZT (ENDS-FIXED STRETCH COEFF. 11.5 X 10-7) R10
  R11
  LOGGING DATA: R12
  NUMBER OF GYRO STATIONS: 1 IN , 130 OUT R13
  TOOL ZERO (AT SURFACE RELATIVE TO K.B.):- R14
  BEFORE RUN IN +5.0M., AFTER RUN OUT +4.7M. R15
  DIFF BETWEEN DEPTH-SYSTEMS:- R16
  RUN IN +0.35M., RUN OUT -0.54M. R17
  R22
  TOOL DATA: R23
  GYRO POSITION TAKEN AS TOOL REFERENCE POINT. R24
  (BOTTOM NOSE WAS 2.28m BELOW GYRO MEASURE POINT) R25
  CCL (SCHLUM.) MEASURE POINT IS 5.33M. ABOVE TOOL REFERENCE. R26
  CCL (GYRO/DATA) MEASURE POINT IS 4.16m ABOVE TOOL REFERENCE R27
  PRESENTATION: R28
  LOGS PLAYED-BACK TO CORRECT OFFSET FROM CCLS TO REF POINT. R29
  DIFF. BETWEEN DEPTH SYSTEMS SHOWN IN DEPTH TRACK.(0->1M) R30
    Other Services
  NONE OS1
Channels  File: ISN .003 Sequence: 1  
  Origin: 62
    System and Miscellaneous

      Spacing: -6.0 in            Number of Channels: 10
CS        DIFF      ETIM      GR        INDEX     MARK      RGR       TENS      TIME      TOD      

      Spacing: -1.0 in            Number of Channels: 3
CCL       INDEX;2    RCCL     
Frame Summary  File: ISN .003 Sequence: 1  
Origin: 62
  Index Type Start Stop Spacing Channels Index Channel Frame Name
  BOREHOLE-DEPTH

3899.61

3744.16 m

-60.0 (0.1 in) up

10

INDEX   

1   

 

12794.00

12284.00 ft

  BOREHOLE-DEPTH

3899.74

3744.16 m

-10.0 (0.1 in) up

3

INDEX;2

2   

 

12794.42

12284.00 ft

Error Summary  File: ISN .003 Sequence: 1  
        No errors detected in file.
File Header  File: ISN .004 Sequence: 2  
  Defining Origin: 90
  File ID: ISN .004 File Type: PLAY
  Producer Name: Schlumberger Product/Version: DLIS/U 0.1 File Set: 10116 File Number: 2 28-JAN-2009 17:18:55
     
          Company Name: ESSO AUSTRALIA LTD.
          Well Name: MACKEREL A-13
          Field Name: MACKEREL
  
    Origin: 31
  File ID: ISN .004 File Type: PLAY
  Producer Code: 440 Product/Version: CSU 32.4 File Set: 0 File Number: 4 10-AUG-1991
     
            Tool String: TEMP, NSM, DTT, CALR, SGTE
  
Well Site Data  File: ISN .004 Sequence: 2  
  Origin: 31
    Well Data
  ESSO AUSTRALIA LTD. CN
  MACKEREL A-13 WN
  MACKEREL FN
  COUNTRY AUSTRALIA CLAB, COUN
  STATE VICTORIA SLAB, STAT
  GIPPSLAND BASIN. FL
  GYRO 910805 SON
  148 20 45"E. LONG
  038 24 48" S. LATI
  65.0 (deg) MHD
  33.8 (m) EKB
  -92.6 (m) EGL
  33.6 (m) EDF
  MSL     0.0 (m) PDAT, EPD
  KB     33.8 (m) LMF, APD
  KB DMF
    Job Data
  10-AUGUST-1991 DATE
  ONE RUN
  3955.0 (m) TDD
  3895.8 (m) TDL
  3896.0 (m) BLI
  3750.0 (m) TLI
  0.0 (in) CSIZ
  9.88 (in) BS
  16:45 10/AUGUST TLAB
  93     VEA LUN, LUL
  N. WOODS A. RICHMOND ENGI
  S.FELSTEAD WITN
  GYRO 910805 SON
    Mud Data
  PRODUCTION FLUIDS. DFT
  102.3 (degC) MRT
  16:45 10/AUGUST TLAB
    Remarks
  WELL DATA: R1
  WELLHEAD PRESS.4.0MPA., BOTTOM HOLE TEMP.102.3DEGC. R2
  TUBING SHOE: 3801M., TOOL HOLD-UP DEPTH: 3895.8M. R3
  WELL DEVIATION: 60DEG (AVER.) 65DEG.(MAX.) @2748M. R4
  R6
  WIRELINE DATA: R7
  ## +6.5M. STRETCH CORR. APPLIED TO GYRO LOG AT WELLSITE. ## R8
  WHEEL CORRECTION: -7 PARTS PER 10,000. R9
  CABLE TYPE: 1-32-ZT (ENDS-FIXED STRETCH COEFF. 11.5 X 10-7) R10
  R11
  LOGGING DATA: R12
  NUMBER OF GYRO STATIONS: 1 IN , 130 OUT R13
  TOOL ZERO (AT SURFACE RELATIVE TO K.B.):- R14
  BEFORE RUN IN +5.0M., AFTER RUN OUT +4.7M. R15
  DIFF BETWEEN DEPTH-SYSTEMS:- R16
  RUN IN +0.35M., RUN OUT -0.54M. R17
  R22
  TOOL DATA: R23
  GYRO POSITION TAKEN AS TOOL REFERENCE POINT. R24
  (BOTTOM NOSE WAS 2.28m BELOW GYRO MEASURE POINT) R25
  CCL (SCHLUM.) MEASURE POINT IS 5.33M. ABOVE TOOL REFERENCE. R26
  CCL (GYRO/DATA) MEASURE POINT IS 4.16m ABOVE TOOL REFERENCE R27
  PRESENTATION: R28
  LOGS PLAYED-BACK TO CORRECT OFFSET FROM CCLS TO REF POINT. R29
  DIFF. BETWEEN DEPTH SYSTEMS SHOWN IN DEPTH TRACK.(0->1M) R30
    Other Services
  NONE OS1
Channels  File: ISN .004 Sequence: 2  
  Origin: 90
    System and Miscellaneous

      Spacing: -6.0 in            Number of Channels: 10
CS        DIFF      ETIM      GR        INDEX     MARK      RGR       TENS      TIME      TOD      

      Spacing: -1.0 in            Number of Channels: 3
CCL       INDEX;2    RCCL     
Frame Summary  File: ISN .004 Sequence: 2  
Origin: 90
  Index Type Start Stop Spacing Channels Index Channel Frame Name
  BOREHOLE-DEPTH

3894.12

3738.07 m

-60.0 (0.1 in) up

10

INDEX   

1   

 

12776.00

12264.00 ft

  BOREHOLE-DEPTH

3894.25

3738.07 m

-10.0 (0.1 in) up

3

INDEX;2

2   

 

12776.42

12264.00 ft

Error Summary  File: ISN .004 Sequence: 2  
        No errors detected in file.
File Header  File: ISN .005 Sequence: 3  
  Defining Origin: 119
  File ID: ISN .005 File Type: PLAY
  Producer Name: Schlumberger Product/Version: DLIS/U 0.1 File Set: 10116 File Number: 3 28-JAN-2009 17:18:56
     
          Company Name: ESSO AUSTRALIA LTD.
          Well Name: MACKEREL A-13
          Field Name: MACKEREL
  
    Origin: 64
  File ID: ISN .005 File Type: PLAY
  Producer Code: 440 Product/Version: CSU 32.4 File Set: 0 File Number: 5 10-AUG-1991
     
            Tool String: TEMP, NSM, DTT, CALR, SGTE
  
Well Site Data  File: ISN .005 Sequence: 3  
  Origin: 64
    Well Data
  ESSO AUSTRALIA LTD. CN
  MACKEREL A-13 WN
  MACKEREL FN
  COUNTRY AUSTRALIA CLAB, COUN
  STATE VICTORIA SLAB, STAT
  GIPPSLAND BASIN. FL
  GYRO 910805 SON
  148 20 45"E. LONG
  038 24 48" S. LATI
  65.0 (deg) MHD
  33.8 (m) EKB
  -92.6 (m) EGL
  33.6 (m) EDF
  MSL     0.0 (m) PDAT, EPD
  KB     33.8 (m) LMF, APD
  KB DMF
    Job Data
  10-AUGUST-1991 DATE
  ONE RUN
  3955.0 (m) TDD
  3895.8 (m) TDL
  3896.0 (m) BLI
  3750.0 (m) TLI
  0.0 (in) CSIZ
  9.88 (in) BS
  16:45 10/AUGUST TLAB
  93     VEA LUN, LUL
  N. WOODS A. RICHMOND ENGI
  S.FELSTEAD WITN
  GYRO 910805 SON
    Mud Data
  PRODUCTION FLUIDS. DFT
  102.3 (degC) MRT
  16:45 10/AUGUST TLAB
    Remarks
  WELL DATA: R1
  WELLHEAD PRESS.4.0MPA., BOTTOM HOLE TEMP.102.3DEGC. R2
  TUBING SHOE: 3801M., TOOL HOLD-UP DEPTH: 3895.8M. R3
  WELL DEVIATION: 60DEG (AVER.) 65DEG.(MAX.) @2748M. R4
  R6
  WIRELINE DATA: R7
  ## +6.5M. STRETCH CORR. APPLIED TO GYRO LOG AT WELLSITE. ## R8
  WHEEL CORRECTION: -7 PARTS PER 10,000. R9
  CABLE TYPE: 1-32-ZT (ENDS-FIXED STRETCH COEFF. 11.5 X 10-7) R10
  R11
  LOGGING DATA: R12
  NUMBER OF GYRO STATIONS: 1 IN , 130 OUT R13
  TOOL ZERO (AT SURFACE RELATIVE TO K.B.):- R14
  BEFORE RUN IN +5.0M., AFTER RUN OUT +4.7M. R15
  DIFF BETWEEN DEPTH-SYSTEMS:- R16
  RUN IN +0.35M., RUN OUT -0.54M. R17
  R22
  TOOL DATA: R23
  GYRO POSITION TAKEN AS TOOL REFERENCE POINT. R24
  (BOTTOM NOSE WAS 2.28m BELOW GYRO MEASURE POINT) R25
  CCL (SCHLUM.) MEASURE POINT IS 5.33M. ABOVE TOOL REFERENCE. R26
  CCL (GYRO/DATA) MEASURE POINT IS 4.16m ABOVE TOOL REFERENCE R27
  PRESENTATION: R28
  LOGS PLAYED-BACK TO CORRECT OFFSET FROM CCLS TO REF POINT. R29
  DIFF. BETWEEN DEPTH SYSTEMS SHOWN IN DEPTH TRACK.(0->1M) R30
    Other Services
  NONE OS1
Channels  File: ISN .005 Sequence: 3  
  Origin: 119
    System and Miscellaneous

      Spacing: -6.0 in            Number of Channels: 10
CS        DIFF      ETIM      GR        INDEX     MARK      RGR       TENS      TIME      TOD      

      Spacing: -1.0 in            Number of Channels: 3
CCL       INDEX;2    RCCL     
Frame Summary  File: ISN .005 Sequence: 3  
Origin: 119
  Index Type Start Stop Spacing Channels Index Channel Frame Name
  BOREHOLE-DEPTH

3892.14

3738.83 m

-60.0 (0.1 in) up

10

INDEX   

1   

 

12769.50

12266.50 ft

  BOREHOLE-DEPTH

3892.27

3738.83 m

-10.0 (0.1 in) up

3

INDEX;2

2   

 

12769.92

12266.50 ft

Error Summary  File: ISN .005 Sequence: 3  
        No errors detected in file.
Schlumberger Verification Listing

Listing Completed: 28-JAN-2009 17:19:57