Origin: 12
Well Data
|
|
ESSO AUSTRALIA LTD.
|
|
CN
|
|
|
A-9 (PREDRILL LOC. P)
|
|
WN
|
|
|
FORTESCUE
|
|
FN
|
|
STATE
|
VICTORIA
|
|
SLAB, STAT
|
|
|
AUSTRALIA
|
|
NATI
|
|
|
GIPPSLAND BASIN
|
|
FL
|
|
|
FSU 850405
|
|
SON
|
|
|
Y=5,745,230 MN
|
|
LONG
|
|
|
X= 610,540 ME
|
|
LATI
|
|
|
34.5 (m)
|
|
EKB
|
|
|
-69.0 (m)
|
|
EGL
|
|
|
34.0 (m)
|
|
EDF
|
|
|
MSL
|
0.01000 (m)
|
PDAT, EPD
|
|
|
RKB
|
34.5 (m)
|
LMF, APD
|
|
|
RKB
|
|
DMF
|
Job Data
|
|
RUNS 1 & 2
|
|
RUN
|
|
|
4046.0 (m)
|
|
TDD
|
|
|
4042.0 (m)
|
|
TDL
|
|
|
4041.0 (m)
|
|
BLI
|
|
|
3920.0 (m)
|
|
TLI
|
|
|
0.0 (in)
|
|
CSIZ
|
|
|
6.50 (in)
|
|
BS
|
|
|
16:00 17TH
|
|
TLAB
|
|
|
41
|
FSU/SEA
|
LUN, LUL
|
|
|
ADAM BAZIRE
|
|
ENGI
|
|
|
BRIAN CROWTHER
|
|
WITN
|
|
|
FSU 850405
|
|
SON
|
Mud Data
|
|
SEAWATER/GEL/POLYMER
|
|
DFT
|
|
|
9.20 (lbm/gal)
|
62.0 (s)
|
DFD, DFV
|
|
|
5.60 (cm3)
|
10.3
|
DFL, DFPH
|
|
|
FLOWLINE
|
|
MSS
|
|
|
0.436 (ohm.m)
|
16.0 (degC)
|
RMS, MST
|
|
|
0.336 (ohm.m)
|
16.0 (degC)
|
RMFS, MFST
|
|
|
0.762 (ohm.m)
|
16.0 (degC)
|
RMCS, MCST
|
|
|
100.0 (degC)
|
|
MRT
|
|
|
06:45 17TH
|
|
TCS
|
|
|
16:00 17TH
|
|
TLAB
|
Cement Data
Remarks
|
MAXIMUM DEVIATION 65 DEG. OPEN HOLE APPROX. 44 DEG. |
R1
|
|
TOOLSTRING RUN WITHOUT ANY STANDOFF. |
R2
|
|
FGT MASTER CALIBRATION MADE IN AIR. |
R3
|
|
NOTE: FGT-C CHANGED FROM RUN 1: ALL OTHER TOOLS THE SAME. |
R4
|
|
ALL HEADING DATA FROM RUN 2. |
R5
|
|
SPLICE MADE AT 4011 M, RUN 1 BELOW, RUN 2 ABOVE. |
R6
|
|
A FISHING JOB AND WIPER TRIP OCCURED BETWEEN RUNS. |
R7
|
Other Services
|